RA5 Hose List.pdf

PDF 172 KB Posted

Attached to
RFQ 1305M222QNMAN0056 - Drydocking and Repairs to NOAA Ship RAINIER
Solicitation number
1305M222QNMAN0056
Issued by

About this file

This document contains a request for quotation (RFQ) for drydocking and repair services for the NOAA Ship RAINIER. The RFQ seeks to drydock the vessel and perform necessary repairs to hull, machinery, electrical systems, deck equipment and other areas. Interested parties should contact the named contracting staff by email to request applicable reference documents and drawings not included in the solicitation attachment. The work is to be performed for the Department of Commerce National Oceanic and Atmospheric Administration. Responses are due based on the standard response timeline following receipt of the full solicitation documentation.

View the file

Other files

File Type Posted
RFQ 1305M222QNMAN0056 Rev e.pdf PDF
Amendment 6.pdf PDF
Attachment IV - Price Schedule rev b.xlsx XLSX spreadsheet
RFQ 1305M222QNMAN0056 Rev d.pdf PDF
Attachment I Specification rev d.pdf PDF
Amendment 5.pdf PDF
RFQ 1305M222QNMAN0056 Rev c.pdf PDF
Amendment 4.pdf PDF
RAINIER DD Q and A 3.xlsx XLSX spreadsheet
Amendment 3.pdf PDF
S2603.pdf PDF
Attachment I Specification rev c.pdf PDF
4.1 Chill Box Shelving Pictures.pdf PDF
Steering Gear Hose List.pdf PDF
Emergency Generator Automatic Bus Transfer.pdf PDF
S2806-2.pdf PDF
3.16_3.17_3.18.zip ZIP file
RAINIER DD Q and A 2.xlsx XLSX spreadsheet
3.67_4.5.zip ZIP file
Amendment 2.pdf PDF
3.19_3.37.zip ZIP file
RFQ 1305M222QNMAN0056 Rev b.pdf PDF
Attachment I Specification Rev b.pdf PDF
3.10_3.13.zip ZIP file
NOAA Rainier Control Philosophy.pdf PDF
3.15.zip ZIP file
RAINIER DD Q and A.xlsx XLSX spreadsheet
Attachment IV - Price Schedule rev a.xlsx XLSX spreadsheet
Attachment I - Specification rev a.pdf PDF
Amendment 1.pdf PDF
Attachment III - Past Performance Questionnaire.pdf PDF
Attachment I - Specification.pdf PDF
RFQ 1305M222QNMAN0056.pdf PDF
Attachment IV - Price Schedule.pdf PDF
Attachment II - Past Performance Information Form.pdf PDF
Attachment V - AIR Process.pdf PDF
Attachment IV - Price Schedule.xlsx XLSX spreadsheet
Attachment VI - Subcontracting Plan Outline.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operating Pressure: Not Known Last Inspected on: Replaced

Hose Brand: Parker; 721TC January, 2017 Feb 10 20

Ref. # I.D. dash size Length (in) PSI Ends Notes Status Recommend 1 ‐16 66 4000 FJX‐FJX Aceptable Monitor

2 ‐16 66 4000 FJX‐FJX Aceptable Monitor

3 ‐12 64 4000 FJX‐FJX Aceptable Monitor

4 ‐12 64 4000 FJX‐FJX Aceptable Monitor

5 ‐12 66 4000 FJX‐FJX Aceptable Monitor

6 ‐12 64 4000 FJX‐FJX Aceptable Monitor

7 ‐8 55 4000 FJX‐FJX Aceptable Monitor

Ref. # I.D. dash size Length PSI Ends Notes Status Recommend 1 ‐8 24 4200 FJX‐FJX90 AFT CYL Aceptable Monitor

2 ‐8 33 4200 FJX‐FJX45 FWD CYL Aceptable Monitor

Ref. # I.D. dash size Length (in) PSI Ends Notes Status Recommend

1 ‐8 24‐36 EST. 3000 FJX‐FJX L.S Cable Guide

2 ‐8 24‐36 EST. 3000 FJX‐FJX L.S Cable Guide

3 ‐8 24‐36 EST. 3000 FJX‐FJX L.S Cable Guide

Ref. # I.D. dash size Length (in) PSI Ends Notes Status Recommend

1 ‐8 24‐36 EST. 3000 FJX‐FJX L.S Cable Guide

2 ‐8 24‐36 EST. 3000 FJX‐FJX L.S Cable Guide

3 ‐8 24‐36 EST. 3000 FJX‐FJX L.S Cable Guide

Ref. # I.D. dash size Length (in) PSI Ends Notes Status Recommend

1 ‐6 20 4200 FJX‐FJX90 Hand Pump Aceptable Monitor

2 ‐6 25 4200 FJX‐FJX90 Aceptable Monitor

3 ‐8 24 4200 FJX‐FJX45 AFT CYL Aceptable Monitor

4 ‐8 33 4200 FJX‐FJX90 Aceptable Monitor

5 ‐8 24 4200 FJX‐FJX45 FWD CYL Aceptable Monitor

6 ‐8 33 4200 FJX‐FJX90 Aceptable Monitor

Hoses on Top of Davit's FWD Arm

Hoses on Top of Davit's AFT Arm

DCV

NOAA RAINIER HYDRAULIC HOSE CATALOG

Equipment: Launch Boat Davit (AFT Portside)

Location on Ship: Boat Deck

Davit

HPU

File details come from the government source that posted it. Updated .