Attachment F_Itemized Schedule of Values Cost Breakdown.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Z1DA--652-24-108 Replace Roofs and Flashing Federal contract opportunity
Solicitation number
36C24624R0064
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document appears to be an Itemized Schedule of Values Cost Breakdown for a federal contract opportunity. It provides a detailed cost breakdown for the base offer and an alternative offer for the project titled "Construct Additional Parking Lot" with a project number of 590-20-103. The project is located at 100 Emancipation Drive, Hampton, VA 23667.

The cost breakdown is organized by construction divisions, with separate columns for labor cost, material cost, and total cost for each division. The document also includes sections for overhead percentage, profit percentage, and bond percentage to be applied to the total costs. The total base offer cost and total alternative 1 offer cost are provided at the bottom of the respective sections.

The related federal contract opportunity is solicitation number 36C24624R0064 for the project titled "Z1DA--652-24-108 Replace Roofs and Flashing", issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--652-24-108 Replace Roofs and Flashing, newest first.
File Type Posted
36C24624R0064 0004.docx DOCX document
S02_Solicitation_36C24624R0064 0004.docx DOCX document
36C24624R0064 0003.docx DOCX document
Questions and Answers_2.pdf PDF
36C24624R0064 0002.docx DOCX document
Specification New Guardrail System_SECTION 05 52 13.pdf PDF
652-24-108 Combined Specifications_10Jun2024.pdf PDF
Questions and Answers_1.pdf PDF
Site Visit Attendance Log 06-07-2024.pdf PDF
36C24624R0064 0001.docx DOCX document
36C24624R0064.docx DOCX document
Attachment D_Contractor EMR Certification Form 2023.docx DOCX document
Attachment A_Wage Determination General Decision Number VA20240007 03292024.pdf PDF
Attachment E_652-24-108 Replace Roofs and Flashing CD_8Jun2023.pdf PDF
Attachment C_Past Performance Questionnaire Form.docx DOCX document
Attachment B_Relevant Corporate Experience Form.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number: 590-20-103 Edward L Roy: VA assigned project #

Date:
Project TitleConstruct Additional Parking Lot

Edward L Roy: VA assigned Project Title

Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Alternative 1

Alternative 1 Offer Cost Breakdown

Project Number: 590-20-103 Edward L Roy: VA assigned project #

Date:
Project TitleConstruct Additional Parking Lot

Edward L Roy: VA assigned Project Title

Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Alt. 1 Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .