This document appears to be an attachment titled "Bill of Quantities" related to a federal contract opportunity for the rehabilitation of two pharmaceutical depots in Grand Gedeh and River Gee Counties, Liberia.

The attachment provides a detailed list of construction and renovation activities required, including masonry work, rendering, biodigester installation, tile work, door and window maintenance, plumbing, roofing, electrical work, HVAC systems, and shelving/pallet replacements. Each line item specifies the description, quantity, unit cost, and total cost. The total estimated cost is $0.00, indicating this is likely a pricing template to be filled out by the contractor.

The related federal contract opportunity is solicitation number 72066924Q00002, issued by USAID/Liberia to fund the rehabilitation of the two medical depots. The project aims to address infrastructure defects and improve storage conditions for pharmaceutical supplies, including malaria and family planning products. The solicitation does not provide award dates or pricing terms, but it identifies the agency, location, and high-level objectives of the project.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grand Gedeh

Liberia MOH Grand Gedeh County Depot -BOQ
Item No.DescriptionName of ItemQuantityUnitUnit CostTotal Cost
Mobilization
1Mobilization / demobilizationSite office and related items (including mobilization equipment and personmnel to site, demobilization, cleaning of site and disposal of construction debris)1LS$0$0.00
2Provide Insurance and bondsProvide Insurance and bonds1LS$0$0.00
3USAID SinageInstallation of USAID signage on wall2pcs$0$0
Subtotal$0
Masonry works to include Extension Walls, concrete and tiling works
3Supply and Install 6'' Hollow-sandcrete blocks for extended walls @ (177.07' x 2.5')Supply and Install 6'' Hollow-sandcrete blocks for extended walls @ (177.07' x 2.5')66.98sy$0.00$0.00
4Supply and install RC concrete (1:2:4) for tie beams and columns extension including rebars and formworks as per drawings and technical specificationsSupply and install RC concrete (1:2:4) for tie beams and columns extension including rebars and formworks as per drawings and technical specifications18.31cy$0.00$0.00
5Repair Structural Cracks in wallsRepair Structural Cracks in walls141.07ft$0.00$0.00
Subtotal$0
Rendering of external and internal extended walls and concrete structures using ( 1:2) sand-motar mix
6Fine agregate (sand)Fine agregate (sand)168.8cf$0.00$0.00
7Cement ( Portland cement. 32.5)Cement ( Portland cement. 32.5)32bags$0.00$0.00
Subtotal$0
Biodigester
8Construction of Biodigester including connections and ventilation systems completeConstruction of Biodigester including connections and ventilation systems complete1No$0$0.00
Subtotal$0
Installation of wall and floor tiles
9supply and install Ceramic anti-slip floor tiles for storage areas, offices and toilets installed on sand base, with cement mortar and finished with tiles adhesive and which cementsupply and install Ceramic anti-slip floor tiles for storage areas, offices and toilets installed on sand base, with cement mortar and finished with tiles adhesive and which cement185.38sy$0.00$0.00
10supply and install Ceramic wall tiles for bath room walls to a hight not exceeding 1.5m with cement mortar and finished with tiles adhesive and which cementsupply and install Ceramic wall tiles for bath room walls to a hight not exceeding 1.5m with cement mortar and finished with tiles adhesive and which cement14.35sy$0.00$0.00
Subtotal$0
Doors
11Aluminum doorSupply and install 3'2" x 7'0"Aluminium framed door with glass panel door, lock and self closing hinges1Pcs$0.00$0.00
12Hardwood panel doorSupply and install 3'2" x 7'2" Hardwood panel door with lock and 3 hinges each1Pcs$0.00$0.00
13Hardwood panel doorSupply and install 3'2" x 7'0" Hardwood panel door with a lock and 3 hinges each1Pcs$0.00$0.00
14Hardwood panel doorSupply and install 3'0" x 7'2" Hardwood panel door with lock and 3 hinges each1Pcs$0.00$0.00
15Single-flush plywood doorDoor, Single-flush Plywood2Pcs$0$0.00
Subtotal$0
Maintenance of metal doors & Window
16Supply and maintain all steel locks, hinges ,etcSupply and maintain all steel locks, hinges ,etc1LS$0$0.00
17Maintain all sliding window lock and strainMaintain all sliding window lock and strain1LS$0$0.00
Subtotal$0
Rough plumbing works Sewage lines
18Supply PVC pipe, fittings and associated cleaners and glues for installation of sewage collection and disposal lines for 1 toilet. Including vents and connection to biodiegesterSupply PVC pipe, fittings and associated cleaners and glues for installation of sewage collection and disposal lines for 1 toilet. Including vents and connection to biodiegester1LS$0.00$0.00
19Construction of Biodigester tank including connections and ventilation systems completeConstruction of Biodigester tank including connections and ventilation systems complete1No$0.00$0.00
Subtotal$0
Water Recticulation and fixtures
20supply upvc pipes for connectoin of portable water system in toilet including connection to w/c and face basin. Including fittings, connections and glues as requiredsupply upvc pipes for connectoin of portable water system in toilet including connection to w/c and face basin. Including fittings, connections and glues as required1LS$0.00$0.00
21Supply and install heavy duty Water CloserSupply and install heavy duty Water Closer1No$0.00$0.00
22Supply and install heavy duty Face basin completeSupply and install heavy duty Face basin complete1No$0.00$0.00
Subtotal$0
Roofing & Ceiling Works: Removal Construction
23Removal & Disposal of exisitng roofing systemsRemoval & Disposal of exisitng roofing systems1LS$0.00$0.00
24Provide & Install Long Span aluminium roofing sheet including ,combing, zinc nail, roofing cement & feltProvide & Install Long Span aluminium roofing sheet including ,combing, zinc nail, roofing cement & felt320sy$0.00$0.00
Subtotal$0
Roofing & Ceiling Works: Provide member of roofing trusses ie rafters,purlin, king pole, facial board,wall plate
25Purlin 2x2Purlin 2x2153Pcs$0$0.00
26Rafter 2x4Rafter 2x4115Pcs$0$0.00
27Wall plate, king pole, Top Cord and Bottom cord 2x6Wall plate, king pole, Top Cord and Bottom cord 2x627Pcs$0$0.00
28Facial Board 1x8Facial Board 1x818Pcs$0$0.00
29Provide for roofing tie bolts using 5/8" diameter tie bolts 10" long installed with 4'*4" washer nuts and lock nutsProvide for roofing tie bolts using 5/8" diameter tie bolts 10" long installed with 4'*4" washer nuts and lock nuts63Pcs$0$0.00
30Provide for storm drainage system using PVC gutter, down spots,brackets and collectorsProvide for storm drainage system using PVC gutter, down spots,brackets and collectors196.85ft$0$0.00
Subtotal$0
Roofing & Ceiling Works: Installation of ceiling in and around the building
31supply and install all ceiling joist and board, using 1/4" plywood fasterned on 2'*2' ceiling joist made of 2"*2"*14; timber finished with plain ceiling stripssupply and install all ceiling joist and board, using 1/4" plywood fasterned on 2'*2' ceiling joist made of 2"*2"*14; timber finished with plain ceiling strips297sy$0.00$0.00
Subtotal$0
Installation of electrical conduits in walls
32Cutting of walls to install conduits and sealing with motar after installationCutting of walls to install conduits and sealing with motar after installation250Ft$0.00$0.00
33Supply and install Utility and Junction cupsSupply and install Utility and Junction cups30Pcs$0.00$0.00
34Supply and install conduits, approx.16-35 mm, in walls and overhead in ceilingsSupply and install conduits, approx.16-35 mm, in walls and overhead in ceilings350ft$0.00$0.00
Subtotal$0
Installation of electircal lines and fixtures
35Supply and install 14-circuit breaker panel box and recloser as per drawingsSupply and install 14-circuit breaker panel box and recloser as per drawings1Pcs$0.00$0.00
36Supply and install incandescent ceiling lamps complete with energy saver bulbs ( 50watts)Supply and install incandescent ceiling lamps complete with energy saver bulbs ( 50watts)22Pcs$0$0.00
37Supply and install 2.5 mm2-diameter conductorsSupply and install 2.5 mm2-diameter conductors6Rolls$0$0.00
38Supply and install 4.0 mm2-diameter conductorsSupply and install 4.0 mm2-diameter conductors4Rolls$0$0.00
39Supply and install 10 mm2-diameter conductorsSupply and install 10 mm2-diameter conductors2Rolls$0$0.00
40Supply and install Switches and Recepticles ( regular)Supply and install Switches and Recepticles ( regular)18Pcs$0$0.00
41Supply and install heavy duty receptacles for AC and Refrigerator outletsSupply and install heavy duty receptacles for AC and Refrigerator outlets4Pcs$0$0.00
42Provide electrical tapeProvide electrical tape1LS$0$0.00
Subtotal$0
Air-Conditioning System
43Refrigerator for drugs storage ( Sub Zero, 1500 L)Refrigerator for drugs storage ( Sub Zero, 1500 L)1No$0$0.00
44Air conditions Split Unit (18000 BTU)Air conditions Split Unit (18000 BTU)2No$0$0.00
45Air condition split Unit (9000 BTU)Air condition split Unit (9000 BTU)2No$0$0.00
Subtotal$0
Replacement of Shelves & Pallets
46Removal, disposed of wooden shelves & Supply, Aluminium framed shelves with Alubond boards reinforced and bolted to walls as per drawingsRemoval, disposed of wooden shelves & Supply, Aluminium framed shelves with Alubond boards reinforced and bolted to walls as per drawings246.06ft$0$0.00
47Removal, disposed of wooden stand alone shelves & Supply, Aluminium framed shelves with Alubond boards double reinfored standing independant of walls as per drawingsRemoval, disposed of wooden stand alone shelves & Supply, Aluminium framed shelves with Alubond boards double reinfored standing independant of walls as per drawings164.04ft$0$0.00
48Supply & placed Pallets (1.0936yd X 1.0936ydSupply & placed Pallets (1.0936yd X 1.0936yd32Pcs$0$0.00
Subtotal$0
Painting & Finishing works
49Scrap wall of existing paint and primeScrap wall of existing paint and prime299sy$0$0.00
50supply and paint with three coats of enamel paint including rollers, brushes, thinner and cutting tapes as required for all wall surfaces, buglar bars, doors, facial board and all other parts ofthe painding requiring paintingsupply and paint with three coats of enamel paint including rollers, brushes, thinner and cutting tapes as required for all wall surfaces, buglar bars, doors, facial board and all other parts ofthe painding requiring painting299sy$0$0.00
Subtotal$0
Total Material Cost$0.00

Labor Cost @ 30% of Total Material Cost $0

Transporation, Overhead & Profit @ 20% of Total Material Cost $0

GRAND TOTAL $0