Attachment F - Mechanical Drawings & Plans.pdf

PDF 329 KB Posted

Attached to
One Waterfront Place Dry Coolers Replacement
Solicitation number
RFB202690000664
Issued by
Mingo County, West Virginia

About this file

These are mechanical design and engineering drawings for the Dry Coolers Replacement Project at West Virginia University's (WVU) One Waterfront Place facility, prepared by Stantec Architecture and Engineering LLC. The project involves replacing existing glycol cooling infrastructure, including two dry coolers (DC-1 and DC-2), associated piping, controls, and related mechanical systems. The drawings, marked as preliminary and not for construction, are dated July 24, 2025 for schematic design and August 15, 2025 for bid issuance. The project includes detailed mechanical plans for exterior dry coolers, glycol piping diagrams, mechanical details, schedules, and control network documentation.

The proposed work includes removing existing dry coolers, installing new 6-inch housekeeping pads, replacing piping, implementing new control systems, and maintaining continuous glycol system operation through a phased approach. The new dry coolers are Liebert DGHX120AA136A00 models, each with 1,448 MBH total heat rejection capacity, designed to operate with a 40% propylene glycol solution. The control strategy involves integrating with the existing Siemens building automation system, with specific sequences for dry cooler staging, temperature control, and maintaining system redundancy. The project also includes monitoring and controlling 9 Computer Room Air Conditioning (CRAC) units as an alternate scope item.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

EQUIPMENT MARK TYPE A, NUMBER 1

REFER TO SCHEDULES FOR EXPLANATION.

SECTION INDICATOR

(SECTION 1 ON DWG. M300)

KEY NOTE INDICATOR

(REFERS TO NOTES ON SAME SHEET)

1 REVISION INDICATOR

DIFFUSER/REGISTER/GRILLE MARK

(SEE SCHEDULE SHEET)

DENOTES CONNECT TO EXISTING

DENOTES LIMIT OF DEMOLITION

EXISTING

REMOVE

EX

RX

XA

22"x22"

M300

CHILLED WATER RETURNCHWR

CHILLED WATER SUPPLYCHWS

ANCHOR

AUTOMATIC AIR VENT

MANUAL AIR VENT

BALANCING VALVE

CHECK VALVE (GENERIC)

FLEXIBLE CONNECTOR

FLANGED CONNECTION

UNION CONNECTION

PRESSURE GAUGE

TEMPERATURE GAUGE

Y STRAINER (GENERIC)

TEMPERATURE AND PRESSURE TAP

GATE VALVE

GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

BACKFLOW PREVENTER (GENERIC)

PIPE CAP

PIPE BREAK

FLOW ARROW

PIPING ELBOW DOWN

PIPING ELBOW UP

PIPING TEE UP

PIPING TEE DOWN

PUMP (GENERIC)

ISOLATION VALVE (GENERIC)

FLOW LIMITING VALVE

VACUUM BREAKER

2-WAY CONTROL VALVE (GENERIC)

3-WAY CONTROL VALVE (GENERIC)

PIPE CROSS

BFP

2 1/2" PIPE SIZE

Y STRAINER (BLOWDOWN)

PRESSURE REGULATOR

PRESSURE RELIEF VALVE

M1

CHILLED WATER WITH GLYCOL RETURNCHWR(G)

CHILLER WATER WITH GLYCOL SUPPLYCHWS(G)

T TEMPERATURE SENSOR

1 2 3 4 5 6 7

A

B

C

D

E

The Contractor shall verify and be responsible for all dimensions.

DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of

Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved

Client/Project

Drawing No.

Project No.

Title

ORIGINAL SHEET - ANSI D (22"x34")

Permit-Seal

Issued

Revision

By Appd YYYY.MM.DD

Revision

By Appd YYYY.MM.DD

PRELIMINARY

NOT FOR CONSTRUCTION

Not for permits, pricing or other official purposes.

This document has not been completed or checked and is for general information or comment only.

Consultants

Legend

Notes www.stantec.com

/1

/2

:3

:2

P

M A u to d e sk D o c s:

W

V U

O

W P

D ry C o o le rs

R e p la c e /s tn m e c h

W

V U

O

W P

D ry C o o le rs

R e p la c e

.r v t

Dry Coolers Replacement Project

WVU One Waterfront Place

MECHANICAL COVER SHEET

M001

218012186

1 Waterfront Place

Morgantown, WV 26501

SCHEMATIC DESIGN 2025.07.24

ISSUED FOR BID 2025.08.15

Stantec Architecture and Engineering LLC 101 East Diamond Street Suite 400 Butler, PA 16001-5975 Tel: (724) 285-4761 / Fax: (724) 285-6815

LEGEND OF SYMBOLS

(SOME SYMBOLS MAY NOT BE USED ON THIS PROJECT)

PROJECT GENERAL NOTES

LIST OF DRAWINGS

ABBREVIATIONS

(SOME ABBREVIATIONS MAY NOT BE USED ON THIS PROJECT)

M001 MECHANICAL COVER SHEET

M300 EXTERIOR DRY COOLERS MECHANICAL PLAN

M600 MECHANICAL GLYCOL PIPING DIAGRAM

M700 MECHANICAL DETAILS, SCHEDULES, AND CONTROLS

M800 MECHANICAL CONTROLS NETWORK DIAGRAM AND SYMBOL LEGEND

M801 MECHANICAL CONTROLS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

INTENT OF THE DRAWINGS AND SPECIFICATIONS ARE TO PROVIDE A COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEM FOR THE PROPOSED PROJECT. THE SYSTEMS PROVIDED SHALL CONFORM TO THE DETAILS STATED IN THE SPECIFICATIONS AND SHOWN ON THE DRAWINGS. ITEMS OR WORK NOT SHOWN OR SPECIFIED, BUT REQUIRED FOR A COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEM, SHALL BE PROVIDED AND SHALL CONFORM WITH ACCEPTED TRADE PRACTICES, LOCAL CODES, AND GOVERNING AUTHORITIES.

THE DRAWINGS AND SPECIFICATIONS ARE PRESENTED TO DEFINE SPECIFIC SYSTEM REQUIREMENTS AND SERVE TO EXPAND ON THE PRIMARY CONTRACT REQUIREMENTS OF PROVIDING COMPLETE SYSTEMS. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE ONLY THE GENERAL ARRANGEMENT OF THE ITEMS COMPRISING THE SEVERAL SYSTEMS INCLUDED IN THE HEATING, VENTILATION AND AIR

CONDITIONING WORK.

DO NOT SCALE THE DRAWINGS. BECAUSE OF THE SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS, VALVES, OR SIMILAR ITEMS WHICH MAY BE REQUIRED TO MAKE A COMPLETE OPERATING SYSTEM. CAREFULLY INVESTIGATE CONDITIONS AFFECTING WORK AND INSTALL WORK IN SUCH A MANNER THAT INTERFERENCES BETWEEN PIPES, CONDUIT, DUCTS, EQUIPMENT, ARCHITECTURAL AND STRUCTURAL FEATURES SHALL BE AVOIDED. PROVIDE ITEMS THAT MAY BE REQUIRED TO MEET THE CONDITIONS AT THE BUILDING.

CONTRACTORS SHALL HAVE SUFFICIENT EXPERTISE IN THIS TYPE OF CONSTRUCTION TO REALIZE THE EXTENT OF THE WORK REQUIRED. THEREFORE, IT SHOULD BE OBVIOUS TO ANY PRUDENT FIRM WITH EXPERIENCE IN THIS FIELD THAT THESE DOCUMENTS MAY NOT EXPLICITLY DISCLOSE FINAL DETAILS; HOWEVER, CONTRACTORS SHALL HAVE THE EXPERTISE NECESSARY TO INCLUDE NECESSARY

APPOINTMENTS.

PROTECT FLOORING FROM DAMAGE DURING THE CONSTRUCTION PERIOD. PROVIDE PLYWOOD OR SIMILAR MATERIAL UNDER EQUIPMENT OR MATERIALS STORED ON FLOORS, AND IN AREA WHERE CONSTRUCTION MAY DAMAGE THE FLOOR SURFACES. FLOOR SURFACES (INCLUDING SEALER) DAMAGED DURING THE CONSTRUCTION SHALL BE REPLACED AT THE COST OF THE CONTRACTOR AT FAULT.

COORDINATE ALL WORK WITH WORK SHOWN ON DRAWINGS FOR OTHER TRADES. COORDINATE EXACT LOCATION OF DIFFUSERS, REGISTERS AND GRILLES WITH THE ARCHITECTS REFLECTED CEILING

PLANS.

PROVIDE MAINTENANCE AREAS AROUND ALL EQUIPMENT AS REQUIRED BY CODES AND RECOMMENDED BY THE EQUIPMENT MANUFACTURER. PAY PARTICULAR ATTENTION TO COIL ACCESS AND

REMOVAL.

INDICATED PIPING RUNS ARE DIAGRAMMATIC. CONTRACTOR SHALL DETERMINE ALL REQUIRED OFFSETS AND DIRECTION CHANGES BEFORE FABRICATION AND INSTALLATION TO AVOID INTERFERENCE

WITH OTHER TRADES.

UNLESS OTHERWISE NOTED, PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF SLAB/STEEL, WITH SPACE FOR INSULATION IF REQUIRED.

ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE INSTALLED CONCEALED IN A FURRED CHASE OR ABOVE THE CEILING.

INSTALL PIPING SO THAT ALL VALVES ARE ACCESSIBLE.

NO PIPING SHALL BE LOCATED IN ELECTRICAL ROOMS, ELECTRICAL CLOSETS OR TELECOMMUNICATIONS ROOMS UNLESS THOSE PIPES OR DUCTS SERVE ONLY THAT SPACE AND ARE INDICATED ON THE

DRAWINGS.

FLOOR PLANS SHOW GENERAL PIPE ROUTING. REFER TO PIPING DIAGRAMS AND DETAILS FOR LOCATIONS OF VALVES AT EQUIPMENT.

INSTALL ALL DRAIN PIPING WITH 2% MINIMUM GRADE UNLESS OTHERWISE NOTED.

PROVIDE DRAIN VALVES AT THE BASE OF ALL RISERS AND AT ALL PIPING LOW POINTS ON HOT WATER, GLYCOL WATER AND CHILLED WATER PIPING SYSTEMS VALVES SHALL BE COMPLETE WITH HOSE

CONNECTIONS AND SCREW-ON CAPS.

PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS FOR VENTING.

PROVIDE SHUT-OFF VALVES AT EQUIPMENT REQUIRING CONNECTION, REGARDLESS OF WHETHER SHOWN ON DRAWINGS.

PROVIDE SHUT-OFF VALVES IN UTILITY SHAFTS ON EACH FLOOR FOR ALL PIPING SERVING THE FLOOR.

PIPING, EXCEPT IN MECHANICAL ROOMS AND ROOMS WITHOUT CEILINGS, SHALL BE LOCATED CONCEALED IN CHASES OR ABOVE THE CEILING UNLESS OTHERWISE NOTED.

UNLESS OTHERWISE NOTED, MINIMUM SIZE FOR ALL PIPING SHALL BE 3/4".

PROVIDE SLEEVES IN STRUCTURE FOR ALL PIPING PENETRATING WALLS OR FLOORS.

PROVIDE APPROVED FIRESAFING AT OPENINGS IN FLOORS, WALLS, ETC.

PAINT ALL PIPING, SUPPORTS, ETC. THAT WILL BE EXPOSED TO WEATHER.

ABOVE ABV.

ABOVE FINISHED FLOOR AFF

ALTERNATE ALT.

ALUMINUM ALUM.

AMBIENT AMB.

ARCHITECTURAL ARCH.

AUTOMATIC TEMPERATURE CONTROL ATC

BRAKE HORSEPOWER BHP

BUILDING BLDG.

BOTTOM BTM.

BRITISH THERMAL UNITS/HOUR BTUH

CAPACITY CAP.

COOLING COIL CC

CUBIC FEET/MINUTE CFM

CABINET HEATER CH

CEILING CLG.

COOLER CLR.

CLEANOUT CO.

COLUMN COL.

COMBINATION COMB.

CONCRETE CONC.

CONDENSATE COND.

CONDENSER CONDR.

CONNECTION CONN.

CONSTRUCTION CONST.

CONTINUOUS CONT.

CITY WATER CW

DRYBULB TEMPERATURE (DEG. F) DB

DECIBEL dB

DIRECT DIGITAL CONTROL DDC

DETAIL DET.

DIAMETER DIA.

DIMENSION DIM.

DISCHARGE DISCH.

DOWN DN.

DRAWING DWG.

ENTERING AIR TEMPERATURE (DEG. F) EAT

ELECTRICAL ELEC.

ELECTRICAL CONTRACTOR E.C.

EMERGENCY GENERATOR EM. GEN.

EQUIPMENT EQUIP.

EXTERNAL STATIC PRESSURE ESP

EVAPORATOR EVAP.

ENTERING WATER TEMPERATURE (DEG. F) EWT

EXISTING EXIST.

FAHRENHEIT F

FLOOR DRAIN FD

FINISH FIN.

FIXTURE FIXT.

FLEXIBLE FLEX.

FLOOR FLR.

FOUNDATION FND.

FIRE PROTECTION FP

FEET PER MINUTE FPM

FEET OF WATER GAUGE FT. W.G.

FOOT (FEET) FT.

GAUGE GA.

GALLONS GAL.

GALVANIZED GALV.

GALLONS PER HOUR GPH

GALLONS PER MINUTE GPM

HEIGHT HGT.

HAND-OFF-AUTOMATIC HOA

HORIZONTAL HORIZ.

HORSEPOWER HP

HIGH POINT HP

HUMIDISTAT H-STAT

HEATING HTG.

HIGH VOLTAGE HV

HEAT EXCHANGER HX

HYDRAULIC HYD.

INSIDE DIAMETER ID

INCHES OF WATER GAUGE IN. W.G.

INSULATION INSUL.

JOINT JT.

KILOWATT KW

KILOWATT HOUR KWh

LEAVING AIR TEMPERATURE LAT

LINEAL FOOT LF

LIGHTING LTG.

LOW VOLTAGE LV

LEAVING WATER TEMPERATURE LWT

THOUSANDS OF BTUs/HOUR MBH

MECHANICAL CONTRACTOR M.C.

MECHANICAL MECH.

MECHANICAL EQUIPMENT ROOM MER

MANUFACTURER MFR.

MAXIMUM OVER CURRENT PROTECTION MOCP

MOUNTED MTD.

MOUNTING MTG.

METAL MTL.

NOT APPLICABLE N/A

NORMALLY CLOSED N.C.

NOT IN CONTRACT NIC

NORMALLY OPEN N.O.

NOMINAL NOM.

NOT TO SCALE NTS

OUTDOOR AIR TEMPERATURE OAT

OUTSIDE DIAMETER OD

OVERHEAD OH

OPENING OPNG.

OPEN END RETURN OER

PRESSURE DIFFERENTIAL PD

PLUMBING PLBG.

PRESSURE PRESS.

POUNDS PER SQUARE INCH PSI

POUNDS PER SQUARE INCH ABSOLUTE PSIA

POUNDS PER SQUARE INCH GAUGE PSIG

RETURN AIR RA

RETURN AIR TEMPERATURE RAT

REVISION REV.

RELATIVE HUMIDITY RH

ROOM RM.

REVOLUTIONS PER MINUTE RPM

SOUND ATTENUATOR SA

SUPPLY AIR SA

SUPPLY AIR TEMPERATURE SAT

SHORT CIRCUIT CURRENT RATING SCCR

SCHEDULE SCHED.

SECTION SECT.

SQUARE FOOT SF

SHEET METAL SM

SPECIFICATION SPEC.

STEEL STL.

STRAINER STR.

STRUCTURAL STRUCT.

SUSPENDED SUSP.

SWITCH SW.

TEMPERATURE DIFFERENTIAL TD

TOTAL HEAT REJECTION THR

TEMPERATURE TEMP.

THICK THK.

TAMPERPROOF SWITCH TS

TOTAL STATIC PRESSURE TSP

THERMOSTAT T-STAT

VERTICAL VERT.

VIBRATION ISOLATOR VI

VOLUME VOL.

WIDE FLANGE WF

WEIGHT WT.

Key Value Keynote Text

M1 EXISTING CHWS/R (G) PIPING BELOW GRADE.

M2 REMOVE EXISTING DRY COOLER, PIPING, CONTROLS VALVES, CONTROL WIRING, AND APPURTENANCES.

M3 REMOVE EXISTING 4" HOUSEKEEPING PAD.

M4 PROVIDE NEW 6" THICK HOUSEKEEPING PAD. PAD SHALL EXTEND 6" MIN BEYOND DRY COOLER BASE RAILS ON ALL

SIDES.

M5 PIPING SUPPORT STANDS.

M6 BALANCE TO INDICATED GPM.

MECHANICAL KEY NOTE LEGEND

PHASING

1.

2.

3.

4.

5.

6.

7.

8.

9.

THE GLYCOL PIPING MAIN DOWNSTREAM OF THE CHILLED WATER/GLYCOL HEAT EXCHANGER SHALL BE MODIFIED TO INSTALL THE TEMPORARY DRY COOLER CONNECTIONS WITH PHASING VALVES AND A NEW MAIN SHUTOFF VALVE TO ALLOW THE PLANT TO BE ISOLATED WITH THE SYSTEM STILL IN OPERATION WITH THE 1200 MBH TEMPORARY DRY COOLER.

INSTALL THE NEW MINIMUM FLOW BYPASS VALVE AT THE TOP OF THE RISER ON LEVEL 6 AND ASSOCIATED CONTROLS FOR THE

BYPASS VALVE (INCLUDING RELOCATION OF THE EXISTING D/P SENSOR).

PROVIDE PIPING FOR THE TEMPORARY DRY COOLER. NEW 4” BLACK STEEL LINES SHALL BE INSTALLED FROM THE TIE-IN POINT TO THE RISER/MAIN TO THE EXTERIOR WALL SPACE BELOW THE ROLL-UP DOOR. PROVIDE INSULATED PLYWOOD BLANK-OFF AROUND THE PIPING AND BELOW THE OPEN PORTION OF THE DOOR. PROVIDE A MEANS OF LOCKING THE ROLL-UP DOOR FOR SECURITY. THE TEMPORARY DRY COOLER SHALL BE LOCATED ON GRADE OUTSIDE THE ROLL-UP DOOR. TEMPORARY PIPING SHALL BE EXTENDED FROM THE VICINITY OF THE DOOR TO THE DRY COOLER. FROM THIS POINT THE MFR MAY USE STANDARD PIPING MATERIAL FOR CONNECTION. THE INTENT IS FOR THE PIPING TO RUN ALONG THE GROUND WITH PLYWOOD COVERS OVER THE PIPING TO PROTECT THE PIPING FROM DAMAGE. THE PIPING AND DRY COOLER SHALL BE LOCATED IN SUCH A WAY TO NOT BLOCK FACILITY ACCESS AND OPERATION (COORDINATE FINAL LOCATION WITH OWNER). FILL TEMPORARY PIPING AND DRY COOLER WITH A 40% PROPYLENE

GLYCOL SOLUTION.

UTILIZE THE EXISTING SHUTOFF VALVES IN THE DRY COOLER PIPING WHERE IT FIRST ENTERS THE BUILDING TO ISOLATE THE MAINS

TO THE EXISTING DRY COOLERS. DRAIN THE EXISTING PIPING BACK TO THE DRY COOLERS.

SHUT DOWN THE EXISTING DRY COOLERS AND RUN OFF OF THE HEAT EXCHANGER/TEMPORARY DRY COOLER FOR N+1 REDUNDANCY.

PROCEED WITH INSTALLING THE NEW DRY COOLERS AND REMAINING SCOPE OF WORK INDICATED.

WHEN INSTALLATION IS COMPLETE, TRANSFER THE LOAD OFF OF THE TEMPORARY DRY COOLER AND BACK TO THE NEW DRY COOLER SYSTEM. ONCE THE NEW PLANT OPERATION IS CONFIRMED, REMOVE THE TEMPORARY DRY COOLER AND ALL OF THE

TEMPORARY PIPING/ELECTRICAL ETC.

THE GLYCOL SYSTEM IS A CRITICAL SYSTEM AND CANNOT BE SHUT DOWN.

THE PROJECT SHALL END WITH THE GLYCOL SYSTEM RETURNING TO THE NEW DRY COOLERS PROVIDING HEAT REJECTION WITH

CHILLED WATER HX BACKUP.

ALTERNATE(S)

M1 PROVIDE START/STOP/STATUS MONITORING OF 9 COMPUTER ROOM AIR CONDITIONING (CRAC) UNITS. SEE DRAWING M801.

Attachment F

GENERAL NOTES

GENERAL NOTES APPLY TO ALL SHEETS IN THE SERIES THAT THEY ARE ON.

EACH SERIES OF SHEETS WILL START OVER AT NOTE 1.

KEY NOTES

KEY NOTES ARE NUMBERED SEQUENTIALLY FROM M1 TO THE LAST KEY NOTE.

THEY ARE PROJECT SPECIFIC. ONLY THE KEY NOTES USED ON A SPECIFIC SHEET

WILL BE LISTED ON THAT SHEET.

1.

2.

3.

4.

5.

EXISTING CONDITIONS ARE BASED ON FIELD SURVEYS AND OWNER

RECORD DRAWINGS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO

START OF DEMOLITION / CONSTRUCTION.

REFER TO SHEET M001 FOR ADDITIONAL GENERAL NOTES, SYMBOLS,

AND ABBREVIATIONS.

DO NOT SCALE DRAWINGS.

COORDINATE SHUTDOWN OF EXISTING BUILDING SYSTEMS FOR WORK

INVOLVED WITH BUILDING OWNER.

REFER TO M600 RISER DIAGRAM DRAWING FOR ADDITIONAL

INFORMATION.

RX 4"ø CHWS(G)

RX 6"ø CHWR(G)

M1

TO/FROM BUILDING

RX 6"ø CHWR(G) RX 6"ø CHWS(G)

RX 6"ø CHWS(G)

EX COOLING TOWERS

RX 4"ø CHWR(G)

RX 4"ø CHWS(G)

RX 4"ø CHWR(G)

RX 6"ø CHWS(G)

M2 (TYP OF 2)

M3 (TYP OF 2)

M1

TO/FROM BUILDING

EX COOLING TOWERS

DC

DC

6"ø CHWR(G)

6"ø CHWS(G)

4"ø CHWS(G) 4"ø CHWR(G)

4"ø CHWS(G) 4"ø CHWR(G)

4"ø CHWS(G) 4"ø CHWR(G)

4"ø CHWS(G) 4"ø CHWR(G)

M4 (TYP OF 2)

6"ø CHWS(G)

6"ø CHWR(G)

M5(TYP)

TRUE

NORTH

1 2 3 4 5 6 7

A

B

C

D

E

The Contractor shall verify and be responsible for all dimensions.

DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of

Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved

Client/Project

Drawing No.

Project No.

Title

ORIGINAL SHEET - ANSI D (22"x34")

Permit-Seal

Issued

Revision

By Appd YYYY.MM.DD

Revision

Scale

By Appd YYYY.MM.DD

PRELIMINARY

NOT FOR CONSTRUCTION

Not for permits, pricing or other official purposes.

This document has not been completed or checked and is for general information or comment only.

Consultants

Legend

Notes www.stantec.com

/1

/2

:3

:2

P

M A u to d e sk D o c s:

W

V U

O

W P

D ry C o o le rs

R e p la c e /s tn m e c h

W

V U

O

W P

D ry C o o le rs

R e p la c e

.r v t

As indicated

Dry Coolers Replacement Project

WVU One Waterfront Place

EXTERIOR DRY COOLERS MECHANICAL

PLAN

M300

218012186

1 Waterfront Place

Morgantown, WV 26501

SCHEMATIC DESIGN 2025.07.24

ISSUED FOR BID 2025.08.15

Stantec Architecture and Engineering LLC 101 East Diamond Street Suite 400 Butler, PA 16001-5975 Tel: (724) 285-4761 / Fax: (724) 285-6815

M1 EXISTING CHWS/R (G) PIPING BELOW GRADE.

M2 REMOVE EXISTING DRY COOLER, PIPING, CONTROLS VALVES,

CONTROL WIRING, AND APPURTENANCES.

M3 REMOVE EXISTING 4" HOUSEKEEPING PAD.

M4 PROVIDE NEW 6" THICK HOUSEKEEPING PAD. PAD SHALL

EXTEND 6" MIN BEYOND DRY COOLER BASE RAILS ON ALL

SIDES.

M5 PIPING SUPPORT STANDS.

1/4" = 1'-0"M300

1 EXTERIOR DRY COOLERS MECHANICAL DEMOLITION PLAN

1/4" = 1'-0"M300

2 EXTERIOR DRY COOLERS MECHANICAL NEW WORK PLAN

LEVEL 2

LEVEL 4

LEVEL 5

LEVEL 1

LEVEL 6

LEVEL 2

LEVEL 4

LEVEL 5

LEVEL 1

LEVEL 6

GENERAL NOTES

GENERAL NOTES APPLY TO ALL SHEETS IN THE SERIES THAT THEY ARE ON.

EACH SERIES OF SHEETS WILL START OVER AT NOTE 1.

KEY NOTES

KEY NOTES ARE NUMBERED SEQUENTIALLY FROM M1 TO THE LAST KEY NOTE.

THEY ARE PROJECT SPECIFIC. ONLY THE KEY NOTES USED ON A SPECIFIC SHEET

WILL BE LISTED ON THAT SHEET.

1.

2.

3.

4.

5.

6.

EXISTING CONDITIONS ARE BASED ON FIELD SURVEYS AND OWNER

RECORD DRAWINGS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO

START OF DEMOLITION / CONSTRUCTION.

REFER TO SHEET M001 FOR ADDITIONAL GENERAL NOTES, SYMBOLS,

AND ABBREVIATIONS.

DO NOT SCALE DRAWINGS.

COORDINATE SHUTDOWN OF EXISTING BUILDING SYSTEMS FOR WORK

INVOLVED WITH BUILDING OWNER.

DRAIN AND DISPOSE OF 40% PROPYLENE GLYCOL MIXTURE.

PROVIDE PROPYLENE GLYCOL, MIX, AND FILL WITH WATER TO BE 40%

SOLUTION.

LEVEL 3

OUTDOOR GLYCOL

COOLERS

BUILDING

EX 6"

CHWR(G)

EX 6"

CHWS(G)

EX 3" CHWR(G)

EX 3" CHWS(G)

EX 6" CHWR(G)

EX 6" CHWS(G)

EX 6" CHWR(G)

EX 6" CHWS(G)

EX CRU-10

EX 6" CHWR(G)

EX 6" CHWS(G)

EX CRU-9

EX CRU-2EX CRU-4EX CRU-3EX CRU-1

EX CRU-8EX CRU-6

EX CRU-7

EX BLIND FLANGE

N.C.N.O.

EX INLINE PUMPS

EX PLATE AND

FRAME HEAT

EXCHANGER

EX 4" CHWS(G)

EX 6" CHWS(G)

EX 6" CHWR(G)

EX 4" CHWS

EX 4" CHWR

EX 6" CHWR(G)

EX 6" CHWR(G)

EX 6" CHWR(G)

EX 6" CHWS

EX 6" CHWR

EX EXPANSION

TANK

EX CHEMICAL

CLOSED SYSTEM

FEEDER.

EX N.O. CONTROL

ISOLATION VALVE

EX N.C. CONTROL

ISOLATION VALVE

EX 6" CHWR(G)

EX 6" CHWR(G)

EX 6" CHWS(G)

MINIMUM FLOW

BYPASS VALVE

DC

DC

PROVIDE NEW MANUAL

AIR VENTS AT SYSTEM

HIGH POINT

NEW LOCATION

OF EXISTING DP

PUMP

CONTROLLER

M6 M6 M6

M6 M6 M6 M6

M6

M6

32 GPM

12 GPM 17 GPM

52 GPM 52 GPM 9 GPM 52 GPM

28 GPM

9 GPM

T

EX TEMPERATURE

SENSOR

NEW TEMPERATURE

SENSOR FOR

SYSTEM CONTROL

T T

PROVIDE TEMPORARY

DRY COOLER

CONNECTIONS

LEVEL 3

RX OUTDOOR

GLYCOL COOLERS

BUILDING

EX 6"

CHWR(G)

EX 6"

CHWS(G)

EX 3" CHWR(G)

EX 3" CHWS(G)

EX 6" CHWR(G)

EX 6" CHWS(G)

EX 6" CHWR(G)

EX 6" CHWS(G)

EX CRU-10

EX 6" CHWR(G)

EX 6" CHWS(G)

EX CRU-9

EX CRU-2EX CRU-4EX CRU-3EX CRU-1

CRU-5EX CRU-8EX CRU-6

EX CRU-7

EX BLIND FLANGE

PREVIOUSLY

REMOVED PER CLIENT

AND SITE SURVEY

N.C.N.O.

EX INLINE PUMPS

EX PLATE AND

FRAME HEAT

EXCHANGER

EX 4" CHWS(G)

EX 6" CHWS(G)

EX 6" CHWR(G)

EX 4" CHWS

EX 4" CHWR

EX 6" CHWR(G)

EX 6" CHWR(G)

EX 6" CHWR(G)

EX 6" CHWS

EX 6" CHWR

EX EXPANSION

TANK

EX CHEMICAL

CLOSED SYSTEM

FEEDER.

EX N.O. CONTROL

ISOLATION VALVE

EX N.C. CONTROL

ISOLATION VALVE

EX 6" CHWR(G)

EX 6" CHWR(G)

EX 6" CHWS(G)

EXISTING DIFFERENTIAL

PRESSURE SENSOR

INSTALLED UNDER

CHILLER UPGRADES

(RELOCATE TO NEW

LOCATION INDICATED)

T

RX TEMPERATURE

SENSOR FOR SYSTEM

CONTROL

RX 6" CHWR(G)

RX 6" CHWS(G)

RX PRESSURE

CONTROL VALVE

RX ORIGINAL DP

CONTROLLER

T

T

EX TEMPERATURE

SENSOR

RX 4" CHWS(G)

1 2 3 4 5 6 7

A

B

C

D

E

The Contractor shall verify and be responsible for all dimensions.

DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of

Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved

Client/Project

Drawing No.

Project No.

Title

ORIGINAL SHEET - ANSI D (22"x34")

Permit-Seal

Issued

Revision

By Appd YYYY.MM.DD

Revision

By Appd YYYY.MM.DD

PRELIMINARY

NOT FOR CONSTRUCTION

Not for permits, pricing or other official purposes.

This document has not been completed or checked and is for general information or comment only.

Consultants

Legend

Notes www.stantec.com

/1

/2

:3

:2

P

M A u to d e sk D o c s:

W

V U

O

W P

D ry C o o le rs

R e p la c e /s tn m e c h

W

V U

O

W P

D ry C o o le rs

R e p la c e

.r v t

Dry Coolers Replacement Project

WVU One Waterfront Place

MECHANICAL GLYCOL PIPING

DIAGRAM

M600

218012186

1 Waterfront Place

Morgantown, WV 26501

SCHEMATIC DESIGN 2025.07.24

ISSUED FOR BID 2025.08.15

Stantec Architecture and Engineering LLC 101 East Diamond Street Suite 400 Butler, PA 16001-5975 Tel: (724) 285-4761 / Fax: (724) 285-6815

Not to ScaleM600

2 MECHANICAL GLYCOL PIPING DIAGRAM NEW WORK

Not to ScaleM600

1 MECHANICAL GLYCOL PIPING DIAGRAM DEMOLITION

M6 BALANCE TO INDICATED GPM.

PAD THICKNESS

HOUSEKEEPING PAD REINFORCEMENT SCHEDULE

T = 4"

4" < T <= 6"

6" < T <= 8"

8" < T <= 12"

12" < T <= 16"

WWR 4x4-W2.9xW2.9 OR #3@12" EACH WAY

WWR 4x4-W4xW4 OR #4@18" EACH WAY

WWR 4x4-W6xW6 OR #4@12" EACH WAY

#4@18" EACH WAY

#4@12" EACH WAY

TOP

REINFORCEMENT

BOTTOM REINFORCEMENT

NONE

NONE

NONE

#4@18" EACH WAY

#4@12" EACH WAY

NOTES:

1. REFER TO MECHANICAL DRAWINGS FOR HOUSEKEEPING PAD PLAN DIMENSIONS AND THICKNESS (4" MINIMUM

THICKNESS).

2. CONTRACTOR SHALL COORDINATE DIMENSIONS AND OTHER SPECIAL REQUIREMENTS WITH EQUIPMENT MANUFACTURERS AND PROVIDE WHERE REQUIRED WHETHER SHOWN ON STRUCTURAL DRAWINGS OR NOT.

COORDINATE WITH

MECHANICAL DRAWINGS.

SINGLE POUR WITH SLAB OR

SEPARATE POUR WITH

BONDING AGENT (LEAVE SLAB

ROUGH)

3/4" CHAMFER

BOTTOM REINFORCEMENT,

WHERE SCHEDULED

TOP REINFORCEMENT,

REFER TO SCHEDULE

REFER TO NOTE 1

1-#4 CONTINUOUS AT

PERIMETER WITH 1-#4x4'-0"

AT EXTERIOR CORNERS AND

1-#4x4'-0" DIAGONAL AT

RE-ENTRANT CORNERS

4'- 0"2'-0"

2' -0

EXTERIOR

CORNERS

RE-ENTRANT

CORNERS

2"

CHWS(G)

UNION

DRY COOLER

6" HOUSEKEEPING PAD

NOTES:

1. LOCATE PIPING TO FACILITATE THE REQUIRED ACCESS AND REMOVAL OF DRY COOLER COMPONENTS.

2. SHUT OFF VALVES AND ACCESSORIES SHALL BE THE SAME SIZE AS THE SYSTEM PIPING. TRANSITION TO THE DRY

COOLER INLET/OUTLET SIZES AT THE DRY COOLER.

3. ISOLATION VALVES ARE SHOWN AS BUTTERFLY VALVES, REFER TO THE SPECIFICATIONS FOR THE SPECIFIC VALVE TYPE

BASED ON THE PIPE SIZE AND APPLICATION.

DRAIN WITH HOSE

END CONNECTION

CHWR(G)

ISOLATION

VALVE

PRESSURE

RELIEF VALVE MANUAL AIR

VENT

PROVIDE NEOPRENE ISOLATION

PADS BETWEEN DRY COOLER

BASE RAIL AND HOUSEKEEPING

PAD.

HANGER ROD

INSULATION

WELD

SADDLE

NOTES:

1. FOLLOW REQUIREMENTS FOR VIBRATION ISOLATION AND SEISMIC AS NOTED IN THE CONTRACT

DOCUMENTS.

2. ALL STEEL MEMBERS SHALL BE HOT DIP GALVANIZED.

ROLLER SUPPORT 6"x6" FISH PLATE

BOLTED/ANCHORED TO

EXISTING CONCRETE (TYP.)

DC

DC

TEMPORARY DRY COOLER LOCATION

1 2 3 4 5 6 7

A

B

C

D

E

The Contractor shall verify and be responsible for all dimensions.

DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of

Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved

Client/Project

Drawing No.

Project No.

Title

ORIGINAL SHEET - ANSI D (22"x34")

Permit-Seal

Issued

Revision

By Appd YYYY.MM.DD

Revision

By Appd YYYY.MM.DD

PRELIMINARY

NOT FOR CONSTRUCTION

Not for permits, pricing or other official purposes.

This document has not been completed or checked and is for general information or comment only.

Consultants

Legend

Notes www.stantec.com

/1

/2

:3

:3

P

M A u to d e sk D o c s:

W

V U

O

W P

D ry C o o le rs

R e p la c e /s tn m e c h

W

V U

O

W P

D ry C o o le rs

R e p la c e

.r v t

Dry Coolers Replacement Project

WVU One Waterfront Place

MECHANICAL DETAILS, SCHEDULES,

AND CONTROLS

M700

218012186

1 Waterfront Place

Morgantown, WV 26501

SCHEMATIC DESIGN 2025.07.24

ISSUED FOR BID 2025.08.15

Stantec Architecture and Engineering LLC 101 East Diamond Street Suite 400 Butler, PA 16001-5975 Tel: (724) 285-4761 / Fax: (724) 285-6815

8 5000 SCCR RATING.

7 FANS ARE TEMPERATURE STAGE CONTROLLED.

6 MANUFACTURER AND MODEL ARE BASIS OF DESIGN.

5 DRY COOLERS ARE 40% PROPYLENE GLYCOL SOLUTION.

4 INSTALL PER MANUFACTURER'S REQUIREMENTS.

2 UNIT MOUNTED ON GRADE ON 6" HOUSEKEEPING PAD.

1 PROVIDE NEMA 3R EXTERNAL FUSED DISCONNECT.

NOTES:

DC-2 CRAC UNITS LEVEL 1 OUTDOOR 1448 120 108 263 16.1 10 74160 95 480/3 27 480/3 2.7 1 LIEBERT DGHX120AA136A00 1, 2, 3, 4, 5, 6, 7, 8

DC-1 CRAC UNITS LEVEL 1 OUTDOOR 1448 120 108 263 16.1 10 74160 95 480/3 27 480/3 2.7 1 LIEBERT DGHX120AA136A00 1, 2, 3, 4, 5, 6, 7,8

EWT (°F) LWT (°F)

FLOW RATE

(GPM)

PRESSURE

DROP (FT)

NO. OF

FANS

FLOW

(CFM)

AMB. TEMP

(°F)

VOLTAGE/

PHASE

FLA

VOLTAGE/

PHASE

FLA HP

TAG SERVICE LOCATION

THR

(MBH)

FLUID SIDE AIR SIDE ELECTRICAL (DRY COOLERS) ELECTRICAL (PER FAN)

MANUFACTURER AND MODEL REMARKS

DRY COOLER SCHEDULE

Not to Scale

TYPICAL HOUSEKEEPING PAD OVER SLAB-ON-GRADE

NOT TO SCALE

DRY COOLER PIPING DETAIL

Not to Scale

PIPING SUPPORT STAND DETAIL

Not to Scale

TEMPORARY DRY COOLER LOCATION

FM

D/P

P

ES

T M

H

L

MAO

FS

D/P

CO2

H

D/P

H

C

H L

C

C

CONTROLS GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

THE DESIGN INTENT IS FOR THE BUILDING AUTOMATION SYSTEM (BAS) TO BE AN EXTENSION OF THE EXISTING SIEMENS

SYSTEM WHICH WAS RECENTLY UPGRADED AS PART OF SIEMENS CONTRACT WITH WVU

UTILIZE EXISTING CONTROLLER FOR THE GLYCOL SYSTEM. ALL SENSORS SHALL BE NEW.

ALL ACTUATORS SHALL BE ELECTRIC ACTUATORS UNLESS NOTED OTHERWISE.

THE CONTROLS CONTRACTOR IS RESPONSIBLE FOR POWERING ALL CONTROL PANELS AND SENSORS / END DEVICES. REFER TO THE ELECTRICAL DRAWINGS FOR THE DESIGNATED ELECTRICAL CIRCUITS THAT SHOULD BE USED BY THE CONTROLS CONTRACTOR. THE CONTROLS CONTRACTOR WILL BE RESPONSIBLE FOR ALL STEP DOWN TRANSFORMERS AND THE 120V

WIRING AS REQUIRED. ALL POWER SHALL COME FROM STANDBY CIRCUITS.

ALL CONTROL POINTS REQUIRED FOR THE SEQUENCES TO BE EXECUTED SHALL BE HARD WIRED TO THE CORRESPONDING CONTROLLER SO THAT THE SEQUENCES CAN STILL OPERATE WITH THE BUILDING CONTROLS LOCATE AREA NETWORK NOT

WORKING.

ALL SAFETIES SHALL BE HARD WIRED.

ALL CONTROL SEQUENCES SHALL UTILIZE DEAD BANDS TO ALLOW FOR STABLE CONTROL.

CONTROLS LEGEND AND SYMBOLS

DI

DO

AI

AO

DIGITAL INPUT

DIGITAL OUTPUT

ANALOG INPUT

ANALOG OUTPUT

LIQUID / STEAM FLOW METER

SMOKE DETECTOR

DIFFERENTIAL PRESSURE TRANSMITTER

AHU CONTROL VALVE

PRESSURE GAUGE

PRESSURE GAUGE W/ ISOLATION VALVE

PRESSURE TRANSMITTER

PARALLEL BLADE DAMPER

AIR FLOW STATION

OPPOSED BLADE DAMPER

STARTER

TEMPERATURE SENSOR

NETWORK INTERFACE PANEL

UNITARY CONTROL PANEL

REGULATOR

BALL VALVE

LINE SIZE BUTTERFLY VALVE

PIPING UNION

ACTUATOR WITH END SWITCH

DUCT STATIC PRESSURE SENSOR

CONTROLLER

FAN

VARIABLE FREQUENCY DRIVE

NIP

UCP

NOTE:

THESE SYMBOL DEFINITIONS SHALL BE USED UNLESS OTHERWISE NOTED ON THE CONTROL DRAWINGS. REFER TO

MECHANICAL LEGEND AND CONTROL SPECIFICATIONS FOR ADDITIONAL DEFINITIONS.

TEMPERATURE SENSOR

2D CONTROL VALVE

REHEAT, UH, CUH, FCU, AND MISC.

COIL/EQUIPMENT CONTROL VALVE

FAN

GROUND

AQUA STAT

PUMP

FLOW SWITCH

DIFFUSER

OCCUPANCY SENSOR

SPACE PRESSURE SENSOR

SPACE TEMPERATURE SENSOR

CHECK VALVE

GLOBE VALVE

DIGITAL CONTROL PANEL WHICH IS A

PROGRAMMABLE LOGIC CONTROLLER

DCP

ELECTRIC ACTUATOR

OCCUPANCY SENSOR

LOW LIMIT TEMPERATURE SENSOR

PRESSURE GAUGE

CO2 SENSOR

SPACE HUMIDITY SENSOR

DIFFERENTIAL PRESSURE SENSOR

OCCUPANCY SENSOR

HEATING COIL

FILTER

LOW LEVEL SENSOR

LINE VOLTAGE THERMOSTAT

DIFFERENTIAL PRESSURE SWITCH

BTU METER

COOLING COIL

TEMPERATURE TRANSMITTER DETAIL

N.T.S.

DIFFERENTIAL PRESSURE DETAIL

N.T.S.

DIFFERENTIAL PRESSURE

TRANSMITTER

PORTS

3-WAY MANIFOLD

1/2" TUBING

BALL VALVE

3/4" WELD-O-LET

RETURN SUPPLY

AI

D/P

L H

AI

INSULATION

TEMP TRANSMITTER

LOGGING WELL

304 STAINLESS STEEL

3/4" WELD-O-LET

1 2 3 4 5 6 7

A

B

C

D

E

The Contractor shall verify and be responsible for all dimensions.

DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of

Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved

Client/Project

Drawing No.

Project No.

Title

ORIGINAL SHEET - ANSI D (22"x34")

Permit-Seal

Issued

Revision

By Appd YYYY.MM.DD

Revision

By Appd YYYY.MM.DD

PRELIMINARY

NOT FOR CONSTRUCTION

Not for permits, pricing or other official purposes.

This document has not been completed or checked and is for general information or comment only.

Consultants

Legend

Notes www.stantec.com

/1

/2

:3

:3

P

M A u to d e sk D o c s:

W

V U

O

W P

D ry C o o le rs

R e p la c e /s tn m e c h

W

V U

O

W P

D ry C o o le rs

R e p la c e

.r v t

Dry Coolers Replacement Project

WVU One Waterfront Place

MECHANICAL CONTROLS NETWORK

DIAGRAM AND SYMBOL LEGEND

M800

218012186

1 Waterfront Place

Morgantown, WV 26501

SCHEMATIC DESIGN 2025.07.24

ISSUED FOR BID 2025.08.15

Stantec Architecture and Engineering LLC 101 East Diamond Street Suite 400 Butler, PA 16001-5975 Tel: (724) 285-4761 / Fax: (724) 285-6815

VFD

TO BAS

DO - START/STOP

DI - STATUS

AO- SPEED ADJUST

DI - BYPASS (STARTER)

D/P

VFD

TO BAS

DO - START/STOP

DI - STATUS

AO- SPEED ADJUST

DI - BYPASS (STARTER)

DO

T

AI

AO

DO

T

AI

AO

A O

A O

T

A I

C H

W R

(G

ALL CONTROL FUNCTIONS, SET POINT ADJUSTMENTS, AND SEQUENCES SHALL BE PROVIDED

THROUGH THE BAS SYSTEM.

ALL TEMPERATURES AND PRESSURES SHALL BE MONITORED THROUGH THE BAS SYSTEM.

ALL SEQUENCES SHALL HAVE TIME CONSTRAINT WHERE APPLICABLE TO ALLOW THE SYSTEM TO

REACH STEADY STATE CONDITIONS. SETPOINTS SHALL BE USER ADJUSTABLE AND BE REFINED

DURING THE CX PROCESS.

1.

2.

3.

EXISTING GLYCOL PUMPS

AT ALL TIMES A MINIMUM OF 1 PUMP SHALL RUN.

THE CHILLED WATER PUMP SPEED SHALL BE VARIED FROM THE MIN SPEED (20 HZ) TO THE MAX SPEED

(60 HZ) TO MAINTAIN THE D/P SET POINT.

THE PUMPS SHALL BE IN A 1 DUTY CONFIGURATION WITH A BACK-UP. THE PUMPS SHALL BE STAGED TO EQUALIZE RUN TIME. THE PUMP COMING ON SHALL START AND RUN TO 20HZ PRIOR TO THE OLD DUTY PUMP SHUTTING OFF SO THAT THE MIN D/P IS MAINTAINED AT ALL TIME. THE PUMP ROTATION SHOULD

BE DONE ONE A MONTH ON A WEEKDAY AT 7AM.

IF THE DUTY PUMP WOULD FAIL, THE DUTY PUMP SHALL BE TAKEN OUT OF ROTATION AND THE PUMP THAT WAS THE STANDBY PUMP SHALL NOW BE THE DUTY PUMP. WHEN THE FAILED PUMP IS REPAIRED AND THE ALARM CLEARED, THE FORMERLY FAILED PUMP SHALL REMAIN OFF UNTIL AT LEAST THE NEXT

TIME TO ROTATE PUMPS.

SETPOINT VALUE

SUPPLY GLYCOL TEMP SP 108

REMOTE DIFFERENTIAL PRESSURE TAB

GENERAL

EX GP-2

AI

CHWR(G)

CHWS(G)

RELOCATED REMOTE DIFFERENTIAL PRESSURE

SENSOR ON LV6

GLYCOL

WATER

RISER

EX GP-1

DRY COOLER DRY COOLER

EX

FREE

COOLING HX

EXISTING MODE SWITCHING - DRY COOLER / FREE COOLING HX

THERE SHALL BE A MODE SELECTOR TO DETERMINE ON THE GRAPHICS.

THERE ARE (2) 2-WAY VALVES TO DETERMINE THE DIRECTION OF FLOW. NORMALLY THE

FLOW WILL GO TO THE DRY COOLERS. THIS SHALL BE THE DEFAULT MODE. THE OTHER

MODE IS CHILLED WATER BACKUP. IN THIS MODE THE CHILLED WATER GOES TO THE HX.

WHEN SWITCHING BETWEEN MODES, THE ISOLATION VALVE THAT IS CLOSED SHALL FULLY

OPEN BEFORE THE OPEN VALVE BEGINS TO CLOSE. AT ALL TIMES THERE SHALL BE A

MINIMUM OF 1 FULLY OPEN VALVE.

IF THE TEMPERATURE COMING FROM THE DRY COOLERS IS NOT AT SET POINT FOR A

PERIOD OF 15 MINUTES, AN ALARM SHALL BE GENERATED. IF THE TEMPERATURE EXCEEDS

THE HIGH LIMIT BY MORE THAN 5 DEGREES AT ANY TIME THERE SHALL BE AN ALARM AND

THE MODE SHALL BE SWITCHED TO CHILLED WATER MODE.

IN CHILLED WATER MODE, THE HX SHALL BE THE PRIORITY. NON CRITICAL AHU LOADS

SHALL BE SHED TEMPORARILY AS REQUIRED TO MAINTAIN SET POINT USING THE HX. THE

AHUS ON LV 3 SHOULD BE SHED FIRST (TOGGLES TO CHANGE THE LEVEL OF AHUS TO BE

SHUT OFF FROM CHILLED WATER).

TEMPERATURE CONTROL

IN DRY COOLER MODE, THE DRY COOLERS SHALL BE CONTROLLED (FAN STAGING) TO

MAINTAIN THE TEMPERATURE SET POINT 108oF (ADJ). THE DESIGN INTENT IS ONE DRY

COOLER WILL SATISFY THE BUILDING LOAD REQUIREMENTS UNDER NORMAL CONDITIONS.

IF THE GLYCOL LOOP SUPPLY TEMPERATURE RISES ABOVE 110oF (ADJ), THE LAG DRY

COOLER SHALL BE ENERGIZED AND THE ASSOCIATED ISOLATION VALVE MODULATED

OPEN TO MAINTAIN LOOP SUPPLY TEMPERATURE SET POINT. WHEN THE LOOP SUPPLY

TEMPERATURE DROPS BELOW 108oF (ADJ), THE LAG DRY COOLER SHALL BE DE-

ENERGIZED AND THE ASSOCIATED ISOLATION VALVE CLOSED.

IN HX MODE, THE CHILLED WATER CONTROL VALVE SHALL MODULATE TO MAINTAIN THE

TEMPERATURE SET POINT AT THE TEMPERATURE SENSOR LEAVING THE HX. WHEN NOT IN

HX MODE, ONCE A MONTH THE CONTROL VALVE ON THE CHILLED WATER LINE SHALL

MODULE SLOWING FROM 0% OPEN TO 100% OPEN AND THEN BACK TO 0% OPEN. THE

CHILLER STAGING / PUMP STATING SHALL BE LOCKED OFF AT THIS TIME TO PREVENT ANY

ADDITIONAL CHILLERS OR PUMPS TO TURN ON DURING THIS SHORT FLOW INCREASE. THIS

SHOULD BE DONE AT 1AM ON A WEEKDAY.

EXISTING

EXISTING

MIN FLOW BYPASS

VALVE ON LV6

DRY COOLER STAGING

THE BAS SHALL ENABLE THE DRY COOLERS WHEN THE PLANT IS ENABLED. THE DRY COOLER

CONTROLLER SHALL OPERATE TO MAINTAIN THE SUPPLY CHILLED WATER WITH GLYCOL

TEMPERATURE SET POINT.

THE BAS SHALL ISOLATE A DRY COOLER WHEN THE DRY COOLER IS NOT RUNNING. AT A MINIMUM, ONE ISOLATION VALVE SHALL ALWAYS BE OPEN. THE VALVES ARE SHOWN AS MODULATING VALVES

SO THE TRANSITION CAN SLOW ENOUGH TO ALLOW TIME FOR THE SYSTEM TO REACT. THE

MINIMUM FLOW IN THE SYSTEM SHOULD BE RESET PRIOR TO TURNING ON A SECOND DRY COOLER

SO THAT THE FLOW STAYS ABOVE THE MINIMUM FLOW DURING THE TRANSITION.

DRY COOLER STAGING SHALL BE USED TO EQUALIZE DRY COOLER RUN TIME. THE LEAD DRY

COOLER SHALL ROTATE AT 6AM IN THE MORNING ON A WEEKDAY TO ROTATE THE DRY COOLER

POSITION. THE DRY COOLER WITH THE SHORTEST RUN TIME SHALL BE THE LEAD.

BYPASS CONTROL

THE BYPASS VALVE SHALL BE USED AS PART OF THE D/P CONTROL. WHEN THE PUMPS

REACH MIN SPEED, THE BYPASS VALVE SHALL MODULATE TO MAINTAIN THE D/P SET POINT.

EX

EX

EX

EX

CHWS

CHWR

CRAC SYSTEM SEQUENCE

THE CRAC UNIT TO CONTINUE TO OPERATE ON EXISTING PACKAGED CONTROL.

PROVIDE DRY CONTACT INTEGRAL OF EXISTING UNIT TO PROVIDE REMOTE START/STOP FUNCTION AND MONITOR UNIT STATUS.

PROVIDE NEW THERMOSTAT TO MONITOR/ALARM ZONE TEMPERATURE.

CONTROLS CONTRACTOR TO PROVIDE BACNET CONNECTION TO BMS.

ALARMS

HIGH SPACE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN COOLING SETPOINT BY 10oF (ADJ.) FOR A PERIOD OF 5 MINUTES

(ADJ.).

COMPUTER ROOM

AC UNIT

EXISTING ROOM

TEMPERATURE

SENSOR

DDC

INTERFACE

24V DRY CONTACT

INTERFACE TO EXISTING

UNIT CONTROL PANEL

ZONE

MONITORING

SENSOR

1 2 3 4 5 6 7

A

B

C

D

E

The Contractor shall verify and be responsible for all dimensions.

DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

The Copyrights to all designs and drawings are the property of

Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

Copyright Reserved

Client/Project

Drawing No.

Project No.

Title

ORIGINAL SHEET - ANSI D (22"x34")

Permit-Seal

Issued

Revision

By Appd YYYY.MM.DD

Revision

By Appd YYYY.MM.DD

PRELIMINARY

NOT FOR CONSTRUCTION

Not for permits, pricing or other official purposes.

This document has not been completed or checked and is for general information or comment only.

Consultants

Legend

Notes www.stantec.com

/1

/2

:3

:3

P

M A u to d e sk D o c s:

W

V U

O

W P

D ry C o o le rs

R e p la c e /s tn m e c h

W

V U

O

W P

D ry C o o le rs

R e p la c e

.r v t

Dry Coolers Replacement Project

WVU One Waterfront Place

MECHANICAL CONTROLS

M801

218012186

1 Waterfront Place

Morgantown, WV 26501

SCHEMATIC DESIGN 2025.07.24

ISSUED FOR BID 2025.08.15

Stantec Architecture and Engineering LLC 101 East Diamond Street Suite 400 Butler, PA 16001-5975 Tel: (724) 285-4761 / Fax: (724) 285-6815

Not to Scale

GLYCOL PLANT

Not to Scale

CRAC SYSTEM MONITOR CONTROL DIAGRAM

HIGH ZONE TEMPERATURE X X

STATUS X X X

START/STOP X X X

ZONE TEMPERATURE X X X

AI DI AO DO AV DV SCHEDULE TREND ALARM

DESCRIPTION

HARDWARE POINTS SOFTWARE POINTS

GRAPHICS

ALTERNATE M1

Sheets
M001 - MECHANICAL COVER SHEET
M300 - EXTERIOR DRY COOLERS MECHANICAL PLAN
M600 - MECHANICAL GLYCOL PIPING DIAGRAM
M700 - MECHANICAL DETAILS, SCHEDULES, AND CONTROLS
M800 - MECHANICAL CONTROLS NETWORK DIAGRAM AND SYMBOL LEGEND
M801 - MECHANICAL CONTROLS