Attachment E - Drawing 19-181 Fire Suppression .pdf
PDF 318 KB Posted
- Attached to
- Z2DZ--GI SPS Equipment Site Prep Federal contract opportunity
- Solicitation number
- 36C24621R0087
About this file
This pre-solicitation notice provides information about an upcoming solicitation for site preparation work related to the renovation of the Gastrointestinal Sterile Processing Section at the Durham VA Medical Center in Durham, North Carolina. The estimated value of the construction work is between $500,000 and $1,000,000. The solicitation will be a total service-disabled veteran-owned small business set-aside, released on or about June 1, 2021 with proposals due approximately 30 days later. Interested parties should monitor the website for the release of specifications, drawings, and amendments and register on the site. Questions must be submitted by email to the point of contact provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0087 0001.docx | DOCX document | |
| Attachment B - Drawing 19-181 General .pdf | ||
| 36C24621R0087_1.pdf | ||
| Attachment H - Wage Determination NC20210028 01_01_2021.pdf | ||
| Attachment F - Drawing 19-181 Mechanical .pdf | ||
| Attachment C - Drawing 19-181 Architectural .pdf | ||
| Attachment K - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Drawing 19-181 Electrical .pdf | ||
| 36C24621R0087_1.docx | DOCX document | |
| Attachment J - Corp Experience Form.docx | DOCX document | |
| Attachment I - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment G - Drawing 19-181 Plumbing .pdf | ||
| Attachment A - Combined Specs .pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINEFL
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
FIRE DRAINDRAIN
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
FIRE PROTECTION CONTRACTORFPC
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION
REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
NOTE: SEE FLOOR
PLAN FOR EXISTING
AND NEW PIPE SIZES.
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE: HANGING DETAILS SHOWN ARE SUBJECT
TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILT QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
UPRIGHT HEAD
SPRINKLER BRANCH LINE
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
UPRIGHT HEAD.
PROVIDE GAURD.
NOTES:
1. SPRINKLER CONTRACTOR SHALL PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR
OTHER OBSTRUCTION OVER 48" IN WIDTH.
2. SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE HVAC AND GENERAL
CONTRACTOR.
3. SPRINKLER CONTRACTOR SHALL INCLUDE COST OF ADDITIONAL SUPPORTS, AS
REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN FULL CONFORMANCE WITH NFPA
REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG FROM DUCT WORK.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL AS
REQUIRED.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
FIRESTOPPING APPROVED
(BY LOCAL CODES)
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF
CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC
REQUIREMENTS.
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
SPRINKLER RISER.
INDICATING BUTTERFLY VALVE
WITH TAMPER SWITCH 7'-0" AFF -
IF GREATER THAN 7'-0" PROVIDE
LADDER.
WATER FLOW SWITCH.
PRESSURE GAUGE.
TO SPRINKLER SYSTEM.
AUXILIARY DRAIN VALVE.
1" INSPECTOR'S TEST VALVE.
SIGHT GLASS.
2" DRAIN CONNECTION. TIE IN TO EXISTING
DRAIN PIPING.
1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR IS TO FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES
PRIOR TO THE START OF WORK.
2. COORDINATE WITH VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. THE CONTRACTOR SHALL GIVE THE VA THREE (3) DAYS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR INTERRUPTION.
3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
4. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE
AND DISPOSED OF.
1. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 27, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.
2. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE VA FIRE PROTECTION DESIGN MANUAL AND NFPA 101.
INSTALLATION SHALL MEET THE REQUIREMENTS OF THE VA.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.
COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE
APPROPRIATE HAZARD CLASSIFICATION.
4. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA
AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA
STANDARDS.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE
SYSTEM IN ACCORDANCE WITH NFPA AND VA REQUIREMENTS.
7. FIRE PROTECTION CONTRACTOR SHOULD OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY OR MAKE ARRANGEMENTS TO HAVE A FLOW TEST PERFORMED. FIRE PROTECTION CONTRACTOR TO INCLUDE IN THEIR BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC CALCULATIONS
AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
9. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE PROTECTION
SYSTEM.
10. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT PRIMARY
BUILDING STRUCTURAL MEMBERS.
11. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.
12. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER DEBRIS
BEFORE APPLICATION OF ANY NEW MATERIALS.
13. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL
WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.
14. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
15. INCLUDE IN BID PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY LOCAL MUNICIPALITY OR VA REQUIRED FOR
COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE INTRODUCED TO VA.
16. PROMPTLY INFORM THE VA, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL LAWS AND REGULATIONS. PERFORM WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL COST
TO THE VA.
17. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO THE VA FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.
18. ALL EXPENSES CARRIED BY THE A/E IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE PART OF A CONTRACTOR, SHALL BE
BORN BY THAT CONTRACTOR.
19. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL
PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
20. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED BY SPRINKLER CONTRACTOR, WIRED
BY ELECTRICAL CONTRACTOR.
21. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED, INSTALLED AND TESTED BY PLUMBING CONTRACTOR. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED
BACKFLOW PREVENTER DEVICE IN HYDRAULIC CALCULATIONS.
22. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES
PER NFPA-13.
23. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.
24. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS OR
CEILING TILE.
25. THE FIRE PROTECTION CONTRACTOR SHALL LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN
ACCORDANCE WITH NFPA-13.
26. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR MORE THAN 48
INCHES ABOVE ADJACENT SURFACE.
27. STANDPIPES SHALL BE PROVIDED IN EACH REQUIRED EGRESS STAIRWAY, WITH 4 INCH DIAMETER MINIMUM SIZE.
28. CLASS 1 SYSTEM SHALL BE PROVIDED WITH 2 1/2 INCH HOSE CONNECTIONS AT EACH INTERMEDIATE LANDING BETWEEN FLOORS IN EACH REQUIRED EGRESS EXIT STAIRWAY. COORDINATE TYPE OF HOSE CONNECTIONS WITH THE AUTHORITY
HAVING JURISDICTION.
1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL
ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY PER VA REQUIREMENTS.
2. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN ESTABLISHED AREA.
3. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY DURING THE TIME PERIOD OF
THE FIRE PROTECTION RENOVATION WORK.
4. IN ADDITION THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER 9, SECTION 901.7).
5. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
6. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.
7. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
8. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACTIVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE SMOKE DAMPERS, AND
SHUT DOWN FANS.
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.
3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S
ACCEPTANCE.
Engineers Architects
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date: Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:4
:5
P M
C U s e rs
\w s h ip le y \D o c u m e n ts
\M -1
-1
-V
A D
U R
H A
M -S
P S
E Q
U
IP
M E
N T
I N
S T
A L
L -N
C w s h ip le y .r v t
FX001
FIRE SUPPRESSION GENERAL
INFORMATION
1 2WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL
Scale: No Scale
TYPICAL SEMI-RECESSED PENDENT SPRINKLER
Scale: No Scale
TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
FIRE SUPPRESSION GENERAL NOTES
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF
FIRE PROTECTION SERVICE
INFECTION CONTROL MEASURES
1 2
1 2
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
GAS
FG189
OFFICE
FG172
NEW EXIT PASSAGEWAY
FG400C
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
FG319
SCOPES SOIL
FG318
SCOPES CLEAN
CIRCULATION
FG300B
1 2
1 2
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
GAS
FG189
OFFICE
FG172
NEW EXIT PASSAGEWAY
FG400C
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
CIRCULATION
FG300B
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:4
:5
P M
FX101
PARTIAL GROUND FLOOR FIRE
SUPPRESSION PLAN - DEMOLITION +
NEW WORK
2 2WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
1 PROVIDE NEW SPRINKLER HEADS AS PER
NEW LAYOUT.
2 PROVIDE NEW BRANCH PIPING AS REQUIRED.
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR FIRE SUPPRESSION PLAN - DEMOLITION
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR FIRE SUPPRESSION PLAN - NEW WORK
1 REMOVE EXISTING SPRINKLER HEAD IN
THIS AREA BEING RENOVATED.
2 DEMOLISH SPRINKLER BRANCH PIPING UP
TO THE MAIN.
| Sheets |
| FX001 - FIRE SUPPRESSION GENERAL INFORMATION |
| FX101 - PARTIAL GROUND FLOOR FIRE SUPPRESSION PLAN - DEMOLITION + NEW WORK |
File details come from the government source that posted it. Updated .