Attachment IV - Price Schedule.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 1305M222QNMAN0056
About this file
This document contains a price schedule attachment and description of a federal solicitation for drydocking and repairs to a NOAA research vessel. The price schedule lists over 80 separate work items to be completed including hull repairs, equipment maintenance and inspections, system upgrades, and small boat services. Unit pricing is requested along with estimated labor hours and percentages for material handling fees. The solicitation also includes 16 optional line items that may be exercised such as additional tank cleaning or ventilation system work. Interested contractors should contact the named NOAA contracting staff by email to request the reference documents and drawings associated with this opportunity. The closing date and other submission details are not provided in this sample.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Attachment IV
1305M222QNMAN0056
| Price Schedule | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 0001 | 3.1 | Drydocking & Berthage | 1 | JB | ||
| 0001 | 3.2 | Temporary Services | 1 | JB | ||
| 0001 | 3.3 | ABS Load Line Survey and Inspection Support | 1 | JB | ||
| 0001 | 3.4 | Fire & Safety Annual Inspection | 1 | JB | ||
| 0001 | 3.5 | Life Raft Annual Inspection & Certification | 1 | JB | ||
| 0001 | 3.6 | Fuel Storage | 1 | JB | ||
| 0001 | 3.7 | Tank Cleaning | 1 | JB | ||
| 0001 | 3.8 | Engineering Space Tank and Bilge Cleaning | 1 | JB | ||
| 0001 | 3.9 | Fresh Water Tanks | 1 | JB | ||
| 0001 | 3.10 | FR 68 – 70 Hull Steel Repairs | 1 | JB | ||
| 0001 | 3.11 | FR 70 – 75 Hull Steel Repairs | 1 | JB | ||
| 0001 | 3.12 | FR 70 Bulkhead Repair | 1 | JB | ||
| 0001 | 3.13 | G Deck Interferences | 1 | JB | ||
| 0001 | 3.14 | Exterior Stack Recoat | 1 | JB | ||
| 0001 | 3.15 | Deck Repair G Deck | 1 | JB | ||
| 0001 | 3.16 | G Deck Drain & Piping Replacement | 1 | JB | ||
| 0001 | 3.17 | Main Deck Drain & Piping Replacement | 1 | JB | ||
| 0001 | 3.18 | FR23 – FR46 Portlight Replacement | 1 | JB | ||
| 0001 | 3.19 | Misc. Piping and Valve Repairs and Replacement | 1 | JB | ||
| 0001 | 3.20 | Machinery Automation Controls System (MACS) Maintenance | 1 | JB | ||
| 0001 | 3.21 | Switchboard Meter Calibration | 1 | JB | ||
| 0001 | 3.22 | Main Switchboard Maintenance | 1 | JB | ||
| 0001 | 3.23 | Emergency Switchboard Maintenance | 1 | JB | ||
| 0001 | 3.24 | MTU Diesel Engine Maintenance & Inspection | 1 | JB | ||
| 0001 | 3.25 | Ship’s Service Generator Maintenance & Inspection | 1 | JB | ||
| 0001 | 3.26 | Emergency Generator Maintenance & Inspection | 1 | JB | ||
| 0001 | 3.27 | Emergency Diesel Generator Engine Hydraulic Start Maintenance | 1 | JB | ||
| 0001 | 3.28 | Main Engine Maintenance & Inspection | 1 | JB | ||
| 0001 | 3.29 | Reduction Gear Inspection | 1 | JB | ||
| 0001 | 3.30 | Controllable Pitch Propeller (CPP) Inspection and Maintenance | 1 | JB | ||
| 0001 | 3.31 | Tail Shaft Inspection | 1 | JB | ||
| 0001 | 3.32 | Rudder Inspection | 1 | JB | ||
| 0001 | 3.33 | Line Shaft Bearing Inspection | 1 | JB | ||
| 0001 | 3.34 | Bow Thruster Motor Room Deck | 1 | JB | ||
| 0001 | 3.35 | Bow Thruster Maintenance & Inspection | 1 | JB | ||
| 0001 | 3.36 | Impressed Cathotic Current Protection Inspection | 1 | JB | ||
| 0001 | 3.37 | Sea Valve Inspection & Maintenance | 1 | JB | ||
| 0001 | 3.38 | Oily Water Separator Maintenance | 1 | JB | ||
| 0001 | 3.39 | Ventilation System Air Flow Balance | 1 | JB | ||
| 0001 | 3.40 | Ventilation System Cleaning | 1 | JB | ||
| 0001 | 3.41 | Gaylord Hood Ventilator Cleaning & Maintenance | 1 | JB | ||
| 0001 | 3.42 | Annual Boiler Inspection & Maintenance | 1 | JB | ||
| 0001 | 3.43 | Pressure Vessel Certification | 1 | JB | ||
| 0001 | 3.44 | Steering Gear Maintenance and Inspection | 1 | JB | ||
| 0001 | 3.45 | Small Boat Temporary Services & Storage | 1 | JB | ||
| 0001 | 3.46 | Fast Rescue Boat (FRB) (RA1) Maintenance and Inspection | 1 | JB | ||
| 0001 | 3.47 | Work Boat (RA2) Maintenance and Inspection | 1 | JB | ||
| 0001 | 3.48 | Dive Boat (RA-4D) Inspection and Maintenance | 1 | JB | ||
| 0001 | 3.49 | Dive Boat (RA-3D) Inspection and Maintenance | 1 | JB | ||
| 0001 | 3.50 | Survey Boat (RA3) Inspection and Maintenance | 1 | JB | ||
| 0001 | 3.51 | Survey Boat (RA6) Inspection and Maintenance | 1 | JB | ||
| 0001 | 3.52 | FRB Davit Inspection | 1 | JB | ||
| 0001 | 3.53 | RA2 Davit Inspection | 1 | JB | ||
| 0001 | 3.54 | RA2 HPU Maintenance | 1 | JB | ||
| 0001 | 3.55 | RA3 Davit Inspection | 1 | JB | ||
| 0001 | 3.56 | RA4 Davit Inspection | 1 | JB | ||
| 0001 | 3.57 | RA5 Davit Inspection | 1 | JB | ||
| 0001 | 3.58 | RA6 Davit Inspection | 1 | JB | ||
| 0001 | 3.59 | Davit Weight Testing & Certification | 1 | JB | ||
| 0001 | 3.60 | Aft Crane Sheave Maintenance | 1 | JB | ||
| 0001 | 3.61 | Aft Crane HPU Maintenance | 1 | JB | ||
| 0001 | 3.62 | Aft Crane Rotational Drive Gear Box Maintenance | 1 | JB | ||
| 0001 | 3.63 | Aft Crane Anti Two Block and Limit Switch Circuit Maintenance | 1 | JB | ||
| 0001 | 3.64 | AFT Crane Inspection | 1 | JB | ||
| 0001 | 3.65 | Port Stores Crane Inspection | 1 | JB | ||
| 0001 | 3.66 | Starboard Stores Crane Inspection | 1 | JB | ||
| 0001 | 3.67 | A-Frame Maintenance | 1 | JB | ||
| 0001 | 3.68 | Elevator 5 Year Maintenance & Inspection | 1 | JB | ||
| 0001 | 3.69 | Lifting Appliance Certification | 1 | JB | ||
| 0001 | 3.70 | Gangway Inspection and Maintenance | 1 | JB | ||
| 0001 | 3.71 | Aft Capstan Foundation Maintenance | 1 | JB | ||
| 0001 | 3.72 | Anchor and Chain Inspection and Preservation | 1 | JB | ||
| 0001 | 3.73 | Hawse Pipe Preservation | 1 | JB | ||
| 0001 | 3.74 | Chain Locker Preservation | 1 | JB | ||
| 0001 | 3.75 | Hull Freeboard Preservation | 1 | JB | ||
| 0001 | 3.76 | Underwater Hull Preservation | 1 | JB | ||
| 0001 | 3.77 | Dock and Sea Trials | 1 | JB | ||
| 0001 | 3.78 | Emergency Diesel Generator Control System Maintenance | 1 | JB | ||
| 0001 | 3.79 | Gauge and Thermometer Calibration | 1 | JB | ||
| 0001 | 3.80 | Forward (FWD) Marine Sanitation Device (MSD) Inspection & Maintenance | 1 | JB | ||
| 0001 | 3.81 | Inclining | 1 | JB | ||
| 0002 | 4.1 | Walk-in Chill Box Shelving Install | 1 | JB | ||
| 0002 | 4.2 | G Deck Non-Skid Renewal | 1 | JB | ||
| 0002 | 4.3 | Fantail Non-Skid Renewal | 1 | JB | ||
| 0003 | 4.4 | CPP Control System Upgrade | 1 | JB | ||
| 0003 | 4.5 | EM304 Installation | 1 | JB | ||
| 0003 | 4.6 | MSD Installation | 1 | JB | ||
| Total Base Items: |
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUIREMENTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 0004 | 5 | AIRS/Growth (estimated) |
AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 1,200 ; Unit of Issue: Hour; Extended Price: $____________ | EST | |
| 1,200 | HRS | |
| AIRs/Growth Material Markup/Handling Fee |
Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [ $100,000.00 X percentage quoted]: $______________ | EST |
| $100,000.00 | % |
| 0005 |
0006 6 AIRS/Growth (estimated) AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 1,125 ; Unit of Issue: Hour; Extended Price: $____________ | EST | |
| 1,125 | HRS | |
| AIRs/Growth Material Markup/Handling Fee |
Unit Price: $85,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [ $85,000.00 X percentage quoted]: $______________ | EST |
| $85,000.00 | % |
| Total Growth: |
| Option Items | ||||||
| Note:These items (7.1 - 7.16) may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| 0007 | 7.1 | Air Conditioning Chill Water Plant Inspection and Maintenance | 1 | JB | ||
| 0007 | 7.2 | Refrigeration Plant Maintenance | 1 | JB | ||
| 0007 | 7.3 | Cutlass Bearing Replacement | 1 | JB | ||
| 0007 | 7.4 | Hull Anode Replacement | 1 | JB | ||
| 0007 | 7.5 | D Deck Drain & Piping Replacement | 1 | JB | ||
| 0007 | 7.6 | E Deck Drain Replacement | 1 | JB | ||
| 0007 | 7.7 | STBD Lube Oil Tank Cover Replacement | 1 | JB | ||
| 0007 | 7.8 | Davit Catwalk Preservation | 1 | JB | ||
| 0007 | 7.9 | Scaffolding | 1 | JB | ||
| 0007 | 7.1 | C-04 Shower Stall Deck Repair | 1 | JB | ||
| 0007 | 7.11 | E-Deck Passageway Tile Replacement | 1 | JB | ||
| 0007 | 7.12 | C-05 Stateroom and Common Area Reconfiguration | 1 | JB | ||
| 0007 | 7.13 | EGEN Room Door Replacement | 1 | JB | ||
| 0007 | 7.14 | Additional Fuel Storage | 1 | JB | ||
| 0007 | 7.15 | Additional Tank Cleaning | 1 | JB | ||
| 0007 | 7.16 | Tank Vents | 1 | JB | ||
| Total Options: | ||||||
| BASE + GROWTH: | ||||||
| BASE + GROWTH + OPTIONS: |
| ADDITIONAL SCHEDULE RATES | ||||||
| CLIN | SPEC WORK ITEM | Product Description | QTY | UNIT | UNIT PRICE | EXTENDED PRICE |
| N/A | N/A | Additional Temporary Services (See CAR 1352.271-89) | 1 | Day | $ | $ |
| N/A | N/A | Lay Day (See CAR 1352.271- 86) | 1 | Day | $ | $ |
File details come from the government source that posted it. Updated .