Attachment F - Drawing 19-181 Mechanical .pdf
PDF 481 KB Posted
- Attached to
- Z2DZ--GI SPS Equipment Site Prep Federal contract opportunity
- Solicitation number
- 36C24621R0087
About this file
The documents provide information for an upcoming federal contract opportunity with the Department of Veterans Affairs for site preparation work at the Durham VA Medical Center in Durham, North Carolina. The solicitation will be for renovations to the Gastrointestinal Sterile Processing Section on the ground floor of Building 1, with an estimated construction value between $500,000 and $1,000,000. The work includes demolition and new mechanical system installation. The solicitation is anticipated as a total service-disabled veteran-owned small business set-aside and will be issued on or around June 1, 2021 via sam.gov. Interested vendors should monitor the website for the solicitation and any subsequent amendments. Site visits will be arranged and detailed in the solicitation. Questions must be sent to the named point of contact by email only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0087 0001.docx | DOCX document | |
| Attachment K - Past Performance Questionnaire.docx | DOCX document | |
| Attachment E - Drawing 19-181 Fire Suppression .pdf | ||
| Attachment D - Drawing 19-181 Electrical .pdf | ||
| 36C24621R0087_1.docx | DOCX document | |
| 36C24621R0087_1.pdf | ||
| Attachment H - Wage Determination NC20210028 01_01_2021.pdf | ||
| Attachment C - Drawing 19-181 Architectural .pdf | ||
| Attachment J - Corp Experience Form.docx | DOCX document | |
| Attachment I - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment G - Drawing 19-181 Plumbing .pdf | ||
| Attachment A - Combined Specs .pdf | ||
| Attachment B - Drawing 19-181 General .pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
EQUIPMENT TAG
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS)
THERMOSTAT OR TEMPERATURE SENSOR
DIFFUSER TAG | DIFFUSER CFM
32-CU-4
EG-8 2000
T
H
F
SD
FS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.
23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
25. INSTALL PIPING FREE OF SAGS AND BENDS.
26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE VOLUME DAMPER
ON BRANCHES (TYP)
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.
W1
W
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
SUPPORT SADDLE
FROM STRUCTURE
FLEXIBLE DUCT SIZE
SAME AS DIFFUSER
INLET: 5'-0" MAX
LENGTH
USE RIGID ELBOWS
FOR CHANGE OF
DIRECTION GREATER
THAN 45°
TYPICAL DIFFUSER
OR REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
CONICAL OUTLET
BRANCH DUCT
12"
SHEET METAL SADDLE
VOLUME DAMPER WITH
LOCKING QUAD
CEILING
NOTE:
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR
SPS SUITE.
Engineers Architects
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date: Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:4
:2
P M
C U s e rs
\w s h ip le y \D o c u m e n ts
\M -1
-1
-V
A D
U R
H A
M -S
P S
E Q
U
IP
M E
N T
I N
S T
A L
L -N
C w s h ip le y .r v t
M-001
MECHANICAL GENERAL INFORMATION
AND SCHEDULES
1 2WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
MECHANICAL ABBREVIATIONS
MECHANICAL LEGEND
MECHANICAL GENERAL NOTES
AIR DEVICE SCHEDULE (SUPPLY)
DIFFUSER
MARK TYPE
AIR FLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL REMARKSMAX. MIN.
SD-11 LOUVERED FACE 180 80 0.08 in-wg CEILING 24x24 6"Ø 21 No WHITE ALUMINUM
SD-13 LOUVERED FACE 380 110 0.09 in-wg CEILING 24x24 10"Ø 22 No WHITE ALUMINUM
AIR DEVICE SCHEDULE (EXHAUST)
DIFFUSER
MARK TYPE
AIRFLOW
MAX. APD MOUNTING
PANEL/FRAME
SIZE NECK SIZE MAX NC DAMPER FINISH MATERIAL REMARKSMAX. MIN.
EG-19 EGG CRATE 315 105 0.09 in-wg CEILING 12x12 8"Ø 18 No WHITE ALUMINUM
EG-21 EGG CRATE 100 60 0.09 in-wg CEILING 24x24 6"Ø 13 No WHITE ALUMINUM
EG-22 EGG CRATE 170 110 0.09 in-wg CEILING 24x24 8"Ø 13 No WHITE ALUMINUM
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
Scale: N.T.S.
DUCT BRANCH TAKE-OFFS
Scale: N.T.S.
DUCTWORK RADIUS ELBOW
Scale: N.T.S.
DUCTWORK SQUARE VANE ELBOWS
Scale: N.T.S.
FLEX AIR DUCT CONNECTOR DETAIL
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE DAMPER IN BRANCH DUCT AS SHOWN ON PLANS.
x x
8ø
8ø
8ø x
6ø x
12x8
12x8
12x10 x ø ø
6ø
6ø ø
6ø
12ø
6ø 8x6 ø
8ø
8ø
6ø 8ø
12ø ø
6ø ø
6ø
TB-2.19
TB-2.17
TB-2.18
TB-2.11
TB-2.12
TB-1.13
TB-1.14
8x8
8ø 6ø
NEW EXIT PASSAGEWAY
FG400C
T
T
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
CIRCULATION
FG300B
GAS
FG189
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
EXAM
FG226
EXAM
FG224
WAITING
FG222B
WAITING
FG222A
CLEAN SUPPLIES
FG221
STAFF T
FG220
STAFF LOCKERS
FG403
OFFICE
FG172
FG319
SCOPES SOIL
FG318
SCOPES CLEAN
x
8ø
14x10
8ø 4ø ø
6ø x
12x8
12x81 x ø ø x ø 6ø
6ø
6ø
8ø
8x8
6ø
6ø
6ø ø ø
8x6 8ø
12ø
6ø
6ø ø
12ø
8ø12x10
TB-2.19
TB-2.17
TB-2.18
TB-2.11
TB-2.12
TB-1.13
TB-1.14
ø
10ø
10ø
50EG-21
65RG-21
65SD-11
200SD-12 200SD-12
275EG-22
SCOPES DECON.
FG318
SCOPES STAGING
FG319
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
CLERIC AL
FG309
ASSIST
FG311
STORAGE
FG312
TOILET
FG314
CIRCULATION
FG300B
OFFICE
FG316
ANTE RM
FG317
NEW EXIT PASSAGEWAY
FG400C
OFFICE
FG172
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B EXAM
FG224
GAS
FG189
ø
T
T
2100EG-19
100EG-19
250SD-13
105SD-11
ø ø
4ø ø
8ø
250SD-13
+250 CFM
-100 CFM
-100 CFM
-275 CFM
-25 CFM
-25 CFM
-25 CFM
+250 CFM
+105 CFM
-50 CFM
C F
M
20 CFM
C F
M
25 CFM
SCOPES STAGING
FG319
SCOPES DECON.
FG318
CIRCULATION
FG300B
ANTE RM
FG317
OFFICE
FG316
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:4
:2
P M
MH101
PARTIAL GROUND FLOOR MECHANICAL
PLAN DEMOLITION + NEW WORK
2 2WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
1 REBALANCE EXISTING SUPPLY DIFFUSER.
2 RELOCATE EXISTING TEMPERATURE SENSOR
TO NEW LOCATION SHOWN.
3 CONNECT 4" EXHAUST DOWN TO MEDIVATOR.
BALANCE TO 25 CFM MINIMUM.
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR MECHANICAL PLAN - DEMOLITION
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR MECHANICAL PLAN - NEW WORK
1 DEMOLISH BACK TO LIMITS OF DEMOLITION
(TYP).
2 REMOVE AND RETAIN EXISTING
TEMPERATURE SENSOR FOR RELOCATION.
Scale: N.T.S.
PARTIAL GROUND FLOOR PRESSURIZATION PLAN
| Sheets |
| M-001 - MECHANICAL GENERAL INFORMATION AND SCHEDULES |
| MH101 - PARTIAL GROUND FLOOR MECHANICAL PLAN DEMOLITION + NEW WORK |
File details come from the government source that posted it. Updated .