RAINIER DD Q and A 2.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
RFQ 1305M222QNMAN0056 - Drydocking and Repairs to NOAA Ship RAINIER
Solicitation number
1305M222QNMAN0056
Issued by

About this file

This request for quotation solicits proposals for drydocking repairs and maintenance work to the NOAA ship RAINIER. Interested contractors must contact the contracting officer or specialist by June 2nd to request the reference documents and drawings applicable to the work items in the RFQ. The solicitation involves hauling the ship out of the water, conducting hull repairs and maintenance, and performing various inspections and tests on equipment such as cranes, tanks, and vents. The response is due by June 16th, and the contract is expected to be awarded by July 2022. The document provides answers to contractor questions on work item details, such as equipment locations, material specifications, and clarifying the scope of certain repair tasks.

View the file

Other files

File Type Posted
RFQ 1305M222QNMAN0056 Rev e.pdf PDF
Amendment 6.pdf PDF
Attachment IV - Price Schedule rev b.xlsx XLSX spreadsheet
RFQ 1305M222QNMAN0056 Rev d.pdf PDF
Attachment I Specification rev d.pdf PDF
Amendment 5.pdf PDF
RFQ 1305M222QNMAN0056 Rev c.pdf PDF
Amendment 4.pdf PDF
RAINIER DD Q and A 3.xlsx XLSX spreadsheet
Amendment 3.pdf PDF
S2603.pdf PDF
Attachment I Specification rev c.pdf PDF
4.1 Chill Box Shelving Pictures.pdf PDF
Steering Gear Hose List.pdf PDF
RA5 Hose List.pdf PDF
Emergency Generator Automatic Bus Transfer.pdf PDF
S2806-2.pdf PDF
3.16_3.17_3.18.zip ZIP file
3.67_4.5.zip ZIP file
Amendment 2.pdf PDF
3.19_3.37.zip ZIP file
RFQ 1305M222QNMAN0056 Rev b.pdf PDF
Attachment I Specification Rev b.pdf PDF
3.10_3.13.zip ZIP file
NOAA Rainier Control Philosophy.pdf PDF
3.15.zip ZIP file
RAINIER DD Q and A.xlsx XLSX spreadsheet
Attachment IV - Price Schedule rev a.xlsx XLSX spreadsheet
Attachment I - Specification rev a.pdf PDF
Amendment 1.pdf PDF
Attachment III - Past Performance Questionnaire.pdf PDF
Attachment I - Specification.pdf PDF
RFQ 1305M222QNMAN0056.pdf PDF
Attachment IV - Price Schedule.pdf PDF
Attachment II - Past Performance Information Form.pdf PDF
Attachment V - AIR Process.pdf PDF
Attachment IV - Price Schedule.xlsx XLSX spreadsheet
Attachment VI - Subcontracting Plan Outline.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RA DD Q&A Amendment 2 NOAA Ship RAINIER

FY 2023 DRYDOCKING REPAIR SPECIFICATIONS

Solicitation: 1305M222QNMAN0056

Work
ItemParagraphContractor InquiryGovernment Response
N/AN/APlease Supply the following drawings and references:

a. 3.78 NOAA ship RAINIER “Emergency Generator Automatic Bus Transfer

b. Code of Federal Regulations, Title 29, Chapter XVII, OSHA Section 1910.1001 and 1915.1001 c.3.81 Stability Standard Test Procedure ASTM F1321-92 d.4.4 VERUS NOAA RAINIER CONTROL PHILOSPHY

a. Uploaded to SAM.gov

b. available via internet search

c. obtainable via subcontractor for work item

d. previously provided in DD Reference folder 6

N/AN/ARequests for extensionsee Amendment 2
N/AN/ARequests for ship check picturesavailable pictures uploaded to SAM.gov
3.104.c - eSpec reads to crop hull plate and provide welders to insert deck plate. Which is it, hull or deck insert?Hull insert. See revised specification.
3.114.c - eSpec reads to crop hull plate and provide welders to insert deck plate. Which is it, hull or deck insert?Hull insert. See revised specification.
3.124.d - fSpec calls out to crop 16.58# and 26.78# plate and provide welders to insert deck. Please confirm or revise plate weights and indicate location of insert, e.g. hull, bulkhead or deck.Bulkhead insert, thickness is 16.58# (13/32"). Removed 26.78# from work item.

See revised specification.

3.154.cPlease provide thickness for required deck insert.Thickness 10.2# (1/4")
3.15N/AWhat frames is the deck repair located?Approximately between Frames 50 - 55.
3.184.aSpec call out to renew 12 each portlights but lists only 11 locations. Please provide 12th location.There are 10 locations (4) Port & (6) Starboard. Work Item changed to reflect quanity and locations. See revised specification.
3.37b.1Specified assumption is unquantifiable. Please provide percentage of fasteners to be destructively removed.30% of the fasteners especially for valves in the bilge areas in the engine room. Work Item updated. See revised specification.
3.402.bPlease provide reference dwg RA-S3801-2-1Correct drawing number is S3801-2. Verifed correct drawing was provided. Drawing number updated in work item. See revised specification.
3.442.bPlease provide reference Rainier Steering Gear Hose ListHose list uploaded to SAM.gov
3.572.bPlease provide reference RA5 Hose ListHose list uploaded to SAM.gov
3.754.fSpec calls out to prepare surfaces identified at paragraph 4.8. There is no paragraph 4.8. Please clarify.4.8 should be 3.75.4.e. Work item changed to reflect this change.

See revised specification.

3.754.f & hSpec calls out to prepare 20% of surface area and 750 square feet. Those values do not align. Please clarify.The ship typically ties up on the port side with bumpers while in port and with the tide changes the bumpers wear off the freeboard paint. This area could amount to 20% on its own. After re-evaluation this area is ~150 sqft. For bidding purposes estimate for 150 sqft plus 15% of total freeboard area. Work Item updated to reflect. See revised specification.
3.763.76.2.aPlease provide reference dwg. S2806-2 Painting and Identification SchemeDrawing uploaded to SAM.gov
3.764.kSpec calls out to apply paint system in accordance with STL-2 of 631-2D. Paint system does not include anti-fouling coating. Please clarify.Paint application to be in accordance with the paint manufacturer's guidance. Work Item updated to reflect this change. See revised specification.
3.801.a. & bPlease provide location of fwd MSD and fwd lift tank.The FWD MSD and lift tank are located in lower level machinery space fwd starboard side underneath the ladder from upper level. FR51 - FR53. FWD Lift Station is shown in the DWG S0900-2 "B" Deck B-06-001.
4.54.j.4.aSpecs call out to remove transverse stiffener in accordance with reference 5.1.2.8. Please provide reference.Should be reference h ( drawing RA-461-006). Work Item updated to reflect change.

See revised specification.

3.60-
3.66N/ADoes NOAA have a preferred vendor for the various crane maintenance and inspection items?No perferred vendor for the crane maintenance and inspection items.
7.16N/AWhat tank vents are to be replaced?Tank vents to be replaced will be for the tanks that are opened for hull repairs, gondola installation and vent identified by the COR. A total of (15) gooseneck w/ inverted check valve assemblies.

RA DD Q&A Amendment 1 NOAA Ship RAINIER

FY 2023 DRYDOCKING REPAIR SPECIFICATIONS

Solicitation: 1305M222QNMAN0056

Work
ItemParagraphContractor InquiryGovernment Response
N/AN/AGiven the remote location for a physical ship check will a digital
ship check be offered for work items that contractors have questions regarding?A digital ship check is not offered. Quoters may request photographic images no later than 6/2/22 5:00 PM EDT.

Requests for images must specify the Work Item number and corresponding paragraph, if relevant. The Government will make a best effort to provide images but reminds quoters that it is not a substitute for a physical ship check.