47QMCA22R0014 Amendment 001 SF30 08_16_2022.pdf

PDF 607 KB Posted

Attached to
2023 Light Duty Vocational Trucks
Solicitation number
47QMCA22R0014
Issued by

About this file

This document is an amendment to a solicitation for the 2023 Light Duty Vocational Trucks contract. The amendment provides answers to questions submitted in response to the draft solicitation, and adjusts the solicitation schedule by moving the final solicitation release date to September 13, 2022, pre-proposal conference to September 20, 2022, AutoBid closing to October 13, 2022 at 3:00 PM EST, and electronic proposal due date to October 14, 2022 at 12:00 PM EST. The amendment clarifies that the General Services Administration (GSA) will conduct two open seasons per year to allow contractors flexibility in revising pricing for new models and to eliminate manual pricing submissions. It addresses how new offerors may participate during open seasons and compete for previously awarded items, and defines who is considered a new offeror.

View the file

Other files

File Type Posted
47QMCA22R0014 Amendment 0004 SF30 09_30_2022.pdf PDF
47QMCA22R0014 Amendment 003 SF30 09_21_2022.pdf PDF
47QMCA22R0014 Pre-Proposal Conference slides 09_20_2022.pptx PPTX presentation
47QMCA22R0014 Solicitation Document 09_13_2022.pdf PDF
Attachment A - Proposal Checklist.docx DOCX document
47QMCA22R0014 Amendment 002 SF30 09_13_2022.pdf PDF
Attachment B - SF1449.pdf PDF
Attachment G - 2023 Model Year Estimated Quantities.xlsx XLSX spreadsheet
Attachment Q - AutoChoice Online Ordering Instructions.pdf PDF
Attachment M2 - Supplemental Weekly Vendor Status Reports Template.xlsx XLSX spreadsheet
Attachment P - AutoBid Vendor Instructions.pdf PDF
Attachment R1 - UltraMod Instructions.pdf PDF
Attachment D1 - Technical Proposal Template.docx DOCX document
Attachment H1 - Optional Equipment Analysis.pdf PDF
Attachment E3 - Option MBC Description.pdf PDF
Attachment I - 888E Proposal Template.xlsx XLSX spreadsheet
Attachment B - SF1449.pdf PDF
Attachment E1 - Federal Vehicle Standard 307BB.pdf PDF
Attachment J - NMY Cut-off Date Pricing Template.xlsx XLSX spreadsheet
Attachment F2 - Schedule of Items - FCA US LLC.pdf PDF
Attachment L - Weekly Contractor Status Reports Submission Requirements.docx DOCX document
Attachment K3 - DIT Process for 2023 Light Duty Trucks Solicitation (Leasing).docx DOCX document
Attachment R2 - UltraMod Worksheet.pdf PDF
Attachment D2 - Technical Exceptions Worksheet.xlsx XLSX spreadsheet
Attachment F4 - Schedule of Items - General Motors.pdf PDF
Attachment K2 - DIT Claim Form Template (Purchasing).pdf PDF
Attachment E2 - Option CF52 Description.pdf PDF
Attachment F1 - Schedule of Items - Daimler Trucks North America.pdf PDF
Attachment N1 - Introduction to FedConnect.pdf PDF
Attachment E5 - Option MSTL Description.pdf PDF
Attachment F3 - Schedule of Items - Ford.pdf PDF
Attachment F5 - Schedule of Items - 888E.pdf PDF
Attachment A - Proposal Checklist.docx DOCX document
Attachment N2 - FedConnect Ready Set Go Guide.pdf PDF
Attachment S - Full Text of Clauses Incorporated by Reference (IBR).pdf PDF
Attachment K4 - DIT Process for 2023 Light Duty Vocational Solicitation (Purchasing).docx DOCX document
Attachment N3 - FedConnect Vendor Reference Guide.pdf PDF
Attachment O - Inspection Points Template.xlsx XLSX spreadsheet
Attachment E4 - Option MCTL Description.pdf PDF
Attachment H2 - Optional Equipment Combination Analysis.pdf PDF
Attachment M1 - Weekly Contractor Status Reports EXAMPLE.xlsx XLSX spreadsheet
Attachment E6 - Option MTTP Description.pdf PDF
47QMCA22R0014 Solicitation Document 07_15_2022.pdf PDF
Attachment C - Offeror Response Document.docx DOCX document
Attachment K1 - DIT Claim Form Template (Leasing).pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

47QMCA22R0014

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 20405 Wing 3200

LIGHT_VEHICLES

1800 F Street, NW US General Services Administration Center for Vehicle Acquisition Light Vehicles Acquisition Support

08/16/20220001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/18/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Program: 2023 Light Duty Vocational Trucks

The above referenced solicitation 47QMCA22R0014 is amended as follows:

1) Provide Questions and Answers as submitted in response to the Draft RFP.

Period of Performance: 12/19/2022 to 12/18/2027

The POC for this amendment is James Santini at james.santini@gsa.gov. All other terms and conditions remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

James D. Santini

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Q1: OEM has confirmed 2023 specifications and pricing will be delayed. Will the submission dates be revised?

A1: The revised solicitation schedule is as follows:

ITEM DATE

Final Solicitation Released Tuesday, September 13, 2022

Pre-Proposal Conference Tuesday, September 20, 2022

AutoBid Closing Thursday, October 13, 2022 @3:00PM EST

Electronic Proposal Due Friday, October 14, 2022 @12:00PM EST

Q2: Has clause 52.219-4 been used and/or factored in for previous awards on this contract?

A2: Yes, clause 52.219-4 has been in past solicitations but has never been factored in for previous awards because there were no offerors identified from this small business classification.

Q3: Why was the Open Season included in this solicitation?

A3: The Open Season concept materialized over the past 18 months in response to the unprecedented turmoil across the automotive landscape, specifically volatile shifts in the supply chain that have greatly impacted contractors’ existing pricing structures. The two Open Season periods allow a contractor the ability to revise its pricing more frequently to alleviate some of the negative pricing exposure when unforeseen circumstances negatively impact the market.

Additionally, the Open Season periods will allow contractors the ability to offer new models and will eliminate the more tedious manual pricing submissions by utilizing AutoBid (electronic) for each Open Season submission.

Q4: Will the Open Season dates be the same for every contractor?

A4: Yes, all contractors will use the same AutoBid period for Open Season submissions, which ensures fair treatment of competitive pricing submissions. The dates for the Open Season will generally be confined to the Spring/Fall time periods but are deliberately not set too far in advance to maintain the flexibility to adapt to the market environment.

Q5: What should contractors do if they do not have all the specifications and information for the next model year of a particular vehicle at the time of an Open Season?

A5: If most specifications and pricing information is known, contractors may enter TBD for any pending details and work with the contracting team and GSA Engineering to provide the missing information after the open season closing date. If pricing is not known by the time that the open season closes, contractors should wait until the next open season period for that particular line item. There will be two (2) open seasons per fiscal year to afford contractors the flexibility to provide vehicle updates according to differing production schedules.

Q6: Will new offerors be able to “swoop in” and steal previously awarded items from contractors during the Open Season periods?

A6: Yes and No. New offerors can introduce price competition for awarded models ONLY for the next model year offering, and ONLY if the current awardee raises the price. The new offeror can ONLY be awarded the item if they are the LPTA bid. Please note if a new offeror did not submit a proposal that was found to be technically acceptable during the solicitation process, they will still be required to do so before they can be considered for an award during an Open Season period.

Q7: Who is considered a “New Offeror” in relation to the Open Season period.

A7: A “New Offeror” is any contractor that has not been awarded the particular line item(s) in question. This could be a current GSA contract holder with other line items or a contractor who has never worked with GSA. As noted in Question 6, if a new offeror did not submit a proposal that was found to be technically acceptable during THIS PARTICULAR solicitation process, they will still be required to do so before they can be considered for an award during an Open Season period.

Q8: Will a contractor be required to submit a Monthly Status Report?

A8: No, a contractor will only be required to submit a weekly status report (attachment M1) and a supplemental weekly status report (attachment M2).

Q9: How does the Price Reduction Clause (Section C.18) work?

A9: In essence, a contractor can reduce its current price on any line item at any time during the life of the contract. If that situation does arise, all other contract holders of that line item will be notified that a reduction as occurred and will have five business days to respond.

Q10: Can the following language from the Fed Standard (307BB 3.3.4 Drive Hubs, Front Wheels) "engaged from the cab" be removed from paragraph 3.3.4?

A10: An exception can be taken to the text in 3.3.4, which will be accepted if a clarification for each item concerned is entered.

Q11: Can an exception be taken to section 3V.6.25 of the Federal Standard 307BB, to be able to offer the front wall made of a plate material?

A11: An offeror is free to offer the optional body construction specified in 3V.6.25 CODE “VBC” COMPOSITE DELIVERY VAN BODY as standard if they choose to do so. No changes to the standard are needed.

Q12: Can the Federal Standard 3V.5.4 PAINT, FINISH AND COLOR, be revised to revert to the previous “Standard Commercial Practice” and the elimination of the “virtually free of all defects” language?

A12: The current 3V.5.4 language is the result of an extensive effort between the Purchasing Director and the Quality Assurance Branch Chief to ensure there is consistency across the board in meeting the expectations of our customers. No exceptions will be granted to this requirement.

47QMCA22R0014 Amendment 001 SF30 08_16_2022
47QMCA22R0014 CALM Posting Amendment 0001 08_16_2022

File details come from the government source that posted it. Updated .