Revised -Attachment J.3b - Grand Gedeh Drawings.pdf
PDF 3 MB Posted
- Attached to
- Rehabilitation of Two (2) Pharmaceutical Depots/Warehouses in Grand Gedeh and River Gee Counties
- Solicitation number
- 72066924Q00002-Rehabilitation-HealthDepots
About this file
This document contains the 100% design submittal drawings for the renovation and construction of medical storage facilities in Grand Gedeh County, Liberia. The drawings provide detailed plans and specifications for the building layout, roof framing, windows, doors, shelving, electrical, HVAC, and plumbing systems. Key details include the use of concrete block walls, corrugated aluminum roofing, aluminum shelving, and the installation of 18,000 BTU and 12,000 BTU air conditioning units. The drawings comply with relevant building codes and design standards.
The related federal contract opportunity is a solicitation issued by USAID/Liberia to fund the rehabilitation of two pharmaceutical depots/warehouses in Grand Gedeh and River Gee Counties. The objective is to repair infrastructure defects and ensure proper storage of vital medicines and supplies. The solicitation provides a description of the requirement and notes that the efficacy of drugs and bed nets is at risk due to the poor condition of the existing facilities.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPUBLIC OF LIBERIA
UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT
RENOVATION AND CONSTRUCTION OF
MEDICAL STORAGE FACILITIES
Grand Gedeh
Volume I - Drawings
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
July 2023
..\River Gee Image.jpg
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133 GEN-001
GENERAL NOTES
SYMBOLS AND ABBREVIATIONS
C - CIVIL
DIA. - DIAMETER
H - HEIGHT
IN. - INCH
L - LENGTH
LPP - LIGHTING & POWER PANEL
M - METER
MAX - MAXIMUM
MH - MANHOLE
MIN - MINIMUM
MM - MILLIMETER
OD - OUTSIDE DIAMETER
PV - PHOTOVOLTAIC
SQ - SQUARE
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
W - WIDTH
Ø - DIAMETER
CIVIL NOTES
GENERAL NOTES
1. GENERAL SITE NOTES APPLY TO ALL DRAWINGS
2. IN CASE OF CONFLICTS IN THE CONSTRUCTION DOCUMENTS, THE
CONTRACTOR SHOULD CONTACT THE DESIGN ENGINEER FOR
CORRECTIONS / INTERPRETATIONS
3. ALL SITE PLAN DIMENSIONS ARE IN IMPERIAL DIMENSIONS, UNLESS NOTED
ON THE DRAWINGS
4. THE CONTRACTOR SHALL FULLY COMPLY WITH ALL ZONING REGULATIONS
AND ALL ADDITIONAL LOCAL REGULATIONS REQUIREMENTS:
5. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY WORK
KNOWINGLY PERFORMED CONTRARY TO SUCH LAWS, ORDINANCES, OR
REGULATIONS THE CONTRACTOR SHALL ALSO PERFORM COORDINATION
WITH ALL UTILITIES AND STATE SERVICE AUTHORITIES.
6. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS THE GENERAL CONTRACTOR SHALL VERIFY
AND IS RESPONSIBLE FOR ALL DIMENSIONS (INCLUDING ROUGH OPENINGS)
AND CONDITIONS ON THE JOB AND MUST NOTIFY THE ENGINEER OF ANY
VARIATIONS FROM THESE DRAWINGS.
7. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER FUNCTION OF
PLUMBING AND ELECTRICAL SYSTEMS. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER WITH ANY PLAN CHANGES REQUIRED FOR DESIGN AND
FUNCTION OF PLUMBING, HVAC AND ELECTRICAL SYSTEMS.
8. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS
AND METHODS, ACTS OR OMISSIONS OF THE CONTRACTOR, OR FAILURE OF
ANY OF THEM TO CARRY OUT WORK IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS, TECHNICAL SPECS AND DEFECT
DISCOVERED IN THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO
THE ATTENTION OF THE ENGINEER BY WRITTEN NOTICE BEFORE
PROCEEDING WITH WORK. REASONABLE TIME NOT ALLOWED THE
ENGINEER TO CORRECT THE DEFECT SHALL PLACE THE BURDEN OF COST
AND LIABILITY FROM SUCH DEFECT UPON THE CLIENT OR CONTRACTOR.
9. ALL MATERIALS AND CONSTRUCTION PRACTICE SHALL MEET THE
PERFORMANCE REQUIREMENT OF THE ENGINEER, WHERE AN ALTERNATIVE
SOLUTION IS PROPOSED, AND PRIOR TO IMPLANTATIONS OR
INSTALLATIONS.
10. THE CONTRACTOR SHALL COORDINATE ALL (HVAC, PLUMBING, ELECTRICAL,
STRUCTURAL, AND ARCHITECTURAL DRAWINGS) AND REPORT
DISCREPANCIES, IF ANY, SHALL BE BROUGHT TO NOTICE OF THE ENGINEER
PRIOR TO EXECUTION OF WORK.
11. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LEVELS, TECHNICAL
SPECIFICATIONS AND ALL OTHER RELEVANT DOCUMENTATION PRIOR TO
THE COMMENCEMENT OF ANY WORKS AND SHALL REPORT ANY
DISCREPANCIES TO THE ENGINEER FOR CLARIFICATION.
12. THE CONTRACTOR SHALL CONDUCT HIS OWN SITE SURVEY OF THE
EXISTING WORK TO BE CARRIED OUT AND REPORT ACTUAL ELEVATION
(LEVELS) TO THE ENGINEER FOR CLARIFICATION AND VERIFICATION.
13. ALL WALL FINISHES OR CEMENT PLASTERING WORKS ARE TO BE EXTENDED
8 INCHES ABOVE SUSPENDED CEILING LEVEL OR AS INDICATED.
14. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT SYSTEMS AND
MATERIALS ARE TO BE REVIEWED, COORDINATED AND ARE TO BE APPLIED
TO ALL RELATED DRAWINGS AND DETAILS.
15. CONTRACTOR TO LOCATE ALL ACCESS WAY IN THE CEILING INSTALLATION
FOR SERVICES ACCESS. (UNLESS NOTED OTHERWISE)
16. THE STRUCTURE SHALL BE ADEQUATELY BRACED FOR WIND LOADS UNTIL
THE ROOF, FLOOR AND WALLS HAVE BEEN PERMANENTLY FRAMED
TOGETHER AND SHEATHED.
17. THESE DOCUMENT HAVE BEEN PRODUCED IN HARD FORMAT FOR USE BY
THE CONSTRUCTION CONTRACTOR. IF THERE ARE ANY QUESTIONS OR
DISCREPANCIES BETWEEN THESE DOCUMENTS AND COPIES MADE FROM
AN ELECTRONIC FILES, THE HARD COPY DOCUMENTS WILL TAKE
PRECEDENCE. USAID WILL NOT BE RESPONSIBLE FOR ANY VERSIONS OF
THESE DOCUMENTS PRINTED FROM THE ELECTRONIC FIELD BY OTHERS.
18. ALL DIMENSIONS, COORDINATES AND CONDITIONS MUST BE VERIFIED BY
THE CONTRACTORS IN THE FIELD AND ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING
WITH THE AFFECTED PORTION OF THE WORK.
19. ALL BUILDING LAYOUT DIMENSIONS ARE TO THE OUTSIDE EDGE OF THE
BUILDING WALL
20. EXISTING BENCHMARK AND CONTROL ARE TO REMAIN UNDISTURBED
DURING DEMOLITION AND CONSTRUCTION.
21. THESE DOCUMENT HAVE BEEN PRODUCED IN HARD FORMAT FOR USE BY
THE CONSTRUCTION CONTRACTOR. IF THERE ARE ANY QUESTIONS OR
DISCREPANCIES BETWEEN THESE DOCUMENTS AND COPIES MADE FROM
AN ELECTRONIC FILES, THE HARD COPY DOCUMENTS WILL TAKE
PRECEDENCE. USAID WILL NOT BE RESPONSIBLE FOR ANY VERSIONS OF
THESE DOCUMENTS PRINTED FROM THE ELECTRONIC FIELD BY OTHERS.
DESIGN CRITERIA AND STANDARDS:
THE GENERAL CONTRACTOR SHALL FULLY COMPLY WITH THE LISTED CODES
AND ALL ADDITIONAL LOCAL CODE REQUIREMENTS:
1. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE( ACI 318-14)
2. BUILDING CODE REQUIREMENTS & SPECIFICATIONS FOR MASONRY
STRUCTURES 2011 EDITION.
3. INTERNATIONAL BUILDING CODE 2012 EDITION.
LOADS
LIVE LOAD = 100 PSF
MEDICAL LOAD (EST.) = 120 PSF
SOIL UNIT WEIGHT = 100 PCF
STRUCTURAL CONCRETE
CONCRETE STRENGTH = 4000 PSI (FOR ALL STRUCTURES)
CONCRETE STRENGTH = 4000PSI (FOR COLUMNS)
CONCRETE STRENGTH = 2000 PSI (FOR LEAN CONCRETE)
CONCRETE UNIT WEIGHT = 150 PCF
STRUCTURAL STEEL
STEEL STRENGTH = 60,000 PSI
STEEL UNIT WEIGHT = 490 PCF
REINFORCED CONCRETE:
UNLESS INDICATED OTHERWISE, ALL CONCRETE SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF 4000PSI AT 28 DAYS. CEMENT TO BE USED
IS 42.5R PORTLAND CEMENT OR BETTER.
MINIMUM CONCRETE COVER STEEL SHALL BE PER CORD. AND FOR REBAR
EXPOSED TO SOIL CONCRETE COVER MUST BE 3INCH. ALL OTHERS - SEE
DESIGN AND CODE
ALL REINFORCEMENT STEEL SHALL HAVE A MINIMUM YIELD STRENGTH OF
60,000PSI.
LIST OF SHEETS
GEN-001 - GENERAL NOTES
ARC-101 - FLOOR PLAN
ARC-102 - BUILDING SECTIONS
ARC-103 - ROOF SHEETING PLAN
ARC-104 - ROOF FRAMING PLAN
ARC-105 - ROOFING DETAILS
ARC-106 - WINDOWS SCHEDULE
ARC-107 - DOORS SCHEDULE
ARC-108 - SHELF LAYOUT PLAN
ARC-109 - SHELF DETAILS
ELE-201 - ELECTRICAL PLAN
ELE-202 - ELECTRICAL DIAGRAM
ELE-203 - ELECTRICAL GROUNDING DIAGRAM
ELE-203 - CABLE AND CONDUIT SCHEDULE
MEC-301 - HVAC/ AIR CONDITIONING PLAN
PLU-401 - PLUMBING PLAN
JULY 25, 2023
OFFICE -1
DWH -1
Ar c
W ay
DWH -3
DWH -2 OFFICE -2
BATH
Conc. Block Wall
C on c.
B lo ck
W al l
C on c.
B lo ck
W al l
D
D 03
D
D
D
Conc. Stair
Pl yw oo d
Bo ar d St ud W al l
T ot al
A re a:
5.
m
Sliding Glass Window 72''x60''
Sliding Glass Window 72''x60''
Fixed Glass Window 36''x18'' Built @ 2.74m above Conc.
Floor
Sliding Glass Window 36''x48''
Sliding Glass Window 24''x24''
D
'-6
9'
-1 1"
9'-2"13'-1"
9' -1
1"
'-4
6' -1
'-1
22'-9"19'-6"
2'-10"3'-0"8'-1"3'-0"5'-10"7'-4"12'-0"
'-1
1"
23'-9"
43'-9"
5'-6" 3'-2" 10'-10"
'-6
'-6
C on c.
S ta ir
W
W
W
W
W
W
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
ARC-101
FLOOR PLAN
A A
B B
R oo fin g be lo w
Aluminum Alloy, corrugated, 28-gauge
R oo fin g rid ge c ap
(1 6'
' w id e)
Outline of roof 1''x8'' Fascia board 6'' CMU block wall
1' 'x
8' ' F as ci a bo ar d
1''x8'' Fascia Board
Roofing below
E
C C
B B
43'-9" 3'-0"3'-0"
'-6
3'
-0
7' -5
3'
-0
'-6
49'-9"
3'-0" 17'-0" 3'-0" 23'-9" 3'-0"
49'-9"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste Arlington, VA 22201 Ph: +1 703 829 6133
'-5
ARC-103
ROOF SHEETING PLAN
2'' x 2'' Purlins @ 30'' o/c both ways
2'' x 6'' Wall plate around building
1''x8'' Fascia board
C on cr et e bl oc k w al l
Roofing below
2'' x 4'' Rafters @ 48'' o/c both ways
2' ' x
'' R id ge b oa rd
Outline of roof R oo fin g be lo w
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste Arlington, VA 22201 Ph: +1 703 829 6133
43'-9" 3'-0"3'-0"
'-6
3'
-0
7' -5
3'
-0
'-6
49'-9"
3'-0" 17'-0" 3'-0" 23'-9" 3'-0"
49'-9"
'-5
ARC-104
ROOF FRAMING PLAN
2'' x 6'' Ridge board
Conc. Block wall
Conc. Tie beam
2''x6'' Bottom chord 2''x2'' ceiling noggings @ 24'' o/c
2''x6'' Wall plate5/8'' Ø Anchor bolts
Hard board Ceiling
3'-0''
2''x2'' Purlins @36'' o/c 2''x4'' Rafter @ 48'' o/c 2''x6'' King post
2''x4'' Roofing members
2''x6'' bottom chord
Hard board Ceiling
2''x2'' ceiling noggings @ 24'' o/c
2''x4'' Rafters @ 48'' o/c
2''x4'' Rafters @ 48'' o/c
2''x6'' Wall plates
2''x6'' Wall plates
2''x6'' Wedge 2''x6'' Wedge
2''x6'' Ridge board
1''x8'' Fascia board
Conc. Block wall
2''x4'' Roofing members
2''x6'' bottom chord
2''x2'' ceiling noggings @
24'' o/c
Hard board Ceiling
2''x2'' Purlins @ 36'' o/c
Aluminum Alloy, corrugated, 28-gauge
3'-0''
2''x4'' Rafter @ 48'' o/c
Hard board Ceiling
4- 1/2'' Ø Rods in Conc. Beam
ENLARGED TRUSS DETAIL @: ''E''
RAFTER/WEDGE DETAILS
TYPICAL EAVE DETAILS @: "E-E"RIDGE DETAILS @: "C-C"
2''x6'' King post 2''x4'' Roofing members 2''x6'' bottom chord
Hard board Ceiling
2''x2'' ceiling noggings @ 24'' o/c
ROOFING DETAILS @: KING POST
2' -0
Conc. Beam
Conc. Beam Conc. Existing
Wall
1''x8'' Fascia Board
5'' Overlaps
2''x4'' Roofing members
Conc. Beam tb 12' - 0"
Fascia Board
Hardboard Ceiling
2''x2'' Purlins @36'' o/cCorrugated Ridge
Cap 2''x4'' Rafters @48'' o/c
2''x2'' ceiling noggings @
24'' o/c
2''x6'' Bottom Chord2''x6'' Wall
Plate
2''x6'' Bottom Chord
2''x6'' Wall Plate Corrugat ed Aluminum 28 gauge Roofing Sheets
Corrugated Ridge Cap
Ceiling Board on 2''x2'' Noggings @
24'' o/c Conc. Block wall Conc. Block wall
Conc. Tie BeamConc. Block wall
18'' Wide Ridge Cap
Aluminum Alloy, corrugated, 28-gauge
2''x4'' Rafters @ 48'' o/c
2'' x 2'' Purlins @ 36'' o/c
2'' x 4'' King Post
TYPICAL HORIZONTAL ROOF
DETAILS @: "B-B"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E
Aluminum Alloy, corrugated, 28-gauge
F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133 ARC-105ROOFING DETAILS
Proposed Conc.
Block Extension wall
Conc. Tie beam above block wall
Conc. Beam
1'' Plaster on Conc. Extension wall2' -0
TYPICAL
EXTENSION WALL
Conc. Existing Wall
5' -0
6'-0'' 3'-0'' 2'-0'' 3'-0''
4' -0
'' 2' -0
1' -6
2(72'' x 60'')
TAG DESCRIPTION SIZE QTY. WINDOWS FRAME
Double-Exterior Sliding Glass
Single -Exterior Sliding Glass 1
(36'' x 48'')
(24'' x 23'')
(36'' x 18'')
Single -Exterior Sliding Glass
Single -Exterior Glass Window
W
W
W
W
Aluminum Frame
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
W
W
W 04
W
ARC-106
WINDOW SCHEDULE
Aluminum Frame
Aluminum Frame
Aluminum Frame
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
D
D
D
D
D
3'-0'' 6'-1''
6' -8
3'-2'' 3'-2'' 3'-2'' 6'
-8
6' -8
1(38'' x 80'')
TAG DESCRIPTION SIZE QTY. DOOR FRAME
Single -Exterior Panel Door
Single -Interior Panel Door 1
(38'' x 80'')
(38'' x 80'')
(36'' x 76'')
Single -Interior Panel Door
Single -Interior Panel Door
Width- 2'' Frame, Header 2'' Frame
1(73'' x 80'')Double -Aluminum Glass Door
D
D
D
D
D
ARC-107
DOOR SCHEDULE
Width- 2'' Frame, Header 2'' Frame
Width- 2'' Frame, Header 2'' Frame
Width- 2'' Frame, Header 2'' Frame
Width- 2'' Frame, Header 2'' Frame
'-1
1"
23'-9"
43'-9"
DWH -3
OFFICE -2
BATH
OFFICE -1
DWH -1
DWH -2
9' -1
1"
9'-2"13'-1"
9' -1
1"
2'-0"4'-4"7'-1"7'-4"2'-0"7'-10"10'-0"2'-0"
2' -0
5'
-1 0"
2' -0
3'
-4
2' -0
3'
-4
2' -0
3'
-4
2' -0
3'
-4
2' -0
3'
-4
2' -0
2'-0" 2'-0" 8'-5" 7'-0" 3'-4" 2'-0"
5' -3
2'
-0
3' -4
2'-0"
7' -0
'-6
12'-0"
8' -7
'-5
'-6
22'-9"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
Xref ..\d0712483\Att1.dwg
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
ARC-108
TYPICAL ALUMINUM SHELVING LAYOUT
Aluminum Shelves
84''
84''24''
8'
6'
2'
8'
6'
2'
84''
FRONT REARSIDE
TOP
Ref. Level 0' - 0"
Fin. Level 8' - 6"
2'
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133 ARC-109
TYPICAL ALUMINUM SHELVING DETAILS
Aluminum Shelves
Aluminum Shelves
Aluminum Shelves
Ref. Level 0' - 0"
Fin. Level 8' - 6"
1"
L3L3
L3 L3
L3L3
L3 L3
L1
L1L1
L1
L2 L2
L4 L5
C01
C01
C02
C02
C04
C02
C02
C02C01
C03C03
ATTENTION
ELECTRICAL
RISK
Panel Box (100amp)
ATTENTION
ELECTRICAL
RISK
KEY LEGEND
SYMBOLS DESCRIPTIONS
Switch Wiring
(AWG)
Receptacle Outlet
2-Way Switch
Ceiling Mounted Lamp
PB
ATTENTION
ELECTRICAL
RISK
1-Way Switch
CO
L
AC01 AC02
AC
AC03
AC01
Air Condition Receptacle Outlet
23'-9"
43'-9"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
ELE-201
ELECTRICAL PLAN
Single Phase Energy Meter
63A-30MA Trip Current DR RCD
Sub Circuit
2 3 4 5 6 7 8 9 10 11 12 13
Sub Circuit kWh
2C - 10 mm2 Wire/PVC Cable
63A DP MCB
S u r g e A r r e s t e r
GENERATOR
( E X I S T I N G )
20A 20A 10A 10A 10A 10A 10A 20A 20A 20A 20A 20A 20A 20A
220V - CIRCUIT SWITCH
(EXISTING)
ELECTRICAL DISTRIBUTION
BOARD DIAGRAM
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
DISTRIBUTION BOARD
ELE-202
ELECTRICAL DIAGRAM
DISTRIBUTION BOARD
220V - CIRCUIT
1C - 10 mm2
1C - 10 mm2
SPARE
20A
13A S
Outlets Radials 4 mm2
Wire/PVC
13A S2 Outlets Radials
4 mm2
Wire/PVC
L1
2.5 mm2
WIRE/PVC
L2
2.5 mm2
WIRE/PVC
L3
2.5 mm2
WIRE/PVC
L4
2.5 mm2
WIRE/PVC
L5
2.5 mm2
Wire/PVC
CO1
Outlets Radials
4 mm2
Wire/PVC
CO2
Outlets Radials
4 mm2
Wire/PVC
CO3
Outlets Radials
4 mm2
Wire/PVC
CO4
Outlets Radials
4 mm2
Wire/PVC
ACO1
4 mm2
Wire/PVC
ACO2
4 mm2
Wire/PVC
ACO3
4 mm2
Wire/PVC
ACO4
4 mm2
Wire/PVC
1C - 10 mm2
1C - 10 mm2
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
Jumper
DISTRIBUTION BOARD;
380-220V - CIRCUIT
Enclosures
S u r g e A r r e s t e r
Service Load
Load From Source
Electrical Grounding Diagram
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
Xref ..\d0712483\Att1.dwg
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
ELE-203
ELECTRICAL GROUNDING DIAGRAM
CABLE SIZE
(SI)
CABLE AREAS AND DIAMETERS
DIAMETER EQUIVALENT
AWG
2.5mm2 1.79mm #12
4.0mm2 2.26mm #10
10mm2 3.57mm #8
1C - 2.5mm2 16mmØ
NO. CABLE SIZE CONDUIT SIZE
1C - 4mm2 16mmØ
1C - 10mm2 16mmØ
2C - 10mm2 21mmØ
NOTE: ALL CABLES ARE COPPER AND PVC INSULATED
WITH MAXIMUM OPERATING TEMPERATURE @ 90°C
1.
2.
4.
3.
CABLE ARRANGEMENT IN CONDUIT
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS NOVEMBER 28, 2022
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
ELE-204
CABLE AND CONDUIT SCHEDULE
C01
C01
C02
C02
C04
C02
C02
C02C01
C03C03
Cold Air
18,000 BTU
ATTENTION
ELECTRICAL
RISK
Cold Air
18,000 BTU
Cold Air
12,000 BTU
Cold Air
12,000 BTU
Panel Box (100amp)
ATTENTION
ELECTRICAL
RISK
KEY LEGEND
SYMBOLS DESCRIPTIONS
Receptacle Outlet
2-Way Switch
18,000 BTU Air Conditional
PB
ATTENTION
ELECTRICAL
RISK
1-Way Switch
CO
AC0
Air Condition Receptacle Outlet
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
'-1
1"
23'-9"
43'-9"
12,000 BTU Air Conditional
AC01 AC02
AC
AC03
MEC-302
HVAC/ AIR CONDITIONING PLAN
1"
OFFICE
-1
DWH -1
DWH -3
DWH -2 OFFICE
-2
4 ' ' P V C Sewage P ipe To Bio Digester S e p t i c T a n k
2 4 ' ' x 2 4 ' ' C o n c .
M a n h o l e
2' ' P
VC
Se w ag e Pi pe
KEY LEGEND
SYMBOLS MATERIALS
WATER CLOSET /WC
FACE BASIN
SEWAGE PVc PIPE LINE
4'' PVC PIPE
2'' PVC PIPE
43'-9"
USAID:LIBERIA A&E IDIQ
TASK ORDER 2, SUBTASK 3
RENOVATION & CONSTRUCTION OF MEDICAL
STORAGE FACILITIES
100% DESIGN SUBMITTAL - NOT FOR CONSTRUCTION
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
A B C D E F G
REMARKS JULY 25, 2023
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
MEC-101
PLUMBING PLAN
| Sheets and Views |
| Grand Gedeh Drawings_GPTech_rev structural-Cover |
| Grand Gedeh Drawings_GPTech_rev structural-GEN-1 |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-101 |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-102A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-103A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-104A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-105A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-106A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-107A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-108A |
| Grand Gedeh Drawings_GPTech_rev structural-ARC-109A |
| Grand Gedeh Drawings_GPTech_rev structural-E-201 |
| Grand Gedeh Drawings_GPTech_rev structural-E-202 |
| Grand Gedeh Drawings_GPTech_rev structural-E-203 |
| Grand Gedeh Drawings_GPTech_rev structural-E-204 |
| Grand Gedeh Drawings_GPTech_rev structural-M-302 |
| Grand Gedeh Drawings_GPTech_rev structural-P-401 |
File details come from the government source that posted it. Updated .