Attachment J-7 - 2024 PMO Contract Pricing Summary Workbook - Final.xlsx

XLSX spreadsheet 63 KB Posted

Attached to
Request for Proposal (RFP) Project Management Oversight (PMO) Requirement
Solicitation number
FTA_2024_PMO_0005
Issued by

About this file

This document contains a cost proposal workbook for a five-year Project Management Oversight (PMO) contract. The workbook includes detailed cost estimates for direct labor, fringe benefits at a rate of 5%, labor overhead at 104%, subcontractors, consultants, travel and other direct costs, material handling overhead, and general and administrative expenses at a rate of 5%. Labor categories and fully burdened rates are provided for 50 positions across five years of performance. Subcontractor cost proposals are included in subsequent tabs for seven subcontractors. The solicitation number for this PMO requirement is FTA_2024_PMO_0005 from the Department of Transportation Federal Transit Administration. Offerors are reminded that responsibility for providing adequate cost proposal support lies with them.

View the file

Other files

File Type Posted
FTA PMO RFP_Final_11.09.23_Executed.pdf PDF
Attachment J-4 Small Business Subcontracting Plan - Final.pdf PDF
Attachment J-5 Labor Category Table 2024 - Final.pdf PDF
Attachment J-8 2024 PMO Firm Fixed Price Form - Final.xlsx XLSX spreadsheet
Attachment J-11 - Conflict of Interest Matrix for 2024 - Final.pdf PDF
Attachment J-12 - Appendix A - Declaration of Completion - Final.xlsx XLSX spreadsheet
Attachment J-12 - Appendix C - Summary of Expenditures - Final.pdf PDF
Attachment J-12 - Appendix E - Delphi User Access Request Form for External Users - Final.pdf PDF
Attachment J-13 Tables B.24, B.25, B.28 and B.29 - Final.xlsx XLSX spreadsheet
Attachment J-14 - Small Business Certification - Letter of Intent - Final.pdf PDF
Attachment J-6 - Modified Pre-Award Survey SF1408 Checklist - Final.pdf PDF
Attachment J-9 - Disclosure of Lobbying Activities - Final.pdf PDF
Attachment J-10 - Combined 2024 Final OPs - Final.pdf PDF
Attachment J-11 - Conflict of Interest Matrix for 2024 - Final.xlsx XLSX spreadsheet
Attachment J-12 - Appendix D - DELPHI eInvoice Checklist - Final.pdf PDF
Attachment J-12 - Appendix E - Delphi User Access Request Form for External Users - Final.xlsx XLSX spreadsheet
Attachment J-13 Tables B.24, B.25, B.28 and B.29 - Final.pdf PDF
Attachment J-12 - Appendix A - Declaration of Completion - Final.pdf PDF
Attachment J-2 - Resume Format - Final.pdf PDF
Attachment J-7 - 2024 PMO J-7 Cost Proposal (Fee_Profit) - Final.pdf PDF
Attachment J-8 PMO FFP Form - Final.pdf PDF
Attachment J-1 - Proposal Checklist - Final.pdf PDF
Attachment J-3 Past Performance Questionnaire - Final.pdf PDF
Attachment J-12 - 2024 PMOC Billing Instructions PMO Program - Final.pdf PDF
Attachment J-12 - Appendix B - SF 1034 - Final.pdf PDF
Attachment J-12 - Appendix C - Summary of Expenditures - Final.xlsx XLSX spreadsheet
Attachment J-12 - Appendix F - 2023 FTA PMOC Invoice Template V1.2.0 - Final.pdf PDF
Attachment J-12 - Appendix F - 2023 FTA PMOC Invoice Template V1.2.0 - Final.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information Cost Proposal

GENERAL INFORMATION

The purpose of the requested information in the attached worksheets is to assit Government personnel in the review and evaluation of cost proposals submitted by Offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed costs; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data.

Total Effort

Attachment J-7 CPFF
Cost Proposal
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)
Direct Labor (DL) (Note 1)YEAR 1YEAR 2YEAR 3YEAR4YEAR 5Total
Offeror's Labor Category (NOTE 1)Name (Last, First)HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Program Manager*John Doe100$50.00$5,000.00100$50.00$5,000.00100$50.00$5,000.00100$50.00$5,000.00100$50.00$5,000.00500$25,000.00
Task Order Manager I*Jane Doe150$60.00$9,000.00150$60.00$9,000.00150$60.00$9,000.00150$60.00$9,000.00150$60.00$9,000.00750$45,000.00
Task Order Manager I*Jane Doe150$60.00$9,000.00150$60.00$9,000.00150$60.00$9,000.00150$60.00$9,000.00150$60.00$9,000.00750$45,000.00
Task Order Manager II*Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Task Order Manager II*Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Systems Integr. Engineer IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Systems Integr. Engineer II **Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Risk Assessment Mgr IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Risk Assessment Mgr II **Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Civil/Environmental Engineer IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Civil/Environmental Engineer II **Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
QA/QC Manager **Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Systems Safety ManagerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Cost Estimation ManagerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Project Scheduling ManagerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Vehicle EngineerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Real Estate ManagerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Contract Procurement ManagerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Transit Operations ManagerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Communications Engr IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Communications Engr IIJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Structural Engineer IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Structural Engineer II **Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Buy America Expert IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Buy America Expert IIJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Mechanical EngineerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Electrical Power Distribution Engineer IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Electrical Power Distribution Engineer IIJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Rail Transit Signal and Control Systems Engr IJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Rail Transit Signal and Control Systems Engr IIJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Tunneling EngineerJane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Technical Writer**Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Clerical Support **Jane Doe150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00150$100.00$15,000.00750$75,000.00
Total Direct Labor Costs4,900$473,000.004,900$473,000.004,900$473,000.004,900$473,000.004,900$473,000.0024,500$2,365,000.00
Fringe Benefits (F/B) (If applicable) Direct Labor only(Note 6)RateRate
Insert F/B rate title$473,000.005.00%$23,650.00$473,000.005.00%$23,650.00$473,000.005.00%$23,650.00$473,000.005.00%$23,650.00$473,000.005.00%$23,650.00$118,250.00
Total Fringe Benefit Costs$23,650.00$23,650.00$23,650.00$23,650.00$23,650.00$118,250.00
Labor Overhead (O/H) Direct Labor only(Note 3 and 6)RateRate
Insert O/H rate title$473,000.00104.00%$491,920.00$473,000.00104.00%$491,920.00$473,000.00104.00%$491,920.00$473,000.00104.00%$491,920.00$473,000.00104.00%$491,920.00$2,459,600.00
Insert O/H rate title$473,000.000.00%$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
Insert O/H rate title$473,000.000.00%$0.000.00%$0.000.00%$0.000.00%$0.000.00%$0.00
Total Labor Overhead Costs$491,920.00$491,920.00$491,920.00$491,920.00$491,920.00$2,459,600.00
Subcontractor Name / Personnel Name (Note 5)Offeror SkillsetCostFixed FeeCostFixed FeeCostFixed FeeCostFixed FeeCostFixed Fee
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$50,000.00$40,000.00$90,000.00$50,000.00$40,000.00$90,000.00$50,000.00$40,000.00$90,000.00$50,000.00$40,000.00$90,000.00$50,000.00$40,000.00$90,000.00$450,000.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$20,000.00$20,000.00$40,000.00$20,000.00$20,000.00$40,000.00$20,000.00$20,000.00$40,000.00$20,000.00$20,000.00$40,000.00$20,000.00$20,000.00$40,000.00$200,000.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #04Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #05Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #06Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #07Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$70,000.00$60,000.00$130,000.00$70,000.00$60,000.00$130,000.00$70,000.00$60,000.00$130,000.00$70,000.00$60,000.00$130,000.00$70,000.00$60,000.00$130,000.00$650,000.00
ConsultantsOfferor SkillsetHoursFlat RateHoursFlat RateHoursFlat RateHoursFlat RateHoursFlat Rate
Consultant Name - #01100$150.00$15,000.00100$150.00$15,000.00100$150.00$15,000.00100$150.00$15,000.00100$150.00$15,000.00$75,000.00
Consultant Name - #020$150.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #030$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #040$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$75,000.00
Other Direct Costs
Travel$50,000.00$50,000.00$50,000.00$50,000.00$50,000.00$250,000.00
Insert line(s) for any other types of ODCs$0.00
Total Other Direct Costs$50,000.00$50,000.00$50,000.00$50,000.00$50,000.00$250,000.00
Material Handling (M/H O/H)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (If applicable) Direct Labor only(Note 6)RateRateRate
Insert G&A rate title$473,0005.00%$23,650.00$473,000.005.000%$23,650.00$473,000.005.000%$23,650.00$473,000.005.000%$23,650.00$473,000.005.000%$23,650.00$118,250.00
Total G&A Costs$23,650.00$23,650.00$23,650.00$23,650.00$23,650.00$118,250.00
Subtotal Costs$1,207,220.00$1,207,220.00$1,207,220.00$1,207,220.00$1,207,220.00$6,036,100.00
Facilities Cost of Money (COM) (If applicable) Direct Labor only(Note 6)RateRateRate
Insert FCOM rate title$473,0000.400%$1,892.00$473,000.000.400%$1,892.00$473,000.000.400%$1,892.00$473,000.000.400%$1,892.00$473,000.000.400%$1,892.00$9,460.00
Total Cost of Money$1,892.00$1,892.00$1,892.00$1,892.00$1,892.00$9,460.00
Total Estimated Costs$1,209,112.00$1,209,112.00$1,209,112.00$1,209,112.00$1,209,112.00$6,045,560.00
Fixed Fee (Prime)(Note 4)$1,012,2208.00%$80,978.00$1,012,220.008.00%$80,978.00$1,012,220.008.00%$80,978.00$1,012,220.008.00%$80,978.00$1,012,220.008.00%$80,978.00$404,890.00
Total Estimated NTE Costs Plus Fixed Fee$1,290,090.00$1,290,090.00$1,290,090.00$1,290,090.00$1,290,090.00$6,450,450.00
Note 1: Any proposed prime personnel in the technical proposal should be identified with their labor category.
Note 2: The values under Total Direct Labor "hours" column indicate the total level of effort for each labor category.
Note 3: JV partners shall select one partner to include under the indirect section and under the prime personnel column for this form and the other JV partners shall fill out a sub form to idenitfy the skillset for each company.
Note 4: Profit or fee will be negoitated. In addition, FTA utilizes DD Form 1547 in calculating the Government objective for fee.
Note 5: Offerors must fill out a worksheet in subsequent tabs for each subcontractor proposed. Each subcontractors total cost must be manually enter under the subcontractor row in this tab. If you have more than 7 subcontractor, please request a revised form from your contract specialist.
Note 5: Offerors must put in the yearly rate on a separate row for the subcontractor skillset proposed. If you need a revised J-7 form adding extra lines, please request from your contact specialist.
Note 6: Approved Indirect Rates (OH, G&A, etc. ) are applicable to direct labor only.

&"Arial,Bold"&12&A

Offeror: Page &P of &N Pages &F

Sub 1

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COSTREFERENCE
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100$150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100$155.00$15,500.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $677,867.90

7. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

8. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

Sub 2

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COST
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100$150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100$155.00$15,500.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $677,867.90

7. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

8. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

Sub 3

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COST
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100$150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100$155.00$15,500.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $677,867.90

7. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

8. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

Sub 4

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COST
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100155.00$15,500.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
100150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $677,867.90

7. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

8. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

Sub 5

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COST
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100$150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100$155.00$15,500.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $677,867.90

7. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

8. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

Sub 6

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COST
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100$150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100$155.00$15,500.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $677,867.90

7. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

8. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

Sub 7

Subcontractor Information
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date:
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data
sources, gathering and maintaining the data needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any
aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy,
GSA, Washington, DC 20405 and to the Office of Management and Budget, Paperwork Reduction Project (2105-0517), Washington, DC 20503.
Name of OfferorSupplies And/Or Services to be Furnished Project Management Oversight Services
Home Office AddressGovernment Solicitation Number
DETAILED DESCRIPTION OF COST ELEMENTS
1. Direct Material (included with Prime)EST. COST ($)TOTAL EST. COST
A. PRCHASED PARTS
B. SUBCONTRACTED ITEMS
C. OTHER - (1) RAW MATERIAL
(2) STANDARD COMMERIAL ITEMS
TOTAL DIRECT MATERIAL
2. MATERIAL OVERHEAD RATE
3. DIRECT LABOR
Labor CategoryHoursHourly RateTotal Direct Cost
Ex. Risk Assessment Mgr Year One100$150.00$15,000.00
Ex. Risk Assessment Mgr Year Two100$155.00$15,500.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
100$150.00$15,000.00
Total Direct Labor$300,500.00
4. LABOR OVERHEADOH RATEX - DIRECT LABOR
105.00%$300,500.00
TOTAL LABOR OVERHEAD$315,525.00

Subtotal Direct Cost $616,025.00

G&A RATEX - DIRECT LABOR
5. GENERAL & ADMINISTRARIVE (G&A) EXPENSE20.00%$300,500.00
TOTAL G&A$60,100.00
6. CONTRACT FACILITIES CAPITAL AND COST OF MONEYFCCM RATEX - DIRECT LABOR
0.58%$300,500.00
TOTAL FCCM$1,742.90

Subtotal $676,125.00

8. FEE OR PROFITFEE/PROFIT %X - DIRECT LABOR
5.00%$676,125.00$33,806.25

9. TOTAL ESTIAMTED COST AND FEE OR PROFIT $711,674.15

File details come from the government source that posted it. Updated .