ATTACHMENT L3 - COST OR PRICE SUMMARY SPREADSHEET_02072020.xls
XLS spreadsheet 472 KB Posted
- Solicitation number
- N6134020R0020
About this file
This document provides details of a federal contract opportunity for Production Support Services in support of Fleet Readiness Center Southeast aboard Naval Air Station Jacksonville, FL and its remote sites. The Naval Air Warfare Center, Training Systems Division in Orlando, FL requires logistical services to support depot-level maintenance of aircraft and components including EA-6B, F/A-18, H-60, P-3, P-8, E-2, C-2, S-3, T-6, T-34, T-44 and T-45. Services include operational management of warehouses, inventory storage, production of tool kits, and external support to the in-service repair program. A single-award, cost-plus-fixed-fee IDIQ contract with a six-year ordering period is anticipated for this small business set-aside opportunity. The final RFP is expected to be issued on or around July 1, 2020. Questions should be directed to the points of contact by the indicated date.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| 1 | Insert the proposal number on the footer for each worksheet. |
| 2 | Insert the firm's name on the footer tab of each worksheet. |
| 3 | The worksheets of the workbook should all be formatted for printing on legal-size paper, without requiring "adjustments." |
| 4 | Within the worksheets, "blue" cells contain formulas and should not be edited. |
| 5 | For CLINs 0001 - 1006, enter all direct and indirect costs based on the Government-provided hours for the FRCSE DLM requirement. |
| 6 | Complete each worksheet with direct and indirect costs for CLINS 0001 - 1006. |
| 7 | The worksheet is arranged so that the hours being proposed for an entire CLIN are shown together. When the total estimated cost and fixed fee amounts are carried to Section B, they will be the same as shown on the worksheet. |
| 8 | In column A the Government Labor Categories from the Historical Information are provided. Proposed labor personnel shall meet the requirements set forth in Section J, Attachment (1), SOW. The Government's labor category titles may not be the same nomenclature as the offeror's existing labor category titles; however, the offeror may NOT tailor the Government Labor Categories in column A. Instead, the offeror shall insert the title of the labor category the offeror will be utilizing in the adjacent column (column B) entitled "Contractor Proposed Category," but only if the offeror's labor category qualifications meet the Government's labor category qualifications set forth in Section J, Attachment (1), SOW. The offeror's proposed labor categories must meet the minimum personnel qualifications for each comparable Government-provided labor category. In column B, the suggested Department of Labor (DoL) Wage Determination (WD) categories are provided. This applies to the Prime Contractor's section and those sections for its subcontractors. In evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. |
| 9 | The Government anticipates all categories will perform on the Government installation. The Offeror should insert a "K" in column E if the worker will be performing at the Contractor's facility. |
| 10 | The prime's own workforce is colored "green". (This reflects that the prime is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. Please note if more subcontractors are needed, the prime may add additional rows to accommodate them, but ensure integrity of formulas. The total number of hours proposed for prime and any/all subcontractors must equal the total Government estimate of hours for all categories. |
| 11 | In the appropriate cells in Column G (Straight Time) and F (Overtime) specify if the employee for the labor category is full time by entering a "F" or part-time by entering a "P". However, the total number of hours per category (full- and part-time combined) should not differ from the Government estimate. |
| 12 | On the Summary Tab: |
| (a) the Prime should insert its total proposed Mobilization FFP for CLIN 0008, inclusive of its Subcontractor(s) FFP for Mobilization. | |
| 13 | On the Straight Time CLINs (0001, 0003, 0005, 1001, 1003, and 1005), the escalation rate shall remain 2.2%. |
| 14 | In the appropriate cells in Columns H, K, N, Q, T (Straight Time) and G, J, M, P,S (Overtime): |
| (a) for the prime, enter the unburdened labor rate (rounded to two decimal places) for each category. | |
| (b) for the subcontractor sections, the prime should enter the fully burdened cost, including the subcontractor's fixed fee, associated with individual labor categories. | |
| 15 | Columns I, L, O, R, U (Straight Time) and H, K, N, Q, T (Overtime) contain the Government's estimate of total labor hours for the entire proposed work effort for each category. The prime should spread these hours between itself and its subcontractors accordingly. NOTE: The Offeror's proposed prime and subcontractor hours may NOT deviate from the estimated number of labor hours provided for each labor category. |
| 16 | In the appropriate cells in Columns H, K, N, Q, T (Straight Time) and G, J, M, P, S (Overtime), the prime should insert its full-time or part-time (if applicable) Government site fringe rate if it is not included in its overhead (O/H) rate. If the fringe is included in its O/H, the fringe cells should be blank. |
| 17 | In the appropriate cells in Columns I, L, O, R, U (Straight Time) and H, K, N, Q, T(Overtime), the prime should insert the base its full-time and part-time fringe rates are being applied to, if it is not included in its O/H base. |
| 18 | In the appropriate cells in Columns H, K, N, Q, T (Straight Time) and G, J, M, P, S (Overtime), the prime should insert its O/H rate for work performed. |
| 19 | In the appropriate cells in Columns I, L, O, R, U (Straight Time) and H, K, N, Q, T (Overtime), the prime should insert the base its O/H rate is being applied to. |
| 20 | In the appropriate cells in Columns H, K, N, Q, T(Straight Time) and G, J, M, P,S(Overtime), the prime should insert its G&A rate being applied. |
| 21 | In the appropriate cells in Columns I, L, O, R, U(Straight Time) and H, K, N, Q, T (Overtime), the prime should insert the base its G&A rate is being applied to. |
| 22 | In the appropriate cells in Columns H, K, N, Q, T(Straight Time) and G, J, M, P, S (Overtime), the prime should insert the subcontractor handling rate applied to its subcontractor labor, if any. |
| 23 | In the appropriate pink cells in Columns H, K, N, Q, T(Straight Time) and G, J, M, P, S (Overtime), the prime should insert the fixed fee rate applied to its cost, excluding subcontractor labor. |
| 24 | In the appropriate orange cells in Columns H, K, N, Q, T (Straight Time) and G, J, M, P, S (Overtime), the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 25 | Any allowable indirect rates not included within this attachment should be added by the Offeror while maintaining the integrity of the spreadsheet. |
| 26 | If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing one subcontractor, then the rows concerning subs 2, 3 and 4 would be hidden. |
| 27 | When submitting this file, the instructions may be deleted. |
| NOTE TO OFFERORS: Current Area Wage Determination rates are included on the "Straight Time" worksheets for informational purposes only. | |
| NOTE TO SUBCONTRACTORS: When completing the worksheet for subcontractor costs, the subcontractor shall use the prime contractor section (green) not the subcontractor section (yellow). Subcontractors shall complete the workbook as if it is submitting as the prime contractor and provide all of the same required data. |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
CLIN Summary
| TOTAL BASE YEARS 1-5 | TOTAL OPTION YEAR 1 | TOTAL SUMMARY | |||||
| Moblization | CLIN 0008: | $ - 0 | CLIN 0008: | $ - 0 | |||
| JAX | ST | CLIN 0001: | $ - 0 | CLIN 1001: | $ - 0 | CLINs 0001/1001: | $ - 0 |
| JAX | OT | CLIN 0002: | $ - 0 | CLIN 1002: | $ - 0 | CLINs 0002/1002: | $ - 0 |
| NORFOLK/OCEANA | ST | CLIN 0003: | $ - 0 | CLIN 1003: | $ - 0 | CLINs 0003/1003: | $ - 0 |
| NORFOLK/OCEANA | OT | CLIN 0004: | $ - 0 | CLIN 1004: | $ - 0 | CLINs 0004/1004: | $ - 0 |
| CASS PEMA | ST | CLIN 0005: | $ - 0 | CLIN 1005: | $ - 0 | CLINs 0005/1005: | $ - 0 |
| CASS PEMA | OT | CLIN 0006: | $ - 0 | CLIN 1006: | $ - 0 | CLINs 0006/1006: | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | |||||
| TOTAL BASE YEARS 1-5 HOURS | SUBTOTAL YR6 HOURS | TOTAL SUMMARY | |||||
| CLIN 0001: | - 0 | ||||||
| JAX | ST | CLIN 0001: | 1,327,040 | CLIN 1001: | 224,000 | CLINs 0001/1001: | 1,551,040 |
| JAX | OT | CLIN 0002: | 16,538 | CLIN 1002: | 2,776 | CLINs 0002/1002: | 19,314 |
| NORFOLK/OCEANA | ST | CLIN 0003: | 89,004 | CLIN 1003: | 18,000 | CLINs 0003/1003: | 107,004 |
| NORFOLK/OCEANA | OT | CLIN 0004: | 8,400 | CLIN 1004: | 1,680 | CLINs 0004/1004: | 10,080 |
| CASS PEMA | ST | CLIN 0005: | 19,668 | CLIN 1005: | 4,000 | CLINs 0005/1005: | 23,668 |
| CASS PEMA | OT | CLIN 0006: | 505 | CLIN 1006: | 101 | CLINs 0006/1006: | 606 |
| 1,461,155 | 250,557 | 1,711,712 |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
JAX_CLIN 0001 (ST)
| JAX STRAIGHT TIME SERVICES | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | Total | |||||||||||||||||||
| Year 1-5 | CLIN 0002 TOTAL COST: | $ - 0 | |||||||||||||||||||||||
| Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | CLIN 0002 FIXED FEE: | $ - 0 | |||||||||||||||||||
| TOTAL CLIN VALUE: | $ - 0 | ||||||||||||||||||||||||
| TOTAL CLIN HOURS | 1,327,040 | ||||||||||||||||||||||||
| STRAIGHT TIME | Current WD Rate | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | |||||||||||||||||||
| Government Labor Category | Contractor Proposed Category | WD Category | 15-4540 (Rev.-8) | sub | F/P | Rate | Year 1 Hours | Subtotal Labor | Rate | Year 2 Hours | Subtotal Labor | Rate | Year 3 Hours | Subtotal Labor | Rate | Year 4 Hours | Subtotal Labor | Rate | Year 5 Hours | Subtotal Labor | Proposed Escalation: | 2.2% | |||
| Operations Manager | None | NONE | G | $ - 0 | 1,600 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | ||||||
| Site Supervisor | None | NONE | G | $ - 0 | 1,600 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | ||||||
| Warehourse Specialist - Lead | 21410 - Warehouse Specialist | $ 18.33 | G | $ - 0 | 1,600 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | ||||||
| Warehourse Specialist | 21410 - Warehouse Specialist | $ 17.33 | G | $ - 0 | 11,200 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | ||||||
| Production Controller - Lead | 01270 - Production Control Clerk | $ 23.72 | G | $ - 0 | 4,800 | $ - 0 | $ - 0 | 5,760 | $ - 0 | $ - 0 | 5,760 | $ - 0 | $ - 0 | 5,760 | $ - 0 | $ - 0 | 5,760 | $ - 0 | $ - 0 | ||||||
| Production Controller | 01270 - Production Control Clerk | $ 22.72 | G | $ - 0 | 91,200 | $ - 0 | $ - 0 | 109,440 | $ - 0 | $ - 0 | 109,440 | $ - 0 | $ - 0 | 109,440 | $ - 0 | $ - 0 | 109,440 | $ - 0 | $ - 0 | ||||||
| Supply Technician - Lead | 01410 - Supply Technician | $ 24.80 | G | $ - 0 | 1,600 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | ||||||
| Supply Technician | 01410 - Supply Technician | $ 23.80 | G | $ - 0 | 22,400 | $ - 0 | $ - 0 | 26,880 | $ - 0 | $ - 0 | 26,880 | $ - 0 | $ - 0 | 26,880 | $ - 0 | $ - 0 | 26,880 | $ - 0 | $ - 0 | ||||||
| Tool & Parts Attendant - Lead | 21210 - Tools And Parts Attendant | $ 18.33 | G | $ - 0 | 1,600 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | 1,920 | $ - 0 | $ - 0 | ||||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $ 17.33 | G | $ - 0 | 27,200 | $ - 0 | $ - 0 | 32,640 | $ - 0 | $ - 0 | 32,640 | $ - 0 | $ - 0 | 32,640 | $ - 0 | $ - 0 | 32,640 | $ - 0 | $ - 0 | ||||||
| Driver, 1 | 31361 - Truck Driver, Light | $ 16.85 | G | $ - 0 | 11,200 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | 13,440 | $ - 0 | $ - 0 | ||||||
| Driver, 3 | 31363 - Truck Driver, Heavy | $ 20.44 | G | $ - 0 | 3,200 | $ - 0 | $ - 0 | 3,840 | $ - 0 | $ - 0 | 3,840 | $ - 0 | $ - 0 | 3,840 | $ - 0 | $ - 0 | 3,840 | $ - 0 | $ - 0 | ||||||
| Forklift Operator | 21020 - Forklift Operator | $ 17.33 | G | $ - 0 | 8,000 | $ - 0 | $ - 0 | 9,600 | $ - 0 | $ - 0 | 9,600 | $ - 0 | $ - 0 | 9,600 | $ - 0 | $ - 0 | 9,600 | $ - 0 | $ - 0 | ||||||
| Stock Clerk - Lead | 21150 - Stock Clerk | $ 16.48 | G | $ - 0 | 1,600.00 | $ - 0 | $ - 0 | 1,920.00 | $ - 0 | $ - 0 | 1,920.00 | $ - 0 | $ - 0 | 1,920.00 | $ - 0 | $ - 0 | 1,920.00 | $ - 0 | $ - 0 | ||||||
| Stock Clerk | 21150 - Stock Clerk | $ 15.48 | G | $ - 0 | 40,000.00 | $ - 0 | $ - 0 | 48,000.00 | $ - 0 | $ - 0 | 48,000.00 | $ - 0 | $ - 0 | 48,000.00 | $ - 0 | $ - 0 | 48,000.00 | $ - 0 | $ - 0 | ||||||
| Dispatchers | 01060 - Dispatcher, Motor Vehicle | $ 17.85 | G | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | 228,800.0 | $ - 0 | 274,560.0 | $ - 0 | 274,560.0 | $ - 0 | 274,560.0 | $ - 0 | 274,560.0 | $ - 0 | $ - 0 | ||||||||||||||
| Fringe | Base | Base | Base | Base | Base | ||||||||||||||||||||
| Fulltime | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| Part time | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | ||||||||||||||||||||
| Government site | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | ||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Subcontractor(s) | |||||||||||||||||||||||||
| Sub 1: | |||||||||||||||||||||||||
| Operations Manager | None | NONE | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Site Supervisor | None | NONE | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist - Lead | 21410 - Warehouse Specialist | $ 18.33 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist | 21410 - Warehouse Specialist | $ 17.33 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $ 23.72 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $ 22.72 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician - Lead | 01410 - Supply Technician | $ 24.80 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | $ 23.80 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant - Lead | 21210 - Tools And Parts Attendant | $ 18.33 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $ 17.33 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | $ 16.85 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | $ 20.44 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $ 17.33 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | $ 16.48 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $ 15.48 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Dispatchers | 01060 - Dispatcher, Motor Vehicle | $ 17.85 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 2: | |||||||||||||||||||||||||
| Operations Manager | None | NONE | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Site Supervisor | None | NONE | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist - Lead | 21410 - Warehouse Specialist | $ 18.33 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist | 21410 - Warehouse Specialist | $ 17.33 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $ 23.72 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $ 22.72 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician - Lead | 01410 - Supply Technician | $ 24.80 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | $ 23.80 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant - Lead | 21210 - Tools And Parts Attendant | $ 18.33 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $ 17.33 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | $ 16.85 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | $ 20.44 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $ 17.33 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | $ 16.48 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $ 15.48 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Dispatchers | 01060 - Dispatcher, Motor Vehicle | $ 17.85 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 3: | |||||||||||||||||||||||||
| Operations Manager | None | NONE | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Site Supervisor | None | NONE | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist - Lead | 21410 - Warehouse Specialist | $ 18.33 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist | 21410 - Warehouse Specialist | $ 17.33 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $ 23.72 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $ 22.72 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician - Lead | 01410 - Supply Technician | $ 24.80 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | $ 23.80 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant - Lead | 21210 - Tools And Parts Attendant | $ 18.33 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $ 17.33 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | $ 16.85 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | $ 20.44 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $ 17.33 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | $ 16.48 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $ 15.48 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Dispatchers | 01060 - Dispatcher, Motor Vehicle | $ 17.85 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 4: | |||||||||||||||||||||||||
| Operations Manager | None | NONE | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Site Supervisor | None | NONE | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist - Lead | 21410 - Warehouse Specialist | $ 18.33 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehourse Specialist | 21410 - Warehouse Specialist | $ 17.33 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $ 23.72 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $ 22.72 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician - Lead | 01410 - Supply Technician | $ 24.80 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | $ 23.80 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant - Lead | 21210 - Tools And Parts Attendant | $ 18.33 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $ 17.33 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | $ 16.85 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | $ 20.44 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $ 17.33 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | $ 16.48 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $ 15.48 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Dispatchers | 01060 - Dispatcher, Motor Vehicle | $ 17.85 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | ||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | ||||||||||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | ||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Estimated Labor and Subcontractor Cost Plus Fee/Profit | 228,800 | $ - 0 | 274,560 | $ - 0 | 274,560 | $ - 0 | 274,560 | $ - 0 | 274,560 | $ - 0 | $ - 0 | ||||||||||||||
| LOE Total all 5 years | 1,327,040 | $ - 0 | |||||||||||||||||||||||
| *Key Labor Category. |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
JAX_CLIN 0002 (OT)
| JAX OVERTIME SERVICES | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | Total | ||||||||||||||||||
| Year 1-5 | CLIN 0003 TOTAL COST: | $ - 0 | ||||||||||||||||||||||
| Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | CLIN 0003 FIXED FEE: | $ - 0 | ||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | TOTAL CLIN VALUE: | $ - 0 | ||||||||||||||||||
| TOTAL CLIN HOURS | 16,538 | |||||||||||||||||||||||
| STRAIGHT TIME | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | |||||||||||||||||||
| Government Labor Category | Contractor Proposed Category | WD Category | sub | F/P | Rate | Year 1 Hours | Subtotal Labor | Rate | Year 2 Hours | Subtotal Labor | Rate | Year 3 Hours | Subtotal Labor | Rate | Year 4 Hours | Subtotal Labor | Rate | Year 5 Hours | Subtotal Labor | |||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | G | $ - 0 | 56 | $ - 0 | $ - 0 | 67 | $ - 0 | $ - 0 | 48 | $ - 0 | $ - 0 | 48 | $ - 0 | $ - 0 | 48 | $ - 0 | $ - 0 | ||||||
| Warehouse Specialist | 21410 - Warehouse Specialist | G | $ - 0 | 945 | $ - 0 | $ - 0 | 1,134 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | 808 | $ - 0 | $ - 0 | ||||||
| Production Controller | 01270 - Production Control Clerk | G | $ - 0 | 1,312 | $ - 0 | $ - 0 | 1,574 | $ - 0 | $ - 0 | 960 | $ - 0 | $ - 0 | 960 | $ - 0 | $ - 0 | 960 | $ - 0 | $ - 0 | ||||||
| Supply Technician | 01410 - Supply Technician | G | $ - 0 | 289 | $ - 0 | $ - 0 | 347 | $ - 0 | $ - 0 | 247 | $ - 0 | $ - 0 | 247 | $ - 0 | $ - 0 | 247 | $ - 0 | $ - 0 | ||||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | $ - 0 | 768 | $ - 0 | $ - 0 | 921 | $ - 0 | $ - 0 | 656 | $ - 0 | $ - 0 | 656 | $ - 0 | $ - 0 | 656 | $ - 0 | $ - 0 | ||||||
| Driver, 1 | 31361 - Truck Driver, Light | G | $ - 0 | 29 | $ - 0 | $ - 0 | 35 | $ - 0 | $ - 0 | 25 | $ - 0 | $ - 0 | 25 | $ - 0 | $ - 0 | 25 | $ - 0 | $ - 0 | ||||||
| Driver, 3 | 31363 - Truck Driver, Heavy | G | $ - 0 | 37 | $ - 0 | $ - 0 | 45 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | 32 | $ - 0 | $ - 0 | ||||||
| Stock Clerk - Lead | 21150 - Stock Clerk | G | $ - 0 | 50 | $ - 0 | $ - 0 | 100 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | ||||||
| Stock Clerk | 21151 - Stock Clerk | G | $ - 0 | 200 | $ - 0 | $ - 0 | 300 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | ||||||
| subtotal | 3,686 | -0 | 4,524 | -0 | 2,776 | -0 | 2,776 | -0 | 2,776 | -0 | $ - 0 | |||||||||||||
| Fringe | Base | Base | Base | Base | Base | |||||||||||||||||||
| Fulltime | G | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | |||||||||||||||||
| Part time | G | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | |||||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | |||||||||||||||||||
| Government site | G | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | |||||||||||||||||
| Base | Base | Base | Base | Base | ||||||||||||||||||||
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | ||||||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Subcontractor(s) | ||||||||||||||||||||||||
| Sub 1: | ||||||||||||||||||||||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21151 - Stock Clerk | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Sub 2: | ||||||||||||||||||||||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21151 - Stock Clerk | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Sub 3: | ||||||||||||||||||||||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21151 - Stock Clerk | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Sub 4: | ||||||||||||||||||||||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Supply Technician | 01410 - Supply Technician | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 1 | 31361 - Truck Driver, Light | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Driver, 3 | 31363 - Truck Driver, Heavy | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk - Lead | 21150 - Stock Clerk | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21151 - Stock Clerk | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Base | Base | Base | Base | Base | ||||||||||||||||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Base | Base | Base | Base | Base | ||||||||||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | |||||||||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | |||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Estimated Labor and Subcontractor Cost Plus Fee/Profit | 3,686 | $ - 0 | 4,524 | $ - 0 | 2,776 | $ - 0 | 2,776 | $ - 0 | 2,776 | $ - 0 | $ - 0 | |||||||||||||
| *Key Labor Category. |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
NORFOLK_OCEANA_CLIN 0003 (ST)
| NORFOLK_OCEANA STRAIGHT TIME SERVICES | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | Total | |||||||||||||||||||
| Year 1-5 | CLIN 0004 TOTAL COST: | $ - 0 | |||||||||||||||||||||||
| Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | CLIN 0004 FIXED FEE: | $ - 0 | |||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | TOTAL CLIN VALUE: | $ - 0 | |||||||||||||||||||
| TOTAL CLIN HOURS | 89,004 | ||||||||||||||||||||||||
| STRAIGHT TIME | Current WD Rate | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | |||||||||||||||||||
| Government Labor Category | Contractor Proposed Category | WD Category | 15-4342 (Rev.-14) | sub | F/P | Rate | Year 1 Hours | Subtotal Labor | Rate | Year 2 Hours | Subtotal Labor | Rate | Year 3 Hours | Subtotal Labor | Rate | Year 4 Hours | Subtotal Labor | Rate | Year 5 Hours | Subtotal Labor | Proposed Escalation: | 2.2% | |||
| Supply Technician - Lead | 01410 - Supply Technician | $25.61 | G | $ - 0 | 1,668.0 | $ - 0 | $ - 0 | 2,000.0 | $ - 0 | $ - 0 | 2,000.0 | $ - 0 | $ - 0 | 2,000.0 | $ - 0 | $ - 0 | 2,000.0 | $ - 0 | $ - 0 | ||||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $19.49 | G | $ - 0 | 7,668.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | ||||||
| Stock Clerk | 21150 - Stock Clerk | $17.08 | G | $ - 0 | 7,668.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | 8,000.0 | $ - 0 | $ - 0 | ||||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | $20.49 | G | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||
| Warehouse Specialist | 21410 - Warehouse Specialist | $19.49 | G | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||
| Production Controller - Lead | 01270 - Production Control Clerk | $29.37 | G | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||
| Production Controller | 01270 - Production Control Clerk | $28.37 | G | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||
| Forklift Operator | 21020 - Forklift Operator | $19.49 | G | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||
| subtotal | 17,004 | $ - 0 | 18,000 | $ - 0 | 18,000 | $ - 0 | 18,000 | $ - 0 | 18,000 | $ - 0 | $ - 0 | ||||||||||||||
| Fringe | Base | Base | Base | Base | Base | ||||||||||||||||||||
| Fulltime | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| Part time | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | ||||||||||||||||||||
| Government site | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | ||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Subcontractor(s) | |||||||||||||||||||||||||
| Sub 1: | |||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | $25.61 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $19.49 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $17.08 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | $20.49 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | $19.49 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $29.37 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $28.37 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $19.49 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 2: | |||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | $25.61 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $19.49 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $17.08 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | $20.49 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | $19.49 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $29.37 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $28.37 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $19.49 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 3: | |||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | $25.61 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $19.49 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $17.08 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | $20.49 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | $19.49 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $29.37 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $28.37 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $19.49 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 4: | |||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | $25.61 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | $19.49 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | $17.08 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist - Lead | 21410 - Warehouse Specialist | $20.49 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Warehouse Specialist | 21410 - Warehouse Specialist | $19.49 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller - Lead | 01270 - Production Control Clerk | $29.37 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Production Controller | 01270 - Production Control Clerk | $28.37 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| Forklift Operator | 21020 - Forklift Operator | $19.49 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | ||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | ||||||||||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | ||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Estimated Labor and Subcontractor Cost Plus Fee/Profit | 17,004 | $ - 0 | 18,000 | $ - 0 | 18,000 | $ - 0 | 18,000 | $ - 0 | 18,000 | $ - 0 | $ - 0 | ||||||||||||||
| LOE Total all 5 years | 89,004 | $ - 0 | |||||||||||||||||||||||
| *Key Labor Category. |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
NORFOLK_OCEANA_CLIN 0004 (OT)
| NORFOLK_OCEANA OVERTIME SERVICES | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | Total | ||||||||||||||||||
| Year 1-5 | CLIN 0005 TOTAL COST: | $ - 0 | ||||||||||||||||||||||
| Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | CLIN 0005 FIXED FEE: | $ - 0 | ||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | TOTAL CLIN VALUE: | $ - 0 | ||||||||||||||||||
| TOTAL CLIN HOURS | 8,400 | |||||||||||||||||||||||
| STRAIGHT TIME | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | |||||||||||||||||||
| Government Labor Category | Contractor Proposed Category | WD Category | sub | F/P | Rate | Year 1 Hours | Subtotal Labor | Rate | Year 2 Hours | Subtotal Labor | Rate | Year 3 Hours | Subtotal Labor | Rate | Year 4 Hours | Subtotal Labor | Rate | Year 5 Hours | Subtotal Labor | |||||
| Supply Technician - Lead | 01410 - Supply Technician | G | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | ||||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | $ - 0 | 1200 | $ - 0 | $ - 0 | 1200 | $ - 0 | $ - 0 | 1200 | $ - 0 | $ - 0 | 1200 | $ - 0 | $ - 0 | 1200 | $ - 0 | $ - 0 | ||||||
| Stock Clerk | 21150 - Stock Clerk | G | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | ||||||
| subtotal | 1,680 | $ - 0 | 1,680 | $ - 0 | 1,680 | $ - 0 | 1,680 | $ - 0 | 1,680 | $ - 0 | $ - 0 | |||||||||||||
| Fringe | Base | Base | Base | Base | Base | |||||||||||||||||||
| Fulltime | G | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | |||||||||||||||||
| Part time | G | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | |||||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | |||||||||||||||||||
| Government site | G | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | |||||||||||||||||
| Base | Base | Base | Base | Base | ||||||||||||||||||||
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 | ||||||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Subcontractor(s) | ||||||||||||||||||||||||
| Sub 1: | ||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | G | 1 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Sub 2: | ||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | G | 2 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Sub 3: | ||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | G | 3 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Sub 4: | ||||||||||||||||||||||||
| Supply Technician - Lead | 01410 - Supply Technician | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Tool & Parts Attendant | 21210 - Tools And Parts Attendant | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| Stock Clerk | 21150 - Stock Clerk | G | 4 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |||||
| subtotal on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||||||||||
| Base | Base | Base | Base | Base | ||||||||||||||||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Base | Base | Base | Base | Base | ||||||||||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | |||||||||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | |||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Estimated Labor and Subcontractor Cost Plus Fee/Profit | 1,680 | $ - 0 | 1,680 | $ - 0 | 1,680 | $ - 0 | 1,680 | $ - 0 | 1,680 | $ - 0 | $ - 0 | |||||||||||||
| LOE Total all 5 years | 8,400 | $ - 0 | ||||||||||||||||||||||
| *Key Labor Category. |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
CASS PEMA_CLIN 0005 (ST)
| CASS PEMA STRAIGHT TIME SERVICES | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | Total | |||||||||||||||||||
| Year 1-5 | CLIN 0006 TOTAL COST: | $ - 0 | |||||||||||||||||||||||
| Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | CLIN 0006 FIXED FEE: | $ - 0 | |||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | TOTAL CLIN VALUE: | $ - 0 | |||||||||||||||||||
| TOTAL CLIN HOURS | 19,668 | ||||||||||||||||||||||||
| STRAIGHT TIME | Current WD Rate | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | |||||||||||||||||||
| Government Labor Category | Contractor Proposed Category | WD Category | 15-4540 (Rev.-11) | sub | F/P | Rate | Year 1 Hours | Subtotal Labor | Rate | Year 2 Hours | Subtotal Labor | Rate | Year 3 Hours | Subtotal Labor | Rate | Year 4 Hours | Subtotal Labor | Rate | Year 5 Hours | Subtotal Labor | Proposed Escalation: | 2.2% | |||
| Production Controller | 01270 - Production Control Clerk | $22.72 | G | $ - 0 | 3,668 | $ - 0 | $ - 0 | 4,000 | $ - 0 | $ - 0 | 4,000 | $ - 0 | $ - 0 | 4,000 | $ - 0 | $ - 0 | 4,000 | $ - 0 | $ - 0 | ||||||
| subtotal | 3,668 | $ - 0 | 4,000 | $ - 0 | 4,000 | $ - 0 | 4,000 | $ - 0 | 4,000 | $ - 0 | $ - 0 | ||||||||||||||
| Fringe | Base | Base | Base | Base | Base | ||||||||||||||||||||
| Fulltime | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| Part time | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | ||||||||||||||||||||
| Government site | G | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| G&A | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | ||||||||||||||
| Mobilization | |||||||||||||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Subcontractor(s) | |||||||||||||||||||||||||
| Sub 1: | |||||||||||||||||||||||||
| Production Controller | 01270 - Production Control Clerk | $22.72 | G | 1 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 2: | |||||||||||||||||||||||||
| Production Controller | 01270 - Production Control Clerk | $22.72 | G | 2 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 3: | |||||||||||||||||||||||||
| Production Controller | 01270 - Production Control Clerk | $22.72 | G | 3 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Sub 4: | |||||||||||||||||||||||||
| Production Controller | 01270 - Production Control Clerk | $22.72 | G | 4 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | |||||
| subtotal on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | ||||||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Base | Base | Base | Base | Base | |||||||||||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | ||||||||||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | 0.0% | $ - 0 | $ - 0 | ||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Estimated Labor and Subcontractor Cost Plus Fee/Profit | 3,668 | $ - 0 | 4,000 | $ - 0 | 4,000 | $ - 0 | 4,000 | $ - 0 | 4,000 | $ - 0 | $ - 0 | ||||||||||||||
| *Key Labor Category. |
&R&A &CSource Selection Information See: FAR 3.104&RN6134019R0005
IGCE
CASS PEMA_CLIN 0006 (OT)
| CASS PEMA OVERTIME SERVICES | YEAR 1 | YEAR 1 | YEAR 1 | YEAR 1 | YEAR 1 | Total | ||||||||||||||||||
| Year 1-5 | CLIN 0007 TOTAL COST: | $ - 0 | ||||||||||||||||||||||
| Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | Anticipated PoP: | CLIN 0007 FIXED FEE: | $ - 0 | ||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | TOTAL CLIN VALUE: | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .