Steering Gear Hose List.pdf

PDF 98 KB Posted

Attached to
RFQ 1305M222QNMAN0056 - Drydocking and Repairs to NOAA Ship RAINIER
Solicitation number
1305M222QNMAN0056
Issued by

About this file

This document contains a request for quotation (RFQ) from the National Oceanic and Atmospheric Administration (NOAA) for drydocking and repair services for the NOAA Ship RAINIER. Interested parties are requested to contact the identified Contract Specialist and Contracting Officer to obtain applicable reference documents and drawings not included in the public RFQ notice due to file size limitations. The RFQ seeks drydocking and repairs for NOAA's RAINIER vessel, with an attached operating pressure and inspection record list for the ship's steering gear hoses and their locations. Responses to the RFQ should address maintenance and repair of the ship's steering system components.

View the file

Other files

File Type Posted
RFQ 1305M222QNMAN0056 Rev e.pdf PDF
Amendment 6.pdf PDF
Attachment IV - Price Schedule rev b.xlsx XLSX spreadsheet
RFQ 1305M222QNMAN0056 Rev d.pdf PDF
Attachment I Specification rev d.pdf PDF
Amendment 5.pdf PDF
RFQ 1305M222QNMAN0056 Rev c.pdf PDF
Amendment 4.pdf PDF
RAINIER DD Q and A 3.xlsx XLSX spreadsheet
Amendment 3.pdf PDF
S2603.pdf PDF
Attachment I Specification rev c.pdf PDF
4.1 Chill Box Shelving Pictures.pdf PDF
RA5 Hose List.pdf PDF
Emergency Generator Automatic Bus Transfer.pdf PDF
S2806-2.pdf PDF
3.16_3.17_3.18.zip ZIP file
RAINIER DD Q and A 2.xlsx XLSX spreadsheet
3.67_4.5.zip ZIP file
Amendment 2.pdf PDF
3.19_3.37.zip ZIP file
RFQ 1305M222QNMAN0056 Rev b.pdf PDF
Attachment I Specification Rev b.pdf PDF
3.10_3.13.zip ZIP file
NOAA Rainier Control Philosophy.pdf PDF
3.15.zip ZIP file
RAINIER DD Q and A.xlsx XLSX spreadsheet
Attachment IV - Price Schedule rev a.xlsx XLSX spreadsheet
Attachment I - Specification rev a.pdf PDF
Amendment 1.pdf PDF
Attachment III - Past Performance Questionnaire.pdf PDF
Attachment I - Specification.pdf PDF
RFQ 1305M222QNMAN0056.pdf PDF
Attachment IV - Price Schedule.pdf PDF
Attachment II - Past Performance Information Form.pdf PDF
Attachment V - AIR Process.pdf PDF
Attachment IV - Price Schedule.xlsx XLSX spreadsheet
Attachment VI - Subcontracting Plan Outline.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operating Pressure: Not Known Last Inspected on:

Hose Brand: G1H

Ref. # I.D. (mm) Length (in) PSI Ends Notes Status Recommend 1 -12 34 1250 FJX-FJX Drains 2 -12 34.5 1250 FJX-FJX Drains 3 -12 20 1250 MP-MP Hand Pump 4 -12 20 1250 MP-MP Hand Pump

5 -4 12 1000 FJX-FJX

6 -4 12 1000 FJX-FJX

7 -16 19 1000 Flange Block 8 -16 19 1000 Flange Block 9 -16 19 1000 Flange Block

10 -16 19 1000 Flange Block

NOAA RAINIER HYDRAULIC HOSE CATALOG

Equipment: Rudder Location on Ship: Steering Gear Flat, C-11-001

RUDDER

File details come from the government source that posted it. Updated .