Attachment A - Bid Summary.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- One Waterfront Place Dry Coolers Replacement
- Solicitation number
- RFB202690000664
- Issued by
- Mingo County, West Virginia
About this file
This document is an Attachment A - Bid Summary Sheet for a solicitation (RFB202690000664) issued by a university, detailing a comprehensive construction or renovation project bid opportunity. The document provides a detailed breakdown of potential work across 33 MasterFormat (2018) divisions, ranging from general requirements to utilities, allowing bidders to provide proposed costs for labor and materials in each division. The bid summary enables contractors to itemize their pricing across various construction categories, with the university reserving the right to accept or reject any bids in its sole discretion.
The bid summary includes extensive labor rate tables for different worker classifications (supervisors, foremen, laborers) with rates for regular, non-regular, holiday, and Sunday hours. An equipment rental section allows contractors to list rental equipment and associated costs, and there is a provision for subcontractor markup. The related contract opportunity specifically involves replacing and commissioning outdoor dry coolers serving the glycol loop at One Waterfront Place in Morgantown, West Virginia. The document is structured to provide granular cost transparency and flexibility for bidders, with a total base bid to be calculated across the specified divisions and labor/material categories.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Bid Summary Sheet - RFB202690000664
Contractor Date
Solicitation Name and Number
The University will utilize this Bid Summary Sheet for the solicitaitons. Bids will be evaluated for the lowest responsive and responsible Bidder at which point an award may be issued. Bidders are to complete the Bid Summary Sheet, either providing a cost for the work or specifying "NO BID". The University reserves the right to accept or reject any or all Bids and/or Alternates, in whole or in part, in its sole discretion.
Please provide a breakdown of the solicitation costs per MASTERFORMAT (2018); in the event a category does not contain costs, mark Zero ($0.00). The proposed costs per divisions utilized should total the TOTAL BASE BID. Included under these divisions are some of the items that make up costing per Masterformat 2018; place costs where most applicable.
Division Section Title Proposed Cost
| General Requirements | ||
| Division 1 | Summary, Admin Requirements, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements, Performance Requirements | Labor |
Materials
| Existing Conditions | ||
| Division 2 | Assessment; Subsurface Investigation; Site Remediation; Contaminated Site Material Removal; Water Remediation; Facility Remediation | Labor |
Materials
| Concrete | ||
| Division 3 | Maintenance of Concrete; Concrete Forming and Accessories; Concrete Reinforcing; Cast-in-Place Concrete; Precast; Cast Decks and Underlayment, Grouting; Mass Concrete | Labor |
Materials
| Masonry | ||
| Division 4 | Maintenance of Masonry and Stone Assemblies; Unit Masonry; Stone Assemblies; Stone Masonry; Refractory Masonry; Corrosion-Resistant Masonry; Manufactured Masonry | Labor |
Materials
| Metals | ||
| Division 5 | Maintenance of Metals; Structural Metal Framing; Metal Joists; Metal Decking; Cold-Formed Metal Framing; Metal Fabrications; Decorative Metal | Labor |
Materials
| Woods, Plastics, and Composites | ||
| Division 6 | Maintenance of Wood, Plastics, and Composites; Rough Carpentry; Finish Carpentry; Architectural Woodwork; Structural Plastics; Plastic Fabrications; Structural Composites; Composite Fabrications | Labor |
Materials
| Thermal and Moisture Protection | ||
| Division 7 | Maintenance of Roofing and Siding Panels; Dampproofing and Waterproofing; Thermal Protection; Steep Slope Roofing; Roofing and Siding Panels; Membrane Roofing; Flashing and Sheet Metal; Roof and Wall Specialties and Accessories; Fire and Smoke Protection; Joint Protection; | Labor |
Materials
| Openings | ||
| Division 8 | Operation and Maintenance of Doors and Frames; Doors and Frames; Specialty Doors and Frames; Entrances, Storefronts, and Curtain Walls; Windows; Roof Windows and Skylights; Hardware; Glazing; Louvers and Vents | Labor |
Materials
| Finishes | ||
| Division 9 | Maintenance of Finishes; Plaster and Gypsum Board; Tiling; Ceilings; Flooring; Wall Finishes; Acoustic Treatments; Paints and Coatings | Labor |
Materials
| Specialties | ||
| Division 10 | Operation and Maintenance of Specialties; Information Specialties; Fireplaces and Stoves; Safety Specialties; Storage Specialties; Exterior Specialties | Labor |
Materials
| Equipment | ||
| Division 11 | Operation and Maintenance of Equipment; Vehicle and Pedestrian Equipment; Commercial Equipment; Residential Equipment; Foodservice Equipment; Educational and Scientific Equipment; Entertainment and Recreation Equipment; Healthcare Equipment | Labor |
Materials
| Furnishings | ||
| Division 12 | Operation and Maintenance of Furnishings; Art; Window Treatments; Casework; Furnishings and Accessories; Furniture; Multiple Seating | Labor |
Materials
| Special Construction | ||
| Division 13 | Operation and Maintenance of Special Construction; Special Facility Components; Special Purpose Rooms; Special Structures; Special Instrumentation | Labor |
Materials
| Conveying Systems/Equipment | ||
| Division 14 | Operation and Maintenance of Conveying Systems/Equipment; Dumbwaiters; Elevators; Escalators and Moving Walks; Lifts; Turntables; Scaffolding | Labor |
Materials
| Fire Suppression | ||
| Division 21 | Operation and Maintenance of Fire Suppression; Water-Based Fire-Suppression Systems; Fire-Extinguishing Systems; Fire Pumps; Fire-Suppression Water Storage | Labor |
Materials
| Plumbing | ||
| Division 22 | Operation and Maintenance of Plumbing; Plumbing Piping; Plumbing Equipment; Plumbing Fixtures; Pool and Fountain Plumbing Systems; Gas and Vacuum Systems for Laboratory and Healthcare Facilities | Labor |
Materials
| Heating, Ventilating, and Air Conditioning | ||
| Division 23 | Operation and Maintenance of HVAC Systems; Facility Fuel Systems; HVAC Piping and Pumps; HVAC Air Distribution; HVAC Air Cleaning Devices; Central Heating Equipment; Central Cooling Equipment; Central HVAC Equipment; Decentralized HVAC Equipment | Labor |
Materials
| Integrated Automation Manufacturers | ||
| Division 25 | Common Work Results for Integrated Automation; Integrated Automation Network Equipment; Integrated Automation Instrumentation and Terminal Devices; Integrated Automation Facility Controls | Labor |
Materials
| Electrical | ||
| Division 26 | Operation and Maintenance of Electrical Systems; Medium-Voltage Electrical Distribution; Low-Voltage Electrical Transmission; Facility Electrical Power Generating and Storing Equipment; Electrical Protection; Lighting | Labor |
Materials
| Communications | ||
| Division 27 | Operation and Maintenance of Audio-Video Communications; Structured Cabling; Data Communications; Voice Communications; Audio-Video Communications; Distributed Communications and Monitoring Systems | Labor |
Materials
| Electronic Safety and Security | ||
| Division 28 | Operation and Maintenance of Access Control, Video Surveillance, Security Detection, Alarm, and Monitoring; Maintenance and Administration of Access Control; Video Surveillance, Fire Detection and Alarm; Access Control; Electronic Surveillance, Electronic Detection and Alarm; Electronic Monitoring and Control; Specialized Systems | Labor |
Materials
Electronic Safety and Security
| Earthwork | ||
| Division 31 | Maintenance of Earthwork; Site Clearing; Earth Moving; Shoring and Underpinning; Excavation Support and Protection; Special Foundations and Load-Bearing Elements; Tunneling and Mining | Labor |
Materials
| Exterior Improvements | ||
| Division 32 | Operation and Maintenance of Exterior Improvements; Bases, Ballasts, and Paving; Site Improvements; Irrigation; Planting | Labor |
Materials
| Utilities | ||
| Division 33 | Operation and Maintenance of Utilities; Water Utilities; Wells; Sanitary Sewerage; Stormwater Utilities; Fuel Distribution Utilities; Hydronic and Steam Energy Utilities | Labor |
Materials
| Miscellaneous | |
| Overhead and Profit, B&O Tax, etc. | $0.00 |
Total Base Bid: $0.00
Labor Rates
Instructions/Notes: Values entered into this form will provide backup documentation for the purchase order to determine adjustment(s) to the work. Type (or write) over gray text to place adequate description of item. In the event a rate/position is not required, either leave "Rate per Hour" space blank, put a "zero" (0), or delete the text. If other rates are required not captured below, please place them in the table.
| Line No. | Description | UOM | Rate per Hour |
| 1 | Supervisor, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 2 | Supervisor, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 3 | Supervisor, Holidays and Sundays (inclusive of all burden, per individual) | Hour | |
| 4 | Foreman, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 5 | Foreman, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 6 | Foreman, Holidays and Sundays (inclusive of all burden, per individual) | Hour | |
| 7 | Laborer, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 8 | Laborer, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 9 | Laborer, Holidays and Sundays (inclusive of all burden, per individual) | Hour | |
| 10 | Laborer 2, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 11 | Laborer 2, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 12 | Laborer 2, Holidays and Sundays (inclusive of all burden, per individual) | Hour | |
| 13 | Laborer 3, Regular Hours (inclusive of all burden, per individual) | Hour | |
| 14 | Laborer 3, Non-Regular Hours (inclusive of all burden, per individual) | Hour | |
| 15 | Laborer 3, Holidays and Sundays (inclusive of all burden, per individual) | Hour |
Equipment Rental
Instructions/Notes: List all that apply; if owned, leave blank. Costs are to include full burden rental costs (operator, machine, any other applicable costs). Unit of Measure (UOM) is to be completed per Contractor, based on rental rates (hours, days, weeks, months, etc.).
| Line No. | Description | UOM | Rate per Hour |
| 1 | Equipment | ||
| 2 | Equipment | ||
| 3 | Equipment |
Subcontractors
Provide percent markup of subcontractor(s) for this project. If work is all self-performed, leave the space blank or put a zero cost ($0.00). 0%
Signatory Date