Attachment G - Drawing 19-181 Plumbing .pdf

PDF 2 MB Posted

Attached to
Z2DZ--GI SPS Equipment Site Prep Federal contract opportunity
Solicitation number
36C24621R0087
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This is a presolicitation notice for a site preparation project for gastrointestinal sterile processing section equipment at the Durham VA Medical Center in Durham, North Carolina. The project scope includes renovations to the GI SPS area in building 1 on the ground floor, with an estimated construction cost between $500,000 and $1,000,000. The solicitation is anticipated to be a total service-disabled veteran-owned small business set-aside, with NAICS code 236220 and a size standard of $39.5 million. The solicitation and any specifications or amendments will be posted on or about June 1, 2021. Proposals will be due approximately 30 days after issuance. A site visit location and points of contact will be provided in the solicitation, with a specified date. Interested vendors should register on the website and check periodically for any amendments or notices. SAM and VetBiz registration must be current and active to be eligible for award. Questions must be emailed to the specified point of contact.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--GI SPS Equipment Site Prep, newest first.
File Type Posted
36C24621R0087 0001.docx DOCX document
Attachment K - Past Performance Questionnaire.docx DOCX document
Attachment E - Drawing 19-181 Fire Suppression .pdf PDF
Attachment D - Drawing 19-181 Electrical .pdf PDF
36C24621R0087_1.docx DOCX document
Attachment J - Corp Experience Form.docx DOCX document
Attachment I - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Attachment A - Combined Specs .pdf PDF
Attachment B - Drawing 19-181 General .pdf PDF
36C24621R0087_1.pdf PDF
Attachment H - Wage Determination NC20210028 01_01_2021.pdf PDF
Attachment F - Drawing 19-181 Mechanical .pdf PDF
Attachment C - Drawing 19-181 Architectural .pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

A

SECTION A-A

32.00

MINIMUM

ADJ. WORK

HEIGHT

SIX FOOT POWER CORD

96.00

28.00 4.00

40.000

MAXIMUM

ADJ. WORK

HEIGHT

(3) 16.0" x 28.0" x 10.5" DEEP SINKS W/

ETCHED GALLON MARKINGS & OVERFLOW HEADS

ADJUSTABLE LEVELING FEET

21.00 KNEE SPACE

4.00

28.0028.00

10.00

PUSH BUTTON

HEIGHT CONTROL

4.00

1.50

16.00

5.00

30.00

1.50

14.00

4.50

30°

.193

1.00

1.50

.50

MARINE EDGE

DEIONIZED WATER FAUCET

P-807

HOT & COLD WATER PRE-RINSE UNIT W/ 44.0" FLEXIBLE

S/S HOSE & 12.0" SWING FAUCET, WRIST-BLADE HANDLES

(T&S BRASS)

4.00 31.00

18.00 4.00

18.00

31.00

48.00

14.00

(3) WS-DL LEVEL HANDLES W/

OPEN/CLOSE DRAIN CONTROL VALVE

& FLEXIBLE DRAIN BELLOW

HIGH PRESSURE SELECTA

WATER PISTOL

P-820

HIGH PRESSURE SELECTA AIR PISTOL

P-820

26.00

OVERFLOW HEAD

(PRE-PLUMBED TO DRAIN)

10.00

22.00

W A

L L

CW

D

HW

HOT WATER - (2) @ 1/2" NPT (FLEX LINE BY OTHERS)

COLD WATER - (2) @ 1/2" NPT (FLEX LINE BY OTHERS)

UTILITY REQUIREMENTS

DRAIN - (3) @ 1-1/2" NPT

HW

D

CW

CWHWDCWHWD D RO

RO WATER IN - 1/2" NPT (FLEX LINE BY OTHERS)RO

COMPRESSED AIR - 3/4" NPT (FLEX LINE BY OTHERS)CA

CA

RO WATER OUT - 1/2" NPT (FLEX LINE BY OTHERS)RO

ROD

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

PLUMBING SYMBOLS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

ANNOTATION SYMBOLS

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

PLUMBING SYMBOLS & ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

ANNOTATION ABBREVIATIONS

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND

SERVICES DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW

PLUMBING AND WORK OF OTHER TRADES.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE

PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT

EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT

MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.

SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH

EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1 WEEK IN ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

NOM. SIZE (IN.)

PIPE (FT.)

TUBING (FT.)

5 FT

THRU 3/4

1 1 1/4

1 1/2

HANGER ROD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR

LOW TEMPERATURE

PIPE)

PROVIDE HIGH

COMPRESSIVE

STRENGTH

INSULATION (9 PSF

MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION SHIELD AT

HANGER

WELD

SADDLE

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE

SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE

SPECIFICATIONS

1/2" DIA. HANGER RODS WITH 36"

MAX. SPACING ON EACH CHANNEL

BAND

1-5/8" 12 GAUGE CHANNEL

OR 2" x 2" x 1/4" ANGLE

NOTES:

SEE SPECIFICATIONS FOR

DETAILED HANGER

REQUIREMENTS. SIDE VIEW TRAPEZE HANGER

FOR UP TO 1000 LB. UNIFORM

LOAD

1" MAX.

PROVIDE INSULATION SHIELD &

INSERT FOR ALL PIPING (8" MIN.)

2 2 1/2 3 4 5 6 8 10 12

11 12 14 16 17 19 22 23

9 10 12 13 14 16 - -

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

MAXIMUM PIPE/TUBING SUPPORT SPACING

WALL

VENT PIPING

LOCATED IN WALL

FINISHED FLOOR

FLOOR SINK

WASTE PIPE

TO MAIN

CODE ALLOWED DISTANCE

NO MORE THAN

1-1/2" P-TRAP WITH

CLEANOUT (JT-150 P-TRAP)

NOTES:

1. BASIS OF DESIGN: JUST MANUFACTURING COMPANY.

AC OUTLET LOCATION FOR AC

FAUCET. (ON EMERGENCY

CIRCUIT ONLY)

COVER REMOVED

FOR CLARITY

SENSOR OPERATED DECXK

MOUNT GOOSENECK FAUCET

WITH ADJUSTABLE

TEMPERATURE CONTROL

WITH AC PLUG. (JSGN-6-AC)

STAINLESS

STEEL DRAIN

(J-35-SSF DRAIN)

SCRUB SINK

(J-770-1-S)

FINISHED FLOOR

THERMOSTATIC MIXING

VALVE BRONZE WITH 1/2"

SWEAT UNION INLET AND

OUTLET CONECTIONS.

(JTM-47LF)

HOT & COLD

WATER

CONNECTIONS

TEMPERED

WATER & COLD

WATER

CONNECTIONS

TO FAUCET

DIGITAL TIMER

(-DTC)

TOP VIEW

FRONT VIEW

/2

2'-10"

SCRUB SINK

(J-770-1-S)

WALL MOUNTED

EYEWASH LOCATION.

SEE DETAIL FOR

INSTALLTION.

FAUCET CONTROL BOX.

Engineers Architects

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date: Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:4

:2

P M

C U s e rs

\w s h ip le y \D o c u m e n ts

\M -1

-1

-V

A D

U R

H A

M -S

P S

E Q

U

IP

M E

N T

I N

S T

A L

L -N

C w s h ip le y .r v t

P-001

PLUMBING GENERAL INFORMATION,

DETAILS, AND SCHEDULES

1 5WRS

SPS EQUIPMENT

INSTALLATION

DURHAM VA MEDICAL CENTER

508 FULTON ST

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

SPG

PLUMBING DEMOLITION GENERAL NOTES

PLUMBING GENERAL NOTES

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION QUANTITY WASTE PIPE VENT PIPE

COLD

WATER HOT WATER

WRIST BLADE

HANDLES

ELECTRIC

SENSOR REMARKS

FD-S FLOOR SINK, 4" OUTLET 5 4" - - - - 304 STAINLESS STEEL BODY 12" SQUARE GRATE

P-517 SINGLE STATION WASH-UP WITH EMERGENCY EYEWASH, WALL HUNG 1 1 1/2" 1 1/2" 3/8" 3/8" NO YES SINGLE STATION WASH-UP WITH EMERGENCY EYEWASH, WALL HUNG

P-533 SINK, TRIPLE COMPARTMENT 2 1 1/2" 1 1/2" 3/8" 3/8" NO NO SINK, TRIPLE COMPARTMENT

PLUMBING LOAD SUMMARY

MARK DESCRIPTION QUANTITY DFU EACH DFU

CW WSFU

EACH

CW WSFU

HW WSFU

EACH HW WSFU

TOTAL WSFU

EACH TOTAL WSFU

P-517 SINGLE STATION WASH-UP WITH EMERGENCY EYEWASH, WALL HUNG 1 3 3 1.5 1.5 1.5 1.5 2 2

P-533 SINK, TRIPLE COMPARTMENT 2 3 6 1.5 3 1.5 3 2 4

3 9 4.5 4.5 6

Scale: N.T.S.

PIPE HANGER DETAIL

Scale: N.T.S.

FLOOR SINK

Scale: No Scale

P-533 TRIPLE COMPARTMENT SINK

Scale: No Scale

EYEWASH DETAIL - WALL MOUNTED

Scale: No Scale

SCRUB SINK DETAIL - SENSOR OPERATED P-519 WITH EYEWASH LOCATION

3/4" DHW

3/4" DCW

3/4" DHW

3/4" DCW 1/2" DCW

1/2" DHW1/2" DHW

1/2" DCW

2" DCW

1 1/4" DHW1 1/4" DCW

1 1/4" DHW

1 1/4" DHW

1/2" DCW

1/2" DHW

3/4" DCW

3/4" DHW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1" DCW

1/2" DCW

1/2" DHW

3/4" DHW

3/4" DCW

3/4" DHW

1 1/2" DCW

1/2" DCW

1/2" DHW

1" DCW

3/4" DHW

3/4" DHW

1" DCW

PROCEDURE

FG165

PROCEDURE 2

FG315

PROCEDURE 3

FG313

SUPPLIES

FG310

PROCEDURE 4

FG308

ANTE RM

FG317

OFFICE

FG316

TOILET

FG314

STORAGE

FG312

ASSIST

FG311

CLERIC AL

FG309

GAS

FG189

OFFICE

FG172

NEW EXIT PASSAGEWAY

FG400C

STAFF LOCKERS

FG403

STAFF T

FG220

CLEAN SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

EXAM

FG224

EXAM

FG226

FG319

SCOPES SOIL

FG318

SCOPES CLEAN

CIRCULATION

FG300B

1 1

3/4" DHW

3/4" DCW

1 1/4" DHW

3/4" DCW

3/4" DHW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1" DCW1/2" DHW

3/4" DHW

3/4" DCW

3/4" DHW

3/4" DCW 1/2" DCW

1/2" DHW1/2" DHW

1/2" DCW

2" DCW

1 1/4" DHW1 1/4" DCW

1 1/4" DHW

1/2" DCW

3/4" DHW

1 1/2" DCW

1/2" DCW

1/2" DHW

1" DCW

3/4" DHW

3/4" DHW

1" DCW

SCOPES STAGING

FG319

3/4" DHW

3/4" DCW

1" DCW

1" DHW

1" DCW

1" DHW5

NEW EXIT PASSAGEWAY

FG400C

OFFICE

FG172

STAFF LOCKERS

FG403

STAFF T

FG220

CLEAN SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

EXAM

FG224

EXAM

FG226

CLERIC AL

FG309

ASSIST

FG311

STORAGE

FG312

TOILET

FG314

OFFICE

FG316

SCOPES DECON.

FG318

CIRCULATION

FG300B

GAS

FG189

PROCEDURE

FG165

PROCEDURE 2

FG315

PROCEDURE 3

FG313

SUPPLIES

FG310

PROCEDURE 4

FG308

P-533

P-517

P-533

PP101

1/2"

/2

/2

/4

3/4"

3/4"

/4

/2

"1 /2

/4

1" DCW

1" DHW

PP101

/4

MA

M A

M A

M A

MA

MA

M A

MA

FIRST FLOOR

0' - 0"

0 - Floor Plan -12' - 0"

RELOCATED EXISTING

THERMOSTATIC MIXING

VALVES AND WATER

FILTERS ON WALL.

/4

D

C W

/4

D

H W

/2

/2

1/2"

1/2"

FIRST FLOOR

0' - 0"

0 - Floor Plan -12' - 0"

1/2" DCW

/2

C

A

/4

D

H W

/4

D

C W

1/2"

RELOCATED EXISTING

THERMOSTATIC MIXING

VALVE WATER

FILTERS UNDER PASS THRU

WINDOW.

Engineers Architects

## KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2 /2

:4

:3

P M

PP101

PARTIAL GROUND FLOOR PLUMBING

PLAN - DEMOLITION + NEW WORK

2 5WRS

SPS EQUIPMENT

INSTALLATION

DURHAM VA MEDICAL CENTER

508 FULTON ST

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

SPG

1 ROUTE 1/2" DCW AND 1/2" DHW DOWN TO

FAUCETS.

2 RELOCATED EXISTING THERMOSTATIC

MIXING VALVES AND WATER FILTERS ON

WALL. SEE PP101/4.

3 RELOCATE EXISTING VACUUM UNIT TO NEW

LOCATION SHOWN.

4 ROUTE 1/2" DCW, AND 1/2" DHW DOWN TO

WATER FILTER ASSEMBLY. ROUTE 3/4" DCW,

AND 3/4" DHW DOWN TO MEDIVATOR. SEE

PP101/3.

5 RELOCATED EXISTING THERMOSTATIC

MIXING VALVE WATER FILTERS UNDER PASS

THRU WINDOW. SEE P101/5.

6 CONNECT TO CLOSEST AIR LINE.

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

GROUND FLOOR

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR PLUMBING PLAN - DEMOLITION

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR PLUMBING PLAN - NEW WORK

1 DEMOLISH EXISTING SINK, 3/4" DCW, AND 3/4"

DHW BACK TO MAIN AND CAP.

2 REMOVE AND RETAIN EXISTING WATER

FILTER ASSEMBLY FOR RELOCATION

3 REMOVE AND RETAIN EXISTING VACUUM

UNIT FOR RELOCATION

Scale: N.T.S.

WATER FILTER ASSEMBLY

Scale: No Scale

RELOCATED MIXING VALVES AND WATER FILTERS ON WALL

Scale: No Scale

RELOCATED MIXING VALVE AND WATER FILTERS UNDER PASS THRU

2" SAN 4" SAN

4" SAN

2" SAN

2" SAN

4" SAN

2" SAN 2" SAN

4" SAN

4" SAN

3" SAN

2" SAN

3" SAN

4" SAN

4" SAN

2" SAN

4" SAN 4" SAN

2" SAN

4" SAN

2" SAN

3" SAN

3" SAN

2" SAN4" SAN

3" SAN

4" SAN

2" SAN

GAS

FG189

PROCEDURE

FG165

PROCEDURE 2

FG315

PROCEDURE 3

FG313

SUPPLIES

FG310

PROCEDURE 4

FG308

CIRCULATION

FG300B

ANTE RM

FG317

OFFICE

FG316

TOILET

FG314

STORAGE

FG312

ASSIST

FG311

CLERIC AL

FG309

NEW EXIT PASSAGEWAY

FG400C

OFFICE

FG172

STAFF LOCKERS

FG403

STAFF T

FG220

CLEAN SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

EXAM

FG224

EXAM

FG226

FG319

SCOPES SOIL

FG318

SCOPES CLEAN

2" SAN

4" SAN

4" SAN

2" SAN

4" SAN

2" SAN 2" SAN

4" SAN

4" SAN

3" SAN

2" SAN

3" SAN

4" SAN

4" SAN

2" SAN

4" SAN 4" SAN

2" SAN

4" SAN

2" SAN

3" SAN

3" SAN

2" SAN4" SAN

3" SAN

4" SAN

2" SAN

4" SAN

2" SAN

4" SAN4" SAN

FD-S

P-533

FD-S

FD-S

FD-S

FD-S

P-533

P-517

SCOPES STAGING

FG319

SCOPES DECON.

FG318

ANTE RM

FG317

OFFICE

FG316

TOILET

FG314

CIRCULATION

FG300B

STORAGE

FG312

ASSIST

FG311

SUPPLIES

FG310

PROCEDURE 3

FG313

PROCEDURE 2

FG315

PROCEDURE

FG165

GAS

FG189

NEW EXIT PASSAGEWAY

FG400C

OFFICE

FG172

STAFF LOCKERS

FG403

WAITING

FG222A

WAITING

FG222B

EXAM

FG224

STAFF T

FG220

CLEAN SUPPLIES

FG221

EXAM

FG226

CLERIC AL

FG309

PROCEDURE 4

FG308

FCO

FCO

EX-FD

Engineers Architects

## KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2 /2

:4

:3

P M

PW100

PARTIAL GROUND FLOOR UNDERSLAB

PLAN - DEMOLITION + NEW WORK

3 5WRS

SPS EQUIPMENT

INSTALLATION

DURHAM VA MEDICAL CENTER

508 FULTON ST

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

SPG

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

GROUND FLOOR

1 PROVIDE NEW FLOOR DRAIN.PATCH FLOOR

AS REQUIRED.

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR UNDERSLAB PLAN - DEMOLITION

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR UNDERSLAB PLAN - NEW WORK

1 DEMOLISH EXISTING SINK AND CAP

SANITARY WASTE IN WALL. EXISTING

SANITARY AND VENT PIPE TO REMAIN.

2 EXISTING FLOOR DRAIN TO REMAIN.

3 EXISTING FLOOR DRAIN TO BE REMOVED.

REPLACED WITH FLOOR CLEANOUT FLUSH

WITH FLOOR. PATCH FLOOR AS REQUIRED.

2" V

2" V

2" V

2" V

2" V

2" V

2" V

6" SD

2" V

2" V

2" V

2" V

ANTE RM

FG317

OFFICE

FG316

TOILET

FG314

STORAGE

FG312

ASSIST

FG311

CLERIC AL

FG309

CIRCULATION

FG300B

PROCEDURE 2

FG315

PROCEDURE 3

FG313

SUPPLIES

FG310

PROCEDURE 4

FG308

PROCEDURE

FG165

GAS

FG189

NEW EXIT PASSAGEWAY

FG400C

OFFICE

FG172

STAFF LOCKERS

FG403

STAFF T

FG220

CLEAN SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

EXAM

FG224

EXAM

FG226

FG319

SCOPES SOIL

FG318

SCOPES CLEAN

2" V

2" V

2" V

2" V

2" V

2" V

6" SD

2" V

2" V

2" V

2" V

FCO

P-533

FD-S

FD-SFD-S

FD-S

FD-S

P-533 P-517

SCOPES STAGING

FG319

SCOPES DECON.

FG318

ANTE RM

FG317

OFFICE

FG316

TOILET

FG314

STORAGE

FG312

ASSIST

FG311

CLERIC AL

FG309

CIRCULATION

FG300B

PROCEDURE

FG165

PROCEDURE 2

FG315

PROCEDURE 3

FG313

SUPPLIES

FG310

PROCEDURE 4

FG308

GAS

FG189

NEW EXIT PASSAGEWAY

FG400C

OFFICE

FG172

STAFF LOCKERS

FG403

STAFF T

FG220

CLEAN SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

EXAM

FG224

EXAM

FG226

FCO

V

Engineers Architects

## KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2 /2

:4

:4

P M

PW101

PARTIAL GROUND FLOOR DRAIN,

WASTE, AND VENT PLAN - DEMOLITION

+ NEW WORK

4 5WRS

SPS EQUIPMENT

INSTALLATION

DURHAM VA MEDICAL CENTER

508 FULTON ST

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

SPG

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

GROUND FLOOR

1 PROVIDE NEW FLOOR DRAIN.

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - DEMOLITION

Scale: 1/4" = 1'-0"

PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - NEW WORK

1 DEMOLISH EXISTING SINK AND CAP

SANITARY WASTE IN WALL. EXISTING

SANITARY AND VENT PIPE TO REMAIN.

3/4" DCW

1" DHW

1/2"

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DHW

P-533

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

1/2" DHW

1/2" DCW

3/4" DHW

3/4" DCWP-533

P-517

1 1/4"

1" DCW

3/4" DHW

1 1/2" DCW

1/2" DHW

1/2" DCW

1 1/4" DCW

1 1/4" DHW

1 1/4" DCW

1/2"

3/4" 3/4"3/4"

3/4"

3/4"

1/2"

/2

/2

/4

3/4"

2" V

2" SAN

2" V

2" SAN

2" SAN

4" SAN

2" SAN

4" SAN

4" SAN

4" SAN

4" SAN

4" SAN

FD-S

FD-E

FD-S

FD-S

FD-S

FD-S

4" SAN

4" SAN

4" SAN

2" SAN

4" SAN

2" SAN

2" V

2" V

2" V

2" V

2" V

2" V

2" SAN

4" SAN

2" SAN

2" V

2" V

3" SAN

2" SAN

4" SAN

3" SAN

2" V

2" V

P-517

Engineers Architects

Revisions: Date

Drawing Title

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2 /2

:4

:4

P M

P-901

PIPE RISER DIAGRAMS

5 5WRS

SPS EQUIPMENT

INSTALLATION

DURHAM VA MEDICAL CENTER

508 FULTON ST

DURHAM, NC 27705 OCTOBER 23, 2020

CONSTRUCTION DOCUMENTS

558-19-30219-181

SPG

Scale: No Scale

DOMESTIC PIPE RISERS

Scale: No Scale

SANITARY PIPE RISER DIAGRAM

FCO

RELOCATED THERMOSTATIC

MIXING VALVE WATER

FILTERS UNDER PASSTHRU

SEE DETAIL PP101/5.

RELOCATED

THERMOSTATIC

MIXING VALVES AND

WATER FILTERS SEE

DETAIL PP101/4.

Sheets
P-001 - PLUMBING GENERAL INFORMATION, DETAILS, AND SCHEDULES
PP101 - PARTIAL GROUND FLOOR PLUMBING PLAN - DEMOLITION + NEW WORK
PW100 - PARTIAL GROUND FLOOR UNDERSLAB PLAN - DEMOLITION + NEW WORK
PW101 - PARTIAL GROUND FLOOR DRAIN, WASTE, AND VENT PLAN - DEMOLITION + NEW WORK
P-901 - PIPE RISER DIAGRAMS

File details come from the government source that posted it. Updated .