Attachment_J.18_TO 003_Recorder of Deeds Furniture - Plans.pdf

PDF 2 MB Posted

Attached to
Multiple Award IDIQ Contract for Furniture and Furnishings Products & Services
Solicitation number
DCSC-25-RFP-066
Issued by

About this file

These architectural floor plans depict the Justice Resource Center located at 515 D St NW, Washington, DC 20001, showing detailed layouts for four floors (basement, first, second, and third floors, plus a fourth floor mechanical level). The plans are color-coded to indicate different design and programming scopes:

  • Basement and First Floor: Primarily mechanical, storage, and support spaces including mechanical rooms, electrical closets, restrooms, locker rooms, mail room, and building storage areas.
  • Second Floor: Includes spaces for Crime Victims Compensation, shared conference areas, lunchroom, and various office configurations.
  • Third Floor: Features Access to Justice, Public Service Center, Virtual Hearing Rooms, and multiple office and meeting spaces.
  • Fourth Floor: Dedicated to mechanical systems, including emergency generator room, mechanical rooms, elevator controls, and utility spaces.

The floor plans are part of a furniture and furnishings contract (Solicitation Number DCSC-25-RFP-066) for the District of Columbia Courts, showing detailed space planning and room allocations for a multi-purpose government facility.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

UP

UP

UP

EVAC

AMP

G A

P

Z C

A

308 SF

SECURITY OFFICE

BUILDING

RECEPTION

148 SF

ENTRY

151 SF

ENTRY

50 SF

EMPLOYEE

ENTRANCE

49 SF

MAIN ENTRANCE

(ADA COMPLIANT)

STAIR 1

S1-1

STAIR 2

S2-1 27 SF

ELECTRICAL

CLOSET

34 SF

TELECOM/

SECURITY

CLOSET

ELEV. 2ELEV. 1

LOBBY

180 SF

OFFICE

259 SF

PANTRY

83 SF

LAN

76 SF

HUDDLE

115 SF

OFFICE

DGS

RECEPTION

115 SF

OFFICE

40 SF

CLOS.

115 SF

OFFICE

115 SF

OFFICE

116 SF

STORAGE

278 SF

CONF.

147 SF

TEAM/ OFFICE

76 SF

HUDDLE

121 SF

COPY

546 SF

OPEN OFFICE

499 SF

OPEN OFFICE

605 SF

TENANT SPACE

61 SF

UNISEX

RESTROOM

(PUBLIC)

59 SF

UNISEX

RESTROOM

(PUBLIC)

102 SF

VENDING

28 SF

JANITOR'S

CLOSET

WAITING/

RECEPTION AREA

100-A

LEGEND

DGS

65 SF

UNISEX

RESTROOM

67 SF

UNISEX

RESTROOM

122 SF

CORRIDOR

761 SF

CORRIDOR

3/16" = 1'-0"03/05/2025 FIRST FLOOR - JUSTICE RESOURCE CENTER

515 D St NW, Washington, DC 20001

AREAS BEING DESIGNED

AS PART OF BASE SCOPE

(CORE AND SHELL)

AREAS TO BE

PROGRAMMED AS PART OF

OPTION 1 (UNCHAGNED)

UP

UP

UP

UP

UP

UP

UP

UP

UP

A4121

A413 1

STORM WATER

MANAGEMENT

ROOM

B101

BUILDING

STORAGE

B102

STAIR 1

S1-B

STAIR 2

S2-B

ELECTRICAL

CLOSET

B116

BUILDING

ENGINEER

OFFICE

B113

MAIL ROOM

(COLLECTION AND

MAILBOXES)

B114

BUILDING

ENGINEER

STORAGE

B110

MEN'S LOCKER

ROOM

B103B

SECURITY

EQUIPMENT

ROOM

B112

HOUSEKEEPING

B108

MECHANICAL

SERVICE ENTRY

ROOM (GAS AND

WATER)

B107

MECHANICAL

ROOM (CHILLERS,

CHILLED WATER

PUMPS,

CONDENSER

WATER PUMPS,

AHU)

B117

MEN'S

RESTROOM

(PUBLIC)

B104

WOMEN'S

RESTROOM

(PUBLIC)

B106

JANITOR'S

CLOSET

B105

CORRIDOR

B100

ELEV. 1 ELEV. 2

TELECOM/

SECURITY

CLOSET

B115

B

B112

S 1-

B B115

B118AS2-B

B

B114

B113

B

B

B101

B

B104

B105

P2A3

P1A3

P0M

P2S3

0"

18' - 0" 22' - 11" 10' - 0" 10' - 0" 10' - 0" 22' - 7" 17' - 10"

A

LI

G N

ALIGN

ALIGN

ALIGN

A

LI

G N

10' - 11" 9' - 8" 4' - 6"

ALIGN ALIGN

A712

B -E

X

B118

P0FH

P0FH

P0FH

P0FH

P0FHP0FH

A611

MAIN ELECTRICAL

ROOM

B111

B

7A

B

7B

P2A3

B

1734 SF

GARAGE

B118

B106

P0FH

P0FH

P0FH

B101A

A611

B100

A203

A203 A203

A205

A214

A204

A208

A201

A202

A202

B

-11' - 8"

-11' - 0"

15' - 6 1/2"

4'

1/ 2"

5' - 1 1/2"16' - 4 3/4"

3/ 8"

7' - 10" 7' - 11 1/2"

A

LI

G N

ASD STOR.

B109

7'

2'

9'

8'

9'

1"

5' - 0" 8' - 0 1/8" 5' - 0"

5' - 6" 7' - 6 1/8"

12' - 0"

P2S3

HOLD

15' - 4"

H O

LD

9'

B

WOMEN'S

LOCKER ROOM

B103A

B103B

B103A

EQ-02

EQ-03

EQ-03

EQ-03

B03

B02

B04

B05

B06

B07

B01

B10

B13

B08

B09

A223

23' - 11 1/4"

6' - 0"

-12' - 4 3/4"

P0FH

-11' - 0"

-13' - 0"

-12' - 0"

EQ-01

EQ-01

(4)

(4)

EQ-02

BASEMENT

AREAS BEING DESIGNED

AS PART OF BASE SCOPE

(CORE AND SHELL)

AREAS TO BE

PROGRAMMED AS PART OF

OPTION 1 (UNCHAGNED)

UP

UP

UP

UP

UP

UP

UP

UP

UP

A4121

A413 1

STORM WATER

MANAGEMENT

ROOM

B101

BUILDING

STORAGE

B102

STAIR 1

S1-B

STAIR 2

S2-B

ELECTRICAL

CLOSET

B116

BUILDING

ENGINEER

OFFICE

B113

MAIL ROOM

(COLLECTION AND

MAILBOXES)

B114

BUILDING

ENGINEER

STORAGE

B110

MEN'S LOCKER

ROOM

B103B

SECURITY

EQUIPMENT

ROOM

B112

HOUSEKEEPING

B108

MECHANICAL

SERVICE ENTRY

ROOM (GAS AND

WATER)

B107

MECHANICAL

ROOM (CHILLERS,

CHILLED WATER

PUMPS,

CONDENSER

WATER PUMPS,

AHU)

B117

MEN'S

RESTROOM

(PUBLIC)

B104

WOMEN'S

RESTROOM

(PUBLIC)

B106

JANITOR'S

CLOSET

B105

CORRIDOR

B100

ELEV. 1 ELEV. 2

TELECOM/

SECURITY

CLOSET

B115

B

B112

S 1-

B B115

B118AS2-B

B

B114

B113

B

B

B101

B

B104

B105

P2A3

P1A3

P0M

P2S3

0"

18' - 0" 22' - 11" 10' - 0" 10' - 0" 10' - 0" 22' - 7" 17' - 10"

A

LI

G N

ALIGN

ALIGN

ALIGN

A

LI

G N

10' - 11" 9' - 8" 4' - 6"

ALIGN ALIGN

A712

B -E

X

B118

P0FH

P0FH

P0FH

P0FH

P0FHP0FH

A611

MAIN ELECTRICAL

ROOM

B111

B

7A

B

7B

P2A3

B

1734 SF

GARAGE

B118

B106

P0FH

P0FH

P0FH

B101A

A611

B100

A203

A203 A203

A205

A214

A204

A208

A201

A202

A202

B

-11' - 8"

-11' - 0"

15' - 6 1/2"

4'

1/ 2"

5' - 1 1/2"16' - 4 3/4"

3/ 8"

7' - 10" 7' - 11 1/2"

A

LI

G N

ASD STOR.

B109

7'

2'

9'

8'

9'

1"

5' - 0" 8' - 0 1/8" 5' - 0"

5' - 6" 7' - 6 1/8"

12' - 0"

P2S3

HOLD

15' - 4"

H O

LD

9'

B

WOMEN'S

LOCKER ROOM

B103A

B103B

B103A

EQ-02

EQ-03

EQ-03

EQ-03

B03

B02

B04

B05

B06

B07

B01

B10

B13

B08

B09

A223

23' - 11 1/4"

6' - 0"

-12' - 4 3/4"

P0FH

-11' - 0"

-13' - 0"

-12' - 0"

EQ-01

EQ-01

(4)

(4)

EQ-02

BASEMENT

DragomirescuA Rectangle

UP

UP

UP

EVAC

AMP

G A

P

Z

BUILDING

RECEPTION

148 SF

ENTRY

151 SF

ENTRY

50 SF

EMPLOYEE

ENTRANCE

49 SF

MAIN ENTRANCE

(ADA COMPLIANT)

STAIR 1

S1-1

STAIR 2

S2-1 27 SF

ELECTRICAL

CLOSET

34 SF

TELECOM/

SECURITY

CLOSET

ELEV. 2ELEV. 1

LOBBY

180 SF

OFFICE

259 SF

PANTRY

83 SF

LAN

76 SF

HUDDLE

115 SF

OFFICE

DGS

RECEPTION

115 SF

OFFICE

40 SF

CLOS.

115 SF

OFFICE

115 SF

OFFICE

116 SF

STORAGE

278 SF

CONF.

147 SF

TEAM/ OFFICE

76 SF

HUDDLE

121 SF

COPY

546 SF

OPEN OFFICE

499 SF

OPEN OFFICE

605 SF

TENANT SPACE

61 SF

UNISEX

RESTROOM

(PUBLIC)

59 SF

UNISEX

RESTROOM

(PUBLIC)

102 SF

VENDING

28 SF

JANITOR'S

CLOSET

WAITING/

RECEPTION AREA

100-A

LEGEND

DGS

65 SF

UNISEX

RESTROOM

67 SF

UNISEX

RESTROOM

122 SF

CORRIDOR

761 SF

CORRIDOR

3/16" = 1'-0"03/05/2025 FIRST FLOOR - JUSTICE RESOURCE CENTER

515 D St NW, Washington, DC 20001

AREAS TO BE

PROGRAMMED AS PART OF

OPTION 1 (UNCHAGNED)

AMP

FATC

Z

53 SF

LACTATION

29 SF

JANITOR'S

114 SF

ELECTRICAL

CLOSET

STAIR 2

S2-2

STAIR 1

S1-2

139 SF

MEN'S

RESTROOM

(PRIVATE)

139 SF

WOMEN'S

RESTROOM

(PRIVATE)

72 SF

UNISEX

RESTROOM

(PUBLIC)

ELEV. 1 ELEV. 2

35 SF

TELECOM/

SECURITY

CLOSET

52 SF

LAN

443 SF

SHARED CONF.

(HISTORIC ROD

OFFICE)

889 SF

SHARED

WORKROOM

(EXISTING

HISTORIC

LIBRARY)

276 SF

SHARED

LUNCHROOM

(PRIVATE)

TENANT SPACE

26 SF

CLOS.

73 SF

VESTIBULE

54 SF

RESTROOM

LEGEND

CRIME VICTIMS COMPENSATION

SHARED LUNCHROOM (PRIVATE)

GUARD

STATION

699 SF

OPEN OFFICE

60 SF

LAN

231 SF

PANTRY

33 SF

PRINT

57 SF

WORK AREA

222 SF

WAITING

281 SF

RECEPTION

119 SF

OFFICE

168 SF

OFFICE

22 SF

SECURE

STORAGE

129 SF

OFFICE

124 SF

OFFICE

633 SF

OPEN OFFICE

53 SF

COPY

115 SF

OFFICE

CORRIDOR

56 SF

WELLNESS

3/16" = 1'-0"03/05/2025 SECOND FLOOR - JUSTICE RESOURCE CENTER

515 D St NW, Washington, DC 20001

AREAS THAT HAVE BEEN

PROGRAMMED AND WILL START

AT DID I

AREAS BEING DESIGNED

AS PART OF BASE SCOPE

(CORE AND SHELL)

AREAS TO BE

PROGRAMMED AS PART OF

OPTION 1 (UNCHAGNED)

AMP

FATC

29 SF

JANITOR'S

114 SF

ELECTRICAL

CLOSET

STAIR 2

S2-3

STAIR 1

S1-3

ELEV. 1

139 SF

WOMEN'S

RESTROOM

(PRIVATE)

139 SF

MEN'S

RESTROOM

(PRIVATE)

CORRIDOR

72 SF

UNISEX

RESTROOM

(PUBLIC)

ELEV. 2

36 SF

TELECOM/

SECURITY

CLOSET

LEGEND

ACCESS TO JUSTICE

PUBLIC SERVICE CENTER

SHARED CONFERENCE

VIRTUAL HEARING ROOMS

125 SF

PROVIDER

MEETING

373 SF

WAITING

237 SF

SHARED CONF.

160 SF

PANTRY

50 SF

LAN

100 SF

PROVIDER

MEETING

121 SF

PROVIDER

MEETING

219 SF

RECEPTION

48 SF

6x8

125 SF

PROVIDER

MEETING

48 SF

6x8

125 SF

PROVIDER

MEETING

238 SF

DIY/ TECH ZONE

110 SF

PROVIDER

MEETING

67 SF

PROVIDER

TOUCHDOWN

77 SF

PROVIDER

TOUCHDOWN

285 SF

HELP ZONE

330 SF

CORRIDOR

11 SF

LOCKERS

45 SF

HOIST ACCESS

ROOM

92 SF

STORAGE

112 SF

OFFICE

125 SF

OFFICE

180 SF

OFFICE

179 SF

COPY

113 SF

OFFICE

638 SF

OPEN OFFICE

110 SF

CORRIDOR

87 SF

PRIVATE HEARING

ROOM

87 SF

PRIVATE HEARING

ROOM

28 SF

COPY

252 SF

RECEPTION

43 SF

CLOSET

226 SF

OPEN OFFICE

75 SF

LAN

74 SF

HEARING ROOM

73 SF

HEARING ROOM

64 SF

HEARING ROOM

64 SF

HEARING ROOM

GUARD

STATION

100 SF

OFFICE

3/16" = 1'-0"03/05/2025 THIRD FLOOR - JUSTICE RESOURCE CENTER

515 D St NW, Washington, DC 20001

UP

UP

AMP

FATC

29 SF

JANITOR'S

114 SF

ELECTRICAL

CLOSET

STAIR 2

S2-3

STAIR 1

S1-3

ELEV. 1

139 SF

WOMEN'S

RESTROOM

(PRIVATE)

139 SF

MEN'S

RESTROOM

(PRIVATE)

CORRIDOR

72 SF

UNISEX

RESTROOM

(PUBLIC)

ELEV. 2

36 SF

TELECOM/

SECURITY

CLOSET

125 SF

PROVIDER

MEETING

373 SF

WAITING

237 SF

SHARED CONF.

206 SF

PANTRY

50 SF

LAN

100 SF

PROVIDER

MEETING

121 SF

PROVIDER

MEETING

219 SF

RECEPTION

48 SF

6x8

125 SF

PROVIDER

MEETING

48 SF

6x8

125 SF

PROVIDER

MEETING

238 SF

DIY/ TECH ZONE

110 SF

PROVIDER

MEETING

67 SF

PROVIDER

TOUCHDOWN

77 SF

PROVIDER

TOUCHDOWN

285 SF

HELP ZONE

330 SF

CORRIDOR

11 SF

LOCKERS

45 SF

HOIST ACCESS

ROOM

92 SF

STORAGE

112 SF

OFFICE

125 SF

OFFICE

180 SF

OFFICE

145 SF

COPY

113 SF

OFFICE

638 SF

OPEN OFFICE

110 SF

CORRIDOR

87 SF

PRIVATE HEARING

ROOM

87 SF

PRIVATE HEARING

ROOM

28 SF

COPY

252 SF

RECEPTION

43 SF

CLOSET

226 SF

OPEN OFFICE

75 SF

LAN

74 SF

HEARING ROOM

73 SF

HEARING ROOM

64 SF

HEARING ROOM

64 SF

HEARING ROOM

GUARD

STATION

100 SF

OFFICE

AREAS BEING DESIGNED

AS PART OF BASE SCOPE

(CORE AND SHELL)

AREAS TO BE

PROGRAMMED AS PART OF

OPTION 1 (UNCHAGNED)

AREAS THAT HAVE BEEN

PROGRAMMED AND WILL START

AT DID I

UP

UP

UP

EVAC

AMP

G A

P

Z

BUILDING

RECEPTION

148 SF

ENTRY

151 SF

ENTRY

50 SF

EMPLOYEE

ENTRANCE

49 SF

MAIN ENTRANCE

(ADA COMPLIANT)

STAIR 1

S1-1

STAIR 2

S2-1 27 SF

ELECTRICAL

CLOSET

34 SF

TELECOM/

SECURITY

CLOSET

ELEV. 2ELEV. 1

LOBBY

180 SF

OFFICE

259 SF

PANTRY

83 SF

LAN

76 SF

HUDDLE

115 SF

OFFICE

DGS

RECEPTION

115 SF

OFFICE

40 SF

CLOS.

115 SF

OFFICE

115 SF

OFFICE

116 SF

STORAGE

278 SF

CONF.

147 SF

TEAM/ OFFICE

76 SF

HUDDLE

121 SF

COPY

546 SF

OPEN OFFICE

499 SF

OPEN OFFICE

605 SF

TENANT SPACE

61 SF

UNISEX

RESTROOM

(PUBLIC)

59 SF

UNISEX

RESTROOM

(PUBLIC)

102 SF

VENDING

28 SF

JANITOR'S

CLOSET

WAITING/

RECEPTION AREA

100-A

LEGEND

DGS

65 SF

UNISEX

RESTROOM

67 SF

UNISEX

RESTROOM

122 SF

CORRIDOR

761 SF

CORRIDOR

3/16" = 1'-0"03/05/2025 FIRST FLOOR - JUSTICE RESOURCE CENTER

515 D St NW, Washington, DC 20001

4TH FLOOR

UP

UP

A4153 1

A712

EMERGENCY

GENERATOR AND

EMERGENCY

ELECTRICAL

ROOM

MECHANICAL

ROOM (COOLING

TOWERS)

STAIR 2

S2-4

STAIR 1

S1-4

CORRIDOR

MECHANICAL

ROOM (AIR

HANDLING UNIT)

ELEVATOR

OVERRUN

ELEC.

CLOSET

UNISEX

RESTROOM

JANITOR'S

CLOSET

ELEVATOR

CONTROLS

CLOSET

ELEVATOR

CONTROLS

CLOSET

S 1-

S2-4

P2A3

P1A3

P2S3

P0FH

P0FH

P0FH

P0FH

A

LI

G N

A611

400A

MECHANICAL

ROOM

P0F2

P1A3 P2A3P2A3

P1A3

P1A3

A611

A212

A212

A212

A202

A202

A211

A202

A212

TYP

A416

Sim

EW1

EW1

EW1

EW1

EW1

EW1

EW1 EW1EW1

EW1

EW1

EW1

EW1

EW1

P0FH

29' - 5" 8' - 6" 8' - 2"

4'

9'

7'

5'

3' - 9"

10' - 11" 9' - 11"

9'

0"

6' - 9"

3'

4'

4'

9' - 10" 4' - 8"

PROVIDE NEW PVC ROOFING AND

STAINLESS STEEL FLASHINGS.

REPLACE EXISTING ROOF DRAINS

AND PROVIDE OVERFLOW DRAINS.

PROVIDE A MINIMUM 1/4" PER FOOR

ROOF PITCH.

RF-1

A220

A221

2'

/4

/4

2'

9'

/2

3'

/4

/8

410 411

A512

A

LI

G N

A224 A224

A224

A225

A225

A226

A225

A227

A224

A227

A227A227

A227

A227

AREAS BEING DESIGNED

AS PART OF BASE SCOPE

(CORE AND SHELL)

Sheets
TF.01 - FIRST FLOOR - JUSTICE RESOURCE CENTER
TF.02 - SECOND FLOOR - JUSTICE RESOURCE CENTER
TF.03 - THIRD FLOOR - JUSTICE RESOURCE CENTER

File details come from the government source that posted it. Updated .