Attachment L-6B- OME EPM Templates-Accelerated.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Orion Main Engine Federal contract opportunity
Solicitation number
80JSC020R0031
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This document contains templates and instructions for a solicitation from the National Aeronautics and Space Administration Johnson Space Center seeking proposals for the Orion Main Engine contract. Key details include:

The solicitation seeks proposals to provide Orion Main Engines, including certification efforts and production of multiple lot buys. Templates are provided for offerors to summarize proposed hours, costs, pricing, subcontractor information, and milestones payments by contract line item and year. Instructions indicate self-calculating formulas are required in templates and milestones must comply with FAR on milestone payments. The pre-proposal conference was scheduled for April 2, 2020 with responses due no later than June 11, 2020. The agency contact is the National Aeronautics and Space Administration Johnson Space Center.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPST CLIN 0001B (CERT)

Prime Price Summary Template (PPST) -- CLIN 0001B: Certification Effort

Prime Contractor Company Name:

CLIN 0001B: CERTIFICATION EFFORT
PRIME OFFEROR TOTAL FIRM FIXED PRICE (ENTIRE TEAM)

Cost Element Contract Year 1 (11/01/20- 10/31/21) Contract Year 2 (11/01/21- 10/31/22) Contract Year 3 (11/01/22- 10/31/23) Contract Year 4 (11/01/23- 10/31/24) Total CLIN 0001B Certification Effort

(CYs 1-4)Ref.
Total Team Direct Labor Hours- 0

Prime Labor Cost $ - 0

Subcontractor Price:
Major Subcontractor (identify by name)- Main Isolation Valve$ - 0
Major Subcontractor (identify by name)- Regulators$ - 0
Major Subcontractor (identify by name)- Injectors$ - 0
Major Subcontractor (identify by name)- Combustion Chamber$ - 0
Total Subcontractor Price (Cost & Profit)$ - 0$ - 0$ - 0$ - 0$ - 0
Non-Labor Resources (NLRs):
Travel$ - 0
Material$ - 0
Other Direct Costs$ - 0
Prime Offeror NLR Subtotal Cost$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Offeror NLR Burden Cost$ - 0
Prime Offeror Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0

Total Prime Labor, Subcontractor, and Prime NLR Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Prime Indirect Cost:
Prime Overhead Cost$ - 0
Prime G&A Cost$ - 0
Prime Other Indirect Cost (identify indirect cost)$ - 0
Total Prime Indirect Cost$ - 0$ - 0$ - 0$ - 0$ - 0

Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Profit:
Profit Base$ - 0
Profit Rate
Total Profit Dollars$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PROPOSED PRICE (Cost & Profit)$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.

INSTRUCTIONS TO OFFERORS

This template is required of the Prime Offeror only. This template is intended to identify all Prime Offeror proposed hours, cost, and profit by contract year for the entire period of performance. Furthermore, the Prime Offeror shall also identify all subcontractors' proposed hours and price by contract year. A reference column has been provided on the template for the Offeror to use in identifying where supporting data for each cost element is located in the Offeror's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost and price development and computations.

MSPST CLIN 0001B (CERT)

Major Subcontractor Price Summary Template (MSPST) -- CLIN 0001B: Certification Effort

Major Subcontractor Company Name:
Critical Part[ ] Main Isolation Valve[ ] Regulators[ ] Injectors
CLIN 1: CERTIFICATION EFFORT
MAJOR SUBCONTRACTOR TOTAL FIRM FIXED PRICE

Cost Element Contract

(11/01/20- 10/31/21) Contract Year 2 (11/01/21- 10/31/22) Contract Year 3 (11/01/22- 10/31/23) Contract Year 4 (11/01/23- 10/31/24) Total CLIN 0001B Certification Effort

(CYs 1-4)Ref.
Total Direct Labor Hours- 0
Direct Labor Cost:
Major Subcontractor Direct Labor Cost$ - 0
Total Direct Labor Cost$ - 0$ - 0$ - 0$ - 0$ - 0
Non-Labor Resources (NLRs):
Travel$ - 0
Material$ - 0
Other Direct Costs$ - 0
Major Sub NLR Subtotal Cost$ - 0$ - 0$ - 0$ - 0$ - 0
Major Sub NLR Burden Cost$ - 0
Major Sub Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0

Sub-Total Major Sub Labor and Major Sub NLR Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Major Sub Indirect Cost:
Major Sub Overhead Cost$ - 0
Major Sub G&A Cost$ - 0
Major Sub Other Indirect Cost (identify indirect cost)$ - 0
Total Major Sub Indirect Cost$ - 0$ - 0$ - 0$ - 0$ - 0

Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Profit:
Profit Base$ - 0
Profit Rate
Total Profit Dollars$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PROPOSED PRICE (Cost & Profit)$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.

INSTRUCTIONS TO OFFERORS

A separate template is needed for each major subcontractor. This template is intended to identify all major subcontractor proposed hours, cost, and profit for the entire period of performance. A reference column has been provided on the template for the Offerors to use in identifying where the supporting data for each cost element is located in the Offerors Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost development and computations.

PPST CLIN 0002B (Lot Buy No. 1)

Prime Price Summary Template (PPST) -- CLIN 0002B: Production Effort Lot Buy No. 1 (Lot Buy of 4 Engines)

Prime Contractor Company Name:

CLIN 0002B: PRODUCTION EFFORT -- LOT BUY NUMBER 1 (LOT BUY OF 4 OMEs)
PRIME OFFEROR TOTAL FIRM FIXED PRICE (ENTIRE TEAM)

Cost Element Contract

11/01/2020-10/31/2021 Contract Year 2 11/01/2021-10/31/2022 Contract Year 3 11/01/2022-10/31/2023 Contract Year 4 11/01/2023-10/31/2024 Contract Year 5 11/01/2024-10/31/2025 Contract Year 6 11/01/2025-10/31/2026 Contract Year 7 11/01/2026-10/31/2027 Contract Year 8 11/01/2027-10/31/2028 Contract Year 9 11/01/2028-10/31/2029 Contract Year 10 11/01/2029-10/31/2030 Contract Year 11

11/01/2030-5/31/2031Contract Year N/A 06/01/2031-12/31/2031Contract Year N/A 01/01/2032-12/31/2032CLIN 0002B
Production Effort -- Lot Buy No. 1Ref.

Total Team Direct Labor Hours - 0

Prime Labor Cost $ - 0

Subcontractor Price:
Major Subcontractor (identify by name)- Main Isolation Valve$ - 0
Major Subcontractor (identify by name)- Regulators$ - 0
Major Subcontractor (identify by name)- Injectors$ - 0
Major Subcontractor (identify by name)- Combustion Chamber$ - 0
Total Subcontractor Price (Cost & Profit)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Non-Labor Resources (NLRs):
Travel$ - 0
Material$ - 0
Other Direct Costs$ - 0
Prime Offeror NLR Subtotal Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prime Offeror NLR Burden Cost$ - 0
Prime Offeror Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Prime Labor, Subcontractor, and Prime NLR Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Prime Indirect Cost:
Prime Overhead Cost$ - 0
Prime G&A Cost$ - 0
Prime Other Indirect Cost (identify indirect cost)$ - 0
Total Prime Indirect Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Profit:
Profit Base$ - 0
Profit Rate
Total Profit Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PROPOSED PRICE (Cost & Profit)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.

ALLOCATION OF LOT BUY NUMBER 1 PRICE TO INDIVIDUAL UNITSCLIN 0002 Production Effort -- Lot Buy No. 1
OME Unit Number 1 (Artemis VI flight)
OME Unit Number 2 (Artemis VI spare or Artemis VII flight)
OME Unit Number 3 (Artemis VII spare or Artemis VIII flight)
OME Unit Number 4 (Artemis VIII spare or Artemis IX flight)
Total for Lot Buy No. 1 (Lot Buy of 4 OMEs)$ - 0

This template is required of the Prime Offeror only. This template is intended to identify all Prime Offeror proposed hours, cost, and profit by contract year for the entire period of performance. Furthermore, the Prime shall also identify all subcontractors' proposed hours and price by contract year. A reference column has been provided on the template for the Offeror to use in identifying where supporting data for each cost element is located in the Offeror's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost and price development and computations.

MSPST CLIN0002B (Lot Buy No. 1)

Major Subcontractor Price Summary Template (MSPST) -- CLIN 0002B: Production Effort Lot Buy No. 1 (Lot Buy of 4 Engines)

Prime Contractor Company Name:
Critical Part[ ] Main Isolation Valve[ ] Regulators[ ] Injectors
CLIN 0002B: PRODUCTION EFFORT -- LOT BUY NUMBER 1 (LOT BUY OF 4 OMEs)
MAJOR SUBCONTRACTOR TOTAL FIRM FIXED PRICE

Cost Element Contract

11/01/2020-10/31/2021 Contract Year 2 11/01/2021-10/31/2022 Contract Year 3 11/01/2022-10/31/2023 Contract Year 4 11/01/2023-10/31/2024 Contract Year 5 11/01/2024-10/31/2025 Contract Year 6 11/01/2025-10/31/2026 Contract Year 7 11/01/2026-10/31/2027 Contract Year 8 11/01/2027-10/31/2028 Contract Year 9 11/01/2028-10/31/2029 Contract Year 10 11/01/2029-10/31/2030 Contract Year 11

11/01/2030-5/31/2031Contract Year N/A 06/01/2031-12/31/2031Contract Year N/A 01/01/2032-12/31/2032CLIN 0002B
Production Effort -- Lot Buy No. 1Ref.

Total Team Direct Labor Hours $ - 0

Direct Labor Cost:
Major Subcontractor Labor Cost$ - 0
Non-Labor Resources (NLRs):
Prime Offeror NLR Subtotal Cost$ - 0
Major Sub NLR Burden Cost$ - 0
Major Sub Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Total Major Sub Labor and Major Sub NLR Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Major Sub Indirect Cost:
Major Sub Overhead Cost$ - 0
Major Sub G&A Cost$ - 0
Major Sub Other Indirect Cost (identify indirect cost)$ - 0
Total Major Sub Indirect Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Profit:
Profit Base$ - 0
Profit Rate
Total Profit Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PROPOSED PRICE (Cost & Profit)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.

INSTRUCTIONS TO OFFERORS

This template is required of the major subcontractor only. This template is intended to identify all major subcontractor proposed hours, cost, and profit by contract year for the entire period of performance. Furthermore, the major subcontractor shall also identify all lower tier subcontractors' proposed hours and price by contract year. A reference column has been provided on the template for the major Offeror to use in identifying where supporting data for each cost element is located in the Offeror's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost and price development and computations.

MPT_B

MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0001 CERTIFICATION

Prime Offeror Company Name:
CLIN 0001 CERTIFICATION EFFORT

MILESTONE PAYMENTS

MilestoneEstimated Date of CompletionAmount (% of Price in CLIN 0001)Amount (in dollars)Notes
Milestone 0- Authority To Proceed Deliverable Submissions
Milestone 1- System Requirements Review
Milestone 2- Preliminary Design Review
Milestone 3- Critical Design Review
Milestone 4- Design Certification Review
Milestone Payment Total0%$ - 0
Remianing balance100%
Total100%$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0002 PRODUCTION

Prime Offeror Company Name:
CLIN 0002 PRODUCTION- Lot Buy No.1
Lot Buy of 4 Engines
MilestoneEstimated Date of CompletionAmount (% of Price in CLIN 0002)Amount (in dollars)Notes
Milestone 1- Authority to Proceed
Milestone 1A- Production Readiness Review #1
Milestone 1B- Production Readiness Review #2
Milestone 2- Pre-Ship Hardware Acceptance Review
Milestone 3- Post-Ship Hardware Acceptance Review
Milestone 4- Post- Flight Assessment Review
Milestone Payment Total0%$ - 0
Remianing balance100%
Total100%$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0002 PRODUCTION

Prime Offeror Company Name:
CLIN 0002 PRODUCTION- Lot Buy No. 2
Lot Buy of 4 Engines
MilestoneEstimated Date of CompletionAmount (% of Price in CLIN 0002)Amount (in dollars)Notes
Milestone 1- Authority To Proceed
Milestone 1A- Production Readiness Review #1
Milestone 1B- Production Readiness Review #2
Milestone 2- Pre-Ship Hardware Acceptance Review
Milestone 3- Post-Ship Hardware Acceptance Review
Milestone Payment Total0%$ - 0
Remianing balance100%
Total100%$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0002 PRODUCTION

Prime Offeror Company Name:
CLIN 0002 PRODUCTION- Lot Buy No. 3
Lot Buy of 2 Engines
MilestoneEstimated Date of CompletionAmount (% of Price in CLIN 0002)Amount (in dollars)Notes
Milestone 0- Authority to Proceed
Milestone 1- Production Readiness Review
Milestone 2- Pre-Ship Hardware Acceptance Review
Milestone 3- Post-Ship Hardware Acceptance Review
Milestone Payment Total0%$ - 0
Remianing balance100%
Total100%$ - 0
NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
Please remember to remove the red highlighted examples from the templates prior to your official proposal submission.

This template is required from the Prime Offeror only. It is used to identify and summarize all milestone payments for the Orion Main Engine Contract. The format is automated and only requires the Offeror to provide source data (milestone payment amount) in areas shaded in blue.

The Offeror can may propose additional milestones and insert those milestones to reflect its unique milestone approach. The Offeror shall not delete the Government mandated milestones.

The estimated completion date for the Government mandated milestones are located in Attachment L-9, OME Need Dates.

A notes column has been provided on the template for the Offerors to use in identifying which engine(s) a specific milestone is applicable to.

**NOTE: Milestone Payment Total must be in compliance with FAR 32.1004(b)(2)(ii). "Total" lines must match CLIN 0001 (Certification Effort) and CLIN 0002 (Production of Lot Buys 1-3) Totals in the ISPT**

File details come from the government source that posted it. Updated .