This document contains a base proposal item price breakdown template and related federal contract opportunity notice. The price breakdown template is for a renovation project at the Durham VA Medical Center involving the Gastrointestinal Sterile Processing Section. The template requires offerors to provide labor and material costs by construction division. It also specifies fields for overhead, profit and bond percentages to calculate total base offer cost.
The related federal contract opportunity is a pre-solicitation notice for the GI SPS Equipment Site Prep project. It provides an estimated construction magnitude between $500,000 and $1,000,000. The notice specifies this will be a total SDVOSB set-aside with NAICS code 236220. The solicitation is expected to be issued on or around June 1, 2021 and proposals will be due approximately 30 days after issuance. It instructs offerors to check the website periodically for amendments and directs any questions to the specified point of contact by email only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0087 0001.docx | DOCX document | |
| 36C24621R0087_1.pdf | ||
| Attachment H - Wage Determination NC20210028 01_01_2021.pdf | ||
| Attachment F - Drawing 19-181 Mechanical .pdf | ||
| Attachment C - Drawing 19-181 Architectural .pdf | ||
| Attachment K - Past Performance Questionnaire.docx | DOCX document | |
| Attachment E - Drawing 19-181 Fire Suppression .pdf | ||
| Attachment D - Drawing 19-181 Electrical .pdf | ||
| 36C24621R0087_1.docx | DOCX document | |
| Attachment B - Drawing 19-181 General .pdf | ||
| Attachment J - Corp Experience Form.docx | DOCX document | |
| Attachment G - Drawing 19-181 Plumbing .pdf | ||
| Attachment A - Combined Specs .pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: 558-19-302 Edward L Roy: VA assigned project #
| Date: | |
| Project Title | GI SPS Equipment Site Prep |
Edward L Roy: VA assigned Project Title
| Project Location | Durham VAMC | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0