Attachment J.3a - Drawings -River Gee.pdf
PDF 2 MB Posted
- Attached to
- Rehabilitation of Two (2) Pharmaceutical Depots/Warehouses in Grand Gedeh and River Gee Counties
- Solicitation number
- 72066924Q00002-Rehabilitation-HealthDepots
About this file
This document is a set of architectural and engineering drawings for the renovation and construction of medical storage facilities in River Gee County, Liberia. The drawings provide detailed specifications for the project, including floor plans, elevations, roof framing, plumbing, electrical, and HVAC systems. The drawings are part of a larger federal contract opportunity issued by USAID/Liberia to rehabilitate two pharmaceutical depots/warehouses in Grand Gedeh and River Gee Counties. The project aims to address infrastructure defects and ensure proper storage of vital medicines and supplies. The solicitation number is 72066924Q00002-Rehabilitation-HealthDepots, and the anticipated contract type is unspecified. The document does not provide pricing terms, set asides, or details on the incumbent contractor.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPUBLIC OF LIBERIA
UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT
RENOVATION AND CONSTRUCTION OF
MEDICAL STORAGE FACILITIES
River Gee
Volume I - Drawings
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
July 2023
SYMBOLS AND ABBREVIATIONS
C - CIVIL
DIA. - DIAMETER
H - HEIGHT
IN. - INCH
L - LENGTH
LPP - LIGHTING & POWER PANEL
M - METER
MAX - MAXIMUM
MH - MANHOLE
MIN - MINIMUM
MM - MILLIMETER
OD - OUTSIDE DIAMETER
PV - PHOTOVOLTAIC
SQ - SQUARE
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
W - WIDTH
Ø - DIAMETER
CIVIL NOTES
GENERAL NOTES
1. GENERAL SITE NOTES APPLY TO ALL DRAWINGS
2. IN CASE OF CONFLICTS IN THE CONSTRUCTION DOCUMENTS, THE
CONTRACTOR SHOULD CONTACT THE DESIGN ENGINEER FOR
CORRECTIONS / INTERPRETATIONS
3. ALL SITE PLAN DIMENSIONS ARE IN IMPERIAL DIMENSIONS, UNLESS NOTED
ON THE DRAWINGS
4. THE CONTRACTOR SHALL FULLY COMPLY WITH ALL ZONING REGULATIONS
AND ALL ADDITIONAL LOCAL REGULATIONS REQUIREMENTS:
5. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY WORK
KNOWINGLY PERFORMED CONTRARY TO SUCH LAWS, ORDINANCES, OR
REGULATIONS THE CONTRACTOR SHALL ALSO PERFORM COORDINATION
WITH ALL UTILITIES AND STATE SERVICE AUTHORITIES.
6. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS THE GENERAL CONTRACTOR SHALL VERIFY
AND IS RESPONSIBLE FOR ALL DIMENSIONS (INCLUDING ROUGH OPENINGS)
AND CONDITIONS ON THE JOB AND MUST NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THESE DRAWINGS.
7. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER FUNCTION OF
PLUMBING AND ELECTRICAL SYSTEMS. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER WITH ANY PLAN CHANGES REQUIRED FOR DESIGN AND
FUNCTION OF PLUMBING, HVAC AND ELECTRICAL SYSTEMS.
8. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS
AND METHODS, ACTS OR OMISSIONS OF THE CONTRACTOR, OR FAILURE OF
ANY OF THEM TO CARRY OUT WORK IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS, TECHNICAL SPECS AND DEFECT
DISCOVERED IN THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO
THE ATTENTION OF THE ENGINEER BY WRITTEN NOTICE BEFORE
PROCEEDING WITH WORK. REASONABLE TIME NOT ALLOWED THE
ENGINEER TO CORRECT THE DEFECT SHALL PLACE THE BURDEN OF COST
AND LIABILITY FROM SUCH DEFECT UPON THE CLIENT OR CONTRACTOR.
9. ALL MATERIALS AND CONSTRUCTION PRACTICE SHALL MEET THE
PERFORMANCE REQUIREMENT OF THE ENGINEER, WHERE AN ALTERNATIVE
SOLUTION IS PROPOSED, AND PRIOR TO IMPLANTATIONS OR
INSTALLATIONS.
10. THE CONTRACTOR SHALL COORDINATE ALL (HVAC, PLUMBING, ELECTRICAL,
STRUCTURAL, AND ARCHITECTURAL DRAWINGS) AND REPORT
DISCREPANCIES, IF ANY, SHALL BE BROUGHT TO NOTICE OF THE ENGINEER
PRIOR TO EXECUTION OF WORK.
11. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LEVELS, TECHNICAL
SPECIFICATIONS AND ALL OTHER RELEVANT DOCUMENTATION PRIOR TO
THE COMMENCEMENT OF ANY WORKS AND SHALL REPORT ANY
DISCREPANCIES TO THE ENGINEER FOR CLARIFICATION.
12. THE CONTRACTOR SHALL CONDUCT HIS OWN SITE SURVEY OF THE
EXISTING WORK TO BE CARRIED OUT AND REPORT ACTUAL ELEVATION
(LEVELS) TO THE ENGINEER FOR CLARIFICATION AND VERIFICATION.
13. ALL WALL FINISHES OR CEMENT PLASTERING WORKS ARE TO BE EXTENDED
8 INCHES ABOVE SUSPENDED CEILING LEVEL OR AS INDICATED.
14. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT SYSTEMS AND
MATERIALS ARE TO BE REVIEWED, COORDINATED AND ARE TO BE APPLIED
TO ALL RELATED DRAWINGS AND DETAILS.
15. CONTRACTOR TO LOCATE ALL ACCESS WAY IN THE CEILING INSTALLATION
FOR SERVICES ACCESS. (UNLESS NOTED OTHERWISE)
16. THE STRUCTURE SHALL BE ADEQUATELY BRACED FOR WIND LOADS UNTIL
THE ROOF, FLOOR AND WALLS HAVE BEEN PERMANENTLY FRAMED
TOGETHER AND SHEATHED.
17. THESE DOCUMENT HAVE BEEN PRODUCED IN HARD FORMAT FOR USE BY
THE CONSTRUCTION CONTRACTOR. IF THERE ARE ANY QUESTIONS OR
DISCREPANCIES BETWEEN THESE DOCUMENTS AND COPIES MADE FROM
AN ELECTRONIC FILES, THE HARD COPY DOCUMENTS WILL TAKE
PRECEDENCE. USAID WILL NOT BE RESPONSIBLE FOR ANY VERSIONS OF
THESE DOCUMENTS PRINTED FROM THE ELECTRONIC FIELD BY OTHERS.
LIST OF SHEETS
GEN-001 - GENERAL NOTES
ARC-101 - EXISTING FLOOR PLAN
ARC-102 - PROPOSED FLOOR PLAN
ARC-103 - FRONT & REAR ELEVATIONS
ARC-104 - RIGHT & LEFT ELEVATIONS
ARC-105 - PROPOSED SHELF LAYOUT PLAN
ARC-106 - PROPOSED SHELF DETAILS
ARC-107 - DOORS & WINDOWS SCHEDULE
ARC-108 - REFLECTED CEILING PLAN
ARC-109 - ROOF SHEETING FLOOR PLAN
ARC-110 - ROOF FRAMING FLOOR PLAN
ARC-111 - TRUSS AND ROOF DETAILS
STR-201 - TURN DOWN SLAB AND LINTEL DETAILS
STR-202 - CMU WALL DETAILS
STR-203 - COLUMN AND BEAM BENDING SCHEDULE
ELE-301 - ELECTRICAL LIGHTING PLAN
ELE-302 - ELECTRICAL POWER PLAN
ELE-303 - ELECTRICAL RISER DIAGRAM
ELE-304 - ELECTRICAL CABLE SCHEDULE
MEC-401- AIR CONDITIONING PLAN
18. ALL DIMENSIONS, COORDINATES AND CONDITIONS MUST BE VERIFIED BY
THE CONTRACTORS IN THE FIELD AND ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING
WITH THE AFFECTED PORTION OF THE WORK.
19. ALL BUILDING LAYOUT DIMENSIONS ARE TO THE OUTSIDE EDGE OF THE
BUILDING WALL
20. EXISTING BENCHMARK AND CONTROL ARE TO REMAIN UNDISTURBED
DURING DEMOLITION AND CONSTRUCTION.
21. THESE DOCUMENT HAVE BEEN PRODUCED IN HARD FORMAT FOR USE BY
THE CONSTRUCTION CONTRACTOR. IF THERE ARE ANY QUESTIONS OR
DISCREPANCIES BETWEEN THESE DOCUMENTS AND COPIES MADE FROM
AN ELECTRONIC FILES, THE HARD COPY DOCUMENTS WILL TAKE
PRECEDENCE. USAID WILL NOT BE RESPONSIBLE FOR ANY VERSIONS OF
THESE DOCUMENTS PRINTED FROM THE ELECTRONIC FIELD BY OTHERS.
DESIGN CRITERIA AND STANDARDS:
THE GENERAL CONTRACTOR SHALL FULLY COMPLY WITH THE LISTED CODES
AND ALL ADDITIONAL LOCAL CODE REQUIREMENTS:
1. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE( ACI 318-14)
2. BUILDING CODE REQUIREMENTS & SPECIFICATIONS FOR MASONRY
STRUCTURES 2011 EDITION.
3. INTERNATIONAL BUILDING CODE 2012 EDITION.
LOADS
LIVE LOAD = 100 PSF
MEDICAL LOAD (EST.) = 120 PSF
SOIL UNIT WEIGHT = 100 PCF
STRUCTURAL CONCRETE
CONCRETE STRENGTH = 4000 PSI (FOR ALL STRUCTURES)
CONCRETE STRENGTH = 4000PSI (FOR COLUMNS)
CONCRETE STRENGTH = 2000 PSI (FOR LEAN CONCRETE)
CONCRETE UNIT WEIGHT = 150 PCF
STRUCTURAL STEEL
STEEL STRENGTH = 60,000 PSI
STEEL UNIT WEIGHT = 490 PCF
REINFORCED CONCRETE:
UNLESS INDICATED OTHERWISE, ALL CONCRETE SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF 4000PSI AT 28 DAYS. CEMENT TO BE USED
IS 42.5R PORTLAND CEMENT OR BETTER.
MINIMUM CONCRETE COVER STEEL SHALL BE PER CORD. AND FOR REBAR
EXPOSED TO SOIL CONCRETE COVER MUST BE 3INCH. ALL OTHERS - SEE
DESIGN AND CODE
ALL REINFORCEMENT STEEL SHALL HAVE A MINIMUM YIELD STRENGTH OF
60,000PSI.
USAID:LIBERIA A&E IDIQ TASK ORDER 2 SUBTASK 3
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
GEN - 001
SHEET TITLE.
SHEET NO.
RIVER GEE
GENERAL NOTESGENERAL NOTES
DN
Elect.
Office
Office
EPI
Dry Store Room
Lobby
W/C
Medical Store
Non Medical Store
+26''
+18''
+0''
+18''
+18''
+26''
+26''
+26'' +26''
+26''
4'- 3"
6'- 0"
6'- 4"
6'- 0"
6'- 0"
6'- 0"
5'- 6"
6'- 0"
6'- 3"
'-4
1'-
6"
6"
'-4
6"
'-4
6"
'-2
4'-9"6'-0"7'-6"6'-0"8'-10"6'-0"7'-5"2'-0"7'-3"6'-0"8'-10"3'-2"1'-9"
6"43'-10"6"5'-2"6"24'-5"6"
75'-5"
2'- 6"
6'- 0"
7'- 4"
6'- 0"
8'- 4"
2'- 0"
8'- 4"
6'- 0"
9'- 3"
6'- 0"
4'- 5"
6"
'-0
6"
'-8
6" 8'-
0" 6"
'-8
6"
'-1
0" 6"
'-2
14'-2"6'-0"12'-8"6'-0"25'-1"6'-0"5'-6"
6"49'-6"6"24'-5"6"
75'-5"
43'-10"
'-4
21'-0" 4'-7" 24'-0"
49'-6"
6'-
'-0
3'- 7"
'-0
24'-5"
'-0
7'-11"16'-0"
'-8
10'-2"
8'- 0"
16'-0"
'-8
16'-0"
'-1
0"
49'-6"
'-4
5'-8"
D
D
D
D
D
D
D
D
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC-101
SHEET TITLE.
SHEET NO.
RIVER GEE
EXISTING FLOOR PLANEXISTING FLOOR PLAN
FR
O
N T
(P
ER
E
LE
VA
TI
O N
S)
DN
Office
Office
EPI
Dry Store Room
Lobby
W/C
Non Medical Store
+26''
+18''
+18''
+18''
+26''
+26''
+26'' +26''
+26''
4'-9"6'-0"7'-6"6'-0"8'-10"6'-0"7'-5"2'-0"7'-3"6'-0"8'-10"3'-2"1'-9"
6"43'-10"6"5'-2"6"24'-5"6"
75'-5"
2'- 6"
6'- 0"
7'- 4"
6'- 0"
8'- 4"
2'- 0"
8'- 4"
6'- 0"
9'- 3"
6'- 0"
4'- 5"
6"
'-0
6"
'-8
6" 8'-
0" 6"
'-8
6"
'-1
0" 6"
'-2
14'-2"6'-0"12'-8"6'-0"25'-1"6'-0"5'-6"
6"49'-6"6"24'-5"6"
83'-5"
43'-10"
'-4
49'-6"
49'-6"
'-4
'-6
3'- 7"
'-0
24'-5"
'-0
7'-11"16'-0"
'-8
10'-2"
8'- 0"
16'-0"
'-8
16'-0"
'-1
0"
39'-6"
'-4
5'-8"
D
D
D
D
D
D
D
D
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
D
Concrete pad for main entrance
9'-6"
Elect.
6'-
0"
D
8'-0"
8'-0"
8'-0"
EXISTING 6'' CMU WALL
NEW WALL 6'' CMU WALL
AA
Receiving Station
Toilet
D
W
5'- 2"
5'- 0"
5'- 2"
4'- 9"
6'- 0"
5'- 6"
'-0
6'-
0" 6'-
4" 6'-
0" 4'-
3"
6"
'-4
6"
'-4
6"
'-2
Medical Store
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 102
SHEET TITLE.
SHEET NO.
RIVER GEE
PROPOSED FLOOR PLANPROPOSED FLOOR PLAN
FR
O
N T
(P
ER
E
LE
VA
TI
O N
S)
FRONT ELEVATION
REAR ELEVATION
GL
GL
'-3
9'-
9"
'-3
9'- 9"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 103
SHEET TITLE.
SHEET NO.
RIVER GEE
FRONT & REAR ELEVATIONS
JULY 25, 2023
FRONT AND REAR ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
GL
GL
'-3
9'-
9"
'-3
9'- 9"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 104
SHEET TITLE.
SHEET NO.
RIVER GEE
RIGHT & LEFT ELEVATIONS
RIGHT & LEFT ELEVATIONS
METAL STEEL SHELF COMPLETE
WITH #5 BAR ANCHOR BOLTS
#5 Ø Anchor Bolts, 5'' into existing slab
0.5'' Thick Steel Plate
Existing Floor Slab
8''
8''
1.5mm Metal Steel Plate
1.5mm Metal Steel Plate
1.5mm Metal Steel Plate
2'- 6''
2'- 6''
2'- 6''
5''
8'-
1'- 4''
7'-7''
NOTES:
Height of Rack/Shelf 2.7m (8.83 ft) Horizontal Beam Length 2..3m (7.48 ft) Depth of Rack/Shelf 0.9m (2.5 ft) Number of levels 3.0 levels (ground plus two levels with panels) Max Capacity per level 1.1 tons
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 106
SHEET TITLE.
SHEET NO.
RIVER GEE
SHELVES DETAILS
PROPOSED SHELF DETAILS
HEIGHT
6'-0''
NO. TYPE
DOOR DIMENSION
WIDTH
QTY. DESCRIPTION
W1
W2 2'-0''
4'- 0'' 13
6mm thk. bronze alum. sliding glass window panels
WINDOWS SCHEDULE
2'- 0''
TOTAL 17
NO. TYPE
DOOR DIMENSION
WIDTH HEIGHT
QTY. DESCRIPTION
2 D2 3'-7'' 7'-0'' 1
DOORS SCHEDULE
7'- 0''
2'-6"
WINDOW SCHEDULE
DOOR SCHEDULE
3 D3 5'-0'' 7'-0'' PANEL DOOR
TOTAL 12
4'-
0''
6'-0"
6'-0''3 W3 4'- 0'' 2
6mm thk. bronze alum. sliding glass window panels
BREEZE BLOCK
5'-0"
7'- 0''
1 D1 3'-0'' 7'-0'' 5
4'- 0''
6'-0"2'-0"
2'- 0''
7'- 0''
3'-7" 7'-
0'' 3'-0"
PANEL DOOR
PANEL DOOR
34 D4 2'-6'' 7'-0'' PLYWOOD DOOR
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 107
SHEET TITLE.
SHEET NO.
RIVER GEE
DOORS & WINDOWS SCHEDULE
DOOR AND WINDOW SCHEDULE
Roof Line Designed Plywood nailed on 2" STU. @4' o/c
2''x4'' H.W Cover strip
2''x2'' ceiling joists ceiling joists braces
PLYWOOD PANEL DETAILA
3/8'' plywood ceiling
Corner strip
2''x2'' ceiling joists wall
PLYWOOD PANEL DETAILB
P
P
PP P
P P
P P
P
P
P
P
P
P
P
B
BB
B
C
BB
A
A A
A
A
A
C
C
C
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 108
SHEET TITLE.
SHEET NO.
RIVER GEE
REFLECTED CEILING PLAN
REFLECTED CEILING PLAN
81'-5"
Aluminum Alloy, corrugated, 28-gauge
SLOPESLOPE
SLOPESLOPE36
'-1
81'-5"
'-1
'-2
Aluminum Alloy, corrugated, 28-gauge
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 109
SHEET TITLE.
SHEET NO.
RIVER GEE
ROOF SHEETING PLAN
ROOF SHEETING FLOOR PLAN
81'-5"
'-1
Aluminum Alloy, corrugated, 28-gauge
SLOPESLOPE
SLOPESLOPE
2" x 4" Rafter @ 3' O/C
2" x 2" Purlin @ 3' O/C
2" x 6" Ridge Board
81'-5"
'-1
'-2
Aluminum Alloy, corrugated, 28-gauge
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 110
SHEET TITLE.
SHEET NO.
RIVER GEE
ROOF FRAMING PLAN
ROOF FRAMING FLOOR PLAN
6"x 9" thick reinforced tie beam
28 gauge Aluminum Roofing Sheet
2"x2" wooden ceiling noggings @ 4' on center
3/8''plywood ceiling
4 No.-1/2'' diameter steel bars in tie beam
2" x 4" wooden rafters in truss @3' on center
2"x 2" wooden purlins in truss @ 3' on center
2"x4" wooden braceszing cummings
ENLARGED TRUSS DETAIL
2"X6" wooden wallplate
2"X 6"wedge in wooden truss
2"X4" rafters in truss @ 4' on center
RAFTER/WEDGE DETAILS
TYPICAL DETAIL @ EAVES
DETAIL @ KINGPOST
2"x2" wooden purlins @ 3' on center 2"x2"wooden ceiling noggings @ 4' on center
6" Masonry sandcrete blocks in superstructure wall
6" x 9" thick reinforced tie beam
2'x6" wall plate
4 No.-1/2'' diameter steel bars in tie beam
1/4 hardboard ceiling
5/8'' diameter anchor bolts
1/4 hardboard ceiling
DETAIL @ RIDGE
2"X6" wooden kingpost in truss @4' on center
2"X4" wooden braces in truss
4" hardboard ceiling
2"x6' bottom cords 2"x2" wooden ceiling noggings @ 4' on center
2"x2" wooden purlins @3' on center
Roof cap 2"x4"wooden rafters
@ 3' on center
CL
2"X6" wooden kingpost
ROOFING DETAILS
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ARC - 111
SHEET TITLE.
SHEET NO.
RIVER GEE
ROOF DETAILS
JULY 25, 2023
TRUSS AND ROOF DETAILS
AutoCAD SHX Text
CL
4''
6'' 6''
1'-0''
1'- 2'' 1'-
6''
#4 Bars @12'' o/c with Grout in New 6'' (CMU) Block.
3 - #4 Bars @ 3'' o/c
Existing Floor Slab
METHOD:
· Saw cut the existing slab to a depth of 1'-6'' from the top of existing slab and excavate depth to 2'-0'' (max)
· Clean and remove all foreign materials
· Compact the soil up to 98% compaction/Standard Proctor.
· Install 3-#4 bars @ 6'' o/c
· Pour concrete with 4000psi (C-25) strength
LINTEL DETAILS
A
A
4 - #4 Bars Straight
#3 Bars @ 12'' o/c
4 - #4 Bars Straight
#3 Bars @ 12'' o/c
SECTION @ A-A
#4 Bars @ 12'' o/c Bent
6''
6''
8''
6''
2'-10''
11'' 11''
PLAN VIEW
TURN-DOWN SLAB DETAILS
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
STR - 201
SHEET TITLE.
SHEET NO.
RIVER GEE
TURN DOWN SLAB & LINTEL DETAILS
TURN DOWN SLAB & LINTEL DETAILS
turn down slab
6''
8''
6''
16''
FILLED CMU BLOCK
Mortar
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
STR - 202
SHEET TITLE.
SHEET NO.
RIVER GEE
GROUTED WALL DETAILS
CMU WALL DETAILS
COLUMN & BEAMS BENDING SCHEDULE
DIAMETER LENGTH SHAPES
#3
#4
#4
20"
Varying Length
LOCATION
Lintel
Lintel / CMU wall
Turn Down Slab Footing
6''
58'' varies
6''
4''
6''
4''
12'' 11'' 11''
12''12''
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
STR - 203
SHEET TITLE.
SHEET NO.
RIVER GEE
COLUMN & BEAM BENDING SCHEDULE
COLUMN & BEAM BENDING SCHEDULE
Toilet
Office
EPI
Dry Store Room
Lobby
C O R R I D O R
Non Medical Store
Elect.
Receiving Station
DRUGS DEPOT
DRUGS DEPOT
S11
S11
S11
S11
S12 S11
S11
S11
S12
S12
S22
S22
S11
LEGEND
22W, 1500mm, 2360 Lumens, Linear Led Batten
14w, 900 Lumens, 325mm dia Surface mounted Led Luminaire
11w, 1100 Lumens, 431mm dia surface mounted Led Luminaire
1 gang, 1 way switch 10A/ 230V
1 gang 2 way switch 10A / 230V
2 gang 2 way switch 10A / 230V
S11
S12
S22
Distribution Panel Board
S12
2-1.5mm2 / 25mmØ
2C-1.5mm2 cable in 1x25mm UPVC conduit for Lights & switches
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ELE - 301
SHEET TITLE.
SHEET NO.
RIVER GEE
ELECTRICAL LIGHTING PLAN
RIVER GEE ELECTRICAL LIGHTING PLAN
Office
EPI
Dry Store Room
Lobby
C O R R I D O R
Non Medical Store
Elect.
Receiving Station
DRUGS DEPOT
DRUGS DEPOT
S11
LEGEND
2 gang, 230v, 16A 2-gang, 3-pin socket outlet
20A, DP Switch with pilot lamp A/C outlet (wall mounted A/C)
Distribution Panel Board
3C-4.0mm2 cable in 1x32mm UPVC conduit for A/C
3C - 2.5mm2 cable in 1x25mm UPVC conduit for Convenience Receptacles
2 2
NOTES:
1. ALL ELECTRICAL COMPONENTS
TO BE RATED FOR 50 HZ
ELECTRICITY
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ELE - 302
SHEET TITLE.
SHEET NO.
RIVER GEE
ELECTRICAL POWER PLAN
RIVER GEE ELECTRICAL POWER PLAN
A/C (3C - 4mm2)
A/C (3C - 4mm2)
A/C (3C - 4mm2)
Receptacle (3C - 2.5mm2)
Lights (2C - 1.5mm2)
SP
SP
SP
SP
SP
SP
20A
20A
20A
16A
16A
10A
A/C (3C - 4mm2)
A/C (3C - 4mm2)
A/C (3C - 4mm2)
Receptacle (3C - 2.5mm2)
Lights (2C - 1.5mm2)
SP
SP
SP
SP
SP
SP
20A
20A
20A
20A
16A
10A
63A
TPN
MCCB
1C - 16mm2 GROUND CABLE
4C - 25mm2 Cu PVC INSULATED CABLES
3 - 4mm2 / 32mmØ
2 - 1.5mm2 / 25mmØ
3 - 4mm2 / 32mmØ
2 - 1.5mm2 / 25mmØ
4 - 25mm2 / 50mmØ / Underground
3 - 4mm2 / 32mmØ
3 - 4mm2 / 32mmØ
3 - 4mm2 / 32mmØ
3 - 4mm2 / 32mmØ
A/C (3C - 4mm2) 3 - 4mm2 / 32mmØ
3 - 2.5mm2 / 25mmØ
Receptacle (3C - 2.5mm2) 3 - 2.5mm2 / 25mmØ
3 - 2.5mm2 / 25mmØ
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ELE - 303
SHEET TITLE.
SHEET NO.
RIVER GEE
ELECTRICAL RISER DIAGRAM
RIVER GEE ELECTRICAL RISER DIAGRAM
CABLE
SIZE (SI)
CABLE AREAS AND DIAMETERS
1.5mm2 1.38mm #16
DIAMETER EQUIVALENT
AWG
2.5mm2 1.79mm #12
4.0mm2 2.26mm #10
25mm2 5.64mm #2
16mm2 4.52mm #4
2C - 1.5mm2 25mmØ
NO. CABLE SIZE CONDUIT SIZE
3C - 2.5mm2 25mmØ
3C - 4.0mm2 32mmØ
4C - 25mm2 50mmØ
NOTE: ALL CABLES ARE COPPER AND PVC INSULATED
WITH MAXIMUM OPERATING TEMPERATURE @ 90°C
1.
2.
4.
3.
CABLE ARRANGEMENT IN CONDUIT
1C - 16mm2 16mmØ5.
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
72066922D00001
ELE - 304
SHEET TITLE.
SHEET NO.
RIVER GEE
ELECTRICAL CABLES SCHEDULE
ELECTRICAL CABLES SCHEDULE
Office
EPI
Dry Store Room
Non Medical Store
Elect.
Receiving Station
Drug Depot
LEGEND
Air Conditioner
A/C
A/ C
A/ C
A/ C
A/C A/
C A/
C A/
C
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
MEC - 401
SHEET TITLE.
SHEET NO.
AIR CONDITIONER PLAN
JULY 25, 2023
MECHANICAL EQUIPMENT SCHEDULE
TAG TYPE DESCRIPTION QUANTITY SIZE
1 Air Conditioner Wall mounted, 220 V GIBSON or equivalent
3 24,000 BTU/Hr
2 Air Conditioner Wall mounted, 220 V GIBSON or equivalent
1 12,000 BTU/Hr
3 Air Conditioner Window mounted, 220 V GIBSON or equivalent
3 9,000 BTU/Hr
AIR CONDITIONER PLAN
| Sheets and Views |
| RIVER GEE_rev structural-COVER |
| RIVER GEE_rev structural-001 GENERAL NOTE |
| RIVER GEE_rev structural-1.0 EXISTING FLOOR PLAN |
| RIVER GEE_rev structural-1.1 PROPOSED FLOOR PLAN |
| RIVER GEE_rev structural-2.0 FRONT & REAR ELEVATIONS |
| RIVER GEE_rev structural-2.1 RIGHT & LEFT ELEVATIONS |
| RIVER GEE_rev structural-3.0 PROPOSED SHELVES LAYOUT PLAN |
| RIVER GEE_rev structural-3.1 PROPOSED SHELVES DETAILS |
| RIVER GEE_rev structural-4.0 DOORS & WINDOWS SCHEDULE |
| RIVER GEE_rev structural-5.0 REFLECTED CEILING PLAN |
| RIVER GEE_rev structural-6.0 ROOF SHEETING PLAN |
| RIVER GEE_rev structural-6.1 ROOF FRAMING PLAN |
| RIVER GEE_rev structural-6.2 ROOF DETAILS |
| RIVER GEE_rev structural-7.0 TURN DOWN SLAB & LINTEL DETAILS |
| RIVER GEE_rev structural-7.1 GROUTED WALL DETAILS |
| RIVER GEE_rev structural-7.2 COLUMN & BEAM BENDING SCHEDULE |
| RIVER GEE_rev structural-8.0 ELECTRICAL LIGHTING PLAN |
| RIVER GEE_rev structural-8.1 ELECTRICAL POWER PLAN |
| RIVER GEE_rev structural-8.2 ELECTRICAL RISER DIAGRAM |
| RIVER GEE_rev structural-8.3 ELECTRICAL CABLES SCHEDULE |
| RIVER GEE_rev structural-9.0 AIR CONDITIONER PLAN |