ATTACHMENT L - Form C-76A - CONTRACTOR’S CERTIFICATE OF COMPLIANCE.pdf

PDF 685 KB Posted

Attached to
IFB 160941 JS Ferry Surry Shipyard Package
Solicitation number
IFB-126120
Issued by
Southampton County, Virginia

About this file

This is a Contractor's Certificate of Compliance form (Form C-76A) issued by the Virginia Department of Transportation (VDOT) for compliance with the Build America, Buy America Act under Public Law 117-58. The form serves as a mandatory documentation requirement for contractors delivering construction materials to VDOT projects. Contractors must submit this form at the time of delivery for any construction materials used for permanent installation on the project. The form requires contractors to identify the manufacturer/supplier, list specific bid items and products being supplied with corresponding quantities and units of measure (linear feet, square yards, cubic yards, etc.), and include the VDOT Project Number, FHWA Project Number, Contract ID, and submittal number for tracking purposes.

The form includes a contractor's certification statement in which the Prime Contractor's Project Superintendent attests that all listed construction materials were produced in the United States and that all manufacturing processes required for fabrication occurred within the United States, with materials meeting all plans and specifications requirements. Supporting documentation demonstrating compliance—such as manufacturer and supplier certifications—must be organized by submittal number and retained by the contractor from the date of material delivery through three years following project acceptance. The form accommodates multiple pages to accommodate projects with numerous bid items, with designated fields for contractor and manufacturer information, signatures, dates, and page numbering.

View the file

Other files

File Type Posted
ATTACHMENT CC - 1-012-05-44 CE2294-64_FUEL OIL AND LUBE OIL SYSTEM-DETAILS 2 OF 2.pdf PDF
ATTACHMENT A - State Corporation Commission Form.pdf PDF
ATTACHMENT GG - 1-012-05-50 CE2298-68_BILGE SYSTEM ARRG'T AND DETAILS 1 OF 2.pdf PDF
ATTACHMENT TT - Surry Docking Plan.pdf PDF
ATTACHMENT G - Federal Forms FHWA-1273.pdf PDF
ATTACHMENT M - Form C-76B - CONTRACTOR’S CERTIFICATE OF COMPLIANCE.pdf PDF
ATTACHMENT C - Subcontracting Approval Request.pdf PDF
ATTACHMENT R - 1-012-05-21 CE2298-43_RUDDERS, STOCKS, AND RUDDER PORTS 2 OF 2.pdf PDF
ATTACHMENT F - Proprietary_Confidential Information.pdf PDF
ATTACHMENT D - Normal and Emergency Contacts.pdf PDF
160941 Question and Answer.pdf PDF
ATTACHMENT U - 1-012-05-22 CE2298-44_FOUNDATIONS 3 OF 7.pdf PDF
ATTACHMENT X - 1-012-05-22 CE2298-44_FOUNDATIONS 6 OF 7.pdf PDF
IFB160941_Prebid Surry shipyard sign in sheet 8-20-26 (1).pdf PDF
ATTACHMENT HH - 1-012-05-50 CE2298-68_BILGE SYSTEM ARRG'T AND DETAILS 2 OF 2.pdf PDF
ATTACHMENT T - 1-012-05-22 CE2298-44_FOUNDATIONS 2 OF 7.pdf PDF
ATTACHMENT E - Bidder Data Sheet.pdf PDF
ATTACHMENT P - 1-012-05-20 CE2298-42_SHAFTS, SHAFT TUBES, AND PROPELLERS 2 OF 2.pdf PDF
IFB_160941_JSF_Surry_Shipyard_Package (2).pdf PDF
ATTACHMENT B - Small Business Subcontracting Plan (SBSP).pdf PDF
ATTACHMENT II - 1-012-05-51 CE2298-69_VENTS AND SOUNDINGTUBES-DETAILS.pdf PDF
ATTACHMENT Y - 1-012-05-22 CE2298-44_FOUNDATIONS 7 OF 7.pdf PDF
ATTACHMENT S - 1-012-05-22 CE2298-44_FOUNDATIONS 1 OF 7.pdf PDF
Attachment_H_Specifications.pdf PDF
ATTACHMENT KK - 1-012-05-55 COMPRESSED AIR SYSTEM ARRGT & DETAILS.pdf PDF
ATTACHMENT AA - 1-012-05-33 CE2298-54_DOOR, HATCH, SCUTTLE, WINDOW AND FIXED LIGHT LIST 2 OF 2.pdf PDF
ATTACHMENT Z - 1-012-05-33 CE2298-54_DOOR, HATCH, SCUTTLE, WINDOW AND FIXED LIGHT LIST 1 OF 2.pdf PDF
ATTACHMENT PP - Fernstrum Grid Cooler Installation and Maintenance Manual.pdf PDF
ATTACHMENT MM - 1-012-05-63 CE2298-79_PAINTING SCHEDULE (D).pdf PDF
ATTACHMENT SS - Surry CUB Pump Unit with oil capacity.pdf PDF
ATTACHMENT K - Form C-76 - CONTRACTOR’S CERTIFICATE OF COMPLIANCE FOR STEEL & IRON ITEMS.pdf PDF
ATTACHMENT W - 1-012-05-22 CE2298-44_FOUNDATIONS 5 OF 7.pdf PDF
ATTACHMENT J - 46CFR Part 1520.pdf PDF
160941 Addendum 1.pdf PDF
ATTACHMENT XX - Thordon TG100 Size #04 seal installation manual.pdf PDF
ATTACHMENT I - Build America - Buy America SP107-003000-01.pdf PDF
ATTACHMENT LL - 1-012-05-61 CE2298-77_STEERING SYSTEM (B).pdf PDF
ATTACHMENT FF - 1-012-05-48 ANODE ARRAINGEMENT.pdf PDF
ATTACHMENT JJ - 1-012-05-52 CE2298-17_F.W.PLUMBING AND GRAVITY DRAINS-ARRGT. AND DETAILS 1 OF 2.pdf PDF
ATTACHMENT EE - 1-012-05-47 CE2298-14_FIREMAN AND S.W.SYSTEM.pdf PDF
ATTACHMENT YY - VDOT Marine Paint Standards for Preservation.pdf PDF
ATTACHMENT WW - Surry Main Deck & Above General Arrangement.pdf PDF
ATTACHMENT O - 1-012-05-20 CE2298-42_SHAFTS, SHAFT TUBES, AND PROPELLERS 1 OF 2.pdf PDF
ATTACHMENT Q - 1-012-05-21 CE2298-43_RUDDERS, STOCKS, AND RUDDER PORTS 1 OF 2.pdf PDF
ATTACHMENT N - 1-012-05-04 CE2298-26_SHELL EXPANSION 2.pdf PDF
ATTACHMENT BB - 1-012-05-44 CE2298-64_FUEL OIL AND LUBE OIL SYSTEM-DETAILS 1 OF 2.pdf PDF
ATTACHMENT OO - 1888803_HYDRAULIC CYLINDER ASSY 5 BORE.pdf PDF
ATTACHMENT V - 1-012-05-22 CE2298-44_FOUNDATIONS 4 OF 7.pdf PDF
ATTACHMENT QQ - Red Fox Type II MSD installation and maintenance manual.pdf PDF
ATTACHMENT DD - 1-012-05-45 CE2298-14_STERN TUBE BEARING COOLING.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form C-76A

Rev. 12-9-22

CONTRACTOR’S CERTIFICATE OF COMPLIANCE

FOR CONSTRUCTION MATERIALS

For Compliance with “Build America, Buy America Act” Public Law, No. 117-58, §§ 70901-70953

Contract ID No.: Page 1 of ______

VDOT Project No.:

Build America Buy America

FHWA Project No.: Submittal No.:

Project Location & Description

The (Name of Manufacturer/Supplier) (Street Address) (City, State) (Phone) has furnished to (Name of Contractor) (Street Address) (City, State) (Phone) the following Construction Materials for permanent use in the above referenced project:

Bid Item No. Bid Item Description Product Description

(if only a portion of the Bid Item)

Quantity

Unit

(LF,YD²,

YD³, etc.)

Submit this form to VDOT at the time of delivery of any Construction Materials to the project. Supporting documentation to demonstrate compliance with Build America Buy America Act provisions (such as manufacturer/supplier certifications, etc.) shall be organized by Submittal Number and maintained by the contractor from the date of delivery until three years after project acceptance. (Note that documentation such as off-site test reports, etc., when also required for other material quality purposes, is still required at time of delivery.)

Contractor’s Statement of Certification

I hereby certify that the Construction Materials listed above and on any additional pages attached to this form were produced in the United States, and that all manufacturing processes required for the manufacture of the Construction Materials occurred in the United States, and that the Contraction

Materials meet all other requirements as set forth in the plans and specifications.

By Title (Name of Prime Contractor’s Project Superintendent, Typed or Printed)

Date (Signature of Prime Contractor’s Project Superintendent)

Form C-76A

Rev. 12-9-22

CONTRACTOR’S CERTIFICATE OF COMPLIANCE

FOR CONSTRUCTION MATERIALS

For Compliance with “Build America, Buy America Act” Public Law, No. 117-58, §§ 70901-70953

Contract ID No.: Page ______ of ______

VDOT Project No.:

Build America Buy America

FHWA Project No.: Submittal No.:

Bid Item No. Bid Item Description Product Description

(if only a portion of the Bid Item) Quantity

Unit (LF,YD², YD³, etc.)

(Initials of Prime Contractor’s Project Superintendent)

Page 1 of:
Project Location Description:
Bid Item NoRow1:
Bid Item DescriptionRow1:
Product Description if only a portion of the Bid ItemRow1:
QuantityRow1:
Unit LFYD² YD³ etcRow1:
Bid Item NoRow2:
Bid Item DescriptionRow2:
Product Description if only a portion of the Bid ItemRow2:
QuantityRow2:
Unit LFYD² YD³ etcRow2:
Bid Item NoRow3:
Bid Item DescriptionRow3:
Product Description if only a portion of the Bid ItemRow3:
QuantityRow3:
Unit LFYD² YD³ etcRow3:
Bid Item NoRow4:
Bid Item DescriptionRow4:
Product Description if only a portion of the Bid ItemRow4:
QuantityRow4:
Unit LFYD² YD³ etcRow4:
Title:
Date:
Page:
of:
Bid Item NoRow1_2:
Bid Item DescriptionRow1_2:
Product Description if only a portion of the Bid ItemRow1_2:
QuantityRow1_2:
Unit LFYD² YD³ etcRow1_2:
Bid Item NoRow2_2:
Bid Item DescriptionRow2_2:
Product Description if only a portion of the Bid ItemRow2_2:
QuantityRow2_2:
Unit LFYD² YD³ etcRow2_2:
Bid Item NoRow3_2:
Bid Item DescriptionRow3_2:
Product Description if only a portion of the Bid ItemRow3_2:
QuantityRow3_2:
Unit LFYD² YD³ etcRow3_2:
Bid Item NoRow4_2:
Bid Item DescriptionRow4_2:
Product Description if only a portion of the Bid ItemRow4_2:
QuantityRow4_2:
Unit LFYD² YD³ etcRow4_2:
Bid Item NoRow5:
Bid Item DescriptionRow5:
Product Description if only a portion of the Bid ItemRow5:
QuantityRow5:
Unit LFYD² YD³ etcRow5:
Bid Item NoRow6:
Bid Item DescriptionRow6:
Product Description if only a portion of the Bid ItemRow6:
QuantityRow6:
Unit LFYD² YD³ etcRow6:
Bid Item NoRow7:
Bid Item DescriptionRow7:
Product Description if only a portion of the Bid ItemRow7:
QuantityRow7:
Unit LFYD² YD³ etcRow7:
Bid Item NoRow8:
Bid Item DescriptionRow8:
Product Description if only a portion of the Bid ItemRow8:
QuantityRow8:
Unit LFYD² YD³ etcRow8:
Bid Item NoRow9:
Bid Item DescriptionRow9:
Product Description if only a portion of the Bid ItemRow9:
QuantityRow9:
Unit LFYD² YD³ etcRow9:
Bid Item NoRow10:
Bid Item DescriptionRow10:
Product Description if only a portion of the Bid ItemRow10:
QuantityRow10:
Unit LFYD² YD³ etcRow10:
Bid Item NoRow11:
Bid Item DescriptionRow11:
Product Description if only a portion of the Bid ItemRow11:
QuantityRow11:
Unit LFYD² YD³ etcRow11:
Bid Item NoRow12:
Bid Item DescriptionRow12:
Product Description if only a portion of the Bid ItemRow12:
QuantityRow12:
Unit LFYD² YD³ etcRow12:
Bid Item NoRow13:
Bid Item DescriptionRow13:
Product Description if only a portion of the Bid ItemRow13:
QuantityRow13:
Unit LFYD² YD³ etcRow13:
Bid Item NoRow14:
Bid Item DescriptionRow14:
Product Description if only a portion of the Bid ItemRow14:
QuantityRow14:
Unit LFYD² YD³ etcRow14:
Bid Item NoRow15:
Bid Item DescriptionRow15:
Product Description if only a portion of the Bid ItemRow15:
QuantityRow15:
Unit LFYD² YD³ etcRow15:
Bid Item NoRow16:
Bid Item DescriptionRow16:
Product Description if only a portion of the Bid ItemRow16:
QuantityRow16:
Unit LFYD² YD³ etcRow16:
Bid Item NoRow17:
Bid Item DescriptionRow17:
Product Description if only a portion of the Bid ItemRow17:
QuantityRow17:
Unit LFYD² YD³ etcRow17:
Initials of Prime Contractors Project:
Name Of Manufacturer - Supplier:
Street Address:
City, State:
Phone Number:
Name of Contractor:
Street Address2:
City, State2:
Phone Number2:
Name Of Prime Contractor's Superintendent:
Contract ID No:
VDOT Project No:
FHWA Project No:
Submittal No:

File details come from the government source that posted it. Updated .