Attachment J.2 Kwajalein-Fac 935 (Tank 14)-Ext Final-2017.pdf

PDF 7 MB Posted

Attached to
POL Tank Inspection KWA - Kwajalein Atoll
Solicitation number
W9128F24Q0001
Issued by

About this file

This document summarizes an API 653 in-service inspection report for an aboveground storage tank (Tank 14) located at U.S. Army Garrison Kwajalein Atoll in the Republic of the Marshall Islands. The inspection evaluated the tank's integrity and collected data to establish a database for future inspections. Key findings include the tank shell having over 30 years of remaining life, and deficiencies related to the secondary containment, piping, coatings, and safety equipment. Recommendations address repairs to comply with standards and improve regular maintenance. The solicitation number and opportunity indicate the U.S. Army Corps of Engineers is seeking inspection services for POL tanks at Kwajalein Atoll.

View the file

Other files

File Type Posted
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Combined Synopsis-Solicitation - W9128F24Q0001 Amendment 0002.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Questions and Answers - W9128F24Q0001.pdf PDF
Combined Synopsis-Solicitation - W9128F24Q0001 Amendment 0001.pdf PDF
Attachment 1 - CLIN Schedule - KWA Tank Inspection.pdf PDF
Attachment I - API External Inspection Template.docx DOCX document
Attachment J.5 Kwajalein-Fac 955 (Tank 15)-Ext Final-2017.pdf PDF
Attachment J.4 Kwajalein-Fac 951 (Tank 8)-FINAL-2017.pdf PDF
Attachment 2 - PWS - SP-POL-CMP-INSPECT-FY24-KWA.pdf PDF
Attachment J.8 Kwajalein Fac 957 (tank 11) Old Report 2006.pdf PDF
Attachment B - KWA Fuels Tank Storage List.xlsx XLSX spreadsheet
Attachment F - API Internal Inspection Template.docx DOCX document
Attachment J.1 Kwajalein -Fac 954 (Tank 16 - Ext Final-2018.pdf PDF
Combined Synopsis-Solicitation - W9128F24Q0001.pdf PDF
Attachment A - General Installation Security Requirements.docx DOCX document
Attachment J.6 Kwajalein Fac 953 (Tank 17) pre-rpr 2017.pdf PDF
Attachment C - Tank Data Sheet.xlsx XLSX spreadsheet
Attachment E - API Internal Inspection Telecon Briefing Template.docx DOCX document
Attachment J.7 Kwajalein-Fac 956 (Tank 12)-Ext Final-2017.pdf PDF
Attachment J.9 Kwajalein-Fac 958 (Tank 10)-FINAL-1994.pdf PDF
Attachment J.3 Kwajalein-Fac 936 (Tank 13) Ext Final - 2018.pdf PDF
Attachment G - Return To Service Letter.docx DOCX document
Attachment 3 - 52.212-1 Addendum - KWA Tank Inspection.pdf PDF
Attachment D - Monthly Contractors Progress Management and Status Report.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USArmyCorpsofEngineers
OmahaDistrict
API653In‐Service
InspectionReport
U.S.ArmyGarrisonKwajaleinAtoll
FacilityNumber935
TankNumber14
USArmyCorpsofEngineersCenterofExpertiseforPetroleum,Oils,andLubricants
(USACEPOL‐MCX)
September29,2017

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

TableofContents
ACRONYMSANDABBREVIATIONS .............................................................................................................................................. 3

GENERAL SUMMARY

INSPECTION DATE

STATE REGULATIONS

PREVIOUS INSPECTION DATES

RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)

GENERAL TANK INFORMATION

A. GENERAL PROJECT INFORMATION

1. API 653 Inspection

2. Site Information

B. TANK INSPECTION COMMENTS

1. Tank Construction

2. Tank Foundation

3. Tank Shell

4. Tank Appurtenances

5. Tank Coating

6. Tank Piping System

7. Fire Protection System

8. Secondary Containment

9. Cathodic Protection

C. FINDINGS AND RECOMMENDATIONS

1. MANDATORY REPAIRS per API 653, UFC 3‐460‐01, or AW 78‐24‐27 Standards

2. REQUIRED REPAIRS to Fully Comply with API 653 or Federal, State, and Local Codes…………………………………..11

3. RECOMMENDED REPAIRS as Part of Regular Maintenance………………………………………………………………………….21

APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS

A.1 SHELL SERVICE LIFE EVALUATION

A.2 SHELL SETTLEMENT EVALUATION

A.3 ULTRASONIC UT DATA

A.4 CONTAINMENT LAYOUT DRAWING

A.5 SHELL LAYOUT DRAWING

A.6 OSHA ACCESS STRUCTURE REPORT

APPENDIX B: 3‐D DOCUMENTATION AND ANALYSIS

APPENDIX C: API 653 CHECKLISTS FOR TANK INSPECTIONS

APPENDIX D: PHOTOGRAPHS

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

ACRONYMS AND ABBREVIATIONS

API American Petroleum Institute

ASME American Society of Mechanical Engineers

ASNT American Society of Non‐Destructive Testing

ARD Anti‐rotation device

ATG Automatic Tank Gauge

BBL Barrel

CFR Code of Federal Regulations

CP Cathodic Protection

DFT Dry Film Thickness

HLA High Level Alarm

HLCS High Level Control Shutoff

HHLA High‐High Level Alarm

LLA Low Level Alarm

LLLA Low‐Low Level Alarm

MFL Magnetic Flux Leakage

MT Magnetic Particle Testing

NACE National Association of Corrosion Engineers

NDT Non‐Destructive Testing

NFPA National Fire Protection Association

PSI Pounds per Square Inch

PT Penetrant Testing

P/V Pressure/Vacuum

RP Recommended Practice

PST Product Saver Tank

RT Radiography Testing

TML Thickness Measurement Location

TRV Thermal Relief Valve

UFC Unified Facilities Criteria

UFGS Unified Facilities Guide Specifications

ULS Ultra Low Sulfur

UT Ultrasonic Testing

VT Visual Testing

VPI Valve Position Indicator

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

GENERALSUMMARY
SummaryofInspection
AnAPIStandard653In‐ServiceinspectionofTank14(Facility935)atUSAGKwajalein‐Atoll,Republicofthe
MarshallIslandswascompletedonSeptember29,2017toevaluatethetank’sintegrity,collectdata,andestablisha
databaseforfutureinspectionsandevaluations.Theshellservicelifeevaluationperformedashavinggreaterthan
30yearsofremainingshelllifeundercurrentconditions.InspectionResultsarelistedinSectionC.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

INSPECTIONDATE
APIIn‐Service(External)InspectionDate:29September2017

Equipment (s) Used:

UltrasonicThickness(A‐scan/B‐scan)Testing
Manufacturer:GeneralElectric
Model:DMSGo+
CalibrationMethodsUsed:ZeroingProcedure,CopperCoatingCalibrationProcedure,andTwoPoint

Calibration Procedure

TankSettlementSurveying
Manufacturer:NorthwestInstrument
Model:NRL802KRotatingwithNLD5GLaserReceiver
CalibrationMethodsUsed:Mainandtransversehorizontalaxeschecksat100ft.≤1/16inch
TankShellSurveying
Manufacturer:LeicaGeosystem
Model:3DDisto
CalibrationMethodsUsed:Tiltsensorcalibrationautomaticallyperformedwithunitsetat<3°and

crosshairs calibration using target at a distance > 25 m

Inspector(s): Benyam Berhane

STATEREGULATIONS
StateRegulationforAPIIn‐ServiceTankInspectionsN/A
StateRegulationforAPIOut‐of‐ServiceTankInspectionsN/A
NOTE:Iftherearenostateregulationsfortankinspections,thenN/Ashallresidein‐placeofthenumberofyears
betweeninspections.Ifstateregulationsreside,therecommendedfutureinspectiondatesshallbebasedon
whicheverismorestringentbetweentheAPIinspector’scalculationsandthestateregulations.
PREVIOUSINSPECTIONDATES
APIOut‐of‐Service(Internal)InspectionDate:11November2012
APIIn‐Service(External)InspectionDate:19March2010
RECOMMENDEDFUTUREINSPECTIONDATES(CALCULATIONSSHALLBEPROVIDED)
APIOut‐of‐Service(Internal)InspectionDate:11November2032PerAPI653Section6.4.2‐
SubsequentInternalInspectionInterval
(11November2022IAWUFC)

API In‐Service (External) Inspection Date: 29 September 2022

BenyamBerhane
MechanicalEngineer/Sr.Inspector
InterSpec,LLC
API653CertifiedInspectorNo.28492

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

GENERAL TANK INFORMATION

ITEMDESCRIPTION
OwnerU.SArmy
LocationU.S.ArmyGarrisonKwajaleinAtoll;RMI
FacilityNumber935
TankNumber14
State/CountryKwajaleinAtoll/ RepublicofMarshallIslands
City‐
InspectionDate29September2017
TankManufacturerChicagoBridgeandIron(PerInspectionRecordsonDataplate)
DesignStandardUnknown(AssumedAPISTD12CEleventhEdition)
DateofConstruction1951
TankContentsJP‐5(F‐44)
TankSerialNumberNone
TankDiameter45Feet
ShellHeight30Feet
ProductHeight26Feet
TankCapacity7,500BBL(315,000gallons)
FoundationCoralBedandPerimeterAsphaltPad(ConcreteRingwallonOuterEdge)

Construction

Bottom Lap‐Welded (Cone‐Down)

Shell Butt‐Welded (Cylindrical)

Floating Roof None

Fixed Roof Aluminum Geodesic Dome

Material

Bottom Carbon Steel (Unknown Specification)

Shell Carbon Steel (Unknown Specification)

Floating Roof NA

FixedRoofAluminum(UnknownSpecification)
CathodicProtectionImpressedCurrent
InteriorCoatingSystemThinFilmEpoxy(BottomandPartialShell,DateUnknown)
ExteriorCoatingSystemThinFilmEpoxy/Polyurethane (Partialin2014onFirstCourse)
LevelGaugingENRAFAutomaticTankGaugewithVarec2500MechanicalTapeGauge
OverfillProtection
HydraulicallyOperatedHighLevelShut‐offValvewithDedicatedFloat(Setat
26.75Feet)
PipingReceipt6"CarbonSteel
Issue6"CarbonSteel
LowSuction6”CarbonSteel
WaterDraw‐Off1"CarbonSteel

Level Alarms

Low‐LevelAlarm:4.28 Feet
Low‐LowLevelAlarm:1.44Feet
High‐LevelAlarm:26.00Feet
High‐HighLevelAlarm:28.00Feet
High‐LevelControlShutoff:26.75Feet
TypeofInternalFloating
RoofNA

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

A. GENERAL PROJECT INFORMATION

1. API653Inspection
ThisprojectwillperformAPI653inspectionsofvarioustanksatfacilitiesthroughouttheUnited
States/OCONUS.Additionalconsiderationisgiventofederal,state,andlocalregulations,aswellas
applicablemilitarycriteriaandgeneralindustrystandards.

An API Standard 653 In‐Service (External) inspection was performed on Tank 14 (FAC 935).

2. SiteInformation
OnSeptember29,2017Burns&McDonnellandoursub‐consultant(InterSpec)performedanAPI653
In‐Service(External)inspectionofTank14(Facility935)locatedatU.S.ArmyGarrisonKwajaleinAtoll,
RMI.USAGKwajaleinAtoll(USAG‐KA)ishometotheRonaldReaganBallisticMissileDefenseTestSite.
TheReaganTestSiteisaMajorRangeandTestFacilityBaseundertheDoDwiththeprimarymissionof
researching,developingtests,anddevelopingmissiledefenseandspaceprograms.

Tank 14 is used as an aboveground JP‐5 fuel storage tank supporting the installation fueling needs.

B. TANK INSPECTION COMMENTS

1. TankConstruction
Tank14(FAC935)isanominal7,500BBL,45‐footdiameterby30‐foottall,F‐44(JP‐5),aboveground
verticalstoragetank.Thetankwasconstructedin1951presumablytoAPISTD12CEleventhEdition.
Therearenodataornameplatesaffixedonthetank.Thetankhasundergoneseveralmodifications
sincetheoriginalconstruction.Themostprominentmodificationistheadditionofashellinsertand
patchplatesonthelowertwelveinchesofthefirstshellcourse.Thiswaslikelyaddedtorepair
corrosionintheseareasduetopoordrainageawayfromthechimeandlowershellarea(tankisresting
slightlyinsideandbelowthefoundation).Additionally,modificationsincludinglevelalarms,ahigh
liquidlevelshut‐offsystem,additionalaluminumstillingwells,shellpatchrepairs,additionofaproduct
savertank(PST),productpiperepair,reinforcementpadrepair,andthecircumferential
stairway/platformrepairswerenotedassomeofthealterations.
2. TankFoundation
Thetanksitsonacoralbedandperimeterasphaltpadfoundationthatisapproximately½"to¼"lower
thanadjacentconcreteringwallfoundation.TheoldestavailablereportperformedinNovember1994
indicatedtheconcreteringfoundationwasapproximatelyfour‐inchesawayfromtheedgeofthetank
bottomextension(chime).Theconcreteringfoundationwasmodifiedinthepasttoeliminatethegap
betweenthechimeandthefoundation.However,thecurrentconfigurationstillpromotesrainwater
intrusionsatthechime.Theconcreteringfoundationextendsapproximately21‐inchesfromthechime
andiselevatedapproximately4‐inchesfromthedikefloor.Theflexiblemembraneliner(FML)forthe
secondarycontainmentisattachedtothefoundationwithbattenstrips.Accessiblesectionsofthe
foundationwerevisuallyevaluatedduringtheinspectionforbrokenconcrete,spalling,cracks,and
vegetationagainstthebottomofthetank.Moderatevegetationwaspresentthroughoutthefoundation
tochimeinterface.Thefoundationtochimeinterfaceisnotsealed.Thereisminorvegetationfromthe
earthensecondarycontainmentencroachingtowardsthetopoftheconcretefoundation.The
foundationisnotdesignedwithaleakdetection(tell‐tale)system.Shellsettlementsurveyswere
performedduringtheinspectioninaccordancewithAnnexBofAPIStandard653.Settlementresults

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

arelistedinAppendixA.Thereisnoindicationofsignificantsettlement.Overall,thefoundation
appearstobeisinsatisfactorycondition;however,repairwithconsiderationtodirectwaterawayfrom
thechimeareashouldbeconsidered.Asmallsectionofthefoundationisaccessibleforinspection.
3. TankShell
Thetankshellisconstructedfromcarbonsteelmaterialofanunknownspecification.Theshellisof
cylindricaldesign,butt‐weldedtogether,andconsistingoffive(5)courseswithoneanglestiffening‐
ringapproximately4"fromthetopoftheshell.Evaluatedtheshellforplumbness,roundness,peaking,
andbanding;allofwhichwerefoundtobewithintheallowabletolerancesoftheAPIStandard653.
Visuallyinspectedtheexterioroftheshell.Inspectedthecoatingfordis‐bonding,adhesion,
deterioration,anddiscoloration.Thetankshellisequippedwithone30"manholeandone20"manhole
(180°apart).Thetankisequippedwithashellmountedlowlevelalarmandhigh‐highlevelalarms,as
wellasahigh‐levelshut‐off.Theshellwasevaluatedforremainingmetalthicknessutilizingultrasonic
technology.Theultrasonicthicknessmeasurementsandthicknessmeasurementlocations(TML)are
listedintheShellPlateThicknessMeasurementstableinAppendixA.Aservicelifeevaluation
performedshowstheshellwithgreaterthan30yearsofremaininglifeundercurrentconditions.The
engineeringcalculations,asperAPIStandard653,fortheservicelifeevaluationareshowninAppendix
Aunder“ServiceLifeEvaluation.”Thetankshellisinsatisfactorymechanicalcondition.
4. TankAppurtenances
a. GeodesicDomeRoof
Thistankisretrofittedwithaclear‐spanaluminumdomecovermanufacturedby
ConservatekIndustries.Itisanaluminumgeodesicdomeroofthatwasretrofittedtothis
tankcirca1990.Thedomeisjoinedwithstainlesssteelfastenerswithaninterlockingpanel
thathasanenclosedgasketincompressionforamechanicalseal.Thebattenbarsand
gussetcoveraresealedwithcaulking(externaljointseals).Thereisminortomoderate
caulkingdeteriorationgeodesicroofpanelcaulking.Inspectionofthedomeroofislimited
towhatisaccessiblefromtheplatform.

b. Gauging

Thetank’sEnraf(Model#854)ATGisinstalledthroughan8‐inchcarbonsteelwell.The
stillingwellisslotted.TheEnrafsystemwasnotinworkingorderatthetimeofthe
inspection.Thereisnomanualgaugingandsampling,wellbutitappearsthisactionis
performedviathegeodesicroofaccesshatch.TheATGwaterprobeisinstalledinthesame
ATGstillingwell.Thetankisequippedwithafloatandtapetypemechanicaltapegauge
manufacturedbyVarec(Model2500).Thesystemisnotingoodworkingcondition.
c. LevelAlarms
Thehighlevelalarm,theHLVfloatchamber,andthehigh‐highlevelalarmaremountedon
theshellandareaccessibleviathecircumferentialstairway.Thetankisequippedwitha
low‐levelalarm,butnoindependentlow‐lowlevelalarmsystemwasinstalled,asrequired
bymilitarycriteria.
d. StairsandPlatforms
Thetank’sfixedroofisaccessiblebyacircumferentialstairwaymountedontheshellofthe
tankwithatopplatform.Thestairsandplatformwereinspectedforcorrosionand
structuralsoundness.Thestairwayhandrailisconstructedwith1½"angleironhandrails

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

andcoatedsteelplatetreadswithnon‐slipprofile.Thetopplatformisagalvanizedgrating
type,andseveralstairwaytreadswerereplacedinthepastwithcarbonsteelgrating.The
overallgeneralconditionofthestairsandplatformaremostlysatisfactory(withsome
exception–SeeSectionC).
e. GroundingandBonding
TherearetwogroundingcablesandtwoCPstructureleadcablesthataremechanically
connectedtolugsonthetank’sshell.Thegroundingrodpenetratesthroughthesecondary
containmentfloorlinerandisattachedtoagroundingcable.Thetankisnotequippedwith
acoppergroundingbarforpersonnelstaticelectricdischarge(typicallyrequiredby
militarycriteria).
5. TankCoating
Thetankshell,stairway,handrails,piping,andappurtenancesarecoated.Theexteriortankcoatingis
anepoxywithapolyurethanetopcompletedinDecember2014(onfirstshellcourseandnozzles;the
restoftank’scoatingdateisunknown).Theexteriorshellcoatingismostlysatisfactorywithisolated
coatingfailuresonthetopshellsandstiffeningring.Isolatedcoatingfailurewasnotedonthe
appurtenances,circumferentialstairway,platform,productpiping,andvalveswithinthesecondary

containment.

6. TankPipingSystem
Thefuelisreceivedthrough6‐inchcarbonsteelpipingandproductisissuedfromthetankthrougha6‐
inchcarbonsteelpipe.Thetankisalsoequippedwithotherauxiliarypipingforthewaterdraw(NPS
1)attachedtoaproductsavertank(PST)anda6‐inchlowsuctionpipingthatterminatestoaCamlock
fittingadjacenttothePST.InspectedandevaluatedeachtanknozzleinaccordancewithAPIStandards
650and653.Identifiedthetypeanduseofeachshellnozzleandmeasuredthenozzleneckthickness
onallaccessibleshellnozzles.Evaluatedallnozzlesandreinforcementplatesforleaksandcorrosion.
7. FireProtectionSystem
Thestoragetankisequippedwithasurfaceapplicationfixedfoamfiresuppressionsystemthatusesa
mobilefoamsupply.OneNPS8foamchamberismountedapproximately17inchesdownfromthetop
ofthetankonshellcoursefive.AllVictauliccouplingsforthefiresuppressionsystempipinghave
deterioratedfasteners.Servallocationshavecompletelyfailedcouplings.Nofirehydrantswerenoted
nearthetankduringtheinspection.
8. SecondaryContainment
Thetanksitsinsideanearthensecondarycontainmentbasinwithageotextilelinerpositioned
approximatelyeighttoteninchesbelowthesoilandconcretedikewalls.Theoveralldimensionofthe
secondarycontainmentis131.42feetx131.25feet,withaverticalheightof68.5"(totopsoil).The
secondarycontainmentisequippedwitha6"draininletandadrainvalvethattietotheunderground
PVCpipingsystemtotheOWS.Thesecondarycontainmentreleasevalveishousedinsideavalvepit
adjacenttothedraininletwithinthedike.ThePVCpipingsystemismanifoldedtogetherandcannotbe
individuallyisolatedoutsideofthevalvepit.Thedrainline,thedraininlet,andvalvepitwerevisually
evaluatedtodetermineifthedrainagesystemisliquid‐tight.Thevalvepithasraincovers,butstanding
waterwasnotedinthevalvepit.Additionaltestingandevaluationmayberequiredtodetermineifthe
valvepitisliquid‐tight.Theliquidinthevalvepitwaslowerthantheliquidintheadjacentdraininlet
andthussuggeststhatthedraininletissatisfactory.However,thesourceofthestandingwaterinthe
valvepitshouldbedetermined.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

Thesecondarycontainmentwasvisuallyevaluatedduringtheinspectionforbrokenconcrete,spalling,
cracks,andvegetationgrowth.Minorhairlinecracks(temperaturecracks)andsomemoderatecracks
werenotedinthesecondarycontainmentwall.Anapproximatetotalof147linearfeetofcracksinthe
secondarycontainmentwallwereidentified.Hairlinecracksdonotseriouslyaffectthestrengthofthe
concretestructures;however,thesecrackscanbepotentialaccesspointsformoistureorwater
seepagethatcouldcorrodethereinforcingsteel(rebar).ThereareseveralCPtestport/anodeaccess
PVCopeningsaroundtheperimeterofthetankthatpenetratetheFML.SomeofthesePVCopenings
havedeterioratedcaulking.Thesecondarycontainmentisinmostlysatisfactorymechanicalcondition,
withtheexceptionofthediscrepanciesidentifiedinSectionCbelow.Fieldassessmentindicatesthat
thesecondarycontainmentisofsufficientsizetocontainatotaltankloss.Thesecondarycontainment
ispartiallyslopedtoallowfordrainageawayfromthetank.
Aformalsecondarycontainmentevaluation,inaccordancewith40CFR112,mayberequiredinorder
tosatisfyfederal,state,andlocalrequirements.
9. CathodicProtection
AnimpressedcurrentCathodicProtection(CP)systemisinstalledonthistankthatservesmultiple
ASTsatthetankfarm(Tank8,9,13,and14).TheCPsystemismanufacturedbyCorrpower(Model
COYSE50‐34RSerial#CO11956).Thisunitisa50volt34ampereair‐cooledrectifierunit(numbered
CP2)andismountedontheoutsideofthepumphouseonthenortheastendofthesecondary
containment.TheJanuary2017reportprovidedindicatedthatTank#14isreceivingcathodic
protectionbasedonNACEcriterion.Therectifier,anodejunctionbox,andtankjunctionboxallarein
satisfactorycondition.
Atthetimeoftheinspection,therectifierwaspoweredonandinserviceableoperationcondition.Base
personnelperformedtherequiredtestinganddatalogging.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

C. FINDINGS AND RECOMMENDATIONS

Thetankisgenerallynotinaccordancewithcurrentmilitarycriteriaforsomeofthetankdesign,
appurtenancesandpipingconfiguration.Therefore,therecommendationsarenotmeanttobringthetankinto
fullcompliancewithUFC3‐460‐01orAW78‐24‐27standardsbutrathertoidentifytheseitemsforthe
owner/user’splanedupgrades,rehabilitation,andpriorityrepairs.Mandatoryrepairsshouldbecompletedto
assurecompliancewithindustrystandards,aswellasfederalorstatejurisdictionalrequirements.
Duringthisevaluation,thetankwasfoundtobeinagenerallyserviceablecondition,withnoimminentriskto
operationandoverallintegrity.However,therewereseveraldeficienciesthatwerenoted.Thesenoted
deficienciesarelistedbelowinnoparticularorder,withrepairrecommendations.
AllrepairsandmodificationsshouldbeperformedinaccordancewithAPIstandard653,UFC3‐460‐01,DoD
StandardDesign78‐24‐27,andapplicableUFGSspecifications.
1. MANDATORYREPAIRSperAPI653,UFC3‐460‐01,orAW78‐24‐27Standards
Mandatoryrepairsrepresentitemsthatrequireimmediateattention,inordertopreventimminentrisk
tosystemoperators,equipmentintegrity,ortheadjacentenvironment.Thetankshouldremainoutof
serviceuntiltheserepairsarecompleted.

No mandatory repairs were identified for this tank.

2. REQUIRED REPAIRS to Fully Comply with API 653 or Federal, State, and Local Codes

Requiredrepairsrepresentitemsthatshouldbeaddressedinatimelymanner,inordertoprevent
futurepotentialriskstosystemoperators,equipmentintegrity,ortheadjacentenvironment.These
itemsareberequiredbyAPI‐653orfederal,state,andlocalcodes.
a. SecondaryContainmentCracks
OBSERVATION:Unsealedcrackswereidentifiedinthesecondarycontainmentwall(thisincludes
areasthatwerepreviouslysealed).
CodeREFERENCE:40CFRSection112.7(c)statesthattheentiresecondarycontainmentsystem,
“includingwallsandfloor,mustbecapableofcontainingoilandmustbeconstructedsothatany
dischargefromaprimarycontainmentsystem...willnotescapecontainmentbeforecleanupoccurs.”
§§112.8(c)(2)and112.12(c)(2)statethatdikedareasmustbe“sufficientlyimpervioustocontainoil.”
RECOMMENDATION:RepairallexposedcracksinthecontainmentwallsbygrindinginaV‐shape
pattern,withatleast¼‐inchwidthatthesurfaceandadepthofatleast¼‐inchandsealingwith
flexibleurethane(e.g.Sikaflex1c)orasimilarapprovedsealant(Quantity:147linearfeet).

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

b. SecondaryContainmentExpansionJointSealant
OBSERVATION:Thereareareasofweatheredanddeterioratedsealantattheexpansionjointsforthe
secondarycontainmentwall.
CodeREFERENCE:40CFRSection112.7(c)(Seereferencefromabove)
RECOMMENDATION:Removethedamagedjointsealantandinstallnewbackerrodsandsealantwithin
thecontainment.Thesealantshallbeadequatetoaccommodateajointcompressionequalto50
percentofthewidthofthejoint.Thebackerrodshallbecompressiblerodstockofpolyethylene
foam,polyurethanefoam,butylrubberfoam,orotherflexible,non‐absorptivematerial,as
recommendedbythesealantmanufacturer.SealantshallconformtoUFGS079200JointSealant
(Quantity:15linearfeet–threelocations).
c. SecondaryContainmentDrain
OBSERVATION:Thevalvepithasraincovers,butstandingwaterwasnotedinvalvepit.Theliquidin
thevalvepitwaslowerthantheliquidintheadjacentdraininletandthussuggeststhatthedrain
inletissatisfactory.However,thesourceofthestandingwaterinthevalvepitshouldbedetermined.
CodeREFERENCE:40CFRSection112.7(c)(Seereferencefromabove)
RECOMMENDATION:UpgradetheconcretedraininletasdetailedinAW78‐24‐27DrawingCD.09
Detail3orsimilar.UseductileironpipinginlieuofthePVCdikedrainlines.Ataminimum,
investigateandrepairsourceofwaterinsidethevalvepit.Slopedikebasinsurfacesaminimumof
1%fordrainage.Drainageswalesshouldbeslopednoflatterthan0.5%todrainageinlet(seeAW78‐

24‐27).

Secondary Containment Drain

Valve Pit Rain Cover

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

d. SecondaryContainmentLinerandPenetration
OBSERVATION:Thesecondarycontainmenthasalinerwithanearthencover.Theconditionofthe
linerisunknown,butsomepenetrationincludingthePVCcathodicprotectionanodeaccesscapsand
thetankgroundingrodsleeveshavedeterioratedcaulkingandloosehoseclamps.Themajorityofthe
battenstripsontheperimeteroffoundation,perimeterofdikewall,andthepipesupportpiersare
notaccessibleforinspection.Ahigherrateofraindisplacementwasnotedforthissecondary
containmentcomparedtotheotherASTdikesystems(ParticularlyTank8and9withoutearthen
cover).Someofthewaterdisplacementislikelyduetothewaterabsorptionrateofthe
soil/vegetation.However,theevaporationoftheexcesswaterabovegradeisexpectedtobeconstant
foralldikesunlessthereisadeterioratedliner.
CodeREFERENCE:40CFRSection112.7(c)(Seereferencefromabove)
RECOMMENDATION:ResealallPVCFMLpenetrationsandsecurethehoseclamps.Seesimilar
applicationoverconcreteinAW78‐24‐27DrawingCD.02Detail2.
e. SecondaryContainmentLinerandPenetration
OBSERVATION:TherearetwoNPS2galvanizedpipecapsthatarecorrodedofflocatedinthedike.
Bothpenetratethesecondarycontainmentfloor.Thisisapotentialbreachinthesecondary
containmentifthispipeextendsoutsideofthedike,withnomeansofisolation.
CodeREFERENCE:40CFRSection112.7(c)(Seereferencefromabove)
RECOMMENDATION:Investigatetheuseandroutingofthegalvanizedpipe.Eithersealofforremove
thepipes.

Drain Valve Drain Inlet

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

f. SecondaryContainmentWallPenetration
OBSERVATION:Thecontainmentpipingpenetratesthroughthesecondarycontainmentwallswithout
theuseofanadequatepipesleeve/seal.Somehavebeenretrofittedwithcompressionsealsbutdo
nothavepipesleeves(Quantity:8).
CodeREFERENCE:40CFRSection112.7(c)(Seereferencefromabove)
RECOMMENDATION:Resealallsecondarycontainmentwallpenetrations.Considerupgradingall
secondarycontainmentwallpenetrationsperAW78‐24‐27DrawingCD.08DetailNA(CONCRETE
WALLPENETRATIONDETAIL).
g. FoundationandDrainage
OBSERVATION:Thereisnojointsealbetweentheconcretefoundationandtheshelltobottom
projection(chime).Thereismoderatevegetationandisolatedcoatingfailurewithcorrosion.The
tankchimeisapproximately½"to¼"lowerthanadjacentconcreteringwallfoundation.The
currentconfigurationpromotesrainwaterintrusionsatthechimeandunderthetankbottom.
CodeREFERENCE:API653section4.4.2,“Inadequatedrainageresultinginsurfacewaterflowing
underthetankbottom.”SeealsoAW78‐24‐27DrawingD.04Detail3.
RECOMMENDATION:Removeallvegetationaroundtheperimeterofthechime.Considersealingthe
gapsbetweentheedgeofthechimeandconcretetodirectwaterawayfromthechimearea.Donot
sealthetopofthechime.NotethisrecommendationisnotinlinewithW78‐24‐27DrawingD.04
Detail3butwillaidineliminatingthevegetationandwaterintrusiongiventheexisting

configuration.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

h. DripsonSSTubingFittings
OBSERVATION:Smalldripswerenotedonthestainlesssteeltubingcompressionfittingforthehigh
liquidlevelshut‐offvalve.
CodeREFERENCE:InaccordancewithNFPA30,paragraph21.8.6,“Storagetanksandtheir
appurtenances,includingnormalvents,emergencyvents,overfillpreventiondevices,andrelated
devices,shallbeinspectedandmaintainedtoensurethattheyfunctionasintendedinaccordance
withwrittenprocedures.”
RECOMMENDATION:Replacefittings.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

i. DeterioratedVictaulicCoupling(AssociatedwiththeFireSuppressionSystem)
OBSERVATION:AllVictauliccouplingsforthefiresuppressionpipinghavedeterioratedbolts.Several
locationshavecompletelyfailedVictauliccouplings.Thiscouldresultinabreachinthesecondary
containmentbecausethispipeextendsoutsideofthesecondarycontainment,andasimilartypeof
corrosionwasnotedonthecouplingfastenersoutsideofthedike.Asectionofthefiresuppression
pipingisalsoroutedundergroundoutsideofthedike,andthetightnessofthepipingisunknown.
Thefiresuppressionsystemwillnotfunctionwiththesedeterioratedcouplingfasteners.
CodeREFERENCE:40CFRSection112.7(c)(Seereferencefromabove).AlsoNFPA11Section4.7.1.4,
“Whereexposedtocorrosiveinfluences,thepipingshallbecorrosionresistantorprotectedagainst
corrosion.”InterSpecconcludestheintegrityofthepipingisdependentonthefastenersthus
incorporatingthecodereferenceforthecouplingfasteners.
RECOMMENDATION:Replacealldeterioratedbolts,couplings,andpipe.Repairthepipetomeetthe
requirementsofNFPA11Section4.7.1.4byinstallingstainlesssteelfasteners.
j. CorrosionandPittingonContainmentPiping
OBSERVATION:Areasofpittingwerenotedon NPS8sectionofreceiptpipingontheweldedtee.
CodeREFERENCE:APIRP574Section7.4.14(CreviceCorrosion).APIRP574Section10.1.6.3(Loss
inthickness)
RECOMMENDATION:Replacethespoolsofpipingthathavesignificantpittingandcorrosion.Itmaybe
practicaltoconductadetailedAPISTD570inspectionofthecontainmentpipingtogetanoverall
conditionassessment.NDTtoolssuchasguidedwaveexaminationcanalsobeemployedtogetthe
conditionofinaccessibleareasbetweenthepipesupports,sleevedpiping,wrappedpiping,or
throughthedikewallpenetration.Guidedwaveexaminationisascreeningtoolusedtoinspectlarge
sectionsofpipingfromasingletestlocation.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

k. TankGroundingLug
OBSERVATION:Thetankgroundingstrapsareboltedtothetankshell(mechanicaljointonacoated
interface)andhavenoreinforcementplatesorgroundinglugsIAWAW78‐24‐27DrawingED.02
Detail2.
CodeREFERENCE:AW78‐24‐27DrawingED.02Detail2.(SeealsoAPI650Section5.8.11.3)
RECOMMENDATION:Exothermicallyweldthegroundingcablestothelugsandinstallreinforcementat
theshell,inaccordancewithAW78‐24‐27DrawingED.02Detail2.Note:ifrepairsareelectednotto
bedone,thepaintshouldberemovedwherethecableboltstothelug,toprovideabetterconnection
toground(Quantity:2groundconnectionsand2CPleadcables).NotethecurrenteditionofAPISTD
650suggestsamaximumlugspacingof100ft.withaminimumoffourlugs.
l. ProductSaverTank(PST)Grounding
OBSERVATION:TheProductSaverTankisnotgroundedattheleganddoesnothaveaventinstalled
inaccordancewithAW78‐24‐27DrawingD.13DetailA1.ThePSTisastainlesssteeltankwithatop
lid.ThePSTtankhasnomeansofgrounding.
CodeREFERENCE:AW78‐24‐27DrawingD.13DetailA1.InaccordancewithNFPA30,paragraph
6.5.4,“Allequipmentsuchastanks,machinery,andpipingshallbedesignedandoperatedtoprevent
electrostaticignitions.Allmetallicequipmentwhereanignitablemixturecouldbepresentshallbe
bondedorgrounded.Thebondorgroundorbothshallbephysicallyappliedorshallbeinherently
presentbythenatureoftheinstallation.”
RECOMMENDATION:InstallagroundcableandventpipingtotheProductSaverTankinaccordance
withAW78‐24‐27DrawingD.13Detail5(Quantity:1ground,1ventpipe(1¼NPS,2‐feethigh).

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

m. ShellManholeCoverwithnoHingeorDavitArm
OBSERVATION:Theshellmanholecoversarenotequippedwithahingeordavitarmtofacilitatethe
handlingofthemanholecoverplates.
CodeREFERENCE:APISTD650Section5.8.3.5states,“Shellmanholecoversshallhavetwohandles.
Thosecoversweighingmorethan34kg(75lb)shallbeequippedwitheitherahingeordavitto
facilitatethehandlingofthemanholecoverplate.Thedavitsupportarmshallnotbeweldeddirectly
totheshellwithoutareinforcingplate.”AlsoAW78‐24‐27drawingD.10detail3
RECOMMENDATION:InstallashellmanholedavitarmIAWwithAPISTD650andAW78‐24‐27
drawingD.10detail3(Quantity:2).Considerincreasingshellmanholesizedto36‐inchesduringthe
nextASTrehabilitationproject(SeeUFC3‐460‐01Chapter12‐1)
n. TopPlatformGratingnotSecuredDown
OBSERVATION:Thecircumferentialstairwaytopplatformdoesnothaveanchor/saddleclips.
CodeREFERENCE:OSHAandAW78‐24‐27DrawingD.11Detail1,“Gratingshallbeanchoredwith
saddleclips.”
RECOMMENDATION:Installgratinganchors.
o. CircumferentialStairwayTreadSpacingandCorrosion
OBSERVATION:Thecircumferentialstairwayhasvaryingtreadspacing(rise).Thiswasnotedonthe
replacementtread(7"to9.5"variancenoted).Moderatecoatingfailureandcorrosionwerenotedon
circumferentialstairwaytreadsandrisers.
CodeREFERENCE:OSHA29CFR1910,SubpartD,“Stairshaveuniformriserheightsandtreaddepths
betweenlandings”.APISTD650Section5.8.10“Risesshallbeuniformthroughouttheheightofthe

stairway.”

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

RECOMMENDATION:Allfuturetreadreplacementshouldproviderisesthatareuniformthroughout
theheightofthecircumferentialstairway.Replacecorrodedtreads(3)andrisers(5)
p. CircumferentialStairwayPathRestricted
OBSERVATION:Thereislimitedorrestrictedpathonthecircumferentialstairwayduetothegeodesic
domeroofflashingprojectiontowardsthecircumferentialstairway.Thereisnointermediate
platform.Thereisanapproximatelytwenty(20)inchclearancebetweenthehandrailandthe
geodesicdomeroof.Thisreducestheexistingtreadwidth.
REFERENCE:UFC3‐460‐01SectionTable8‐1itemj.OSHAminimumrequiredtreadwidthis22inches
(1920.25(C)(3)).SeealsoAPI650Table5.18item3.
RECOMMENDATION:Installanintermediateplatformorreworkthecircumferentialstairwayto
provideasufficientpathpastthegeodesicdomeroof.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

q. Conduit,JunctionBoxes,FittingsandMountingHardware
OBSERVATION:Theconduits,junctionboxes,fittings,andmountinghardwarewithinthesecondary
containmenthavedeteriorated.ThiswillnotmeettheClass1,Division1ratingrequirementsfor
hazardouslocations.
CodeREFERENCE:AllwiringandfittingsinaClassIlocationthatisabulkplantorterminalmust
complywiththeapplicableprovisionsofNECArticle501orArticle505[515.7].
RECOMMENDATION:Replaceallcorroded/deterioratedconduits,junctionboxes,fittings,and
mountinghardware.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

3. RECOMMENDEDREPAIRSasPartofRegularMaintenance
Recommendedrepairsrepresentitemsthatshouldbeaddressedinatimelymanner,inorderto
preventfuturepotentialriskstosystemoperators,equipmentintegrity,ortheadjacentenvironment.
a. ExteriorCoatingFailuresonTankandAppurtenances
OBSERVATION:Thereisisolatedcoatingfailureontheexteriorshellmostlyaroundthestiffeningring,
topplatform,circumferentialstairway,stiffeningring,andshellmanholes.Similarisolatedcoating
failurewasnotedonthePSTpump,HLVtubingsupportmountingbrace,andlowlevelandhighlevel
sensorchambers.ThereismoderatecoatingfailureandcorrosionnotedontheLLA,HLA,HHLA,and
HLVonthepipenipplesandflanges.
CodeREFERENCE:UFC3‐460‐01,Section8‐3.10andSection9‐10
RECOMMENDATION:Mechanicallycleanandrecoattheareasofcoatingfailureonthetankshell,
circumferentialstairway,landing,piping,andappurtenances.Repairsshouldbeaccomplishedusing
anepoxybasedcoatingsystemorequivalent.
b. TankMarking(NFPADiamond)
OBSERVATION:ThetankisnotequippedwithanNFPAmarking.
CodeREFERENCE:MarkthetankinaccordancewithNFPA704.AW78‐24‐27DrawingD.13Detail3
Note4) “ProvidehazardidentificationsystemlabelinginaccordancewithNFPA704.”
RECOMMENDATION:InstallanNFPA704marking.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

c. NoorFadedConfinedSpaceMarkingsatManholes
OBSERVATION:The tankisnotequippedwithaconfinedspacemarking.
CodeREFERENCE:InaccordancewithOSHARegulation29CFR1910.146(c)(2),“Iftheworkplace
containspermitspaces,theemployershallinformexposedemployees,bypostingdangersignsorby
anyotherequallyeffectivemeans,oftheexistenceandlocationofandthedangerposedbythepermit
spaces.NOTE:AsignreadingDANGER‐‐PERMIT‐REQUIREDCONFINEDSPACE,DONOTENTERor
usingothersimilarlanguagewouldsatisfytherequirementforasign.”
RECOMMENDATION:Installconfinedspacemarkingsonalltankentrypoints.
d. ProductSaverTank(PST)PumpandLevelAlarm
OBSERVATION:TheProductSaverTank(PST)isnotequippedwithanelectricalpumpanddoesnot
havehighlevelalarms.Theexistingdiaphragmoperatedpumphasmoderatecorrosionwith
deterioratedappurtenances(brokenregulator,corrodedairfilterhousing,andcorrodedvalve

handle).

CodeREFERENCE:AW78‐24‐27DrawingD.13Detail5.IAWUFC3‐460‐01Section3‐6.6.7,“Mount
permanentlyinstalledpumpsonsubstantialfoundationsofreinforcedconcretedesignedin
accordancewithHydraulicInstituteStandards.”
RECOMMENDATION:ConsiderreplacementoftheexistingsysteminaccordancewithAW78‐24‐27.
e. TankElectronicATGandWaterProbe
OBSERVATION:Thetank’sEnraf(Model#854)ATGisinstalledthroughan8‐inchcarbonsteelwell.
Thestillingwellisslotted.TheEnrafsystemwasreportedtobeinnon‐workingorderatthetimeof

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

theinspection.Therewerebrokenconduitsandexposedwires.Thewaterprobeisnotmountedover
thesumpandisinstalledinthesamewellastheATG.
CodeREFERENCE:UFC3‐460‐01Table8‐1(itempands)andAW78‐24‐27DrawingD.07Detail3,4
and5)
RECOMMENDATION:ReplaceorrepairtheATG.ReplacethestillingwellsIAWwithAW78‐24‐27.
f. IndependentLow‐LowLevelAlarm
OBSERVATION:Thetankisnotequippedwithanindependentlow‐lowlevelalarm.Thereisalow
levelalarmsensorinstalledonthesideofthetankshell(seephotobelow).
CodeREFERENCE:UFC4603‐460‐01Table8‐1(k)andAW78‐24‐27DrawingD.12Detail1
RECOMMENDATION:Installanindependentlow‐lowlevelarm.
g. MechanicalTapeGauge(MTG)
OBSERVATION:Thetankisequippedwithafloatandtapetypemechanicaltapegaugemanufactured
byVarec(Model2500).Thesystemisnotinworkingcondition.Thecheckerknobdidnotrespond
whenactuated.Theviewingwindowiscloudyandhascorrodedfittings.
CodeREFERENCE:Generalmaintenance/manufacturer’sinstructionandUFC3‐460‐01Table8‐1
(itemo)
RECOMMENDATION:ConsiderreplacementoftheexistingsystemwithnewMTG.Considerincreasing
theelevationofthegaugehead,sotheproductlevelreadingwindowisat“convenienteyelevel”from
grade.UFC3‐460‐01Section8‐8.3(itemo)listsaliquidlevelgaugemountedat60”abovethe
walkingsurface.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

h. InternalLadder
OBSERVATION:Thereisnointernalladder(noteroofisnotequippedwithfloatingroofandthis
recommendationmaybedeferredtountilIFRisinstalled).
CodeREFERENCE:UFC4603‐460‐01Table8‐1(h)andAW78‐24‐27DrawingD.08Detail2
RECOMMENDATION:Installtheinternalladder(inaccordancewithOSHAcriteria)fortanksof5,000
gallons(19000L)orlargerperUFC4603‐460‐01Table8‐1(h)andAW78‐24‐27DrawingD.08
Detail2.
i. NoSampleGaugeWell
OBSERVATION:Thereisnomanualsampling/gaugingwell.
CodeREFERENCE:UFC4603‐460‐01Table8‐1(s)andAW78‐24‐27DrawingD.07Detail2
RECOMMENDATION:Installa10‐inchroofnozzleandanaluminum,slottedstillingwellthatextendsto
within3inchesofthebottomofthetankforgaugingandsamplingwithadatumplatetoestablisha
gaugingzeropoint.
j. DoubleBlockandBleedValveMissingBodyPressureRelief
OBSERVATION:Theproductreceiptandissuedoubleblockandbleedvalvesdonothaveabody
pressurereliefsystem.Itiscurrentlypluggedoff.“TwinSealvalvesholdbubble‐tight,foreaseof
openinginliquidservice,itisimportanttopreventtrappedbodypressurefromexceedingthe
workingpressureofthevalve.Therefore,areliefsystemisrequiredtopreventpressurebuildupin
thebodycavity.”
CodeREFERENCE:Generalmaintenance/manufacturerinstruction.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

RECOMMENDATION:Installadifferentialthermalrelief(DTR)systemwithpressuredischarging
towardtheflowpath.
k. ProductPipingLabelMarking
OBSERVATION:Themajorityofthesecondarycontainmentpipinghasproductpipemarking.Fadedor
missingmarkingswerenoted.
CodeREFERENCE:AW78‐24‐27DrawingCD.13Detailx.(refertoMIL‐STD‐161Gforcorrectfueltype)
RECOMMENDATION:Reapplytheproductpipingmarking.
l. FadedTankMarking
OBSERVATION:Thetankmarkingshavefaded/peeled.
CodeREFERENCE:Markthetankswitheasilydiscerniblepaintednumbersandlettersindicatingthe
followinginadditiontotherequirementsstatedinMIL‐STD‐161:Tanknumber,Facilitynumber,“No
Smoking”onClass1tanks,and“ConfinedSpace”onRoofManhole/LadderHatch(UFC3‐460‐01,
Section2‐18).
RECOMMENDATION:ReplacethefadedtankmarkingIAWNATOrequirements.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

m. FixedRoofDeteriorated
OBSERVATION:Thereisminortomoderatecaulkingdeteriorationonthegeodesicdomeroofpanels.
Inspectionofthedomeroofislimitedtowhatisaccessiblefromtheplatform.
CodeREFERENCE:Generalmaintenance/manufacturerinstruction
RECOMMENDATION:Sealthetopsideofthegeodesicdomeroofasneededtoeliminatewater

intrusion.

n. RoofHatchDoorFixedRoofDeterioratedCaulkingBrokenLidHinge
OBSERVATION:Thegeodesicdoomroofhatchlidhasabrokenhinge.
CodeREFERENCE:Generalmaintenance/manufacturerinstruction
RECOMMENDATION:Repairhinge.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

o. ShellPitandGouge(NoRepairRecommendation)
OBSERVATION:Thereisoneareaofisolatedpittingonshellcoursetwoandthreegougeareasonshell
courseone(SeeShelldrawinglayout).Thepittingdepthis0.130"andthemaxgougedepthis0.120"
CodeREFERENCE:API653Section9.4,“Theneedforrepairingindicationssuchascracks,gougesor
tears(suchasthoseoftenremainingaftertheremovaloftemporaryattachments),widelyscattered
pits,andcorrodedareasdiscoveredduringaninspectionofthetankshellshallbedeterminedonan
individualcasebasisinaccordancewithSection4.”
RECOMMENDATION:Norepairsrecommendatthistime(isolate/greaterthantmincalculation).
RevaluateatthenextAPISTD653inspectioninterval.RepairatthenextAPISTD653out‐of‐service

inspection.

p. PersonnelStaticElectricDischarge
OBSERVATION:Thetankisnotequippedwithacoppergroundingbarforpersonnelstaticelectric
discharge(typicallyrequiredbymilitarycriteria).
CodeREFERENCE:UFC3‐460‐03Section2‐3.21andAW78‐24‐27DrawingD.11Detail4
RECOMMENDATION:Installacoppergroundingbarforpersonnelstaticelectricdischargeatthebase
ofthecircumferentialstairway.
q. AST ExteriorFireProtectionWaterSystems
OBSERVATION:ThetankdoesnotappeartomeettheequipmentrequirementforASTexteriorfire
protectionsystem.Thestandpostmountedwaterjetmonitorwasnotedalongthefacilityfenceline
northeastcornerofthedike.
CodeREFERENCE:UFC3‐460‐03Section2‐15.2.1

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

RECOMMENDATION:InstalladditionalservicesforthetankexteriorfireprotectionwatersystemsIAW
UFC3‐460‐01Section2‐15.2.1(fireprotectionwatermains,hydrants,valves,pumps,andapplication
devicesoutsideofdike)tocontrolbrushandgrassfiresandcoolingofstoragetanksintheeventofa
fireexposure.

API 653 In‐Service Inspection Report USAG Kwajalein‐Atoll

APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS

A.1SHELLSERVICELIFEEVALUATION
A.2SHELLSETTLEMENTEVALUATION
A.3ULTRASONICUTDATA
A.4CONTAINMENTLAYOUTDRAWING
A.5SHELLLAYOUTDRAWING
A.6OSHAACCESSSTRUCTUREREPORT

Where:

t min = minimum acceptable shell thickness for each course, in inches; however, t min shall not be less than 0.1 inch for any tank course.

t nom = nominal shell thickness, in inches.

t act = current measured shell thickness, excluding pits and corrosion, in inches.

t prev = previous measured shell thickness, excluding pits and corrosion or t nom , in inches.

D = nominal diameter of the tank, in feet.

H = height from the bottom of the shell course under considerations to the established maximum liquid level, in feet.

H c = calculated safe fill height, in feet, for the current product.

G = specific gravity of the contents.

Y = specified minimum yield strength of the plate; use 30,000 pounds per square inch if not known (N/A for riveted tanks).

T = smaller of the specified minimum tensile strength of the plate or 80,000 pounds per square inch; use 55,000 psi if not known (N/A for riveted tanks).

S = The maximum allowable stress, in pounds per square inch. For welded tanks, use the smaller of 0.80Y or 0.429T for the bottom and the second course or the smaller of 0.88Y or 0.472T for all other courses. For riveted tanks, use S =21,000 psi. For elevated temperatures above

200OF, the maximum allowable stress shall be the smaller of 2/3 the minimum yield strength multiplied by the M-factor (M) of API Standard 650 Appendix M or the product design stress value listed in Table M-1a or M-1b of API Standard 650.

E = original joint efficiency for the tank. Use Table 4-2 from API Standard 653 if original E is unknown; E =1.0 when evaluating the retirement thickness in a corroded plate, when away from welds or joints by at least the greater of one inch or twice the plate thickness. For riveted tanks, use E =1.0 for shell plates when greater than 6 inches from rivets; use the value of E from API Standard 653 Table 4-3 when within 6 inches of rivets.

L r = remaining life of the shell, in years.

C r = shell corrosion rate, in inches per year.

I ut = inspection interval for the next ultrasonic inspection, in years (not to exceed 15 years).

I v = inspection interval for the next visual external inspection, in years (not to exceed 5 years).

Y = years between the previous measured shell thickness (t prev ) and the current measured shell thickness (t act ), in years.

The maximum inspection intervals are determined by the most restrictive shell course in regard to the remaining life and the corrosion rate calculations for each shell course using the following formulas:

A.1 Shell Service Life Evaluation tmin =

2.6(H−1)DG

SE

Lr = tact − tmin

Cr Cr = tprev − tact Y Iut = tact − tmin 2Cr

Iv = tact − tmin

4Cr

1) Minimum Required Thickness

D = 45 feet

G = 0.845

𝞓Y = 66 years

Course

No.

Plate

Specification

Course

Height

(feet)

Product

Height

(feet)

(H )

Maximum

Allowable

Stress

(psi)

(S )

Joint

Efficiency

(E )

Minimum

Acceptable

Thickness

(inches)

(t min )

Previous

Measured

Thickness

(inches)

(t prev )*

Current

Measured

Thickness

(inches)

(t act )

1 Unknown 6 26 23,600 0.85 0.123 0.2656 0.248

2 Unknown 6 20 23,600 0.85 0.100 0.2656 0.25

3 Unknown 6 14 26,000 0.85 0.100 0.2656 0.249

4 Unknown 6 8 26,000 0.85 0.100 0.2656 0.243

5 Unknown 6 2 26,000 0.85 0.100 0.2656 0.258

*The t prev values were based on t nom .

A.1 Shell Service Life Evaluation

0.000

0.050

0.100

0.150

0.200

0.250

0.300

1 2 3 4 5

In c h e s

Course

Thickness Graph tprev tact tmin

A.1 Shell Service Life Evaluation

2) Corrosion Rate, Remaining Life and Inspection Intervals

Course

No.

Corrosion

Rate

(in./yr)

(C r )

Remaining

Life

(years)

(L r )

Next

Visual

Inspection

(years)

(I v )

Next

Ultrasonic

Thickness

Inspection

(years)

(I ut )

1 0.00027 467 5 15

2 0.00024 634 5 15

3 0.00025 592 5 15

4 0.00034 417 5 15

5 0.00012 1372 5 15

* Let C r =0.0002 inches per year for calculation purposes.

Note: The engineering data used to calculate in-service period of operation (Remaining Life) assumes the tank remains…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .