Attachment K4 - DIT Process for 2023 Light Duty Vocational Solicitation (Purchasing).docx

DOCX document 345 KB Posted

Attached to
2023 Light Duty Vocational Trucks
Solicitation number
47QMCA22R0014
Issued by

About this file

This document provides instructions for submitting damage in transit claims for light duty vehicles purchased through the General Services Administration Federal Acquisition Service. Claims must be filed using a Google form and submitted within three business days of vehicle receipt. Photos and a signed bill of lading documenting the damages must be included. Standardized damage codes should be used to describe issues. Resolutions will be handled directly with the vehicle manufacturer, with claims aimed to be adjudicated within 21 days. Additionally, the draft solicitation 47QMCA22R0014 seeks light duty vocational trucks for delivery in 2023, with proposals for this opportunity due by September 12, 2022. The awarded contract will be carried out by GSA Federal Acquisition Service.

View the file

Other files

File Type Posted
47QMCA22R0014 Amendment 0004 SF30 09_30_2022.pdf PDF
47QMCA22R0014 Amendment 003 SF30 09_21_2022.pdf PDF
47QMCA22R0014 Pre-Proposal Conference slides 09_20_2022.pptx PPTX presentation
47QMCA22R0014 Solicitation Document 09_13_2022.pdf PDF
Attachment A - Proposal Checklist.docx DOCX document
47QMCA22R0014 Amendment 002 SF30 09_13_2022.pdf PDF
Attachment B - SF1449.pdf PDF
47QMCA22R0014 Amendment 001 SF30 08_16_2022.pdf PDF
Attachment G - 2023 Model Year Estimated Quantities.xlsx XLSX spreadsheet
Attachment Q - AutoChoice Online Ordering Instructions.pdf PDF
Attachment M2 - Supplemental Weekly Vendor Status Reports Template.xlsx XLSX spreadsheet
Attachment P - AutoBid Vendor Instructions.pdf PDF
Attachment R1 - UltraMod Instructions.pdf PDF
Attachment D1 - Technical Proposal Template.docx DOCX document
Attachment H1 - Optional Equipment Analysis.pdf PDF
Attachment E3 - Option MBC Description.pdf PDF
Attachment I - 888E Proposal Template.xlsx XLSX spreadsheet
Attachment B - SF1449.pdf PDF
Attachment E1 - Federal Vehicle Standard 307BB.pdf PDF
Attachment J - NMY Cut-off Date Pricing Template.xlsx XLSX spreadsheet
Attachment F2 - Schedule of Items - FCA US LLC.pdf PDF
Attachment L - Weekly Contractor Status Reports Submission Requirements.docx DOCX document
Attachment K3 - DIT Process for 2023 Light Duty Trucks Solicitation (Leasing).docx DOCX document
Attachment R2 - UltraMod Worksheet.pdf PDF
Attachment D2 - Technical Exceptions Worksheet.xlsx XLSX spreadsheet
Attachment F4 - Schedule of Items - General Motors.pdf PDF
Attachment K2 - DIT Claim Form Template (Purchasing).pdf PDF
Attachment E2 - Option CF52 Description.pdf PDF
Attachment F1 - Schedule of Items - Daimler Trucks North America.pdf PDF
Attachment N1 - Introduction to FedConnect.pdf PDF
Attachment E5 - Option MSTL Description.pdf PDF
Attachment F3 - Schedule of Items - Ford.pdf PDF
Attachment F5 - Schedule of Items - 888E.pdf PDF
Attachment A - Proposal Checklist.docx DOCX document
Attachment N2 - FedConnect Ready Set Go Guide.pdf PDF
Attachment S - Full Text of Clauses Incorporated by Reference (IBR).pdf PDF
Attachment N3 - FedConnect Vendor Reference Guide.pdf PDF
Attachment O - Inspection Points Template.xlsx XLSX spreadsheet
Attachment E4 - Option MCTL Description.pdf PDF
Attachment H2 - Optional Equipment Combination Analysis.pdf PDF
Attachment M1 - Weekly Contractor Status Reports EXAMPLE.xlsx XLSX spreadsheet
Attachment E6 - Option MTTP Description.pdf PDF
47QMCA22R0014 Solicitation Document 07_15_2022.pdf PDF
Attachment C - Offeror Response Document.docx DOCX document
Attachment K1 - DIT Claim Form Template (Leasing).pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchased Vehicles Damage in Transit Claim Submission Step-by-Step Instructions

The following instructions are in accordance with vehicle supplier required information and documentation submissions necessary to file a claim for Damage in Transit (DIT). The following instructions only apply to Agency Owned Vehicles purchased through GSA Fleet. Follow the steps below to file your DIT claim:

1. If a vehicle is delivered damaged:

a. Within 24 hours of identifying DIT, contact GSA Fleet at vehicle.claims@gsa.gov. We will send you the link to the claim form. If you are unable to access the form we can send you an excel version.

i. Please note that you must submit the notated Bill of Lading (BOL)/delivery receipt and photographs of the damages with your initial claims notification.

b. Obtain a signed Bill of Lading (BOL)/delivery receipt from the delivery driver with all damages notated prior to the driver’s departure. This is a critical document for claim submission.

c. Electronic versions of BOLs/delivery receipts are acceptable. Make sure you receive a link to the carrier’s website and/or an email of the BOL.

d. If BOL/delivery receipt is unavailable, include an explanation on the DIT form submission.

e. Consignor locations are required to accept the vehicle even if it is damaged.

2. Document location and type of damage using the Industry Standardized Damage Codes on the Bill of Lading and on the Claims Submission Form.

a. See Appendix A for the codes.

b. Take photographs that clearly show damage and its location.

i. You must also include a photograph of the VIN Plate/Sticker.

c. The standardized damage codes matrix are already loaded into the google submission form.

3. You will need the following information to complete a DIT report:

a. Your name, your email address, and your phone number.

b. Consignee (Customer) Point of Contact’s Name, email address, and phone number.

c. Name of person who received the vehicle.

d. Agency & Bureau Name.

e. Address where vehicle was received, and receipt location POC’s Name, email address, and phone number.

f. Name of Vehicle Supplier/Vehicle Brand, i.e. Chevy, Ford, Ram, Hyundai, etc.

g. RPN/Order Number

h. Full VIN.

i. Name of Agency Fleet Manager and Agency Fleet Manager’s email address and phone number.

j. Date received.

k. Delivered during normal business hours (Y/N)?

l. Date damage was noticed.

m. Was the vehicle accepted or rejected at delivery?

n. Current Location Address of Vehicle.

o. Name of Transportation Company.

p. Name of Transportation Driver (when available, enter N/A if unknown).

q. Description of Damage.

r. Select Damage Codes

s. Name of Preferred Dealership & Contact Information for Preferred Dealership.

t. Attachments: Photos (to include photo of VIN plate/sticker), Signed Bill of Lading/delivery receipt (or explanation of missing BOL/delivery receipt).

i. Photos and all files must be labeled with RPN and the last 8 of VIN like this: ON655-LR234842_1, ON655-LR234842_2, ON655-LR234842_3, etc.

u. Additional Information (if applicable).

v. Certification Statement.

4. DIT reports must be submitted in accordance with:

a. Use the Google Claim Reporting Form link provided by GSA Fleet to file your Claims Package. Your completed Claims Package must be received by no later than 12:00 PM Eastern Time on the 3rd Business Day following receipt of the damaged vehicle.

b. To submit the DIT report you are required to utilize a Government e-mail Address.

i. Customers who are unable to use the Google Form must e-mail vehicle.claims@gsa.gov to request a one-time exemption from using the Google Form. GSA Fleet will then provide the Customer with an Excel spreadsheet to complete in place of the Google Form. Customers must complete the Excel Spreadsheet and submit it to vehicle.claims@gsa.gov with all necessary attachments. Customers must request to use the Excel Spreadsheet for each individual claim prior to submitting their claim for each individual instance. Customers must CC their Fleet Manager on all email communications with GSA Fleet.

c. GSA Fleet will assist with any questions regarding the submission of the DIT Report.

d. It is the responsibility of the submitter to ensure that their claim is complete and accurate. GSA Fleet will send the claim to the manufacturer exactly as submitted. GSA Fleet may report repeated instances of incomplete/inaccurate claims submissions, especially those causing claims denials, to the respective interested parties.

5. Once you have submitted the DIT Claims Form:

a. GSA Fleet will send the claim to the Vehicle Supplier for adjudication.

b. GSA Fleet will use your RPN & VIN to serve as a reference for your claim.

c. GSA Fleet will obtain status updates at 7 calendar day intervals following your submission of your claims package, and will provide updates on your claim's adjudication status upon written request.

d. Per contract terms, claim resolution terms will consist of either approval (repair or replace, depending on the specific circumstances of your claim) or denial. No concessions will be applicable, and there shall be no appeals.

e. Under the contract, all claims shall be fully adjudicated within 21 calendar days following the submission of your claims package to the vehicle supplier.

f. GSA Fleet will assist customer agencies to ensure that resolution terms are fulfilled within a timely manner.

For additional information and training on this process, or if you have any questions or concerns, please email GSA Fleet at vehicle.claims@gsa.gov. Thank you!

APPENDIX A

Industry Standardized Damage Code Reference Guide image1.png

File details come from the government source that posted it. Updated .