This document is a request for proposal for continuous maintenance and emergent maintenance services for Littoral Combat Ships. Commander Logistics Group Western Pacific Ship Repair Unit is seeking proposals from qualified US contractors to provide maintenance support for LCS vessels forward deployed in the Western Pacific region. The solicitation is issued by NAVSUP Fleet Logistics Center Yokosuka Site Singapore and includes the RFP, fourteen attachments, cost data reporting templates, and an amendment. Interested offerors should have experience performing LCS continuous and emergent maintenance. Proposals are due by the date specified in the RFP. The awarded IDIQ contracts will have a one year base period and four one-year options and will be managed by CLWP SRU to support maintenance requirements for LCS ships operating in the Western Pacific.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMUSFLTFORCOMINST 4790.3 REV D
16 Oct 2019
WORK AUTHORIZATION FORM
1. USS
2. SYSTEM
3. WAF NO.
4. JSN 5. DIVISION/LWC/RA
7. JOB DESCRIPTION
6. TECHNICAL WORK DOCUMENT
PREPARATION FOR WORK
8. POST WORK TESTING AS SPECIFIED: BELOW IN THE TWD NO TEST REQD FORMAL TEST PROGRAM
9. RESTRICTIONS/PRECAUTIONS/REMARKS
10. DIVISION/REPAIR ACTIVITY READY TO COMMENCE WORK.
LPO/DIV OFF /RA __________________________________________________________________________ DATE___________________
AUTHORIZATION TO WORK
11. SAFETY OF SHIP (Submarine Only): YES NO
RA SSO (if SPOD used) or QUALIFIED WATCH/DUTY OFFICER (if SOSMIL used)
____________ ________________________________________ DATE ____________________
12. CONCURRENCES:
_______________________ DATE _______ _________________________ DATE _______ _________________________ DATE _______
13. TAGOUT REQUIRED: YES NO
SYSTEM/COMPONENT IS LINED UP FOR WORK, A TAGOUT IS HUNG,
VERIFIED AND SIGNED BY THE REPAIR ACTIVITY (IF REQUIRED) AND SHIP.
TAGOUT NO.____________________________
WATCH/DUTY OFFICER DATE
14. PLANT/SHIP CONDITIONS (E.G., DRAINED, DE-PRESSURIZED,
DE-ENERGIZED, RESTRAINED) SET. DIVISION/RA IS AUTHORIZED TO
START WORK. ________________________________________________
WATCH/DUTY OFFICER DATE
REPAIR ACTIVITY DATE
NOTIFICATION OF WORK COMPLETION
15. RESTRICTIONS/PRECAUTIONS/REMARKS
16. WORK IS COMPLETE
LPO/DIV OFF or RA _________________________DATE __________
17. TESTING IS COMPLETE
WATCH/DUTY OFF or RA _________________DATE__________
18. WAF CLOSED OUT
RA_____________________________DATE___________ WATCH/DUTY OFF __________________________________DATE_______________
CHECK IF CONTINUED ON ANOTHER SHEET
Sheet _____
WORK AUTHORIZATION FORM CONTINUATION SHEET
1. USS 3. WAF NO. REV
CHECK IF CONTINUED ON ANOTHER SHEET
Sheet _____
INSTRUCTIONS FOR COMPLETING WORK AUTHORIZATION FORM
Block 1. USS: Enter name or the hull number.
Block 2. SYSTEM: Enter the system noun name, abbreviation or identification number.
Block 3. WAF NO.: Enter the WAF serial number.
Block 4. JSN: Enter the Job Sequence Number or job order.
Block 5. DIVISION, Lead Work Center (LWC) or REPAIR ACTIVITY (RA): Enter ship’s Division, LWC or repair activity Point of Contact responsible for conducting the maintenance.
Block 6. TECHNICAL WORK DOCUMENT: Enter the TWD (e.g., Controlled Work Package (CWP) or Formal Work Package (FWP), Task Group Instruction (TGI)) number(s) or enter “see attached TWD Record Sheet”. If a TWD Record Sheet is used, it must be referenced in Block 6.
Block 7. JOB DESCRIPTION: Enter a description of work to be performed detailed enough for the Authorizing Officer or RAR to understand the scope of the work boundary and prepare or concur in the isolation established for this work. If necessary, use of an additional Continuation Sheet per Appendix C is authorized. Description of work can contain either a description of work boundaries or a description of components (see paragraph 10.4.3a of this chapter).
Block 8. POST WORK TESTING IS AS SPECIFIED: Check BELOW and identify test requirements when retest is not contained in a TWD or formal test program. Check FORMAL TEST PROGRAM if retesting will be tracked or completed in a program administered by the repair activity. If FORMAL TEST PROGRAM or NO TEST REQUIRED is checked, Block 17 is N/A.
Block 9. RESTRICTIONS, PRECAUTIONS AND REMARKS (OPENING): Enter any restrictions or precautions associated with the work item. If any information is entered in this block, the person making the entry must enter name, organization and date. If necessary, use of an additional Continuation Sheet per Appendix C is authorized.
Block 10. DIVISION OR REPAIR ACTIVITY READY TO COMMENCE WORK: Signature by Leading Petty Officer or Division Officer for Ship’s Force work or repair activity indicates that sufficient prerequisites are met to commence isolation for production work.
NOTE: SHIPYARDS IMPLEMENTING SAFETY OF SHIP REQUIREMENTS FOR SURFACE FORCE SHIPS
PER LOCAL MOAS MAY MODIFY AND USE BLOCK 11 TO DOCUMENT SHIP SAFETY
DETERMINATIONS.
Block 11. SAFETY OF SHIP: For submarines, when required by paragraph 10.4.8 of this chapter or reference (a), check YES.
(1) If the SPOD is used, the Repair Activity’s Ships Safety Officer will sign concurrence.
(2) If the SOSMIL is used, the qualified Watch or Duty Officer will verify that work is listed on the SOSMIL for that day and sign the block. NON-SAFETY OF SHIP WORK CONTROLS. Check NO. When safety of ship qualified RA or Ship’s Force work control personnel process their respective WAFs, they may sign concurrence for non-safety of ship maintenance.
Block 12. CONCURRENCES: Concurrence signatures may be entered as necessary (e.g., nuclear or non-nuclear interface, assist work center(s), two cognizant department heads). The Authorizing Officer or RAR should define any needed concurrences by noting the concurring organization beneath the signature line in Block 12 and obtain the concurrences. Enter N/A if no concurrences are required.
Block 13. TAGOUT REQUIRED: If tagout is required, mark YES. When tagout is hung, enter tagout number(s) (Log Serial Number or Shift Operations Management System line item number) and Watch or Duty Officer will sign block. If no tagout is required, mark NO. Enter N/A in TAGOUT NO., and Watch or Duty Officer will sign block.
Block 14. PLANT OR SHIP CONDITIONS (e.g., drained, de-pressurized, de-energized, restrained) SET, FMA, DIVISION OR REPAIR ACTIVITY ARE AUTHORIZED TO START WORK: The Watch or Duty Officer signs in all cases for authorizing the start of all work. Note any restrictions, precautions, or both, in Block 9. If Block 11 is checked YES, the Watch or Duty Officer must ensure the work of the WAF is listed on the SOSMIL or Ship’s Plan of the Day prior to authorization of the WAF. RAR signs for authorizing the start of work when the WAF is for repair activity work.
Block 15. RESTRICTIONS, PRECAUTIONS OR REMARKS: Enter any general conditions (e.g., outstanding work) that may affect system restoration. If any information is entered in this block, the person making the entry must enter name, organization and date. If necessary, use of an additional Continuation Sheet per Appendix C is authorized.
Block 16. WORK IS COMPLETE: A signature by Ship’s Force or the repair activity is entered when the work described in Block 7 is verified complete and tags may be cleared with any exceptions listed in Block 15.
Block 17. TESTING IS COMPLETE: A signature by the activity performing the retest is entered when testing of Block 8 is completed. Block 17 is marked N/A if Formal Test Program is in effect or no test required.
Block 18. WAF CLOSED OUT: When work specified in Block 7 and testing as specified in Block 8 is completed, including all exceptions listed in Block 15, repair activity signature is entered to indicate the WAF is closed out.
Ship’s Force signature indicates acceptance of the work and testing and that appropriate system status has been set (e.g., clear tags and perform valve lineups as appropriate for the situation). Block 18 may be signed prior to completion of testing covered by a formal test program. A copy of the closed out WAF must be provided to Ship’s Force if the repair activity is maintaining the original WAF.