Eau Gallie Muck Removal Project - Price Sheet Summary
This is a price sheet attachment for Brevard County's Eau Gallie Muck Removal Project, a dredging and sediment disposal initiative in the Indian River Lagoon. The project encompasses hydraulic dredging of approximately 189,972 cubic yards of organic muck from Eau Gallie Dredge Area A1, with three alternate bid options that could add 42,007, 34,940, and 31,835 cubic yards respectively. Work will be conducted across three pay sections: Pay Section X (Shallow Face - 104,412 CY), Pay Section Y (Deep Face East - 25,174 CY), and Pay Section Z (Deep Face West - 53,386 CY). The bid opening is scheduled for February 4, 2025, at 2:00 PM. The project timeline requires substantial completion within 730 calendar days, with final completion occurring 60 days thereafter. The contractor will utilize the Florida Inland Navigation District's Dredge Material Management Area (DMMA) BV-52 along US-1 Highway for dewatering, material transport, and disposal operations, with full responsibility for site restoration upon project completion.
The price sheet is structured as a lump sum fixed costs bid with estimated measured quantity costs, organized across multiple pay sections and alternate bid items. Bid items include general conditions such as mobilization/demobilization, environmental protection, and dewatering facility site preparation, as well as dredge material handling including management, raw water testing, gopher tortoise burrow grouting, and standby time provisions. Each pay section includes muck dredging, survey work, environmental protection, and effluent treatment for nitrogen and phosphorus with associated deduction line items. The estimated construction budget is $18,500,000, with contractors required to submit a 5% bid bond and 100% public construction bond. Contractors must accept ACH payment in accordance with the Florida Prompt Payment Act and may offer optional cash discounts for prompt payment that will not be considered in award determinations. Addendum acknowledgments must be completed, and the sole documented bidder is Waterfront Property Services, LLC DBA Gator Dredging from Clearwater, Florida.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B-6-25-24 Eau Gallie Muck Removal Project Price Sheet | |||||
| Lump Sum Fixed Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Lump Sum Total |
| General Conditions | |||||
| 01.01 | Mobilization/Demobilization - DMMA | 1 | LS | $ - 0 | |
| 01.02 | Mobilization/Demobilization - In Water | 1 | LS | $ - 0 | |
| 01.03 | Pre and Post Construction Videos | 1 | LS | $ - 0 | |
| Dewatering Facility / Site | |||||
| 02.01 | DMMA - Site Preparation | 1 | LS | $ - 0 | |
| 02.02 | Environmental Protection – DMMA | 1 | LS | $ - 0 | |
| 02.03 | DMMA Restoration | 1 | LS | $ - 0 | |
| 02.04 | DMMA – Perimeter Ditch Restoration | 1 | LS | $ - 0 |
SUB TOTAL LUMP SUM FIXED COSTS - BASE BID: $ - 0
| Estimated Measured Quantity Costs - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredge Material Handling | |||||
| 03.01 | DMMA Management - Dewater, Material Transport, & Disposal | 182,972 | CY | $ - 0 | |
| 03.02 | DMMA - Untreated Raw Water Testing | 50 | EA | $ - 0 | |
| 03.03 | Vacant Gopher Tortoise Burrow Grouting | 5 | EA | $ - 0 | |
| 03.04 | Standby Time - Dredge | 300 | Hourly | $ - 0 | |
| 03.05 | Standby Time – Dewatering | 300 | Hourly | $ - 0 |
SUB TOTAL ESTIMATED MEASURED QUANTITY COSTS - BASE BID: $ - 0
| Estimated Measured Quantity Costs - Pay Section X - Shallow Face - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| X.01 | Muck Dredging | 104,412 | CY | $ - 0 | |
| X.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| X.03 | Environmental Protection | 1 | LS | $ - 0 | |
| A.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| A.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| A.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| A.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION X: $ - 0
| Estimated Measured Quantity Costs - Pay Section Y - Deep Face East - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Y.01 | Muck Dredging | 25,174 | CY | $ - 0 | |
| Y.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Y.03 | Environmental Protection | 1 | LS | $ - 0 | |
| B.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| B.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| B.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| B.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Y: $ - 0
| Estimated Measured Quantity Costs - Pay Section Z - Deep Face West - Base Bid | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.00 | Muck Dredging | 53,386 | CY | $ - 0 | |
| Z.02.00 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.03.00 | Environmental Protection | 1 | LS | $ - 0 | |
| C.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| C.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| C.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| C.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | $ - 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z: $ - 0
| Estimated Measured Quantity Costs - Alt Bid 1 Pay Section Z - Deep Face West 16.5ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.01 | Muck Dredging | 42,007 | CY | $ - 0 | |
| Z.02.01 | DMMA Management - Dewater, Material Transport, & Disposal | 42,007 | CY | $ - 0 | |
| Z.03.01 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.01 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 1: $ - 0
| Estimated Measured Quantity Costs - Alt Bid 2 Pay Section Z - Deep Face West 18ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.02 | Muck Dredging | 34,940 | CY | $ - 0 | |
| Z.02.02 | DMMA Management - Dewater, Material Transport, & Disposal | 34,940 | CY | $ - 0 | |
| Z.03.02 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.02 | Environmental Protection | 1 | LS | $ - 0 | |
| D.04 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | |
| D.04.a | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.05 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.05.a | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 2: $ - 0
| Estimated Measured Quantity Costs - Alt Bid 3 Pay Section Z - Deep Face West 21ft | |||||
| Bid Item | Item Description | Est. Qty. | Unit | Unit Cost | Estimated Total |
| Dredging | |||||
| Z.01.03 | Muck Dredging | 31,835 | CY | $ - 0 | |
| Z.02.03 | DMMA Management - Dewater, Material Transport, & Disposal | 31,835 | CY | $ - 0 | |
| Z.03.03 | Survey (BD, Progress, AD, As-Built) | 1 | LS | $ - 0 | |
| Z.04.03 | Environmental Protection | 1 | LS | $ - 0 | |
| D.05 | Effluent Treatment - Nitrogen | 1 | LS | $ - 0 | $ - 0 |
| D.06 | Effluent Treatment - Nitrogen Deduction | 1 | LS | 0 | $ - 0 |
| D.07 | Effluent Treatment - Phosphorus | 1 | LS | $ - 0 | $ - 0 |
| D.08 | Effluent Treatment - Phosphorus Deduction | 1 | LS | 0 | $ - 0 |
SUB TOTAL ESTIMATED COSTS - PAY SECTION Z ALT BID 3: $ - 0
| Summary of Costs | ||
| TOTAL LUMP SUM FIXED COSTS - BASE BID: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - BASE BID: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - PAY SECTION X: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - PAY SECTION Y: | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - PAY SECTION Z: | $ - 0 | |
| Subtotal | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - Alt Bid 1 Pay Section Z 16.5ft | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - Alt Bid 2 Pay Section Z 18ft | $ - 0 | |
| ESTIMATED MEASURED QUANTITY COSTS - Alt Bid 3 Pay Section Z 21ft | $ - 0 | |
| BID ALT ESTIMATE: | $ - 0 | |
| TOTAL ESTIMATE | $ - 0 | |
| Contingency (15%) | ERROR:#REF! | |
| TOTAL ESTIMATE | ERROR:#REF! |
ACH PAYMENTS
tc={68EDA1A9-0B41-4CCD-8EB6-60CB54FCC44D}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Delete from cost estimate form. Replace with a cost estimate qualification statement or disclaimer.
Does your company accept ACH Payment Method? _____Yes / _____ No
| PROMPT PAYMENT DISCOUNT |
| Brevard County shall remit payment in accordance with the Florida Prompt Payment Act, Florida Statutes section 218.70. Contractors may offer cash discounts for prompt payment but they will not be considered in determination of award. If a Contractor offers a discount, it is understood that the discount time will be from the date of satisfactory delivery, at the place of acceptance, and receipt of correct invoice, at the office specified, whichever occurs last. |
* If Prompt Payment Discount is offered, please state discount and terms:
| ADDENDUM ACKNOWLEDGMENT |
| Contractor acknowledges receipt of amendments by indicating amendment number and date of issue. |
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
Add. No.________ Dated_______________ // Add. No.________ Dated_______________
I hereby acknowledge that I have read, understand, and agree to all terms, conditions, insurance, scope of work, specifications and pricing for Bid #/Bid Title.
| COMPANY NAME_____________________________________________________________ |
| ADDRESS___________________________________________________________________ |
| AUTHORIZED SIGNATURE_______________________________________________________ |
| PRINTED SIGNATURE_________________________________DATE_____________________ |
| TELEPHONE #__________________________________FAX #__________________________ |
| EMAIL______________________________________________________________________ |
Delete from cost estimate form. Replace with a cost estimate qualification statement or disclaimer.
File details come from the government source that posted it. Updated .