This document contains questions and answers regarding a solicitation for drydocking and repair services for NOAA Ship RAINIER. The solicitation seeks repair and maintenance of various ship systems including hull, machinery, electrical and electronic systems. Questions from contractors address clarification needs around work specifications, equipment details, drawings and references. The government provides responses to ensure bidders have the information required to fully understand repair requirements and submit accurate bids for the work. Locations on the ship for specified repairs are identified where needed. Relevant equipment details like fluid types and quantities are also included. The document aims to facilitate contractor bidding through resolving questions upfront.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RA DD Q&A Amendment 3 NOAA Ship RAINIER
FY 2023 DRYDOCKING REPAIR SPECIFICATIONS
Solicitation: 1305M222QNMAN0056
| Work | ||||
| Item | Paragraph | Contractor Inquiry | Government Response | |
| Period of Performance (PoP) | Contractor requests that the performance period for the project be modified to permit commencing shipyard repairs on or about September 1, 2022. | The PoP start and completion dates to remain 3-OCT-22 through 14-JAN-23. | ||
| 3.4 | a. Most of the Co2 cylinders are requiring hydro test and recharge this year, which is written in the scope of work. The cylinders are currently fitted with C-O-T-W-O brand valves, which are obsolete, and to be replaced with Ansul CV98 style valves. This will also require new CO2 discharge hoses, actuators, time delays, and other system components and materials. Would NOAA like us to incorporate the costs for these additional items in the bid, or would this be addressed during time of service as a change order request? |
b. Are any of the CO2 systems equipped with pneumatic control heads or heat detectors for actuation?
a. Shall be addressed via CFR if needed.
b. No, CO2 systems are manually actuated by cables from a remote lever.
| 3.22 | 3.22.4 | |
| Line B | On item 3.22 or Rainier spec paragraph 3.22.4 item “b” breaker relocation, we request this be changed to a separate work item. This breaker relocation will need to be engineered, drawing will need to be made with BOM and will need to be ABS approved before we can just go in and butcher up the board to hash in bigger frame breakers in a section that doesn’t have provision for these breakers. NOAA is aware of this as the contractor in Newport last winter called us last minute with some idea we could come down and make this work in a few days. We cannot bid this item as written. | |
| Can this portion of the specification along with the fabrication of the switchboard cover be changed to a separate item? | For clarification: RAINIER is an ABS load line only classed ship. It is unclear why breaker location needs to be engineered w/ a new drawing as there is space to accommodate lowering the position of the the breakers as the engineering for these breakers were completed during the design process of the AC CW plant. ABS approval of the drawing is NOT required. |
See revised specification.
3.30 8.f.1 It states to perform UT readings on the propellers. Does NOAA want UT shots done on the propeller blades? What locations on the blades and how many are to be done on each blade?Does NOAA want the propeller blades to be Dye Penetrant Tested to check for cracks instead of UT shots?
| See revised specification. | ||
| 3.35 | Is the Chevron Clarity AW 46 the current oil used in the bow thruster or is NOAA using a EAL fluid product from RSC BioSolutions? | |
| How many gallons of oil is needed for the Bow Thruster? | Cheveron Clarity EA46 is used for RAINIER's Bow Thruster System. |
50 gallons of oil is required.
See revised specification.
| 3.42 | 3.42.1.b States the pumps and motors are to be renewed in kind and section 3.42.4.e. states renew but describes rebuilding the units, Are these being renewed or overhauled? | Overhauled. See revised specification. | ||
| 3.72 | 3.72.2 & | |||
| 3.72.4 -5 | Can NOAA supply NOAA Standard Specification S2603, “Inspection, Repair, and Preservation of Ground Tackle” that is in paragraph 3.72.2. a. in References? |
In paragraph 3.72.4 – 5 on page 198, it states to blast and paint the anchor and anchor chain in accordance with STL-1 of reference b. There is no reference b. in the specification with STL-1. Can NOAA supply STL-1?
Will NOAA tell the Contractor which reference we are to follow or tell us what we are to do far as the blasting and painting of the anchors and anchor chains?
S2603 uploaded to SAM.gov See revised specification.
Contractor to use both references as guidance for blasting and painting of the anchor chains.
3.79 Is there a list indicating the type, range size of the gauges and thermometers to be calibrated? A current list of gauges and thermometers is not available at this time. Prior to start of this work item Prime and Sub-contractor to walk through with the COR to identify the gauges and thermometers to be calibrated. Gauges range from 0 - 15 to 0 - 6000 psi and thermometers range from -50o to 100o F. Gauges and thermometers found to exceed the amount requested to be calibrated or replaced subject to a CFR. See revised specification.
| 3.80 | |||
| 4.6 | OEM is requesting the serial numbers of the MSD units or a photo of the data plates. | The serial number for the FWD MSD: 14-M5508-D031904B. |
Cannot provide at this time because the unit is in the process of being procured and built by the OEM. The known unit to be provided will be a new OMNIPURE 8MC.
See revised specification
4.1 a. What are the “retaining bars”?
b.What is required for the frame work of the shelves.
c.Are there any details for the “ladders conforming to the hull”.
d. A couple of photo’s would help.
e.Is the existing frame work being reused and, how do the shelves attach?
f. Any info on material thickness? a. Retaining bars are to act as retention for item stacked on the shelves in heavy seas.
b.2" x 1/8" thick slotted Angle. See pictures provided.
c. No details available, however, the insulation is straight with no curvature (see pictures provided). Frame work bolted to the ceiling and attached with an adhesive to the deck.
d. Uploaded to SAM.gov
e. The current shelving is different from what is being replaced with. The existing framing could be reused. The trays can be attached by fasteners.
f. 12 guage
| 4.5 | 4.5.1 – | |
| 4.5.6 | a. RA-461-004 – Who is providing parts 126300,124681,124682 (Items 14 and 17 on the material list? |
b. The Contractor shall be responsible for modifying the blocking plan upon installation of the gondola. This shall be done to ensure that the gondola is free of interferences upon installation. 4 ft from bottom of drydock to bottom of new gondola is preferred working height.
• j) Install sealing compound between cover plates and transducer modules.–This should be removed.
c. Alignment survey completed within tolerance and report delivered to the COR with specified details, format and conventions.
- Who is providing the Alignment survey Team? Report Reference details? a. Items 14 & 17 will be Government Furnished.
b. These requirements will not be removed from the SOW. Contractor will be responsible for meeting the requirements.
c.For clarification on the alignment survey - the alignment survey is for the alignment of the gondola to the ship's reference points and the installed EM304 sonar flatness to the gondola and directionally. Bidders to request Kongsberg to include marine surveyor for the gondola alignment with Kongberg's pricing for OEM assistance with installation of the EM304. Kongsberg PoCs: Mark Amend; Senior Sales Representative; mark.amend@km.kongsberg.com or Travis Eliasen; Engineering Support Manager; travis.eliasen@km.kongsberg.com
7.3 Is the Chevron Clarity AW 46 the current oil used in the CPP System Is the Chevron Clarity AW 46 th current oil used in the bow thruster or is NOAA using a EAL fluid product from RSC BioSolutions? or is NOAA using a EAL fluid product from RSC BioSolutions? Cheveron Clarity EA46 is used for RAINIER's CPP System. 400 gallons required to fill both port & stbd CPP oil tanks.
See revised specification.
7.4 7.4.4 Can NOAA give us more information on the type of aluminum anodes is to be replaced as follows;
Are these (25) aluminum anodes welded on type with straps sticking out or a bolted on type with the strap enclosed to the aluminum?
Do these (25) aluminum anodes have one strap going through them or two straps going through them?
When you say 25 pound aluminum anode. They don’t make one. Can NOAA give us a model number such as AHS-9 (9 pounds) in aluminum which is equivalent to a 25 pound zinc anode model number ZHS-26, which is a weld on type on anode with one strap with a tab on each end or ?
| Can NOAA supply the model number of the type of aluminum anode that NOAA wants? | RAINIER has various sized aluminum anodes attached to the hull either by welds or fasteners with single or double straps. Unfortunately there are no records of location or anode size for this ship. For bidding purposes price per 200 lbs of aluminum US$. | |
| 7.16 | 7.16.1 & | |
| 7.16.2.b. | a.Can NOAA tell the Contractor how many 2 1⁄2” tank vent goose necks with inverted check valves are to be replaced? |
b.Can NOAA tell the Contractor what tanks are affected by the renewals?
c.Can NOAA supply reference b. NOAA Standard Specification – 630-2D, “Steel Coating Systems”? a.15 b.Tanks are listed in work item 3.7. and additional vents found by ABS during load line inspection requiring replacement.
c. 630-2D was provided it may be labeled MOC-630-2D
RA DD Q&A Amendment 2 NOAA Ship RAINIER
FY 2023 DRYDOCKING REPAIR SPECIFICATIONS
Solicitation: 1305M222QNMAN0056
| Work | |||
| Item | Paragraph | Contractor Inquiry | Government Response |
| N/A | N/A | Please Supply the following drawings and references: |
a. 3.78 NOAA ship RAINIER “Emergency Generator Automatic Bus Transfer
b. Code of Federal Regulations, Title 29, Chapter XVII, OSHA Section 1910.1001 and 1915.1001 c.3.81 Stability Standard Test Procedure ASTM F1321-92 d.4.4 VERUS NOAA RAINIER CONTROL PHILOSPHY
a. Uploaded to SAM.gov
b. available via internet search
c. obtainable via subcontractor for work item
d. previously provided in DD Reference folder 6
| N/A | N/A | Requests for extension | see Amendment 2 |
| N/A | N/A | Requests for ship check pictures | available pictures uploaded to SAM.gov |
| 3.10 | 4.c - e | Spec reads to crop hull plate and provide welders to insert deck plate. Which is it, hull or deck insert? | Hull insert. See revised specification. |
| 3.11 | 4.c - e | Spec reads to crop hull plate and provide welders to insert deck plate. Which is it, hull or deck insert? | Hull insert. See revised specification. |
| 3.12 | 4.d - f | Spec calls out to crop 16.58# and 26.78# plate and provide welders to insert deck. Please confirm or revise plate weights and indicate location of insert, e.g. hull, bulkhead or deck. | Bulkhead insert, thickness is 16.58# (13/32"). Removed 26.78# from work item. |
See revised specification.
| 3.15 | 4.c | Please provide thickness for required deck insert. | Thickness 10.2# (1/4") |
| 3.15 | N/A | What frames is the deck repair located? | Approximately between Frames 50 - 55. |
| 3.18 | 4.a | Spec call out to renew 12 each portlights but lists only 11 locations. Please provide 12th location. | There are 10 locations (4) Port & (6) Starboard. Work Item changed to reflect quanity and locations. See revised specification. |
| 3.37 | b.1 | Specified assumption is unquantifiable. Please provide percentage of fasteners to be destructively removed. | 30% of the fasteners especially for valves in the bilge areas in the engine room. Work Item updated. See revised specification. |
| 3.40 | 2.b | Please provide reference dwg RA-S3801-2-1 | Correct drawing number is S3801-2. Verifed correct drawing was provided. Drawing number updated in work item. See revised specification. |
| 3.44 | 2.b | Please provide reference Rainier Steering Gear Hose List | Hose list uploaded to SAM.gov |
| 3.57 | 2.b | Please provide reference RA5 Hose List | Hose list uploaded to SAM.gov |
| 3.75 | 4.f | Spec calls out to prepare surfaces identified at paragraph 4.8. There is no paragraph 4.8. Please clarify. | 4.8 should be 3.75.4.e. Work item changed to reflect this change. |
See revised specification.
| 3.75 | 4.f & h | Spec calls out to prepare 20% of surface area and 750 square feet. Those values do not align. Please clarify. | The ship typically ties up on the port side with bumpers while in port and with the tide changes the bumpers wear off the freeboard paint. This area could amount to 20% on its own. After re-evaluation this area is ~150 sqft. For bidding purposes estimate for 150 sqft plus 15% of total freeboard area. Work Item updated to reflect. See revised specification. |
| 3.76 | 3.76.2.a | Please provide reference dwg. S2806-2 Painting and Identification Scheme | Drawing uploaded to SAM.gov |
| 3.76 | 4.k | Spec calls out to apply paint system in accordance with STL-2 of 631-2D. Paint system does not include anti-fouling coating. Please clarify. | Paint application to be in accordance with the paint manufacturer's guidance. Work Item updated to reflect this change. See revised specification. |
| 3.80 | 1.a. & b | Please provide location of fwd MSD and fwd lift tank. | The FWD MSD and lift tank are located in lower level machinery space fwd starboard side underneath the ladder from upper level. FR51 - FR53. FWD Lift Station is shown in the DWG S0900-2 "B" Deck B-06-001. |
| 4.5 | 4.j.4.a | Specs call out to remove transverse stiffener in accordance with reference 5.1.2.8. Please provide reference. | Should be reference h ( drawing RA-461-006). Work Item updated to reflect change. |
See revised specification.
| 3.60- | ||||
| 3.66 | N/A | Does NOAA have a preferred vendor for the various crane maintenance and inspection items? | No perferred vendor for the crane maintenance and inspection items. | |
| 7.16 | N/A | What tank vents are to be replaced? | Tank vents to be replaced will be for the tanks that are opened for hull repairs, gondola installation and vent identified by the COR. A total of (15) gooseneck w/ inverted check valve assemblies. |
RA DD Q&A Amendment 1 NOAA Ship RAINIER
FY 2023 DRYDOCKING REPAIR SPECIFICATIONS
Solicitation: 1305M222QNMAN0056
| Work | |||
| Item | Paragraph | Contractor Inquiry | Government Response |
| N/A | N/A | Given the remote location for a physical ship check will a digital | |
| ship check be offered for work items that contractors have questions regarding? | A digital ship check is not offered. Quoters may request photographic images no later than 6/2/22 5:00 PM EDT. |
Requests for images must specify the Work Item number and corresponding paragraph, if relevant. The Government will make a best effort to provide images but reminds quoters that it is not a substitute for a physical ship check.
File details come from the government source that posted it. Updated .