Attachment_G_-_Volume_C_-_MCO_Tenant_Design_Criteria_-_Volume_2.1_-_Building_Conditions.pdf
PDF 33 MB Posted
- Attached to
- Terminal C, Concessions Package 3 - Retail
- Solicitation number
- 25-585-RFP
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is a tenant design criteria specification prepared for the Greater Orlando Aviation Authority (GOAA) for Terminal C at Orlando International Airport, presenting architectural floor plans, sections, and perspectives for multiple concession spaces. The document establishes design standards and layouts for 15 food and beverage tenant spaces (C.A.FB1 through C.A.FB15) and 3 retail spaces (C.A.R1 through C.A.R3) within the South Terminal Complex. Each space includes detailed floor plans with dimensions, cross-sectional views showing ceiling heights ranging from 10 feet to 46 feet, and perspective renderings that illustrate the relationship between base building finishes and tenant-provided improvements. The design criteria specify lease line boundaries, neutral pier locations, parallel bulkhead signage zones, and HVAC supply locations to guide tenant buildout. The concession spaces feature varying configurations accommodating different operational requirements, with some spaces incorporating public seating areas, service elevators, baggage elevators, mechanical shafts, and existing exposed columns that tenants must work around or integrate into their designs.
The document emphasizes the distinction between base building finishes—which remain the Aviation Authority's responsibility—and tenant finishes, which proposers must provide according to minimum investment requirements of $500 per square foot. Design standards require the use of painted gypsum board, interior curtain wall systems, metal wall panels, and glass railing systems to create a cohesive, modern aesthetic throughout the terminal. Signage zones are clearly designated with parallel bulkhead configurations to maintain visual consistency across the concourse. The architectural specifications support the Aviation Authority's sustainability objectives and contemporary design vision, with provisions for contactless payment, compostable packaging, and prohibitions on single-use plastics integrated into the operational framework. These design criteria serve as the baseline for tenant proposals and will guide all subsequent tenant improvement plans and final construction documentation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G
INTENTIONALLY LEFT BLANK
NORTH CONCOURSE
CONCESSIONS
PALM COURT
CONCESSIONS MOMENT VAULT
MULTIMEDIA
WINDOWS ON
ORLANDO
MULTIMEDIA
WEST CONCOURSE
CONCESSIONS
RETAIL
LEGEND
DUTY FREE
THEMED RETAIL
FOOD & BEVERAGE
FUTURE RETAIL
FUTURE FOOD & BEVERAGE
RETAIL
LEGEND
DUTY FREE
THEMED RETAIL
FOOD & BEVERAGE
OPEN TO
BELOW
OPEN TO
BELOW
LEGEND
THEMED RETAIL
FOOD & BEVERAGE
COMMON USE CLUB
FUTURE COMMON USE CLUB
LEGEND
FOOD & BEVERAGE
NORTH CONCOURSE
CONCESSIONS
PALM COURT
CONCESSIONS MOMENT VAULT
MULTIMEDIA
WINDOWS ON
ORLANDO
MULTIMEDIA
WEST CONCOURSE
CONCESSIONS
RETAIL
LEGEND
DUTY FREE
THEMED RETAIL
FOOD & BEVERAGE
LEASE LINE
BASE BUILDING
FINISHES
TENANT
FINISHES
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER NEUTRAL PIER
EGRESS STAIR
SERVICE
ELEVATOR
BAGGAGE
ELEVATOR
MECHANICAL
SHAFT
EXISTING EXPOSED
COLUMN
EXISTING EXPOSED
COLUMN
PUBLIC STAIR
PUBLIC GLASS
ELEVATOR
B
PERSPECTIVE 1
PERSPECTIVE 2
A
C.A.FB1 FLOOR PLAN
N
0 4 8 16 32
C.A.FB14
6’ -0
’-0
’-8
CONCOURSE LEVEL
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
C.A.FB1 SECTION A
0 2 4 8 16
TENANT SPACE
C.A.FB14
CONCOURSE LEVEL
6’ -0
’-0
’-1
0”
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
HVAC SUPPLY
NEUTRAL PIER
C.A.FB1 SECTION B
0 2 4 8 16
TENANT SPACE
C.A.FB1 PERSPECTIVE 1
PAINTED GYP. BD.
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER NEUTRAL PIER
PAINTED GYP. BD.
C.A.FB1 PERSPECTIVE 2
TENANT SPACE
NEUTRAL PIER
NEUTRAL PIER
PAINTED GYP. BD.
PARALLEL BULKHEAD
SIGNAGE ZONE
FINISHES
TENANT
FINISHES
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER NEUTRAL PIER
SERVICE
ELEVATOR
BAGGAGE
ELEVATOR
MECHANICAL
SHAFT
EGRESS STAIR
PUBLIC GLASS
ELEVATOR
A
PERSPECTIVE
C.A.FB2 FLOOR PLAN
N
-0
’-0
CONCOURSE LEVEL
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
PUBLIC GLASS ELEVATOR,
PALM COURT
NEUTRAL PIER
C.A.FB2 SECTION A
C.A.FB2 PERSPECTIVE
PAINTED GYP. BD.
PUBLIC GLASS
ELEVATOR
NEUTRAL PIER
NEUTRAL PIER
FINISHES
TENANT
FINISHES
EXTERIOR WALL
LEASE LINE
TRASH DROP
NEUTRAL PIER
NEUTRAL PIER
A
PERSPECTIVE
PUBLIC
SEATING AREA
C.A.FB3 FLOOR PLAN
N
0 4 8 16 32
EXISTING EXPOSED
COLUMN
’-0
’-6
6’ -0
CONCOURSE LEVEL
C.A.C1
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
HVAC SUPPLYEXISTING HVAC
EQUIPMENT
C.A.FB3 SECTION A
0 2 4 8 16
TENANT SPACE
C.A.FB3 PERSPECTIVE
TENANT SPACE
NEUTRAL PIER
NEUTRAL PIER
TRASH DROP
ROOM ENTRY
PARALLEL BULKHEAD
SIGNAGE ZONE
HVAC SUPPLY
PAINTED GYP. BD.
TENANT
FINISHES
EXTERIOR WALL
LEASE LINE
NEUTRAL PIER
A
PERSPECTIVE
PUBLIC
SEATING AREA
C.A.FB4 FLOOR PLAN
N
0 4 8 16 32
C.A.FB4 PERSPECTIVE
NEUTRAL PIERNEUTRAL PIER
PARALLEL BULKHEAD
SIGNAGE ZONE HVAC SUPPLY
PAINTED GYP. B
PAINTED GYP. BD.
’-0
’-6
6’ -0
CONCOURSE LEVEL
C.A.C1
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
HVAC SUPPLYEXISTING HVAC
EQUIPMENT
C.A.FB4 SECTION A
PLANTER, TYP.
BASE BUILDING
FINISHES
TENANT
FINISHES
’-0
55’-0”
C.A.FB5 FLOOR PLAN
N
0 4 8 16 32
A
PERSPECTIVE
C.A.FB5 PERSPECTIVE
TENANT SPACE
CONCOURSE ROOF
CONCOURSE LEVEL
’-6
’-0
CEILING
LEASE LINE
TENANT SPACE
C.A.FB5 SECTION A
B13
NS0
D13
N0.3
A22
S0.3
Y04
LEASE LINE
BASE BUILDING
FINISHES
TENANT
FINISHES
BASE BUILDING
COLUMN
PLANTER, TYP.
BASE BUILDING
COLUMN
PERSPECTIVE
PUBLIC
SEATING AREA
C.A.FB6 FLOOR PLAN
N
CONCOURSE ROOF
CONCOURSE LEVEL
’-0
’-0
CEILING
LEASE LINE
TENANT SPACE
C.A.FB6 SECTION A
0 2 4 8 16
C.A.FB6 PERSPECTIVE
TENANT SPACE
PUBLIC
SEATING AREA
LEASE LINE
BASE BUILDING
FINISHES
TENANT
FINISHES
BASE BUILDING
COLUMN, TYP.
LANDSCAPE POTS, TYP.
C.A.FB7 FLOOR PLANN
’-0
HUB ROOF
CONCOURSE LEVEL
CEILING
LEASE LINE
BASE BUILDING COLUMN
TENANT SPACE
C.A.FB7 SECTION A
C.A.FB7 PERSPECTIVE
ILDING
MN, TYP
OPENN
TOTOTO
ABOVEAB
EXISTING EXPOSED
COLUMN
LEASE LINE
NEUTRAL PIER
NEUTRAL PIER
TENANT PROVIDED
ELEVATOR
MECHANICAL SHAFT
BASE BUILDING
FINISHES
TENANT
FINISHES
A
C.A.FB8-1 FLOOR PLAN
N
HUB ROOF
C.A.FB8-2
4’ -0
’-0
6’ -0
’-0
CONCOURSE LEVEL
C.A.FB8 SECTION A
0 2 4 8 16
TENANT SPACE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
INTERIOR CURTAIN
WALL SYSTEM
EXISTING HVAC
EQUIPMENT
EXISTING HVAC
EQUIPMENT
OPENN
TOTOTO
BELOWE
EXISTING EXPOSED
COLUMN
EXISTING EXPOSED
COLUMN
LEASE LINE
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER
TENANT PROVIDED
ELEVATOR
MECHANICAL
SHAFT
A
C.A.FB8-2 FLOOR PLAN
N
C.A.FB8 PERSPECTIVE
NEUTRAL PIER
PAINTED GYP. BD.
HVAC SUPPLY, TYP
NEUTRAL PIER
PARALLEL BULKHEAD
INTERIOR CURTAIN WALL
NEUTRAL PIER
NEUTRAL PIER
EXISTING EXPOSED
COLUMN
BASE BUILDING
FINISHES
TENANT
FINISHES
A
PERSPECTIVE
C.A.FB9 FLOOR PLAN
N
C.A.FB9 PERSPECTIVE
NEUTRAL PIER
NEUTRAL PIER
PARALLEL BULKHEAD
SIGNAGE ZONE
PAINTED GYP. BD.
INTERNATIONAL ARRIVALS
CONCOURSE LEVEL
’-0
”11 ’-5
3’ -0
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
LEASE LINE
HVAC SUPPLY
EXISTING HVAC
EQUIPMENT
C.A.FB9 SECTION A
C.A.FB10 FLOOR PLAN
N
0 4 8 16 32
EXISTING EXPOSED
COLUMN
LEASE LINE
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER
BASE BUILDING
FINISHES
TENANT
FINISHES
C.A.FB10 PERSPECTIVE
NEUTRAL PIER
NEUTRAL PIER
PARALLEL BULKHEAD
SIGNAGE ZONE
PARALLEL BULKHEAD
SIGNAGE ZONE
PAINTED GYP. BD.PAINTED GYP. BD.
INTERNATIONAL ARRIVALS
CONCOURSE LEVEL
’-0
”11 ’-5
3’ -0
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
LEASE LINE
HVAC SUPPLY
EXISTING HVAC
EQUIPMENT
C.A.FB10 SECTION A
NEUTRAL PIER
BASE BUILDING
FINISHES
TENANT
FINISHES
AIRLINE HOLDROOM PUBLIC
CONCOURSE
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER
A
EXISTING EXPOSED
COLUMN
EXISTING EXPOSED
COLUMN
EXISTING EXPOSED
COLUMN
EXISTING EXPOSED
COLUMN
PERSPECTIVE
C.A.FB11 FLOOR PLAN
C.A.FB11 PERSPECTIVE
NEUTRAL PIER
PARALLEL BULKHEAD
SIGNAGE ZONE
PAINTED GYP. BD.
CONCOURSE LEVEL
’-0
”11 ’-5
3’ -0
3’
-0
’-6
PARALLEL BULKHEAD
SIGNAGE ZONE
CONCOURSE CEILING
NEUTRAL PIER
LEASE LINE
EXISTING HVAC
EQUIPMENT
HVAC SUPPLY
C.A.FB11 SECTION A
WALL
PERSPECTIVE
A
10’-0”
’-0
C.A.FB12 FLOOR PLAN
N
BASE BUILDING FLOOR AND
WALL FINISHES
’-0
C.A.FB12 PERSPECTIVE
TENANT SPACE
CONCOURSE LEVEL
’-6
’-0
LEASE LINE
BASE BUILDING WALL
BASE BUILDING FLOOR
CEILING
C.A.FB12 SECTION A
WALL
A
PERSPECTIVE
C.A.FB13 FLOOR PLAN
N
0 4 8 16 32
10’-0”
C.A.FB13 PERSPECTIVE
TENANT SPACE
BASE BUILDING FLOOR AND
WALL FINISHES
CONCOURSE LEVEL
’-6
’-0
LEASE LINE
BASE BUILDING WALL
CEILING
C.A.FB13 SECTION A
0 2 4 8 16
BASE BUILDING FLOOR
LEASE LINE
NEUTRAL PIER
NEUTRAL PIER
PUBLIC GLASS
ELEVATOR
NEUTRAL PIER NEUTRAL PIER NEUTRAL PIER
BASE BUILDING
FINISHES
TENANT
FINISHES
EGRESS STAIR
SERVICE
ELEVATOR
BAGGAGE
ELEVATOR
MECHANICAL
SHAFT
PERSPECTIVE 1
PERSPECTIVE 2
PUBLIC STAIR
E
A
E
A
C.A.FB14 FLOOR PLAN
-0
6’
-0
’-1
0”
6’ -6
’-0
CONCOURSE LEVEL
INTERIOR CURTAIN WALL
SYSTEM
PARALLEL BULKHEAD
SIGNAGE ZONE
PUBLIC GLASS ELEVATOR,
PALM COURT
PUBLIC GLASS ELEVATOR
NEUTRAL PIER
LEASE LINE
C.A.FB14 SECTION A
C.A.FB14 PERSPECTIVE 1
TENANT SPACE
PUBLIC GLASS
ELEVATORINTERIOR CURTAIN WALL
SYSTEM
METAL WALL PANEL
NEUTRAL PIER
PAINTED GYP. BD.
C.A.FB14 PERSPECTIVE 2
TENANT SPACE
PUBLIC GLASS
ELEVATOR
NEUTRAL PIER
NEUTRAL PIER
INTERIOR CURTAIN WALL
SYSTEM
METAL WALL PANEL
LEVEL 4
HUB ROOF
6’ -0
6’
-0
’-4
’-4
6’ -6
’-0
2’ -6
5’
-6
’-0
CONCOURSE LEVEL
INTERIOR CURTAIN WALL
SYSTEM
PARALLEL BULKHEAD
SIGNAGE ZONE
PUBLIC GLASS ELEVATOR,
PALM COURT
PUBLIC GLASS ELEVATOR
EXISTING HVAC EQUIPMENT
LEASE LINE
NEUTRAL PIER
C.A.FB15 SECTION A
TENANT
FINISHES
BASE BUILDING
FINISHES
TENANT
FINISHES
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER
BASE BUILDING
COLUMN
PUBLIC GLASS
ELEVATOR
SERVICE ELEVATOR
BAGGAGE ELEVATOR
SERVICE ELEVATOR
BAGGAGE ELEVATOR
EGRESS STAIR
EGRESS STAIR
MECHANICAL SHAFT
PERSPECTIVE 2
INTERIOR GLASS
RAILING
PUBLIC GLASS
ELEVATOR
MECHANICAL SHAFT
NEUTRAL PIER
NEUTRAL PIER
NEUTRAL PIER
BASE BUILDING
COLUMN
B
A
STERILE
CORRIDOR
STERILE
CORRIDOR
INTERNATIONAL
BAGGAGE
CLAIM
PERSPECTIVE 1
C.A.FB15 FLOOR PLAN
N
0 4 8 16 32
C.A.FB15
(32’-6” ABOVE CONCOURSE LEVEL)
0”
4’
0” 5’
LEASE LINE
BASE BUILDING COLUMN
GLASS BOULEVARD
CEILING SYSTEM
INTERIOR GLASS RAILING
METAL WALL PANEL
TENANT SPACE
C.A.FB15 SECTION B
GLASS RAILING SYSTEM
PARALLEL BULKHEAD
SIGNAGE ZONE
C.A.FB15 PERSPECTIVE 1
TENANT SPACE
PUBLIC GLASS
ELEVATOR
NEUTRAL PIER
INTERIOR CURTAIN WALL
SYSTEM
METAL WALL PANEL
NEUTRAL PIER
C.A.FB10 PERSPECTIVE 2
TENANT SPACE
METAL WALL PANEL
PUBLIC GLASS
ELEVATOR
METAL WALL PANEL
PUBLIC GLASS
ELEVATOR
INTERIOR CURTAIN
WALL SYSTEM
INTERIOR GLASS
RAILING
INTERIOR CURTAIN
WALL SYSTEM
NEUTRAL PIER
BASE BUILDING
COLUMN
NEUTRAL PIER
COLUMN
BASE BUILDING
FINISHES
TENANT
FINISHES
NEUTRAL PIER
NEUTRAL PIER
TRASH DROP
MECHANICAL SHAFT
TRASH DROP ROOM
LEASE LINE
A
PERSPECTIVE
C.A.R1 FLOOR PLAN
’-6
6’ -0
CONCOURSE LEVEL
C.A.C1
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
HVAC SUPPLYEXISTING HVAC
EQUIPMENT
C.A.R1 SECTION A
0 2 4 8 16
TENANT SPACE
C.A.R1 PERSPECTIVE
TENANT SPACE
NEUTRAL PIER
NEUTRAL PIER
ENTRY TO SERVICE
ELEVATOR
PARALLEL BULKHEAD
SIGNAGE ZONE
FINISHES
TENANT
FINISHES
NEUTRAL PIER
PUBLIC
SEATING
AREA
NEUTRAL PIER
PERSPECTIVE1
EXISTING EXPOSED
COLUMN
A
C.A.R2 FLOOR PLAN
C.A.R2 PERSPECTIVE
NEUTRAL PIER
NEUTRAL PIER
PARALLEL BULKHEAD
SIGNAGE ZONE
HVAC SUPPLY
PAINTED GYP. BD.
’-0
’-6
6’ -0
CONCOURSE LEVEL
C.A.C1
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
HVAC SUPPLYEXISTING HVAC
EQUIPMENT
C.A.R2 SECTION A
FINISHES
TENANT
FINISHES NEUTRAL PIERMECHANICAL SHAFT
PUBLIC
SEATING
AREA
NEUTRAL PIER
PERSPECTIVE
EXISTING EXPOSED
COLUMN
A
C.A.R3 FLOOR PLAN
C.A.R3 PERSPECTIVE
NEUTRAL PIER
NEUTRAL PIER
PARALLEL BULKHEAD
SIGNAGE ZONE HVAC SUPPLY
PAINTED GYP. BD.
’-0
’-6
6’ -0
CONCOURSE LEVEL
C.A.C1
LEASE LINE
PARALLEL BULKHEAD
SIGNAGE ZONE
NEUTRAL PIER
HVAC SUPPLYEXISTING HVAC
EQUIPMENT
C.A.R3 SECTION A
File details come from the government source that posted it. Updated .