Attachment I - Base Proposal Item Price Breakdown.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Z2DZ--GI SPS Equipment Site Prep Federal contract opportunity
Solicitation number
36C24621R0087
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document contains a base proposal item price breakdown template and related federal contract opportunity notice. The price breakdown template is for a renovation project at the Durham VA Medical Center involving the Gastrointestinal Sterile Processing Section. The template requires offerors to provide labor and material costs by construction division. It also specifies fields for overhead, profit and bond percentages to calculate total base offer cost.

The related federal contract opportunity is a pre-solicitation notice for the GI SPS Equipment Site Prep project. It provides an estimated construction magnitude between $500,000 and $1,000,000. The notice specifies this will be a total SDVOSB set-aside with NAICS code 236220. The solicitation is expected to be issued on or around June 1, 2021 and proposals will be due approximately 30 days after issuance. It instructs offerors to check the website periodically for amendments and directs any questions to the specified point of contact by email only.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--GI SPS Equipment Site Prep, newest first.
File Type Posted
36C24621R0087 0001.docx DOCX document
36C24621R0087_1.pdf PDF
Attachment H - Wage Determination NC20210028 01_01_2021.pdf PDF
Attachment F - Drawing 19-181 Mechanical .pdf PDF
Attachment C - Drawing 19-181 Architectural .pdf PDF
Attachment K - Past Performance Questionnaire.docx DOCX document
Attachment E - Drawing 19-181 Fire Suppression .pdf PDF
Attachment D - Drawing 19-181 Electrical .pdf PDF
36C24621R0087_1.docx DOCX document
Attachment B - Drawing 19-181 General .pdf PDF
Attachment J - Corp Experience Form.docx DOCX document
Attachment G - Drawing 19-181 Plumbing .pdf PDF
Attachment A - Combined Specs .pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number: 558-19-302 Edward L Roy: VA assigned project #

Date:
Project TitleGI SPS Equipment Site Prep

Edward L Roy: VA assigned Project Title

Project LocationDurham VAMC
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0