Attachment A - Bid Summary.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
One Waterfront Place Dry Coolers Replacement
Solicitation number
RFB202690000664
Issued by
Mingo County, West Virginia

About this file

This document is an Attachment A - Bid Summary Sheet for a solicitation (RFB202690000664) issued by a university, detailing a comprehensive construction or renovation project bid opportunity. The document provides a detailed breakdown of potential work across 33 MasterFormat (2018) divisions, ranging from general requirements to utilities, allowing bidders to provide proposed costs for labor and materials in each division. The bid summary enables contractors to itemize their pricing across various construction categories, with the university reserving the right to accept or reject any bids in its sole discretion.

The bid summary includes extensive labor rate tables for different worker classifications (supervisors, foremen, laborers) with rates for regular, non-regular, holiday, and Sunday hours. An equipment rental section allows contractors to list rental equipment and associated costs, and there is a provision for subcontractor markup. The related contract opportunity specifically involves replacing and commissioning outdoor dry coolers serving the glycol loop at One Waterfront Place in Morgantown, West Virginia. The document is structured to provide granular cost transparency and flexibility for bidders, with a total base bid to be calculated across the specified divisions and labor/material categories.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Summary Sheet - RFB202690000664

Contractor Date

Solicitation Name and Number

The University will utilize this Bid Summary Sheet for the solicitaitons. Bids will be evaluated for the lowest responsive and responsible Bidder at which point an award may be issued. Bidders are to complete the Bid Summary Sheet, either providing a cost for the work or specifying "NO BID". The University reserves the right to accept or reject any or all Bids and/or Alternates, in whole or in part, in its sole discretion.

Please provide a breakdown of the solicitation costs per MASTERFORMAT (2018); in the event a category does not contain costs, mark Zero ($0.00). The proposed costs per divisions utilized should total the TOTAL BASE BID. Included under these divisions are some of the items that make up costing per Masterformat 2018; place costs where most applicable.

Division Section Title Proposed Cost

General Requirements
Division 1Summary, Admin Requirements, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements, Performance RequirementsLabor

Materials

Existing Conditions
Division 2Assessment; Subsurface Investigation; Site Remediation; Contaminated Site Material Removal; Water Remediation; Facility RemediationLabor

Materials

Concrete
Division 3Maintenance of Concrete; Concrete Forming and Accessories; Concrete Reinforcing; Cast-in-Place Concrete; Precast; Cast Decks and Underlayment, Grouting; Mass ConcreteLabor

Materials

Masonry
Division 4Maintenance of Masonry and Stone Assemblies; Unit Masonry; Stone Assemblies; Stone Masonry; Refractory Masonry; Corrosion-Resistant Masonry; Manufactured MasonryLabor

Materials

Metals
Division 5Maintenance of Metals; Structural Metal Framing; Metal Joists; Metal Decking; Cold-Formed Metal Framing; Metal Fabrications; Decorative MetalLabor

Materials

Woods, Plastics, and Composites
Division 6Maintenance of Wood, Plastics, and Composites; Rough Carpentry; Finish Carpentry; Architectural Woodwork; Structural Plastics; Plastic Fabrications; Structural Composites; Composite FabricationsLabor

Materials

Thermal and Moisture Protection
Division 7Maintenance of Roofing and Siding Panels; Dampproofing and Waterproofing; Thermal Protection; Steep Slope Roofing; Roofing and Siding Panels; Membrane Roofing; Flashing and Sheet Metal; Roof and Wall Specialties and Accessories; Fire and Smoke Protection; Joint Protection;Labor

Materials

Openings
Division 8Operation and Maintenance of Doors and Frames; Doors and Frames; Specialty Doors and Frames; Entrances, Storefronts, and Curtain Walls; Windows; Roof Windows and Skylights; Hardware; Glazing; Louvers and VentsLabor

Materials

Finishes
Division 9Maintenance of Finishes; Plaster and Gypsum Board; Tiling; Ceilings; Flooring; Wall Finishes; Acoustic Treatments; Paints and CoatingsLabor

Materials

Specialties
Division 10Operation and Maintenance of Specialties; Information Specialties; Fireplaces and Stoves; Safety Specialties; Storage Specialties; Exterior SpecialtiesLabor

Materials

Equipment
Division 11Operation and Maintenance of Equipment; Vehicle and Pedestrian Equipment; Commercial Equipment; Residential Equipment; Foodservice Equipment; Educational and Scientific Equipment; Entertainment and Recreation Equipment; Healthcare EquipmentLabor

Materials

Furnishings
Division 12Operation and Maintenance of Furnishings; Art; Window Treatments; Casework; Furnishings and Accessories; Furniture; Multiple SeatingLabor

Materials

Special Construction
Division 13Operation and Maintenance of Special Construction; Special Facility Components; Special Purpose Rooms; Special Structures; Special InstrumentationLabor

Materials

Conveying Systems/Equipment
Division 14Operation and Maintenance of Conveying Systems/Equipment; Dumbwaiters; Elevators; Escalators and Moving Walks; Lifts; Turntables; ScaffoldingLabor

Materials

Fire Suppression
Division 21Operation and Maintenance of Fire Suppression; Water-Based Fire-Suppression Systems; Fire-Extinguishing Systems; Fire Pumps; Fire-Suppression Water StorageLabor

Materials

Plumbing
Division 22Operation and Maintenance of Plumbing; Plumbing Piping; Plumbing Equipment; Plumbing Fixtures; Pool and Fountain Plumbing Systems; Gas and Vacuum Systems for Laboratory and Healthcare FacilitiesLabor

Materials

Heating, Ventilating, and Air Conditioning
Division 23Operation and Maintenance of HVAC Systems; Facility Fuel Systems; HVAC Piping and Pumps; HVAC Air Distribution; HVAC Air Cleaning Devices; Central Heating Equipment; Central Cooling Equipment; Central HVAC Equipment; Decentralized HVAC EquipmentLabor

Materials

Integrated Automation Manufacturers
Division 25Common Work Results for Integrated Automation; Integrated Automation Network Equipment; Integrated Automation Instrumentation and Terminal Devices; Integrated Automation Facility ControlsLabor

Materials

Electrical
Division 26Operation and Maintenance of Electrical Systems; Medium-Voltage Electrical Distribution; Low-Voltage Electrical Transmission; Facility Electrical Power Generating and Storing Equipment; Electrical Protection; LightingLabor

Materials

Communications
Division 27Operation and Maintenance of Audio-Video Communications; Structured Cabling; Data Communications; Voice Communications; Audio-Video Communications; Distributed Communications and Monitoring SystemsLabor

Materials

Electronic Safety and Security
Division 28Operation and Maintenance of Access Control, Video Surveillance, Security Detection, Alarm, and Monitoring; Maintenance and Administration of Access Control; Video Surveillance, Fire Detection and Alarm; Access Control; Electronic Surveillance, Electronic Detection and Alarm; Electronic Monitoring and Control; Specialized SystemsLabor

Materials

Electronic Safety and Security

Earthwork
Division 31Maintenance of Earthwork; Site Clearing; Earth Moving; Shoring and Underpinning; Excavation Support and Protection; Special Foundations and Load-Bearing Elements; Tunneling and MiningLabor

Materials

Exterior Improvements
Division 32Operation and Maintenance of Exterior Improvements; Bases, Ballasts, and Paving; Site Improvements; Irrigation; PlantingLabor

Materials

Utilities
Division 33Operation and Maintenance of Utilities; Water Utilities; Wells; Sanitary Sewerage; Stormwater Utilities; Fuel Distribution Utilities; Hydronic and Steam Energy UtilitiesLabor

Materials

Miscellaneous
Overhead and Profit, B&O Tax, etc.$0.00

Total Base Bid: $0.00

Labor Rates

Instructions/Notes: Values entered into this form will provide backup documentation for the purchase order to determine adjustment(s) to the work. Type (or write) over gray text to place adequate description of item. In the event a rate/position is not required, either leave "Rate per Hour" space blank, put a "zero" (0), or delete the text. If other rates are required not captured below, please place them in the table.

Line No.DescriptionUOMRate per Hour
1Supervisor, Regular Hours (inclusive of all burden, per individual)Hour
2Supervisor, Non-Regular Hours (inclusive of all burden, per individual)Hour
3Supervisor, Holidays and Sundays (inclusive of all burden, per individual)Hour
4Foreman, Regular Hours (inclusive of all burden, per individual)Hour
5Foreman, Non-Regular Hours (inclusive of all burden, per individual)Hour
6Foreman, Holidays and Sundays (inclusive of all burden, per individual)Hour
7Laborer, Regular Hours (inclusive of all burden, per individual)Hour
8Laborer, Non-Regular Hours (inclusive of all burden, per individual)Hour
9Laborer, Holidays and Sundays (inclusive of all burden, per individual)Hour
10Laborer 2, Regular Hours (inclusive of all burden, per individual)Hour
11Laborer 2, Non-Regular Hours (inclusive of all burden, per individual)Hour
12Laborer 2, Holidays and Sundays (inclusive of all burden, per individual)Hour
13Laborer 3, Regular Hours (inclusive of all burden, per individual)Hour
14Laborer 3, Non-Regular Hours (inclusive of all burden, per individual)Hour
15Laborer 3, Holidays and Sundays (inclusive of all burden, per individual)Hour

Equipment Rental

Instructions/Notes: List all that apply; if owned, leave blank. Costs are to include full burden rental costs (operator, machine, any other applicable costs). Unit of Measure (UOM) is to be completed per Contractor, based on rental rates (hours, days, weeks, months, etc.).

Line No.DescriptionUOMRate per Hour
1Equipment
2Equipment
3Equipment

Subcontractors

Provide percent markup of subcontractor(s) for this project. If work is all self-performed, leave the space blank or put a zero cost ($0.00). 0%

Signatory Date

Printed Name Title

&"Times New Roman,Regular"&12Attachment A

&"Times New Roman,Regular"Divisions Form, V1.2

Sheet2

File details come from the government source that posted it. Updated .