Attachment L-6B- OME EPM Templates-Accelerated_.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Orion Main Engine Federal contract opportunity
- Solicitation number
- 80JSC020R0031
About this file
This document contains templates for proposals responding to a solicitation for the Orion Main Engine contract. The templates require offerors to provide pricing details including direct labor hours, subcontractor costs, non-labor expenses, indirect rates, and milestones payments for certification and production efforts across multiple contract line items and years. Offerors must also use self-calculating formulas in prescribed areas. The solicitation seeks proposals due no later than June 11, 2020 to provide Orion Main Engines under contract number 80JSC020R0031 for the National Aeronautics and Space Administration Johnson Space Center.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPST CLIN 0001B (ACC CERT)
Prime Price Summary Template (PPST) -- CLIN 0001B: Accelerated Certification Effort
Prime Contractor Company Name:
| CLIN 0001B: ACCELERATED CERTIFICATION EFFORT |
| PRIME OFFEROR TOTAL FIRM FIXED PRICE (ENTIRE TEAM) |
Cost Element Contract Year 1 (11/01/20- 10/31/21) Contract Year 2 (11/01/21- 10/31/22) Contract Year 3 (11/01/22- 10/31/23) Contract Year 4 (11/01/23- 10/31/24) Total CLIN 0001B Accelerated Certification Effort
| (CYs 1-4) | Ref. | |||||
| Prime Hours | - 0 | |||||
| All Subcontractor Hours | - 0 | |||||
| Total Team Direct Labor Hours | - 0 | - 0 | - 0 | - 0 | - 0 |
Prime Labor Cost $ - 0
| Subcontractor Price: | |||||
| Major Subcontractor (identify by name)- Main Isolation Valve | $ - 0 | ||||
| Major Subcontractor (identify by name)- Regulators | $ - 0 | ||||
| Major Subcontractor (identify by name)- Injectors | $ - 0 | ||||
| Major Subcontractor (identify by name)- Combustion Chamber | $ - 0 | ||||
| All Minor Subcontractors | $ - 0 | ||||
| Total Subcontractor Price (Cost & Profit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Resources (NLRs): | |||||
| Travel | $ - 0 | ||||
| Material | $ - 0 | ||||
| Other Direct Costs | $ - 0 | ||||
| Prime Offeror NLR Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Prime Offeror NLR Burden Cost | $ - 0 | ||||
| Prime Offeror Total NLR Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Prime Labor, Subcontractor, and Prime NLR Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Prime Indirect Cost: | |||||
| Prime Overhead Cost | $ - 0 | ||||
| Prime G&A Cost | $ - 0 | ||||
| Prime Other Indirect Cost (identify indirect cost) | $ - 0 | ||||
| Total Prime Indirect Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Profit: | |||||
| Profit Base | $ - 0 | ||||
| Profit Rate | |||||
| Total Profit Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL PROPOSED PRICE (Cost & Profit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas. |
INSTRUCTIONS TO OFFERORS
This template is required of the Prime Offeror only. This template is intended to identify all Prime Offeror proposed hours, cost, and profit by contract year for the entire period of performance. Furthermore, the Prime Offeror shall also identify all subcontractors' proposed hours and price by contract year. A reference column has been provided on the template for the Offeror to use in identifying where supporting data for each cost element is located in the Offeror's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost and price development and computations.
MSPST CLIN 0001B (ACC CERT)
Major Subcontractor Price Summary Template (MSPST) -- CLIN 0001B: Accelerated Certification Effort
| Major Subcontractor Company Name: | ||||
| Critical Part | [ ] Main Isolation Valve | [ ] Regulators | [ ] Injectors | [ ] Combustion Chamber |
| CLIN 1: ACCELERATED CERTIFICATION EFFORT |
| MAJOR SUBCONTRACTOR TOTAL FIRM FIXED PRICE |
Cost Element Contract
(11/01/20- 10/31/21) Contract Year 2 (11/01/21- 10/31/22) Contract Year 3 (11/01/22- 10/31/23) Contract Year 4 (11/01/23- 10/31/24) Total CLIN 0001B Accelerated Certification Effort
| (CYs 1-4) | Ref. | |
| Total Direct Labor Hours | - 0 |
| Direct Labor Cost: | |||||
| Major Subcontractor Direct Labor Cost | $ - 0 | ||||
| Total Direct Labor Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
All Minor Subcontractor Price: $ - 0
| Non-Labor Resources (NLRs): | |||||
| Travel | $ - 0 | ||||
| Material | $ - 0 | ||||
| Other Direct Costs | $ - 0 | ||||
| Major Sub NLR Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Major Sub NLR Burden Cost | $ - 0 | ||||
| Major Sub Total NLR Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Sub-Total Major Sub Labor, Minor Subcontractor Price, Major Sub NLR Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Major Sub Indirect Cost: | |||||
| Major Sub Overhead Cost | $ - 0 | ||||
| Major Sub G&A Cost | $ - 0 | ||||
| Major Sub Other Indirect Cost (identify indirect cost) | $ - 0 | ||||
| Total Major Sub Indirect Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Profit: | |||||
| Profit Base | $ - 0 | ||||
| Profit Rate | |||||
| Total Profit Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL PROPOSED PRICE (Cost & Profit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas. |
INSTRUCTIONS TO OFFERORS
A separate template is needed for each major subcontractor. This template is intended to identify all major subcontractor proposed hours, cost, and profit for the entire period of performance. A reference column has been provided on the template for the Offeror to use in identifying where the supporting data for each cost element is located in the Offeorr's Volume III, Cost/Price Proposal. The cost and price data submitted shal be clearly displayed and detailed so that the Government may fully understand the cost development and computations.
PPST CLIN 0002B (Lot Buy No. 1)
Prime Price Summary Template (PPST) -- CLIN 0002B: Accelerated Production Effort Lot Buy No. 1 (Lot Buy of 4 Engines)
Prime Contractor Company Name:
| CLIN 0002B: ACCELERATED PRODUCTION EFFORT -- LOT BUY NUMBER 1 (LOT BUY OF 4 OMEs) |
| PRIME OFFEROR TOTAL FIRM FIXED PRICE (ENTIRE TEAM) |
Cost Element Contract
11/01/2020-10/31/2021 Contract Year 2 11/01/2021-10/31/2022 Contract Year 3 11/01/2022-10/31/2023 Contract Year 4 11/01/2023-10/31/2024 Contract Year 5 11/01/2024-10/31/2025 Contract Year 6 11/01/2025-10/31/2026 Contract Year 7 11/01/2026-10/31/2027 Contract Year 8 11/01/2027-10/31/2028 Contract Year 9 11/01/2028-10/31/2029 Contract Year 10 11/01/2029-10/31/2030 Contract Year 11
| 11/01/2030-5/31/2031 | Contract Year N/A 06/01/2031-12/31/2031 | Contract Year N/A 01/01/2032-12/31/2032 | CLIN 0002B | ||||||||||||
| Acceleration Production Effort -- Lot Buy No. 1 | Ref. | ||||||||||||||
| Prime Hours | - 0 | ||||||||||||||
| All Subcontractor Hours | - 0 | ||||||||||||||
| Total Team Direct Labor Hours | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
Prime Labor Cost $ - 0
| Subcontractor Price: | ||||||||||||||
| Major Subcontractor (identify by name)- Main Isolation Valve | $ - 0 | |||||||||||||
| Major Subcontractor (identify by name)- Regulators | $ - 0 | |||||||||||||
| Major Subcontractor (identify by name)- Injectors | $ - 0 | |||||||||||||
| Major Subcontractor (identify by name)- Combustion Chamber | ||||||||||||||
| All Minor Subcontractors | $ - 0 | |||||||||||||
| Total Subcontractor Price (Cost & Profit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Resources (NLRs): | ||||||||||||||
| Travel | $ - 0 | |||||||||||||
| Material | $ - 0 | |||||||||||||
| Other Direct Costs | $ - 0 | |||||||||||||
| Prime Offeror NLR Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Prime Offeror NLR Burden Cost | $ - 0 | |||||||||||||
| Prime Offeror Total NLR Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Prime Labor, Subcontractor, and Prime NLR Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Prime Indirect Cost: | ||||||||||||||
| Prime Overhead Cost | $ - 0 | |||||||||||||
| Prime G&A Cost | $ - 0 | |||||||||||||
| Prime Other Indirect Cost (identify indirect cost) | $ - 0 | |||||||||||||
| Total Prime Indirect Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Profit: | ||||||||||||||
| Profit Base | $ - 0 | |||||||||||||
| Profit Rate | ||||||||||||||
| Total Profit Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL PROPOSED PRICE (Cost & Profit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
| ALLOCATION OF LOT BUY NUMBER 1 PRICE TO INDIVIDUAL UNITS | CLIN 0002 Production Effort -- Lot Buy No. 1 |
| OME Unit Number 1 | |
| OME Unit Number 2 | |
| OME Unit Number 3 | |
| OME Unit Number 4 | |
| Total for Lot Buy No. 1 (Lot Buy of 4 OMEs) | $ - 0 |
This template is required of the Prime Offeror only. This template is intended to identify all Prime Offeror proposed hours, cost, and profit by contract year for the entire period of performance. Furthermore, the Prime shall also identify all subcontractors' proposed hours and price by contract year. A reference column has been provided on the template for the Offeror to use in identifying where supporting data for each cost element is located in the Offeror's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost and price development and computations.
MSPST CLIN0002B (Lot Buy No. 1)
Major Subcontractor Price Summary Template (MSPST) -- CLIN 0002B: Accelerated Production Effort Lot Buy No. 1 (Lot Buy of 4 Engines)
| Prime Contractor Company Name: | ||||
| Critical Part | [ ] Main Isolation Valve | [ ] Regulators | [ ] Injectors | [ ] Combustion Chamber |
| CLIN 0002B: ACCELERATED PRODUCTION EFFORT -- LOT BUY NUMBER 1 (LOT BUY OF 4 OMEs) |
| MAJOR SUBCONTRACTOR TOTAL FIRM FIXED PRICE |
Cost Element Contract
11/01/2020-10/31/2021 Contract Year 2 11/01/2021-10/31/2022 Contract Year 3 11/01/2022-10/31/2023 Contract Year 4 11/01/2023-10/31/2024 Contract Year 5 11/01/2024-10/31/2025 Contract Year 6 11/01/2025-10/31/2026 Contract Year 7 11/01/2026-10/31/2027 Contract Year 8 11/01/2027-10/31/2028 Contract Year 9 11/01/2028-10/31/2029 Contract Year 10 11/01/2029-10/31/2030 Contract Year 11
| 11/01/2030-5/31/2031 | Contract Year N/A 06/01/2031-12/31/2031 | Contract Year N/A 01/01/2032-12/31/2032 | CLIN 0002B | |
| Acceleration Production Effort -- Lot Buy No. 1 | Ref. | |||
| Total Team Direct Labor Hours | $ - 0 |
| Direct Labor Cost: | |
| Major Subcontractor Labor Cost | $ - 0 |
All Minor Subcontractor Price: $ - 0
| Non-Labor Resources (NLRs): | ||||||||||||||
| Prime Offeror NLR Subtotal Cost | $ - 0 | |||||||||||||
| Major Sub NLR Burden Cost | $ - 0 | |||||||||||||
| Major Sub Total NLR Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub-Total Major Sub Labor, Minor Subcontractor Price, Major Sub NLR Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Major Sub Indirect Cost: | ||||||||||||||
| Major Sub Overhead Cost | $ - 0 | |||||||||||||
| Major Sub G&A Cost | $ - 0 | |||||||||||||
| Major Sub Other Indirect Cost (identify indirect cost) | $ - 0 | |||||||||||||
| Total Major Sub Indirect Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Estimated Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Profit: | ||||||||||||||
| Profit Base | $ - 0 | |||||||||||||
| Profit Rate | ||||||||||||||
| Total Profit Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL PROPOSED PRICE (Cost & Profit) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
NOTE: IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas.
INSTRUCTIONS TO OFFERORS
This template is required of the major subcontractor only. This template is intended to identify all major subcontractor proposed hours, cost, and profit by contract year for the entire period of performance. Furthermore, the major subcontractor shall also identify all lower tier subcontractors' proposed hours and price by contract year. A reference column has been provided on the template for the major Offeror to use in identifying where supporting data for each cost element is located in the Offeror's Volume III, Cost/Price Proposal. The cost and price data submitted shall be clearly displayed and detailed so that the Government may fully understand the cost and price development and computations.
MPT_B
MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0001B: ACCELERATED CERTIFICATION
| Prime Offeror Company Name: | |
| CLIN 0001B ACCELERATED CERTIFICATION EFFORT |
MILESTONE PAYMENTS
| Milestone | Estimated Date of Completion | Amount (% of Price in CLIN 0001) | Amount (in dollars) | Notes |
| Milestone 0- Authority To Proceed Deliverable Submissions | ||||
| Milestone 1- System Requirements Review | ||||
| Milestone 2- Preliminary Design Review | ||||
| Milestone 3- Critical Design Review | ||||
| Milestone 4- Design Certification Review | ||||
| Milestone Payment Total | 0% | $ - 0 |
| NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas. |
| Please remember to remove the red highlighted examples from the templates prior to your official proposal submission. |
MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0002B: ACCELERATED PRODUCTION
| Prime Offeror Company Name: | |
| CLIN 0002B: ACCELERATED PRODUCTION- Lot Buy No.1 | |
| Lot Buy of 4 Engines |
| Milestone | Estimated Date of Completion | Amount (% of Price in CLIN 0002) | Amount (in dollars) | Notes |
| Milestone 0- Authority to Proceed | ||||
| Milestone 1A- Production Readiness Review #1 | ||||
| Milestone 1B- Production Readiness Review #2 | ||||
| Milestone 2- Pre-Ship Hardware Acceptance Review | ||||
| Milestone 3- Post-Ship Hardware Acceptance Review | ||||
| Milestone Payment Total | 0% | $ - 0 |
| NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas. |
| Please remember to remove the red highlighted examples from the templates prior to your official proposal submission. |
MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0002B: ACCELERATED PRODUCTION
| Prime Offeror Company Name: | |
| CLIN 0002B: ACCELERATED PRODUCTION- Lot Buy No. 2 | |
| Lot Buy of 4 Engines |
| Milestone | Estimated Date of Completion | Amount (% of Price in CLIN 0002) | Amount (in dollars) | Notes |
| Milestone 0- Authority To Proceed | ||||
| Milestone 1A- Production Readiness Review #1 | ||||
| Milestone 1B- Production Readiness Review #2 | ||||
| Milestone 2- Pre-Ship Hardware Acceptance Review | ||||
| Milestone 3- Post-Ship Hardware Acceptance Review | ||||
| Milestone Payment Total | 0% | $ - 0 |
| NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas. |
| Please remember to remove the red highlighted examples from the templates prior to your official proposal submission. |
MILESTONE PAYMENT TEMPLATE (MPT) -- CLIN 0002B: ACCELERATED PRODUCTION
| Prime Offeror Company Name: | |
| CLIN 0002B: ACCELERATED PRODUCTION- Lot Buy No. 3 | |
| Lot Buy of 2 Engines |
| Milestone | Estimated Date of Completion | Amount (% of Price in CLIN 0002) | Amount (in dollars) | Notes |
| Milestone 0- Authority to Proceed | ||||
| Milestone 1- Production Readiness Review | ||||
| Milestone 2- Pre-Ship Hardware Acceptance Review | ||||
| Milestone 3- Post-Ship Hardware Acceptance Review | ||||
| Milestone Payment Total | 0% | $ - 0 |
| NOTE: Examples are highlighted in red font. IMPORTANT: Self-calculating formulas MUST BE PROVIDED for all grey shaded areas. |
| Please remember to remove the red highlighted examples from the templates prior to your official proposal submission. |
This template is required from the Prime Offeror only. It is used to identify and summarize all milestone payments for the Orion Main Engine Contract. The format is automated and only requires the Offeror to provide source data (milestone payment amount) in areas shaded in blue.
The Offeror can may propose additional milestones and insert those milestones to reflect its unique milestone approach. The Offeor shall not delete the Government mandated milestones.
The estimated completion date for the Government mandated milestones are located in Attachment L-9B, OME Accelerated Need Dates.
A notes column has been provided on the template for the Offeror to use in identifying which engine(s) a specific milestone is applicable to.
**NOTE: Milestone Payment Total must be in compliance with FAR 32.1004(b)(2)(ii). "Total" lines must match CLIN 0001 (Certification Effort) and CLIN 0002 (Production of Lot Buys 1-3) Totals in the ISPT**