Attachment B - Drawing 19-181 General .pdf
PDF 1 MB Posted
- Attached to
- Z2DZ--GI SPS Equipment Site Prep Federal contract opportunity
- Solicitation number
- 36C24621R0087
About this file
This pre-solicitation notice is for a construction project to renovate the Gastrointestinal Sterile Processing Section at the Durham VA Medical Center in Durham, North Carolina. The project scope includes renovations to approximately 533 square feet in the GI SPS area on the ground floor of Building 1 of the hospital. The estimated construction value is between $500,000 and $1,000,000. The solicitation is anticipated to be a total service-disabled veteran-owned small business set-aside, and will be issued on or around June 1, 2021 via the federal procurement website. Interested offerors should monitor the website for the solicitation and any subsequent amendments. Proposals will be due approximately 30 days after solicitation issuance. The location and points of contact for the mandatory pre-bid site visit will be identified in the solicitation. All questions must be submitted by email to the named contracting officer by the specified date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0087 0001.docx | DOCX document | |
| Attachment K - Past Performance Questionnaire.docx | DOCX document | |
| Attachment E - Drawing 19-181 Fire Suppression .pdf | ||
| Attachment D - Drawing 19-181 Electrical .pdf | ||
| 36C24621R0087_1.docx | DOCX document | |
| Attachment J - Corp Experience Form.docx | DOCX document | |
| Attachment I - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment G - Drawing 19-181 Plumbing .pdf | ||
| Attachment A - Combined Specs .pdf | ||
| 36C24621R0087_1.pdf | ||
| Attachment H - Wage Determination NC20210028 01_01_2021.pdf | ||
| Attachment F - Drawing 19-181 Mechanical .pdf | ||
| Attachment C - Drawing 19-181 Architectural .pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
508 FULTON ST,
DURHAM, NC
PROJECT LOCATION
Engineers Architects
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2 /2
:2
:2
P M
G-001
TITLE SHEET AND INDEX OF
DRAWINGS
1 3EJD
SPS GI EQUIPMENT INSTALL
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPS GI EQUIPMENT INSTALL
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705
VA PROJECT #: 558-19-302
WVS
DRAWING LIST
GENERAL
G-001 TITLE SHEET AND INDEX OF DRAWINGS 1 3
LS100 OVERALL GROUND FLOOR LIFE SAFETY PLAN 2 3
G-002 PARTIAL GROUND FLOOR PLAN - ICRA 3 3
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 3
A-100 PARTIAL GROUND FLOOR PLAN DEMO + NEW WORK 2 3
A-101 PARTIAL GROUND FLOOR DEMOLITION REFLECTED CEILING PLAN + NEW WORK REFLECTED CEILING PLAN 3 3
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 PARTIAL GROUND FLOOR FIRE SUPPRESSION PLAN - DEMOLITION + NEW WORK 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION, DETAILS, AND SCHEDULES 1 5
PP101 PARTIAL GROUND FLOOR PLUMBING PLAN - DEMOLITION + NEW WORK 2 5
PW100 PARTIAL GROUND FLOOR UNDERSLAB PLAN - DEMOLITION + NEW WORK 3 5
PW101 PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - DEMOLITION + NEW WORK 4 5
P-901 PIPE RISER DIAGRAMS 5 5
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION AND SCHEDULES 1 2
MH101 PARTIAL GROUND FLOOR MECHANICAL PLAN DEMOLITION + NEW WORK 2 2
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 5
E-101 PARTIAL GROUND FLOOR ELECTRICAL PLANS 2 5
E-102 GROUND FLOOR OVERALL ELECTRICAL PLAN 3 5
EL101 PARTIAL GROUND FLOOR LIGHTING PLAN 4 5
E-501 ELECTRICAL DETAILS 5 5
BUILDING 1
N
N N
FG144A
EG017A
FG234
FG231 FG232 FG233
FG201 FG400B
GENERAL
LAB
WAITING
OFFICE
RECEPTION
NEW EXIT
PASSAGEWAY
STORAGE
TO CRAWL
SPACE
TO CRAWL
SPACE
TO CRAWL SPACE
RAMP
RAMP
FG178
FG179
FG172
FG184
FG180
FG168
FG169
FG187
FG182
FG181
FG185A
FG182A
FG186
FG184A
FG184
FG170
FG185
FG183
BG016
BG017
BG014
BG006
BG008A
BG010
BG013
BG012
BG015
BG008
BG009A
BG007
BG004
BG009
BG005
DG018
DG017 DG021
FG130FG136 FG132FG135 FG134
BG000
BG001
AG002A
AG000A
AG002
FG126
CG009
CG020
CG008
CG012
CG014
CG016
CG015
CG018
DG008
CG013
DG006
DG009 DG007 DG005
DG002
DG001
DG014
S4
S5 P3
P2
P1 P7
P6
P5
AG005
AG009
AG011AG012
AG007
AG005AAG009A
AG008
AG015A
AG015B
DG013DG015
DG016
AG003
CG009
CG007
CG009F
CG010
DG004
BG003
FG127
FG120
FG105D
FG105
FG15A
FG15
FG14
FG133 FG131 FG129
FG140
FG139
FG138
FG109
FG137
FG108
FG114FG111 FG113
FG112
FG107A
FG107C
FG107B
FG116
FG117FG115
FG118
GF119
FG107
FG106
FG145
FG146A
EG006
EG013
EG015
EG017
EG007
EG011
EG009
EG018
EG010
EG014
EG012
EG008
EG004
EG005
EG002
EG003
FG156
FG155
FG154
FG143
FG137A
FG147FG146 FG147A
FG142
FG148
FG149
FG157
FG158
FG104
FG160
FG160A
FG159
AG017
AG015
AG010
FG124
FG125
FG123
FG122
FG121
FG105B
FG105A
FG12
FG163
FG103
EG005A
EG007A
EG001
FG105C
FG163A
FG125B
FG125C
FG43
FG141
FG16
FG16A
FG14A
P10
P11
FG104A
FG156A
FG151
DG011
DG005B
DG005A
CG009B
CG009A
CG009C
CG009B
BG002 BG001A
AG001
EG003A EG003B
EG012A
EG018A EG017A
FG1000
FG1001
G185A
G185C
G185B
G186A
FG130
CG004
CG003
FG133B
FG176
FG404
FG219
FG200A
FG234
FG402
FG401
FG220
FG221
FG218
FG202FG203FG205FG207
FG215
FG217
FG216
FG214 FG208 FG204 FG230
FG223 FG227 FG229
FG224 FG226 FG228
FG231 FG232 FG233
FG206
FG225
FG213
FG200C
F G
D
FG222A FG222B
F G
B
FG210
FG211
FG212
FG201FG209
FG405
FG403
FG165
FG321
FG322
FG345
FG316
FG340
FG341
FG342
FG344
FG320
FG308 FG306 FG304 FG302FG315 FG313
FG332
FG323
FG312
FG324 FG325 FG326 FG327 FG328 FG329 FG334FG330 FG335 FG336 FG337 FG338
FG301FG303FG305FG307FG309
FG400D
FG311
FG339
FG333
FG300B
FG314
FG189
FG310
FG331
FG300D
FG300A
FG300CL
FG237
FG236
FG239
FG241
FG243
FG245
FG247
FG249
FG250
FG248
FG236
FG242
FG240
FG246
FG236
FG235
FG500C
FG343A
FG343
FG400C
FG218A
FG182C
FG182D
FG182B
FG166
FG164
FG173
FG174
FG184B
FG184C
FG167
FG171
FG175
BG008B
FG133A
FG133B
FIRE PROTECTION
ROLLING
SHUTTER
ROLLING
SHUTTER
UPDN
UP
DN
UP
STAIR-1
STORAGE
SOILED UTILITY
WORK RM
SEDATION
COOK-CHILL UNITSCOOLER
FREEZER
COOLER
COOLER
CANTEEN STORAGE
OFFICE
MENS SHOWER
STAIR-3
STAIR-5
STAIR-4
F.H.C
MORGUE
AIR HANDLING UNIT -6
OFFICE
FREEZER
CANTEEN STORAGE
FOOD
OFFICE
OFFICE
D
OFFICE
FREEZER
STORAGE KITCHEN
ESCORT
FIRE PROTECTION
STORAGE
MAIL PROCESSING AREA
ELECTRONIC SHOP STORAGE VENDING RM
KEEPING
CPR EQUIP
STORAGE
CANTEEN CANTEEN
OFFICE
FREEZER
STAIR-12
CONFERENCE RMOFFICEOFFICEOFFICE
STORAGE
TELECOM
FREEZER
GAS
STORAGE
GAS
STORAGE
CLOSET
FIRE PROTECTION
HOUSE
KEEPING
HOUSE
ELECTRICAL RM
TELEPHONE
CLOSET
ISO OFFICE
KEEPING
OFFICE
LAB
OFFICE
OFFICE
OFFICE
STORAGE
STORAGE
STORAGE
RESEARCH
AFGE
AFGE
DECEDENT
AFFAIRS OFFICE ISO OFFICE
IRM OFFICE
CLOSET TOILET
COMP AND PEN
SERVER RM
TELECOM
TELECOM
RELEASE OF INFO
RELEASE OF
INFO
PC LAB
RM
MENTAL HEALTH
OFFICEKEEPING OFFICE
OFFICE
GROUP MEETING
OFFICE
OFFICE
OFFICE
EXAM RM-1
RECEPTION
OFFICE
OFFICEOFFICE
OFFICE
IRMS
RELEASE OF INFO
OFFICE
CLOSET
ELEVATOR
FIRE
PROTECTION
ELECTRICAL
HOUSE
LAB
FIRE PROTECTION
KEEPING
HOUSE
HOUSE
COPY RM
OFFICE
DIRECTOR MHCOFFICE
OFFICE
SOCIAL WORKER
FIRE PROTECTION
RM
COPY
OFFICE
RESIDENT
PSYCHIATRIST
CLINIC
WOMENS
HEALTH
EXAM RM-2
IRM
OFFICE
IRM OFFICE
IRM OFFICE
IRM OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MENS
LOCKER
BROWN
ELEVATOR
BROWN
ELEVATOR
OFFICE
OFFICE
STORAGE
STORAGE
WORK RM IRM
IRM OFFICE
STORAGE
CANTEEN
STAIR-10
HAC
ELECTRICAL CLOSET
KITCHEN
DUMB WAITER
DUMB WAITER
STORAGE OFFICE
FIRE PROTECTION
WOMENS
MECH
STORAGE
NUTRITION
OFFICE
GREEN
ELEVATOR
GREEN
ELEVATOR
GREEN
ELEVATOR
OFFICE
OFFICE
OFFICE
DUMB WAITER
BIO-MED
OFFICE
FIRE PROTECTION FIRE
CANTEEN
STORAGE
LINEN
CHUTE
CANTEEN
WAREHOUSE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ELEVATOR
EQUIP
CONTROL RM
WAITING
STORAGE
MRI EXAM
CONTROL
OFFICE
STORAGE
STORAGE
STORAGE
FIRE PROTECTION
OFFICE
CAFETERIA
CAFETERIA
OFFICE
CORRIDOR
LINEN
CHUTE LINEN
CHUTE
SHAFT
PREP AREA ONC OFFICE STORAGEESCORT
CORRIDOR
MENS TOILET
TRASH RM
FEMALE TOILET
FEMALE TOILET
CORRIDOR
CORRIDOR
CORRIDOR
RETAIL STORE
MECH
RETAIL STORE
RECORDS RM
TOILET
STAIR
CORRIDOR
MENS TOILET
ELEVATOR LOBBY
CORRIDOR
TOILET
TOILET
COMPUTER RM
OFFICE, PRIVACY
CANTEEN DINING
CANTEEN DINING
TRAINING
KITCHEN
DINING
OFFICE
CORRIDOR
OFFICE, NURSING UNION ISO OFFICE
BIO-MED
CORRIDOR
CORRIDOR
CORRIDOR
MECH RM
CORRIDOR
BIO-MED CLINICAL EQUIP UNIT
CORRIDOR CORRIDOR
CORRIDOR
STORAGE
CONFERENCE RM
CORRIDOR
CORRIDOR
HEM / OFFICE OFFICE
ADMIN OFFICE
BIO-MED
ELECTRICAL
ELECTRICAL
WELL
WOMENS
ELECTRICAL
UTILITY
BREAK
PROTECTION
DATA RM
HSK
CIRCULATION
WAITING
PUBLIC TOILETS (M)
PUBLIC TOILETS(W)
STAFF T
CLEAN SUPPLIES
CLEAN UTILITY
PHOTOEXAMEXAMEXAM
LASER
EXAM
WAITING
PROCEDURES EXAM EXAM EXAM
EXAM EXAM EXAM
EXAM EXAM EXAM
FIELD PRETEST/FIT
EXAM
EXAM
LASER
CIRCULATION
C
IR
C U
L A
T
IO
N
WAITING WAITING
C
IR
C U
L A
T
IO
N
OFFICE
CONFERENCE
OFFICE
RECEPTIONEXAM
ELEC. RM
STAFF LOCKERS
PRESCREEN
HSK
EQUIP
MECHANICAL
CLEAN
RESIDENTS
EXAMS
EXAMS
WAITING
PROCEDURE 4 PROCEDURE 5 PROCEDURE 6 PROCEDURE 7PROCEDURE 3
NURSE STATION
TOILET
STORAGE
RECOVERY HOLDING HOLDING HOLDING HOLDING HOLDING
P.A.PHYSICIANCHIEFCLERICAL
CORRIDOR
ASSIST
TOILET
TOILET
CIRCULATION
TOILET
GAS
SUPPLIES
Nourish
CIRCULATION
CIRCULATION
ELEC CLOSET
GROUP THERAPY
OFFICE
OFFICE
STORAGE
CONFERENCE ROOM
CIRCULATION
LOCKER ROOM
RECEPTION
NEW EXIT PASSAGWAY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PHYSICIAN
PROCEDURE 2
PROCEDURE 1
RECOVERY RECOVERY RECOVERY RECOVERY RECOVERY RECOVERY
SOILED UTILITY
DRSG
STORAGE
DRSG RM
EXAM RM
TOILET
WAITING
WAITING
TOILET
DRSG RM
DRSG RM
MRI EXAM
EQUIP
TOILET
RECEPTION
CORRIDOR
DRSG RM
DRSG
REPRODUCTION AREA
RECEPTION
WAITING RM
4 46. 3969
AREA OF WORK
FEC1
TRAVEL DISTANCE: 85'-10"
4 2 1
6 2
LIFE SAFETY PLAN LEGEND
CODE DATA
APPLICABLE CODE:
NFPA 101 (2018)
IBC (2018)
OCCUPANCY CLASSIFICATION
(VA FIRE PROTECTION DESIGN MANUAL SECTION 4.1):
HEALTHCARE
NFPA A.6.1.5.1 HEALTHCARE
MEANS OF EGRESS:
STAIR ENCLOSURE: 2-HR (NFPA 101, A.7.1.3.2.1)
MIN. EXIT WIDTH: 32" CLEAR (IBC 2018, 1010.1.1)
HORIZ. EXITS: 2 HR ASSEMBLY (NFPA 101, 7.2.4.3.2)
GUARDS: 42" HT/ 4" CLR. SPACING (NFPA 101, 7.1.8)
HANDDRAILS: 34-38" HT. (IBC 2018,1014.1)
RAMPS: 1:20 SLOPE MAX. (PG-18-13)
OCCUPANT LOAD: (NFPA 101.7.3)
NO CHANGE IN EXISTING OCCUPANT LOAD
CAPACITY FACTORS: (NFPA 101.7.3.3):
STAIRS: 0.3
OTHER: 0.2
GENERAL NOTE:
PROVIDE 2-HR RATED FIRESTOPPING AT FLOOR
PENETRATIONS.
FEC 1 FIRE EXTINGUISHER CABINET
- FULLY RECESSED
NOT IN CONTRACT
INDICATES AREA OF WORK
CONSTRUCTION ROUTE - CONSTRUCTION
MATERIALS ROUTE
ALTERNATE EMERGENCY EXIT ROUTE -
MINIMUM CORRIDOR WIDTHS FOR EXISTING
OCCUPANCY LOAD ARE SHOWN ON
ENLARGED PLANS APPEARING ON THE
A-100'S SHEETS. IF WIDTHS ARE
OBSTRUCTED DURING CONSTRUCTION,
PROVIDE SIGNAGE FOR ALTERNATE EXIT
ROUTES AS SHOWN THIS SHEET
PHOTO KEY LEGEND
# PHOTO VANTAGE POINT
REFER TO THIS SHEET FOR
PHOTOS
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:3
:0
P M
LS100
OVERALL GROUND FLOOR LIFE
SAFETY PLAN
2 3EJD
SPS GI EQUIPMENT INSTALL
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
WVS
0 4 8 16
NORTH
PLAN
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
Scale: 1" = 20'-0"
OVERALL GROUND FLOOR LIFE SAFETY PLAN
A. SEE SPECIFICATION FOR BADGING REQUIREMENTS.
B. NO MAJOR EQUIPMENT ACCESS THROUGH THE
BUILDING BETWEEN 7 AM TO 5PM. CONTRACTOR TO
COORDINATE WITH A VA COR.
C. STICKY MAT AT CONSTRUCTION ACCESS.
STICKYMATS TO BE CHANGED WHEN DIRTY AND AT
VA REQUEST.
D. A JOB SITE TRAILER IS UNABLE TO BE LOCATED
WITHIN REASONABLE DISTANCE OF AREA OF WORK.
IF A TRAILER IS DESIRED, CONSULT VA COR FOR
POSSIBLE LOCATIONS.
Scale: 1" = 1'-0"
PHOTO 1
Scale: 1" = 1'-0"
PHOTO 2
Scale: 1" = 1'-0"
PHOTO 3
Scale: 1" = 1'-0"
PHOTO 4
1 CONTRACTOR MAY NOT BLOCK PUBLIC DRIVE
AREA TO DROP OFF OR PICK UP MATERIAL. ANY
IMPACTS TO THIS ROAD MUST BE COORDINATED
WITH COR AND VA POLICE IN ADVANCE
2 CONSTRUCTION ROUTE IS INTENDED FOR
CONSTRUCTION DEBRIS EGRESS ONLY.
DEPENDENT ON FACILITY CONDITIONS, SITE
ACCESS MAY BE RESTRICTED TO MAIN
ENTRANCES ONLY. NO STAGING OR STORAGE OF
MATERIALS ALONG THIS ROUTE IS PERMITTED. ALL
DEBRIS MUST BE REMOVED DAILY AND TAKEN
OFFSITE.
3 EXISTING FENCE
4 EXISTING GENERATORS
5 EXISTING TRAILER
6 EXISTING CANOPY
QTY.
D O O R A N D F R A M E S C H E D U L E
NO.
MISCELLANEOUS
THICK.
FRAME INFORMATION
HEIGHTWIDTH MAT'LTYPE MAT'LTYPE RATING REMARKSHRDWR.DEPTH
DOOR INFORMATION
TYPE ITYPE A
(1)D000 1 3/4"7'-0"3'-0" A HM HMTYPE I SET 16 5/8"
HINGES
DUST PROOF STRIKE
LATCH SET
DOOR CLOSER
KICK PLATES
GASKETING
TA2714
VA SPEC F01
DC6210xA11
K1050F
S888 x HEAD & JAMBS
HARDWARE SET 1
32D
26D
32D
MK
RO
CO
RO
PE
MANUFACTURERS:
CORBIN RUSSWIN
McKINNEY
PEMKO
ROCKWOOD
CO
MK
PE
RO
NOTE:
HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN.
ALTERNATE MANUFACTURERS ACCEPTABLE, SUBJECT TO
REVIEW BY ARCHITECT AND C.O.R .FOR EQUAL QUALITY
COMPLIANCE.
NOTE: DOOR AND FRAME SCHEDULE FOR ICRA ENCLOSURE ONLY
90 MIN.
2" SEE SCHED 2"
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS
MATRIX FOR CONSTRUCTION RENOVATION
Type of Construction / Project Activity Table
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
TYPE A
TYPE B
TYPE C
TYPE D
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Patient Risk Group Table
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
1. Office Areas
2. Hallways
3. EMS
1. Ancillary Therapy Areas
2. Respiratory Therapy
3. Outpatient Clinics
4. CBOC's
5. Mental Health Units
1. Pharmacy Areas
2. Radiology
3. Triage
4. Laboratories
5. Gastrointestinal Suites
1. CLC's
2. SPD
3. Acute Care Units
4. Bone Marrow Transplant Unit
5. Operating Rooms
6. Chemotherapy Areas
(Outpatient Clinics/Inpatient)
7. Areas/ Units adjacent to BMTU
8. ICU's
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type
Patient Risk Group
LOW Risk Group 1
MEDIUM Risk Group
HIGH Risk Group 3
HIGHEST Risk Group 4
TYPE A
I
I
II
III
I
I
III
III/IV
II
III
III/IV
III/IV
IV
IV
IV
III/IV
TYPE B TYPE C TYPE D
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
Class III control procedures are necessary.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
1. Wipe surfaces to remove dust
C L -1
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
C L A
S S
II 1. Wipe work surfaces with disinfect.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or
Facilities Management Maintenance and Engineering Department before construction begins.
3. Remove or isolate HVAC system in area where work is to being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
C L A
S S
II
I
1. Wipe work surfaces with disinfect.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or
Facilities Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in Areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed
14. Remove isolation of HVAC system in areas where work is being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with HEPA filtered vacuums.
6. Remove or isolate HVAC system in areas where work was being performed.
C L A
S S
IV
HEPA
NEGATIVE AIR
UNIT
FINISHED
FLOORING TO BE
KEPT CLEAN.
FLOORS NOT
BEING REPLACED
MUST BE
PROTECTED.
COVER WITH
CONSTRUCTION
GRADE
TEMPORARY
FLOOR
PROTECTION.
EXHAUST AIR TO
OUTSIDE OR VA
APPROVED
LOCATION.
PROVIDE FIRE
DAMPER EQUAL
RATING WHEN
PENETRATING A
RATED WALL.
COORDINATE
WITH C.O.R.
A P
P R
O X
A .F
.F
HM DOOR &
FRAME
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
D000
EXISTING CEILING
CEMENTITIOUS BACKER TO
ENCLOSURE SIDE
UL U404, 2HR
PAINT
EXISTING FLOOR
W A
L L
H E
IG
H
T V
A R
IE
S
F E
IL
D
V E
R
IF
Y
6 1/8"
A 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
UNDERSIDE OF EXISTING
CEILING
M
IN
CORRIDOR
RATED
ENCLOSURE SIDE
FIRE RESISTANT SEALANT,
BOTH SIDES TO WALL
ABOVE OPENING
TOP OF TEMPORARY
CONSTRUCTION ACCESS
A. PERFORM WORK REQUIRED BY VA INFECTION
CONTROL PERSONNEL REGARDING ICRA FORM. SEE
ICRA FORM FOR REQUIREMENTS. ALL ICRA AND ISLM
WORK ITEMS MUST BE COMPLETED PRIOR TO
BEGINNING ANY DEMOLITION WORK OR NEW
CONSTRUCTION .
B. VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK STATION.
C. PERMITS INCLUDING: ICRA. ISLM, ABOVE CEILING,
FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE
ALARM SYSTEM, MEDICAL GASES AND CONFINED
SPACE.
D. AREA OF WORK: APPROXIMATELY 533 S.F.
E. ANY WORK ABOVE CEILING OUTSIDE THE
CONTAINMENT AREA TO TAKE PLACE WITH MOBILE
HEPA CART
F. SMOKING PROHIBITED EVERYWHERE ON CAMPUS
SEE SPECIFICATIONS FOR FURTHER INFORMATION.
G. CONTRACTOR TO REFERENCE NFPA 241,
SAFEGUARDING CONSTRUCTION, ALTERATION, AND
DEMOLITION OPERATIONS.
2018 NFPA 101 LIFE SAFETY CODE
NFPA 99 HEALTHCARE FACILITIES CODE
2018 INTERNATIONAL BUILDING CODE
REFERENCE CODES
CLR
MAINTAIN 6'-0"
C L R
M A
IN
T
A
IN
7'-0"
D000
3' -0
TOILET
FG314
SCOPES
CLEAN
FG318
OFFICE
FG316
STORAGE
FG317
OFFICE
FG172
NEW
EXIT
PASSAGEWAY
FG400C
PROCEDURE
FG165
PROCEDURE
FG315
PROCEDURE
FG313
GAS
FG189
WAITING
FG164
STAFF
LOCKERS
FG403
STAFF T
FG220
CLEAN
SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
SCOPES
SOIL
FG319
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
A D
J U
S T
A B
L E
H E
IG
H
T
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:2
:2
P M
G-002
PARTIAL GROUND FLOOR PLAN - ICRA
3 3EJD
SPS GI EQUIPMENT INSTALL
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
WVS
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
Scale: 1/2" = 1'-0"
HEPA FILTRATION
Scale: 1/2" = 1'-0"
TEMPORARY ENCLOSURE ELEVATION
Scale: 3/4" = 1'-0"
TEMPORARY ENCLOSURE ELEVATION
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR PLAN - ICRA 0 2 4 8
NORTH
PLAN
1 NEW RATED 2 HR ICRA ENCLOSURE - SEE DETAILS
THIS SHEET
2 PROVIDE STICKY MAT. TO BE CHANGED END OF
SHIFT OR MORE TO MAINTAIN CLEANLINESS
3 ALL DOORS TO REMAIN CLOSED THROUGH
CONSTRUCTION. TAPE AND SEAL DOORS AIRTIGHT
PRIOR TO ANY CONSTRUCTION ACTIVITIES
4 LIMITED ACCESS CORRIDOR, CONTRACTOR TO
PERFORM ANY WORK IN THIS AREA OFF HOURS.
COORDINATE WITH COR
5 CONTRACTOR TO CUT NEW 3'-0"X 7'-0" OPENING IN
EXISTING WALLS FOR ACCESS TO AREA OF WORK.
FRAME IN SIDES AND INSTALL 5/8" GYP. BD. AT
JAMBS OF OPENING - EXACT LOCATION TO BE
FIELD DETERMINED
6 MAINTAIN 6'-0" CLEAR WIDTH AT EGRESS
CORRIDOR AT ALL TIMES. NO STORING OR
STAGING MATERIAL IN CORRIDOR THAT IMPEDES
MINIMUM CLEARANCE
7 NEW TEMPORARY DOOR - SEE SCHEDULE THIS
SHEET
8 USE MOBILE CART ON ALL WORK ABOVE CEILING
Scale: 1/2" = 1'-0"
MOBILE HEPA CART
| Sheets |
| G-001 - TITLE SHEET AND INDEX OF DRAWINGS |
| G-002 - PARTIAL GROUND FLOOR PLAN - ICRA |
File details come from the government source that posted it. Updated .