Attachment G - Drawing 19-181 Plumbing .pdf
PDF 2 MB Posted
- Attached to
- Z2DZ--GI SPS Equipment Site Prep Federal contract opportunity
- Solicitation number
- 36C24621R0087
About this file
This is a presolicitation notice for a site preparation project for gastrointestinal sterile processing section equipment at the Durham VA Medical Center in Durham, North Carolina. The project scope includes renovations to the GI SPS area in building 1 on the ground floor, with an estimated construction cost between $500,000 and $1,000,000. The solicitation is anticipated to be a total service-disabled veteran-owned small business set-aside, with NAICS code 236220 and a size standard of $39.5 million. The solicitation and any specifications or amendments will be posted on or about June 1, 2021. Proposals will be due approximately 30 days after issuance. A site visit location and points of contact will be provided in the solicitation, with a specified date. Interested vendors should register on the website and check periodically for any amendments or notices. SAM and VetBiz registration must be current and active to be eligible for award. Questions must be emailed to the specified point of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0087 0001.docx | DOCX document | |
| Attachment K - Past Performance Questionnaire.docx | DOCX document | |
| Attachment E - Drawing 19-181 Fire Suppression .pdf | ||
| Attachment D - Drawing 19-181 Electrical .pdf | ||
| 36C24621R0087_1.docx | DOCX document | |
| Attachment J - Corp Experience Form.docx | DOCX document | |
| Attachment I - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment A - Combined Specs .pdf | ||
| Attachment B - Drawing 19-181 General .pdf | ||
| 36C24621R0087_1.pdf | ||
| Attachment H - Wage Determination NC20210028 01_01_2021.pdf | ||
| Attachment F - Drawing 19-181 Mechanical .pdf | ||
| Attachment C - Drawing 19-181 Architectural .pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
A
SECTION A-A
32.00
MINIMUM
ADJ. WORK
HEIGHT
SIX FOOT POWER CORD
96.00
28.00 4.00
40.000
MAXIMUM
ADJ. WORK
HEIGHT
(3) 16.0" x 28.0" x 10.5" DEEP SINKS W/
ETCHED GALLON MARKINGS & OVERFLOW HEADS
ADJUSTABLE LEVELING FEET
21.00 KNEE SPACE
4.00
28.0028.00
10.00
PUSH BUTTON
HEIGHT CONTROL
4.00
1.50
16.00
5.00
30.00
1.50
14.00
4.50
30°
.193
1.00
1.50
.50
MARINE EDGE
DEIONIZED WATER FAUCET
P-807
HOT & COLD WATER PRE-RINSE UNIT W/ 44.0" FLEXIBLE
S/S HOSE & 12.0" SWING FAUCET, WRIST-BLADE HANDLES
(T&S BRASS)
4.00 31.00
18.00 4.00
18.00
31.00
48.00
14.00
(3) WS-DL LEVEL HANDLES W/
OPEN/CLOSE DRAIN CONTROL VALVE
& FLEXIBLE DRAIN BELLOW
HIGH PRESSURE SELECTA
WATER PISTOL
P-820
HIGH PRESSURE SELECTA AIR PISTOL
P-820
26.00
OVERFLOW HEAD
(PRE-PLUMBED TO DRAIN)
10.00
22.00
W A
L L
CW
D
HW
HOT WATER - (2) @ 1/2" NPT (FLEX LINE BY OTHERS)
COLD WATER - (2) @ 1/2" NPT (FLEX LINE BY OTHERS)
UTILITY REQUIREMENTS
DRAIN - (3) @ 1-1/2" NPT
HW
D
CW
CWHWDCWHWD D RO
RO WATER IN - 1/2" NPT (FLEX LINE BY OTHERS)RO
COMPRESSED AIR - 3/4" NPT (FLEX LINE BY OTHERS)CA
CA
RO WATER OUT - 1/2" NPT (FLEX LINE BY OTHERS)RO
ROD
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
DCW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
DHW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
PLUMBING SYMBOLS
DHWR DOMESTIC HW RECIRCULATION
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
ANNOTATION SYMBOLS
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
PLUMBING SYMBOLS & ABBREVIATIONS
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PLUMBING SYMBOLS
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
ANNOTATION ABBREVIATIONS
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DA DENTAL COMPRESSED AIR
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DV DENTAL VACUUM
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PACAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF
THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND
ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND
APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND
SERVICES DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW
PLUMBING AND WORK OF OTHER TRADES.
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE
PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT
MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.
SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.
11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH
EXISTING CONDITIONS.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1 WEEK IN ADVANCE.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
NOM. SIZE (IN.)
PIPE (FT.)
TUBING (FT.)
5 FT
THRU 3/4
1 1 1/4
1 1/2
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR
LOW TEMPERATURE
PIPE)
PROVIDE HIGH
COMPRESSIVE
STRENGTH
INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD AT
HANGER
WELD
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH CHANNEL
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2" x 2" x 1/4" ANGLE
NOTES:
SEE SPECIFICATIONS FOR
DETAILED HANGER
REQUIREMENTS. SIDE VIEW TRAPEZE HANGER
FOR UP TO 1000 LB. UNIFORM
LOAD
1" MAX.
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (8" MIN.)
2 2 1/2 3 4 5 6 8 10 12
11 12 14 16 17 19 22 23
9 10 12 13 14 16 - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
MAXIMUM PIPE/TUBING SUPPORT SPACING
WALL
VENT PIPING
LOCATED IN WALL
FINISHED FLOOR
FLOOR SINK
WASTE PIPE
TO MAIN
CODE ALLOWED DISTANCE
NO MORE THAN
1-1/2" P-TRAP WITH
CLEANOUT (JT-150 P-TRAP)
NOTES:
1. BASIS OF DESIGN: JUST MANUFACTURING COMPANY.
AC OUTLET LOCATION FOR AC
FAUCET. (ON EMERGENCY
CIRCUIT ONLY)
COVER REMOVED
FOR CLARITY
SENSOR OPERATED DECXK
MOUNT GOOSENECK FAUCET
WITH ADJUSTABLE
TEMPERATURE CONTROL
WITH AC PLUG. (JSGN-6-AC)
STAINLESS
STEEL DRAIN
(J-35-SSF DRAIN)
SCRUB SINK
(J-770-1-S)
FINISHED FLOOR
THERMOSTATIC MIXING
VALVE BRONZE WITH 1/2"
SWEAT UNION INLET AND
OUTLET CONECTIONS.
(JTM-47LF)
HOT & COLD
WATER
CONNECTIONS
TEMPERED
WATER & COLD
WATER
CONNECTIONS
TO FAUCET
DIGITAL TIMER
(-DTC)
TOP VIEW
FRONT VIEW
/2
2'-10"
SCRUB SINK
(J-770-1-S)
WALL MOUNTED
EYEWASH LOCATION.
SEE DETAIL FOR
INSTALLTION.
FAUCET CONTROL BOX.
Engineers Architects
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date: Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:4
:2
P M
C U s e rs
\w s h ip le y \D o c u m e n ts
\M -1
-1
-V
A D
U R
H A
M -S
P S
E Q
U
IP
M E
N T
I N
S T
A L
L -N
C w s h ip le y .r v t
P-001
PLUMBING GENERAL INFORMATION,
DETAILS, AND SCHEDULES
1 5WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING GENERAL NOTES
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION QUANTITY WASTE PIPE VENT PIPE
COLD
WATER HOT WATER
WRIST BLADE
HANDLES
ELECTRIC
SENSOR REMARKS
FD-S FLOOR SINK, 4" OUTLET 5 4" - - - - 304 STAINLESS STEEL BODY 12" SQUARE GRATE
P-517 SINGLE STATION WASH-UP WITH EMERGENCY EYEWASH, WALL HUNG 1 1 1/2" 1 1/2" 3/8" 3/8" NO YES SINGLE STATION WASH-UP WITH EMERGENCY EYEWASH, WALL HUNG
P-533 SINK, TRIPLE COMPARTMENT 2 1 1/2" 1 1/2" 3/8" 3/8" NO NO SINK, TRIPLE COMPARTMENT
PLUMBING LOAD SUMMARY
MARK DESCRIPTION QUANTITY DFU EACH DFU
CW WSFU
EACH
CW WSFU
HW WSFU
EACH HW WSFU
TOTAL WSFU
EACH TOTAL WSFU
P-517 SINGLE STATION WASH-UP WITH EMERGENCY EYEWASH, WALL HUNG 1 3 3 1.5 1.5 1.5 1.5 2 2
P-533 SINK, TRIPLE COMPARTMENT 2 3 6 1.5 3 1.5 3 2 4
3 9 4.5 4.5 6
Scale: N.T.S.
PIPE HANGER DETAIL
Scale: N.T.S.
FLOOR SINK
Scale: No Scale
P-533 TRIPLE COMPARTMENT SINK
Scale: No Scale
EYEWASH DETAIL - WALL MOUNTED
Scale: No Scale
SCRUB SINK DETAIL - SENSOR OPERATED P-519 WITH EYEWASH LOCATION
3/4" DHW
3/4" DCW
3/4" DHW
3/4" DCW 1/2" DCW
1/2" DHW1/2" DHW
1/2" DCW
2" DCW
1 1/4" DHW1 1/4" DCW
1 1/4" DHW
1 1/4" DHW
1/2" DCW
1/2" DHW
3/4" DCW
3/4" DHW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1" DCW
1/2" DCW
1/2" DHW
3/4" DHW
3/4" DCW
3/4" DHW
1 1/2" DCW
1/2" DCW
1/2" DHW
1" DCW
3/4" DHW
3/4" DHW
1" DCW
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
GAS
FG189
OFFICE
FG172
NEW EXIT PASSAGEWAY
FG400C
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
FG319
SCOPES SOIL
FG318
SCOPES CLEAN
CIRCULATION
FG300B
1 1
3/4" DHW
3/4" DCW
1 1/4" DHW
3/4" DCW
3/4" DHW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1" DCW1/2" DHW
3/4" DHW
3/4" DCW
3/4" DHW
3/4" DCW 1/2" DCW
1/2" DHW1/2" DHW
1/2" DCW
2" DCW
1 1/4" DHW1 1/4" DCW
1 1/4" DHW
1/2" DCW
3/4" DHW
1 1/2" DCW
1/2" DCW
1/2" DHW
1" DCW
3/4" DHW
3/4" DHW
1" DCW
SCOPES STAGING
FG319
3/4" DHW
3/4" DCW
1" DCW
1" DHW
1" DCW
1" DHW5
NEW EXIT PASSAGEWAY
FG400C
OFFICE
FG172
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
CLERIC AL
FG309
ASSIST
FG311
STORAGE
FG312
TOILET
FG314
OFFICE
FG316
SCOPES DECON.
FG318
CIRCULATION
FG300B
GAS
FG189
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
P-533
P-517
P-533
PP101
1/2"
/2
/2
/4
3/4"
3/4"
/4
/2
"1 /2
/4
1" DCW
1" DHW
PP101
/4
MA
M A
M A
M A
MA
MA
M A
MA
FIRST FLOOR
0' - 0"
0 - Floor Plan -12' - 0"
RELOCATED EXISTING
THERMOSTATIC MIXING
VALVES AND WATER
FILTERS ON WALL.
/4
D
C W
/4
D
H W
/2
/2
1/2"
1/2"
FIRST FLOOR
0' - 0"
0 - Floor Plan -12' - 0"
1/2" DCW
/2
C
A
/4
D
H W
/4
D
C W
1/2"
RELOCATED EXISTING
THERMOSTATIC MIXING
VALVE WATER
FILTERS UNDER PASS THRU
WINDOW.
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:4
:3
P M
PP101
PARTIAL GROUND FLOOR PLUMBING
PLAN - DEMOLITION + NEW WORK
2 5WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
1 ROUTE 1/2" DCW AND 1/2" DHW DOWN TO
FAUCETS.
2 RELOCATED EXISTING THERMOSTATIC
MIXING VALVES AND WATER FILTERS ON
WALL. SEE PP101/4.
3 RELOCATE EXISTING VACUUM UNIT TO NEW
LOCATION SHOWN.
4 ROUTE 1/2" DCW, AND 1/2" DHW DOWN TO
WATER FILTER ASSEMBLY. ROUTE 3/4" DCW,
AND 3/4" DHW DOWN TO MEDIVATOR. SEE
PP101/3.
5 RELOCATED EXISTING THERMOSTATIC
MIXING VALVE WATER FILTERS UNDER PASS
THRU WINDOW. SEE P101/5.
6 CONNECT TO CLOSEST AIR LINE.
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR PLUMBING PLAN - DEMOLITION
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR PLUMBING PLAN - NEW WORK
1 DEMOLISH EXISTING SINK, 3/4" DCW, AND 3/4"
DHW BACK TO MAIN AND CAP.
2 REMOVE AND RETAIN EXISTING WATER
FILTER ASSEMBLY FOR RELOCATION
3 REMOVE AND RETAIN EXISTING VACUUM
UNIT FOR RELOCATION
Scale: N.T.S.
WATER FILTER ASSEMBLY
Scale: No Scale
RELOCATED MIXING VALVES AND WATER FILTERS ON WALL
Scale: No Scale
RELOCATED MIXING VALVE AND WATER FILTERS UNDER PASS THRU
2" SAN 4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" SAN 2" SAN
4" SAN
4" SAN
3" SAN
2" SAN
3" SAN
4" SAN
4" SAN
2" SAN
4" SAN 4" SAN
2" SAN
4" SAN
2" SAN
3" SAN
3" SAN
2" SAN4" SAN
3" SAN
4" SAN
2" SAN
GAS
FG189
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
CIRCULATION
FG300B
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
NEW EXIT PASSAGEWAY
FG400C
OFFICE
FG172
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
FG319
SCOPES SOIL
FG318
SCOPES CLEAN
2" SAN
4" SAN
4" SAN
2" SAN
4" SAN
2" SAN 2" SAN
4" SAN
4" SAN
3" SAN
2" SAN
3" SAN
4" SAN
4" SAN
2" SAN
4" SAN 4" SAN
2" SAN
4" SAN
2" SAN
3" SAN
3" SAN
2" SAN4" SAN
3" SAN
4" SAN
2" SAN
4" SAN
2" SAN
4" SAN4" SAN
FD-S
P-533
FD-S
FD-S
FD-S
FD-S
P-533
P-517
SCOPES STAGING
FG319
SCOPES DECON.
FG318
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
CIRCULATION
FG300B
STORAGE
FG312
ASSIST
FG311
SUPPLIES
FG310
PROCEDURE 3
FG313
PROCEDURE 2
FG315
PROCEDURE
FG165
GAS
FG189
NEW EXIT PASSAGEWAY
FG400C
OFFICE
FG172
STAFF LOCKERS
FG403
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
STAFF T
FG220
CLEAN SUPPLIES
FG221
EXAM
FG226
CLERIC AL
FG309
PROCEDURE 4
FG308
FCO
FCO
EX-FD
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:4
:3
P M
PW100
PARTIAL GROUND FLOOR UNDERSLAB
PLAN - DEMOLITION + NEW WORK
3 5WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
1 PROVIDE NEW FLOOR DRAIN.PATCH FLOOR
AS REQUIRED.
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR UNDERSLAB PLAN - DEMOLITION
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR UNDERSLAB PLAN - NEW WORK
1 DEMOLISH EXISTING SINK AND CAP
SANITARY WASTE IN WALL. EXISTING
SANITARY AND VENT PIPE TO REMAIN.
2 EXISTING FLOOR DRAIN TO REMAIN.
3 EXISTING FLOOR DRAIN TO BE REMOVED.
REPLACED WITH FLOOR CLEANOUT FLUSH
WITH FLOOR. PATCH FLOOR AS REQUIRED.
2" V
2" V
2" V
2" V
2" V
2" V
2" V
6" SD
2" V
2" V
2" V
2" V
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
CIRCULATION
FG300B
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
PROCEDURE
FG165
GAS
FG189
NEW EXIT PASSAGEWAY
FG400C
OFFICE
FG172
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
FG319
SCOPES SOIL
FG318
SCOPES CLEAN
2" V
2" V
2" V
2" V
2" V
2" V
6" SD
2" V
2" V
2" V
2" V
FCO
P-533
FD-S
FD-SFD-S
FD-S
FD-S
P-533 P-517
SCOPES STAGING
FG319
SCOPES DECON.
FG318
ANTE RM
FG317
OFFICE
FG316
TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERIC AL
FG309
CIRCULATION
FG300B
PROCEDURE
FG165
PROCEDURE 2
FG315
PROCEDURE 3
FG313
SUPPLIES
FG310
PROCEDURE 4
FG308
GAS
FG189
NEW EXIT PASSAGEWAY
FG400C
OFFICE
FG172
STAFF LOCKERS
FG403
STAFF T
FG220
CLEAN SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
EXAM
FG224
EXAM
FG226
FCO
V
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2 /2
:4
:4
P M
PW101
PARTIAL GROUND FLOOR DRAIN,
WASTE, AND VENT PLAN - DEMOLITION
+ NEW WORK
4 5WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
GROUND FLOOR
1 PROVIDE NEW FLOOR DRAIN.
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - DEMOLITION
Scale: 1/4" = 1'-0"
PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - NEW WORK
1 DEMOLISH EXISTING SINK AND CAP
SANITARY WASTE IN WALL. EXISTING
SANITARY AND VENT PIPE TO REMAIN.
3/4" DCW
1" DHW
1/2"
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
P-533
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
3/4" DHW
3/4" DCWP-533
P-517
1 1/4"
1" DCW
3/4" DHW
1 1/2" DCW
1/2" DHW
1/2" DCW
1 1/4" DCW
1 1/4" DHW
1 1/4" DCW
1/2"
3/4" 3/4"3/4"
3/4"
3/4"
1/2"
/2
/2
/4
3/4"
2" V
2" SAN
2" V
2" SAN
2" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
FD-S
FD-E
FD-S
FD-S
FD-S
FD-S
4" SAN
4" SAN
4" SAN
2" SAN
4" SAN
2" SAN
2" V
2" V
2" V
2" V
2" V
2" V
2" SAN
4" SAN
2" SAN
2" V
2" V
3" SAN
2" SAN
4" SAN
3" SAN
2" V
2" V
P-517
Engineers Architects
Revisions: Date
Drawing Title
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:4
:4
P M
P-901
PIPE RISER DIAGRAMS
5 5WRS
SPS EQUIPMENT
INSTALLATION
DURHAM VA MEDICAL CENTER
508 FULTON ST
DURHAM, NC 27705 OCTOBER 23, 2020
CONSTRUCTION DOCUMENTS
558-19-30219-181
SPG
Scale: No Scale
DOMESTIC PIPE RISERS
Scale: No Scale
SANITARY PIPE RISER DIAGRAM
FCO
RELOCATED THERMOSTATIC
MIXING VALVE WATER
FILTERS UNDER PASSTHRU
SEE DETAIL PP101/5.
RELOCATED
THERMOSTATIC
MIXING VALVES AND
WATER FILTERS SEE
DETAIL PP101/4.
| Sheets |
| P-001 - PLUMBING GENERAL INFORMATION, DETAILS, AND SCHEDULES |
| PP101 - PARTIAL GROUND FLOOR PLUMBING PLAN - DEMOLITION + NEW WORK |
| PW100 - PARTIAL GROUND FLOOR UNDERSLAB PLAN - DEMOLITION + NEW WORK |
| PW101 - PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - DEMOLITION + NEW WORK |
| P-901 - PIPE RISER DIAGRAMS |
File details come from the government source that posted it. Updated .