Revised - Attachment J.1a - Bill of Quantities - Grand Gedeh.xlsx

XLSX spreadsheet 64 KB Posted

Attached to
Rehabilitation of Two (2) Pharmaceutical Depots/Warehouses in Grand Gedeh and River Gee Counties
Solicitation number
72066924Q00002-Rehabilitation-HealthDepots
Issued by

About this file

This document is a Bill of Quantities for the Rehabilitation of Two (2) Pharmaceutical Depots/Warehouses in Grand Gedeh and River Gee Counties, Liberia. The Bill of Quantities provides a detailed breakdown of the materials, labor, and associated costs for the renovation work, including reinforced concrete, blockwork, painting, roofing, plumbing, electrical, and HVAC systems. The key objectives of the project are to repair wall cracks, address infrastructure defects, and improve the storage conditions for pharmaceutical supplies at the county depots to ensure the efficacy of drugs and bed nets. The federal contract opportunity, solicitation number 72066924Q00002, is being issued by the US Agency for International Development (USAID) Liberia to fund the rehabilitation of these two medical depots.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grand Gedeh

Liberia MOH Grand Gedeh County Depot Bill of Quantities
Item No.DescriptionQuantityUnitUnit CostTotal CostMaterials Cost
Mobilization
1Site OfficeSite office and related items (including mobilization, equipment and personmnel to site, demobilization, cleaning of site and disposal of construction debris)1LS$0.00$0.00
2InsuranceInsurance for liability and professional services indemnity1LS$0.00$0.00
3PPESafety gear and equipment1LS$0.00$0.00
4ScaffoldingScaffolding and falsworks1LS$0.00$0.00
Subtotal$0
Reinforced Concrete
5RC concrete for tie beams and columns extensionRC concrete (1:1:2 mix or C25) for tie beams and columns extension including rebars and formworks as per drawings and technical specifications18.31cy$0.00$0.00
Subtotal$0
Blockwork
6CMU blocksCMU, hollow, 6" X 16"602.78sf$0.00$0.00
7MortarCMU joints & filling7.5cy$0.00$0.00
8Plaster1" wall plastering2.0cy$0.00$0.00
9Structural cracksRepair structural cracks in walls141.07ft$0.00
Subtotal$0
Painting & Finishing works
10Exterior wallsWhite enamel, double coat2,256.0sf$0.00$0.00
11Interior wallsWhite emulsion, double coat4,000.0sf$0.00$0.00
12CeilingWhite emulsion, double coat2,200.0sf$0.00$0.00
13Hydrated LimeHydrated Lime, to be applied to new walls1.0bag$0.00$0.00
14Painting accessoriesMiscellaneous painting accessories1.0LS$0.00$0.00
$0.00Subtotal$0.00
Roofing & Ceiling
15Removal & Disposal of exisitng roofing systemsRemoval & Disposal of exisitng roofing systems1LS$0.00
16Roofing SheetAluminum Alloy, corrugated, 28-gauge (0.45-mm thick), including combing, zinc nail, roofing cement & felt, 3'x8' (20/bundle)11.0bdl$0.00$0.00
17Treated Timber (Refer to Technical Specification Section 21.7), purlin and nogginsPurlin 2"x2"x14'153number$0.00$0.00
18Treated Timber (Refer to Technical Specification Section 21.7), rafterRafter 2"x4"x14'115number$0.00$0.00
19Treated Timber (Refer to Technical Specification Section 21.7), wall plate, king pole, top chord and bottom chordWall plate, king pole, Top Cord and Bottom cord 2"x6"x14'27number$0.00$0.00
20WawaFacial Board 1"x8"x14'18number$0.00$0.00
21Roofing tie boltsProvide for roofing tie bolts using 5/8" diameter tie bolts 10" long installed with 4'*4" washer nuts and lock nuts63number$0.00$0.00
22Treated Ceiling joist (Refer to Technical Specification Section 21.7) and boardCeiling joist and board, using 3/8" plywood fasterned on 2'*2' ceiling joist made of 2"*2"*14; timber finished with plain ceiling strips297sy$0.00$0.00
23Storm drainage systemProvide for storm drainage system using PVC gutter, down spots,brackets and collectors196.85ft$0.00$0.00
Subtotal$0
Installation of wall and floor tiles
24Ceramic anti-slip floor tilesRemove existing floor tiles. Supply and install ceramic anti-slip floor tiles for storage areas, offices and toilets installed on sand base, with cement mortar and finished with tiles adhesive and which cement185.38sy$0.00$0.00
25Ceramic wall tilesRemove existing wall tiles. Supply and install ceramic wall tiles for bath room walls to a height not exceeding 1.5m with cement mortar and finished with tiles adhesive and which cement14.35sy$0.00$0.00
Subtotal$0
Doors & Windows
26Removal of existing doors and windowsRemoval of existing doors and windows, and dispose off in accordance to the health & safety plan.1LS$0.00$0.00
27Door, D1Exterior, single, panel, hardwood, including lock and 3 hinges, 3'2" x 6'8"1number$0.00$0.00
30Door, D2Interior, single, panel, hardwood, including lock and 3 hinges, 3'2" x 6'8"1number$0.00$0.00
31Door, D3Interior, single, panel, hardwood, including lock and 3 hinges, 3'2" x 6'8"1number$0.00$0.00
28Door, D4Interior, single, panel, hardwood, including lock and 3 hinges, 3'2" x 6'4"2number$0.00$0.00
26Door, D5Double, aluminium framed door with glass panel door, including lock and self closing hinges, 6'1" x 6'8"1number$0.00$0.00
29Window, W1Aluminum, double sliding windows, 6' x 5'2number$0.00$0.00
30Window, W2Aluminum, single sliding windows, 3' x 4'1number$0.00$0.00
31Window, W3Aluminum, single sliding windows, 2' x 2'1number$0.00$0.00
32Window, W4Aluminum, single sliding windows, 3' x 1.5'2number$0.00$0.00
Subtotal$0
Maintenance of metal doors & Window
33Steel locks, hinges ,etcSupply and maintain all steel locks, hinges ,etc1LS$0.00$0.00
34Sliding window locks and strainMaintain all sliding window lock and strain1LS$0.00$0.00
Subtotal$0
Plumbing
35Sewage collection and disposal lines for one toilet.Supply PVC pipe, fittings and associated cleaners and glues for installation of sewage collection and disposal lines for 1 toilet. Including vents and connection to biodiegester1LS$0.00$0.00
36Portable water system in toiletSupply uPVC pipes for connectoin of portable water system in toilet including connection to w/c and face basin. Including fittings, connections and glues as required1LS$0.00$0.00
37Water ClosetRemove existing water closet. Supply and install new heavy duty Water Closet1number$0.00$0.00
38Face basin completeRemove existing face basin. Supply and install new heavy duty Face basin complete1number$0.00$0.00
Subtotal$0
Biodigester
39BiodigesterConstruction of Biodigester including connections and ventilation systems complete1number$0.00$0.00
Subtotal$0
Wiring Points
40Conduit installationCutting of walls to install conduits and sealing with motar after installation250Ft$0.00
41Utility and Junction cupsUtility and Junction cups30number$0.00$0.00
42Rigid PVC Conduit, 25 mmRigid PVC Conduit, 25 mm, 10 ft section w/coupling90number$0.00$0.00
43Rigid PVC Elbow, 45 deg, 25 mmRigid PVC Elbow, 45 deg, 25 mm20number$0.00$0.00
44Rigid PVC Conduit, 32 mmRigid PVC Conduit, 32 mm, 10 ft section w/coupling35number$0.00$0.00
45Rigid PVC Elbow, 45 deg, 32 mmRigid PVC Elbow 45 deg, 32 mm12number$0.00$0.00
46Rigid PVC Conduit, 50 mmRigid PVC Conduit, 50 mm, 10 ft section w/coupling8number$0.00$0.00
47Rigid PVC Elbow, 45 deg, 50 mmRigid PVC Elbow 45 deg, 50 mm6number$0.00$0.00
Subtotal$0
Surge Protection, Switches, Outlets
48Main Circuit BreakerMERLIN GERIN/SIEMENS/LEGRAND or equivalent 63A, TPN DB c/w 63 A Main CB and fitted with TYPC C mcbs (8 x 20 A,SPN mcbs; 2 x 15 A, SPN mcbs; 5 x 10A, SPN mcbs)1number$0.00$0.00
4910 A, 1-gang 1-way flush Switch10A, 1-gang 1-way flush Switch complete3number$0.00$0.00
5010 A, 2-gang 2-way flush Switch10A, 2-gang 2-way flush Switch complete4number$0.00$0.00
5116 A, 2-gang Universal Power Socket16A, 2-gang Universal Power Socket11number$0.00$0.00
52Heavy duty receptacles for AC and Refrigerator outletsSupply and install heavy duty receptacles for AC and Refrigerator outlets5number$0.00$0.00
Subtotal$0.00
Lighting
53LED ceiling lamps, 6 WLED ceiling lamps complete with energy saver bulbs (6 W)16number$0.00$0.00
Subtotal$0
BASEC-approved Cables
54XLPE/SWA/PVC Copper Cable, 4-core 25 mm²4-core 25 mm² XLPE/SWA/PVC Copper Cable, rated at 90 deg C, for service panel connections40yd$0.00$0.00
55XLPE/SWA/PVC Copper Cable, 1-core 16 mm²1-core 16 mm² XLPE/SWA/PVC Copper Ground Cable, rated at 90 deg C, for service panel connections25yd$0.00$0.00
56XLPE/SWA/PVC Copper Cable, 3-core 10.0 mm²3-core 10.0 mm² XLPE/SWA/PVC Copper Cable, rated at 90 deg C, for service panel connections82yd$0.00$0.00
57XLPE/SWA/PVC Copper Cable, 3-core 4.0 mm²3-core 4.0 mm² XLPE/SWA/PVC Copper Cable, rated at 90 deg C, for service panel connections125yd$0.00$0.00
58XLPE/SWA/PVC Copper Cable, 3-core 2.5 mm²3-core 2.5 mm² XLPE/SWA/PVC Copper Cable, rated at 90 deg C, for service panel connections150yd$0.00$0.00
Subtotal$0
Termination Materials
59Termination fittings and accessoriesLugs, connectors, tapes, ties, fixtures mounting accessories, markers, etc.1.0LS$0.00$0.00
Subtotal$0.00
Air-Conditioning System
60Refrigerator for drugs storage ( Sub Zero, 1500 L)Refrigerator for drugs storage ( Sub Zero, 1500 L)1No$0.00$0.00
611 1/2-Ton (18,000 Btu/hr) air-conditioning unitRemove existing AC system. Supply & install 1 1/2-Ton (18,000 Btu/hr) air-conditioning unit, split system2No$0.00$0.00
621-Ton (12,000 Btu/hr) air-conditioning unitRemove existing AC system. Supply & install GIBSON or equivalent 1-Ton (12,000 Btu/hr), 220 V A/C unit, to condition partitions2No$0.00$0.00
Subtotal$0
Shelving
63Removal, disposed of wooden shelvesRemoval, disposed of wooden shelves1LS$0.00
64Heavy duty racks3-level, 8'-10" high, 7'-8" wide, including supports162.0ft$0.00$0.00
Subtotal$0
Total Material Cost$0.00$0.00
Labor Cost @ xx% of Total Material Cost$0
Transporation, Overhead & Profit @ xx% of Total Material Cost$0

GRAND TOTAL $0