This pre-solicitation notice is for a construction project to renovate the Gastrointestinal Sterile Processing Section at the Durham VA Medical Center in Durham, North Carolina. The project scope includes renovations to approximately 533 square feet in the GI SPS area on the ground floor of Building 1 of the hospital. The estimated construction value is between $500,000 and $1,000,000. The solicitation is anticipated to be a total service-disabled veteran-owned small business set-aside, and will be issued on or around June 1, 2021 via the federal procurement website. Interested offerors should monitor the website for the solicitation and any subsequent amendments. Proposals will be due approximately 30 days after solicitation issuance. The location and points of contact for the mandatory pre-bid site visit will be identified in the solicitation. All questions must be submitted by email to the named contracting officer by the specified date.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--GI SPS Equipment Site Prep, newest first.
File Type Posted
36C24621R0087 0001.docx DOCX document
Attachment K - Past Performance Questionnaire.docx DOCX document
Attachment E - Drawing 19-181 Fire Suppression .pdf PDF
Attachment D - Drawing 19-181 Electrical .pdf PDF
36C24621R0087_1.docx DOCX document
Attachment J - Corp Experience Form.docx DOCX document
Attachment I - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Attachment G - Drawing 19-181 Plumbing .pdf PDF
Attachment A - Combined Specs .pdf PDF
36C24621R0087_1.pdf PDF
Attachment H - Wage Determination NC20210028 01_01_2021.pdf PDF
Attachment F - Drawing 19-181 Mechanical .pdf PDF
Attachment C - Drawing 19-181 Architectural .pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

508 FULTON ST,

DURHAM, NC

PROJECT LOCATION

Engineers Architects

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/2 /2

:2

:2

P M

G-001

TITLE SHEET AND INDEX OF

DRAWINGS

1 3EJD

SPS GI EQUIPMENT INSTALL

DURHAM VA MEDICAL CENTER

508 FULTON ST.

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

SPS GI EQUIPMENT INSTALL

DURHAM VA MEDICAL CENTER

508 FULTON ST.

DURHAM, NC 27705

VA PROJECT #: 558-19-302

WVS

DRAWING LIST

GENERAL

G-001 TITLE SHEET AND INDEX OF DRAWINGS 1 3

LS100 OVERALL GROUND FLOOR LIFE SAFETY PLAN 2 3

G-002 PARTIAL GROUND FLOOR PLAN - ICRA 3 3

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 3

A-100 PARTIAL GROUND FLOOR PLAN DEMO + NEW WORK 2 3

A-101 PARTIAL GROUND FLOOR DEMOLITION REFLECTED CEILING PLAN + NEW WORK REFLECTED CEILING PLAN 3 3

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2

FX101 PARTIAL GROUND FLOOR FIRE SUPPRESSION PLAN - DEMOLITION + NEW WORK 2 2

PLUMBING

P-001 PLUMBING GENERAL INFORMATION, DETAILS, AND SCHEDULES 1 5

PP101 PARTIAL GROUND FLOOR PLUMBING PLAN - DEMOLITION + NEW WORK 2 5

PW100 PARTIAL GROUND FLOOR UNDERSLAB PLAN - DEMOLITION + NEW WORK 3 5

PW101 PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - DEMOLITION + NEW WORK 4 5

P-901 PIPE RISER DIAGRAMS 5 5

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION AND SCHEDULES 1 2

MH101 PARTIAL GROUND FLOOR MECHANICAL PLAN DEMOLITION + NEW WORK 2 2

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 5

E-101 PARTIAL GROUND FLOOR ELECTRICAL PLANS 2 5

E-102 GROUND FLOOR OVERALL ELECTRICAL PLAN 3 5

EL101 PARTIAL GROUND FLOOR LIGHTING PLAN 4 5

E-501 ELECTRICAL DETAILS 5 5

BUILDING 1

N

N N

FG144A

EG017A

FG234

FG231 FG232 FG233

FG201 FG400B

GENERAL

LAB

WAITING

OFFICE

RECEPTION

NEW EXIT

PASSAGEWAY

STORAGE

TO CRAWL

SPACE

TO CRAWL

SPACE

TO CRAWL SPACE

RAMP

RAMP

FG178

FG179

FG172

FG184

FG180

FG168

FG169

FG187

FG182

FG181

FG185A

FG182A

FG186

FG184A

FG184

FG170

FG185

FG183

BG016

BG017

BG014

BG006

BG008A

BG010

BG013

BG012

BG015

BG008

BG009A

BG007

BG004

BG009

BG005

DG018

DG017 DG021

FG130FG136 FG132FG135 FG134

BG000

BG001

AG002A

AG000A

AG002

FG126

CG009

CG020

CG008

CG012

CG014

CG016

CG015

CG018

DG008

CG013

DG006

DG009 DG007 DG005

DG002

DG001

DG014

S4

S5 P3

P2

P1 P7

P6

P5

AG005

AG009

AG011AG012

AG007

AG005AAG009A

AG008

AG015A

AG015B

DG013DG015

DG016

AG003

CG009

CG007

CG009F

CG010

DG004

BG003

FG127

FG120

FG105D

FG105

FG15A

FG15

FG14

FG133 FG131 FG129

FG140

FG139

FG138

FG109

FG137

FG108

FG114FG111 FG113

FG112

FG107A

FG107C

FG107B

FG116

FG117FG115

FG118

GF119

FG107

FG106

FG145

FG146A

EG006

EG013

EG015

EG017

EG007

EG011

EG009

EG018

EG010

EG014

EG012

EG008

EG004

EG005

EG002

EG003

FG156

FG155

FG154

FG143

FG137A

FG147FG146 FG147A

FG142

FG148

FG149

FG157

FG158

FG104

FG160

FG160A

FG159

AG017

AG015

AG010

FG124

FG125

FG123

FG122

FG121

FG105B

FG105A

FG12

FG163

FG103

EG005A

EG007A

EG001

FG105C

FG163A

FG125B

FG125C

FG43

FG141

FG16

FG16A

FG14A

P10

P11

FG104A

FG156A

FG151

DG011

DG005B

DG005A

CG009B

CG009A

CG009C

CG009B

BG002 BG001A

AG001

EG003A EG003B

EG012A

EG018A EG017A

FG1000

FG1001

G185A

G185C

G185B

G186A

FG130

CG004

CG003

FG133B

FG176

FG404

FG219

FG200A

FG234

FG402

FG401

FG220

FG221

FG218

FG202FG203FG205FG207

FG215

FG217

FG216

FG214 FG208 FG204 FG230

FG223 FG227 FG229

FG224 FG226 FG228

FG231 FG232 FG233

FG206

FG225

FG213

FG200C

F G

D

FG222A FG222B

F G

B

FG210

FG211

FG212

FG201FG209

FG405

FG403

FG165

FG321

FG322

FG345

FG316

FG340

FG341

FG342

FG344

FG320

FG308 FG306 FG304 FG302FG315 FG313

FG332

FG323

FG312

FG324 FG325 FG326 FG327 FG328 FG329 FG334FG330 FG335 FG336 FG337 FG338

FG301FG303FG305FG307FG309

FG400D

FG311

FG339

FG333

FG300B

FG314

FG189

FG310

FG331

FG300D

FG300A

FG300CL

FG237

FG236

FG239

FG241

FG243

FG245

FG247

FG249

FG250

FG248

FG236

FG242

FG240

FG246

FG236

FG235

FG500C

FG343A

FG343

FG400C

FG218A

FG182C

FG182D

FG182B

FG166

FG164

FG173

FG174

FG184B

FG184C

FG167

FG171

FG175

BG008B

FG133A

FG133B

FIRE PROTECTION

ROLLING

SHUTTER

ROLLING

SHUTTER

UPDN

UP

DN

UP

STAIR-1

STORAGE

SOILED UTILITY

WORK RM

SEDATION

COOK-CHILL UNITSCOOLER

FREEZER

COOLER

COOLER

CANTEEN STORAGE

OFFICE

MENS SHOWER

STAIR-3

STAIR-5

STAIR-4

F.H.C

MORGUE

AIR HANDLING UNIT -6

OFFICE

FREEZER

CANTEEN STORAGE

FOOD

OFFICE

OFFICE

D

OFFICE

FREEZER

STORAGE KITCHEN

ESCORT

FIRE PROTECTION

STORAGE

MAIL PROCESSING AREA

ELECTRONIC SHOP STORAGE VENDING RM

KEEPING

CPR EQUIP

STORAGE

CANTEEN CANTEEN

OFFICE

FREEZER

STAIR-12

CONFERENCE RMOFFICEOFFICEOFFICE

STORAGE

TELECOM

FREEZER

GAS

STORAGE

GAS

STORAGE

CLOSET

FIRE PROTECTION

HOUSE

KEEPING

HOUSE

ELECTRICAL RM

TELEPHONE

CLOSET

ISO OFFICE

KEEPING

OFFICE

LAB

OFFICE

OFFICE

OFFICE

STORAGE

STORAGE

STORAGE

RESEARCH

AFGE

AFGE

DECEDENT

AFFAIRS OFFICE ISO OFFICE

IRM OFFICE

CLOSET TOILET

COMP AND PEN

SERVER RM

TELECOM

TELECOM

RELEASE OF INFO

RELEASE OF

INFO

PC LAB

RM

MENTAL HEALTH

OFFICEKEEPING OFFICE

OFFICE

GROUP MEETING

OFFICE

OFFICE

OFFICE

EXAM RM-1

RECEPTION

OFFICE

OFFICEOFFICE

OFFICE

IRMS

RELEASE OF INFO

OFFICE

CLOSET

ELEVATOR

FIRE

PROTECTION

ELECTRICAL

HOUSE

LAB

FIRE PROTECTION

KEEPING

HOUSE

HOUSE

COPY RM

OFFICE

DIRECTOR MHCOFFICE

OFFICE

SOCIAL WORKER

FIRE PROTECTION

RM

COPY

OFFICE

RESIDENT

PSYCHIATRIST

CLINIC

WOMENS

HEALTH

EXAM RM-2

IRM

OFFICE

IRM OFFICE

IRM OFFICE

IRM OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

MENS

LOCKER

BROWN

ELEVATOR

BROWN

ELEVATOR

OFFICE

OFFICE

STORAGE

STORAGE

WORK RM IRM

IRM OFFICE

STORAGE

CANTEEN

STAIR-10

HAC

ELECTRICAL CLOSET

KITCHEN

DUMB WAITER

DUMB WAITER

STORAGE OFFICE

FIRE PROTECTION

WOMENS

MECH

STORAGE

NUTRITION

OFFICE

GREEN

ELEVATOR

GREEN

ELEVATOR

GREEN

ELEVATOR

OFFICE

OFFICE

OFFICE

DUMB WAITER

BIO-MED

OFFICE

FIRE PROTECTION FIRE

CANTEEN

STORAGE

LINEN

CHUTE

CANTEEN

WAREHOUSE

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ELEVATOR

EQUIP

CONTROL RM

WAITING

STORAGE

MRI EXAM

CONTROL

OFFICE

STORAGE

STORAGE

STORAGE

FIRE PROTECTION

OFFICE

CAFETERIA

CAFETERIA

OFFICE

CORRIDOR

LINEN

CHUTE LINEN

CHUTE

SHAFT

PREP AREA ONC OFFICE STORAGEESCORT

CORRIDOR

MENS TOILET

TRASH RM

FEMALE TOILET

FEMALE TOILET

CORRIDOR

CORRIDOR

CORRIDOR

RETAIL STORE

MECH

RETAIL STORE

RECORDS RM

TOILET

STAIR

CORRIDOR

MENS TOILET

ELEVATOR LOBBY

CORRIDOR

TOILET

TOILET

COMPUTER RM

OFFICE, PRIVACY

CANTEEN DINING

CANTEEN DINING

TRAINING

KITCHEN

DINING

OFFICE

CORRIDOR

OFFICE, NURSING UNION ISO OFFICE

BIO-MED

CORRIDOR

CORRIDOR

CORRIDOR

MECH RM

CORRIDOR

BIO-MED CLINICAL EQUIP UNIT

CORRIDOR CORRIDOR

CORRIDOR

STORAGE

CONFERENCE RM

CORRIDOR

CORRIDOR

HEM / OFFICE OFFICE

ADMIN OFFICE

BIO-MED

ELECTRICAL

ELECTRICAL

WELL

WOMENS

ELECTRICAL

UTILITY

BREAK

PROTECTION

DATA RM

HSK

CIRCULATION

WAITING

PUBLIC TOILETS (M)

PUBLIC TOILETS(W)

STAFF T

CLEAN SUPPLIES

CLEAN UTILITY

PHOTOEXAMEXAMEXAM

LASER

EXAM

WAITING

PROCEDURES EXAM EXAM EXAM

EXAM EXAM EXAM

EXAM EXAM EXAM

FIELD PRETEST/FIT

EXAM

EXAM

LASER

CIRCULATION

C

IR

C U

L A

T

IO

N

WAITING WAITING

C

IR

C U

L A

T

IO

N

OFFICE

CONFERENCE

OFFICE

RECEPTIONEXAM

ELEC. RM

STAFF LOCKERS

PRESCREEN

HSK

EQUIP

MECHANICAL

CLEAN

RESIDENTS

EXAMS

EXAMS

WAITING

PROCEDURE 4 PROCEDURE 5 PROCEDURE 6 PROCEDURE 7PROCEDURE 3

NURSE STATION

TOILET

STORAGE

RECOVERY HOLDING HOLDING HOLDING HOLDING HOLDING

P.A.PHYSICIANCHIEFCLERICAL

CORRIDOR

ASSIST

TOILET

TOILET

CIRCULATION

TOILET

GAS

SUPPLIES

Nourish

CIRCULATION

CIRCULATION

ELEC CLOSET

GROUP THERAPY

OFFICE

OFFICE

STORAGE

CONFERENCE ROOM

CIRCULATION

LOCKER ROOM

RECEPTION

NEW EXIT PASSAGWAY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PHYSICIAN

PROCEDURE 2

PROCEDURE 1

RECOVERY RECOVERY RECOVERY RECOVERY RECOVERY RECOVERY

SOILED UTILITY

DRSG

STORAGE

DRSG RM

EXAM RM

TOILET

WAITING

WAITING

TOILET

DRSG RM

DRSG RM

MRI EXAM

EQUIP

TOILET

RECEPTION

CORRIDOR

DRSG RM

DRSG

REPRODUCTION AREA

RECEPTION

WAITING RM

4 46. 3969

AREA OF WORK

FEC1

TRAVEL DISTANCE: 85'-10"

4 2 1

6 2

LIFE SAFETY PLAN LEGEND

CODE DATA

APPLICABLE CODE:

NFPA 101 (2018)

IBC (2018)

OCCUPANCY CLASSIFICATION

(VA FIRE PROTECTION DESIGN MANUAL SECTION 4.1):

HEALTHCARE

NFPA A.6.1.5.1 HEALTHCARE

MEANS OF EGRESS:

STAIR ENCLOSURE: 2-HR (NFPA 101, A.7.1.3.2.1)

MIN. EXIT WIDTH: 32" CLEAR (IBC 2018, 1010.1.1)

HORIZ. EXITS: 2 HR ASSEMBLY (NFPA 101, 7.2.4.3.2)

GUARDS: 42" HT/ 4" CLR. SPACING (NFPA 101, 7.1.8)

HANDDRAILS: 34-38" HT. (IBC 2018,1014.1)

RAMPS: 1:20 SLOPE MAX. (PG-18-13)

OCCUPANT LOAD: (NFPA 101.7.3)

NO CHANGE IN EXISTING OCCUPANT LOAD

CAPACITY FACTORS: (NFPA 101.7.3.3):

STAIRS: 0.3

OTHER: 0.2

GENERAL NOTE:

PROVIDE 2-HR RATED FIRESTOPPING AT FLOOR

PENETRATIONS.

FEC 1 FIRE EXTINGUISHER CABINET

- FULLY RECESSED

NOT IN CONTRACT

INDICATES AREA OF WORK

CONSTRUCTION ROUTE - CONSTRUCTION

MATERIALS ROUTE

ALTERNATE EMERGENCY EXIT ROUTE -

MINIMUM CORRIDOR WIDTHS FOR EXISTING

OCCUPANCY LOAD ARE SHOWN ON

ENLARGED PLANS APPEARING ON THE

A-100'S SHEETS. IF WIDTHS ARE

OBSTRUCTED DURING CONSTRUCTION,

PROVIDE SIGNAGE FOR ALTERNATE EXIT

ROUTES AS SHOWN THIS SHEET

PHOTO KEY LEGEND

# PHOTO VANTAGE POINT

REFER TO THIS SHEET FOR

PHOTOS

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2 /2

:3

:0

P M

LS100

OVERALL GROUND FLOOR LIFE

SAFETY PLAN

2 3EJD

SPS GI EQUIPMENT INSTALL

DURHAM VA MEDICAL CENTER

508 FULTON ST.

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

WVS

0 4 8 16

NORTH

PLAN

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

GROUND FLOOR

Scale: 1" = 20'-0"

OVERALL GROUND FLOOR LIFE SAFETY PLAN

A. SEE SPECIFICATION FOR BADGING REQUIREMENTS.

B. NO MAJOR EQUIPMENT ACCESS THROUGH THE

BUILDING BETWEEN 7 AM TO 5PM. CONTRACTOR TO

COORDINATE WITH A VA COR.

C. STICKY MAT AT CONSTRUCTION ACCESS.

STICKYMATS TO BE CHANGED WHEN DIRTY AND AT

VA REQUEST.

D. A JOB SITE TRAILER IS UNABLE TO BE LOCATED

WITHIN REASONABLE DISTANCE OF AREA OF WORK.

IF A TRAILER IS DESIRED, CONSULT VA COR FOR

POSSIBLE LOCATIONS.

Scale: 1" = 1'-0"

PHOTO 1

Scale: 1" = 1'-0"

PHOTO 2

Scale: 1" = 1'-0"

PHOTO 3

Scale: 1" = 1'-0"

PHOTO 4

1 CONTRACTOR MAY NOT BLOCK PUBLIC DRIVE

AREA TO DROP OFF OR PICK UP MATERIAL. ANY

IMPACTS TO THIS ROAD MUST BE COORDINATED

WITH COR AND VA POLICE IN ADVANCE

2 CONSTRUCTION ROUTE IS INTENDED FOR

CONSTRUCTION DEBRIS EGRESS ONLY.

DEPENDENT ON FACILITY CONDITIONS, SITE

ACCESS MAY BE RESTRICTED TO MAIN

ENTRANCES ONLY. NO STAGING OR STORAGE OF

MATERIALS ALONG THIS ROUTE IS PERMITTED. ALL

DEBRIS MUST BE REMOVED DAILY AND TAKEN

OFFSITE.

3 EXISTING FENCE

4 EXISTING GENERATORS

5 EXISTING TRAILER

6 EXISTING CANOPY

QTY.

D O O R A N D F R A M E S C H E D U L E

NO.

MISCELLANEOUS

THICK.

FRAME INFORMATION

HEIGHTWIDTH MAT'LTYPE MAT'LTYPE RATING REMARKSHRDWR.DEPTH

DOOR INFORMATION

TYPE ITYPE A

(1)D000 1 3/4"7'-0"3'-0" A HM HMTYPE I SET 16 5/8"

HINGES

DUST PROOF STRIKE

LATCH SET

DOOR CLOSER

KICK PLATES

GASKETING

TA2714

VA SPEC F01

DC6210xA11

K1050F

S888 x HEAD & JAMBS

HARDWARE SET 1

32D

26D

32D

MK

RO

CO

RO

PE

MANUFACTURERS:

CORBIN RUSSWIN

McKINNEY

PEMKO

ROCKWOOD

CO

MK

PE

RO

NOTE:

HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN.

ALTERNATE MANUFACTURERS ACCEPTABLE, SUBJECT TO

REVIEW BY ARCHITECT AND C.O.R .FOR EQUAL QUALITY

COMPLIANCE.

NOTE: DOOR AND FRAME SCHEDULE FOR ICRA ENCLOSURE ONLY

90 MIN.

2" SEE SCHED 2"

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS

MATRIX FOR CONSTRUCTION RENOVATION

Type of Construction / Project Activity Table

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

TYPE A

TYPE B

TYPE C

TYPE D

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Patient Risk Group Table

Group 1 Low Risk

Group 2 Medium Risk

Group 3 High Risk

Group 4 Highest Risk

1. Office Areas

2. Hallways

3. EMS

1. Ancillary Therapy Areas

2. Respiratory Therapy

3. Outpatient Clinics

4. CBOC's

5. Mental Health Units

1. Pharmacy Areas

2. Radiology

3. Triage

4. Laboratories

5. Gastrointestinal Suites

1. CLC's

2. SPD

3. Acute Care Units

4. Bone Marrow Transplant Unit

5. Operating Rooms

6. Chemotherapy Areas

(Outpatient Clinics/Inpatient)

7. Areas/ Units adjacent to BMTU

8. ICU's

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

Construction Project Type

Patient Risk Group

LOW Risk Group 1

MEDIUM Risk Group

HIGH Risk Group 3

HIGHEST Risk Group 4

TYPE A

I

I

II

III

I

I

III

III/IV

II

III

III/IV

III/IV

IV

IV

IV

III/IV

TYPE B TYPE C TYPE D

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

Class III control procedures are necessary.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

1. Wipe surfaces to remove dust

C L -1

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

C L A

S S

II 1. Wipe work surfaces with disinfect.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or

Facilities Management Maintenance and Engineering Department before construction begins.

3. Remove or isolate HVAC system in area where work is to being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

C L A

S S

II

I

1. Wipe work surfaces with disinfect.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or

Facilities Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in Areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed

14. Remove isolation of HVAC system in areas where work is being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with HEPA filtered vacuums.

6. Remove or isolate HVAC system in areas where work was being performed.

C L A

S S

IV

HEPA

NEGATIVE AIR

UNIT

FINISHED

FLOORING TO BE

KEPT CLEAN.

FLOORS NOT

BEING REPLACED

MUST BE

PROTECTED.

COVER WITH

CONSTRUCTION

GRADE

TEMPORARY

FLOOR

PROTECTION.

EXHAUST AIR TO

OUTSIDE OR VA

APPROVED

LOCATION.

PROVIDE FIRE

DAMPER EQUAL

RATING WHEN

PENETRATING A

RATED WALL.

COORDINATE

WITH C.O.R.

A P

P R

O X

A .F

.F

HM DOOR &

FRAME

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

D000

EXISTING CEILING

CEMENTITIOUS BACKER TO

ENCLOSURE SIDE

UL U404, 2HR

PAINT

EXISTING FLOOR

W A

L L

H E

IG

H

T V

A R

IE

S

F E

IL

D

V E

R

IF

Y

6 1/8"

A 2-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

UNDERSIDE OF EXISTING

CEILING

M

IN

CORRIDOR

RATED

ENCLOSURE SIDE

FIRE RESISTANT SEALANT,

BOTH SIDES TO WALL

ABOVE OPENING

TOP OF TEMPORARY

CONSTRUCTION ACCESS

A. PERFORM WORK REQUIRED BY VA INFECTION

CONTROL PERSONNEL REGARDING ICRA FORM. SEE

ICRA FORM FOR REQUIREMENTS. ALL ICRA AND ISLM

WORK ITEMS MUST BE COMPLETED PRIOR TO

BEGINNING ANY DEMOLITION WORK OR NEW

CONSTRUCTION .

B. VA REQUIRES THAT ALL APPLICABLE PERMITS BE

COMPLETED AND APPROVED PRIOR TO BEGINNING

ANY WORK STATION.

C. PERMITS INCLUDING: ICRA. ISLM, ABOVE CEILING,

FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE

ALARM SYSTEM, MEDICAL GASES AND CONFINED

SPACE.

D. AREA OF WORK: APPROXIMATELY 533 S.F.

E. ANY WORK ABOVE CEILING OUTSIDE THE

CONTAINMENT AREA TO TAKE PLACE WITH MOBILE

HEPA CART

F. SMOKING PROHIBITED EVERYWHERE ON CAMPUS

SEE SPECIFICATIONS FOR FURTHER INFORMATION.

G. CONTRACTOR TO REFERENCE NFPA 241,

SAFEGUARDING CONSTRUCTION, ALTERATION, AND

DEMOLITION OPERATIONS.

2018 NFPA 101 LIFE SAFETY CODE

NFPA 99 HEALTHCARE FACILITIES CODE

2018 INTERNATIONAL BUILDING CODE

REFERENCE CODES

CLR

MAINTAIN 6'-0"

C L R

M A

IN

T

A

IN

7'-0"

D000

3' -0

TOILET

FG314

SCOPES

CLEAN

FG318

OFFICE

FG316

STORAGE

FG317

OFFICE

FG172

NEW

EXIT

PASSAGEWAY

FG400C

PROCEDURE

FG165

PROCEDURE

FG315

PROCEDURE

FG313

GAS

FG189

WAITING

FG164

STAFF

LOCKERS

FG403

STAFF T

FG220

CLEAN

SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

SCOPES

SOIL

FG319

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

A D

J U

S T

A B

L E

H E

IG

H

T

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2 /2

:2

:2

P M

G-002

PARTIAL GROUND FLOOR PLAN - ICRA

3 3EJD

SPS GI EQUIPMENT INSTALL

DURHAM VA MEDICAL CENTER

508 FULTON ST.

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

WVS

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

GROUND FLOOR

Scale: 1/2" = 1'-0"

HEPA FILTRATION

Scale: 1/2" = 1'-0"

TEMPORARY ENCLOSURE ELEVATION

Scale: 3/4" = 1'-0"

TEMPORARY ENCLOSURE ELEVATION

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR PLAN - ICRA 0 2 4 8

NORTH

PLAN

1 NEW RATED 2 HR ICRA ENCLOSURE - SEE DETAILS

THIS SHEET

2 PROVIDE STICKY MAT. TO BE CHANGED END OF

SHIFT OR MORE TO MAINTAIN CLEANLINESS

3 ALL DOORS TO REMAIN CLOSED THROUGH

CONSTRUCTION. TAPE AND SEAL DOORS AIRTIGHT

PRIOR TO ANY CONSTRUCTION ACTIVITIES

4 LIMITED ACCESS CORRIDOR, CONTRACTOR TO

PERFORM ANY WORK IN THIS AREA OFF HOURS.

COORDINATE WITH COR

5 CONTRACTOR TO CUT NEW 3'-0"X 7'-0" OPENING IN

EXISTING WALLS FOR ACCESS TO AREA OF WORK.

FRAME IN SIDES AND INSTALL 5/8" GYP. BD. AT

JAMBS OF OPENING - EXACT LOCATION TO BE

FIELD DETERMINED

6 MAINTAIN 6'-0" CLEAR WIDTH AT EGRESS

CORRIDOR AT ALL TIMES. NO STORING OR

STAGING MATERIAL IN CORRIDOR THAT IMPEDES

MINIMUM CLEARANCE

7 NEW TEMPORARY DOOR - SEE SCHEDULE THIS

SHEET

8 USE MOBILE CART ON ALL WORK ABOVE CEILING

Scale: 1/2" = 1'-0"

MOBILE HEPA CART

Sheets
G-001 - TITLE SHEET AND INDEX OF DRAWINGS
G-002 - PARTIAL GROUND FLOOR PLAN - ICRA

File details come from the government source that posted it. Updated .