This document is a set of drawings for the "Replace Roofs and Flashing" project at the VA Medical Center in Richmond, Virginia, Contract No. 652-24-108. The drawings provide detailed plans for the replacement of roofs and flashing on multiple buildings, including Buildings 500 and 509. The key details include:

The project scope requires the demolition and removal of existing roofing systems and insulation down to the concrete deck, replacement of roof drains and storm drain piping, installation of new vapor barrier, insulation, and multi-part modified SBS bitumen roofing system, new flashing and pitch pockets, new ballasted roof guardrail system, new walkway mats, and a new UL-certified lightning protection system. The contractor is required to field verify existing conditions and include all roof equipment and penetrations in the bid price. Specific requirements are provided for scaffolding, dumpsters, window protection, and use of only propane or electric equipment. The drawings provide detailed roof plans for the various building areas.

The related federal contract opportunity is Solicitation No. 36C24624R0064 for the "Replace Roofs and Flashing" project, issued by the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--652-24-108 Replace Roofs and Flashing, newest first.
File Type Posted
36C24624R0064 0004.docx DOCX document
S02_Solicitation_36C24624R0064 0004.docx DOCX document
36C24624R0064 0003.docx DOCX document
Specification New Guardrail System_SECTION 05 52 13.pdf PDF
Questions and Answers_2.pdf PDF
36C24624R0064 0002.docx DOCX document
Questions and Answers_1.pdf PDF
Site Visit Attendance Log 06-07-2024.pdf PDF
36C24624R0064 0001.docx DOCX document
652-24-108 Combined Specifications_10Jun2024.pdf PDF
Attachment F_Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
Attachment D_Contractor EMR Certification Form 2023.docx DOCX document
Attachment A_Wage Determination General Decision Number VA20240007 03292024.pdf PDF
36C24624R0064.docx DOCX document
Attachment C_Past Performance Questionnaire Form.docx DOCX document
Attachment B_Relevant Corporate Experience Form.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

652-24-108

03/17/2023

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 500, 509

Office of Construction and Facilities Management o n e e ig h th in ch o n e f o o t

B

A

C

D

E

F th re e in ch e s o n e f o o t 6 o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t 4 o n e q u a rt e r in ch o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

BID DOCUMENTS

FULLY SPRINKLERED

Department of Veterans Affairs

B

A

C

D

E

F

COVER SHEET

& DRAWING INDEX

GI001

DRTH

REPLACE ROOFS AND FLASHING

DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 652-24-108

RICHMOND VAMC

BUILDING 500

1201 BROAD ROCK BLVD

RICHMOND, VA

ACTUAL / PLAN

NORTH

DRAWING INDEX

DRAWING No.DRAWING TITLE

GI001 COVERSHEET AND DRAWING INDEX

A100 FIRST FLOOR ROOF PLAN - 1F AND 1D AREAS

A101 FIRST FLOOR ROOF PLAN - 1B AREA

A102 FIRST FLOOR ROOF PLAN - 1S AREA

A103 FIRST FLOOR ROOF PLAN - 1M, 1N, AND 1P AREAS

A104 FIRST FLOOR ROOF PLAN - 1V AREA

A105 FIRST FLOOR ROOF PLAN - 1Z AND 1Y AREAS

A200 SECOND FLOOR ROOF PLAN - 2R SAWTOOTH AND 2L AREAS

A300 THIRD FLOOR ROOF PLAN - 3A AREA

A400 FOURTH FLOOR ROOF PLAN - 4A AREA

A500 BUILDING 509 ROOF PLAN

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

BUILDING KEY PLAN

AutoCAD SHX Text

PROJECT LOCATION

BUILDING 500

652-24-108

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

1F AND 1D AREAS

FIRST FLOOR ROOF PLAN

A100

SECOND FLOOR

SECOND FLOOR

SECOND FLOOR

N O

T

IN

C O

N

TR

AC

T

SECOND FLOOR

NOT IN CONTRACT

Scale: 1/16"=1'-0"

KEY MAP

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

18. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

19. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SPECIFIC NOTES

A. EXISTING AIR HANDLER UNIT ON ROOF WITH ASSOCIATED DUCTWORK. REPLACE FLASHING AROUND ROOF CURB AND ALL

DUCTWORK SUPPORT POSTS. REPLACE ANY OTHER ASSOCIATED FLASHING AND PITCH POCKETS.

B. EXISTING ROOFTOP UNIT. REPLACE FLASHING AROUND ROOF CURB. REPLACE ALL FLASHING/PITCH POCKETS AS NECESSARY C. EXISTING ROOFTOP CONDENSING UNITS. REPLACE ALL CURB FLASHINGS, AND FLASHING/PITCH POCKETS AT ROOF

PENETRATIONS.

D. HVAC AIR INTAKE/EXHAUST COVERS. REPLACE ALL CURB FLASHING FOR THESE COVERS.

E. NEW BALLASTED ROOF SAFETY GUARDRAILS

SYMBOLS

RD - EXISTING ROOF DRAIN

RECOMMENDED ROOF

ACCES AREA

AIR INTAKE

AIR EXHAUST

AIR INTAKE

AI

R

IN

TA

KE

ROOF AREA 1D

ROOF AREA 1F

A

B

C

C

D

D

D

D

RD

RD

RD

RD RD

RDRD

RDRD

RD RD

RD RD

RD RD

RECOMMENDED ROOF

ACCES AREA

RD

E

E

E

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

REF

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

1B AREA

FIRST FLOOR ROOF PLAN

A101

SECOND FLOOR

SECOND FLOOR

SECOND FLOOR

NOT IN CONTRACT

SECOND FLOOR

KEY MAP

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

18. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SYMBOLS

RD - EXISTING ROOF DRAIN

Scale: 1/16"=1'-0"

RECOMMENDED ROOF

ACCESS AREA

RDRD

RDRD

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

1M, 1N AND 1P AREAS

FIRST FLOOR ROOF PLAN

A102

SECOND FLOOR

NOT IN

CONTRACT

NOT IN CONTRACT

AIR INTAKE

AIR EXHAUST

N.I.C

AI

R

E

XH

AU

ST

AI

R

IN

TA

KE

A

B

C

D

D

B

RECOMMENDED ROOF

ACCESS AREA

RECOMMENDED ROOF

ACCESS AREA

D D F

C

E

Scale: 1/16"=1'-0"

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. EXISTING ROOF GUARD RAILS IN 1P AREA TO REMAIN IN PLACE.

11. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

12. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

13. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

14. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

15. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

16. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

17. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM ON 1M AND 1N ROOF AREAS IN ACCORDANCE WITH THE SPECIFICATIONS.

THE BALLASTED GUARDRAIL SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

18. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

19. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

20. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SPECIFIC NOTES

A. EXISTING EXHAUST VENTILATOR. REPLACE CURB FLASHING.

B. EXISTING ROOF RAILING. REPLACE FLASHING AT BASE OF POSTS.

C. EXISTING EXHAUST FANS. REPLACE CURB FLASHING.

D. INTAKE/EXHAUST HOODS. REPLACE CURB FLASHING AT ALL HOODS.

E. REFRIGERATION EQUIPMENT. REPLACE CURB FLASHING AND PITCHPOCKETS FOR ROOF PENETRATIONS.

F. EXISTING BALLASTED ROOF ANTENNA. RELOCATE ANTENNA AS NEEDED TO INSTALL ROOF. THE CONTRACTOR SHALL MOVE

THE ANTENNA IN SUCH A WAY TO MAINTAIN SATELLITE CONNECTIVITY AT ALL TIMES.

SYMBOLS

RD - EXISTING ROOF DRAIN

FDC - ROOF TOP FIRE DEPT. CONNECTION

NIC - NOT IN CONTRACT

RDRD

RD RDRD

RDRD

RD

RD

RDRD

RDRD

RD

RD

RDRD

RD RD

RD

RD

1M AREA 1N AREA

1P AREA

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Office of Construction and Facilities Management

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

1V AREA

FIRST FLOOR ROOF PLAN

A103

SECOND FLOOR

SECOND FLOOR

NOT IN CONTRACT

SECOND FLOOR

N.I.C

AIR INTAKE

AIR EXHAUST

RECOMMENDED ROOF

ACCESS AREA

A

B

B

1V AREA

Scale: 1/16"=1'-0"

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

18. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

19. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SPECIFIC NOTES

A. EXISTING REFRIGERATION EQUIPMENT. REPLACE ALL FLASHING AND/OR PITCH POCKETS FOR THIS ROOF MOUNTED

EQUIPMENT.

B. EXISTING INTAKE/EXHAUST HOODS. REPLACE ALL CURB FLASHING FOR THE INTAKE AND EXHAUST HOODS.

SYMBOLS

RD - EXISTING ROOF DRAIN

FDC - ROOF TOP FIRE DEPT. CONNECTION

NIC - NOT IN CONTRACT

RD RD

RD

RD

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

1Z AND 1Y AREAS

FIRST FLOOR ROOF PLAN

A104

Scale: 1/16"=1'-0"

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

18. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

19. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SPECIFIC NOTES

A. EXISTING CONDENSING UNITS. REPLACE ALL FLASHING AND/OR PITCH POCKETS FOR THIS ROOF MOUNTED EQUIPMENT.

B. EXISTING INTAKE/EXHAUST HOODS. REPLACE ALL CURB FLASHING FOR THE INTAKE AND EXHAUST HOODS.

C. EXISTING EXHAUST FANS. REPLACE ALL CURB FLASHING AND ANY PITCH POCKETS AS NECESSARY.

D. INSTALL NEW BALLASTED GUARDRAILS IN THE LOCATION INDICATED FOR THIS ROOF. NEW GUARDRAILS ARE TO BE INSTALLED

ON THE EXISTING UNMODIFIED ROOF AS WELL AS THE ROOF THAT WAS REPLACED.

E. DO NOT INSTALL GUARDRAILS OVER MRI SUITES. INSTALL GUARDRAILS IN THE LOCATIONS INDICATED.

SYMBOLS

RD - EXISTING ROOF DRAIN

FDC - ROOF TOP FIRE DEPT. CONNECTION

NIC - NOT IN CONTRACT

RDRD

RD

RD

RD

RD

RD RD

A

A

A

A

A

A

B

B

C

B

B

C

1Y ROOF AREA

E

D1Z ROOF AREA

ROOF ACCESS

LOCATION

ROOF

ACCESS

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

2L AREA

SECOND FLOOR ROOF PLAN

A200

NOT IN CONTRACT

NIC

ROOF BELOW

RECOMMENDED ROOF

ACCESS LOCATION

(2L ROOF)

AIR INTAKE

AIR EXHAUST

THIRD FLOOR

Scale: 1/16"=1'-0"

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF (2L ROOF ONLY). AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

18. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

19. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SPECIFIC NOTES

A. EXISTING ROOFTOP CONDENSING UNITS. REPLACE ALL CURB FLASHINGS, AND FLASHING/PITCH POCKETS AT ROOF

PENETRATIONS.

B. HVAC AIR INTAKE/EXHAUST COVERS. REPLACE ALL CURB FLASHING FOR THESE COVERS.

SYMBOLS

RD - EXISTING ROOF DRAIN

NIC - NOT IN CONTRACT

A

B

B

RDRD

RD RD

RD

RD

RDRDRDRDRD

RD

RD

RD

RD RD RD RD RD RD RD RD RD RD RD RD RD RD RD

2L ROOF AREA

NOT IN CONTRACT

OPEN TO GROUND

LEVEL

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

3A AREA

THIRD FLOOR ROOF PLAN

A300

LOWER ROOF

(NIC)

FOURTH FLOOR

NOT IN CONTRACT

NOT IN CONTRACT

Scale: 1" = 20'

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

18. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

19. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

SYMBOLS

RD - EXISTING ROOF DRAIN

NIC - NOT IN CONTRACT

3A ROOF AREA

RDRD

RD RD

RECOMMENDED ROOF

ACCESS LOCATION

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

4A AREAS

FOURTH FLOOR ROOF PLAN

LOWER ROOF

(NIC)

RECOMMENDED

LAYDOWN AREA

FIFTH FLOOR

Scale: 1"= 20'

A400

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

3. CRANE PICKS TO MOVE EQUIPMENT AND MATERIALS MUST BE SCHEDULED 14 DAYS IN ADVANCE AND MUST OCCUR AFTER

NORMAL OPERATING HOURS OR ON WEEKENDS.

4. LOCATE SCAFFOLDING AND DEMOLITION DUMPSTERS AT RECOMMENDED LOCATIONS INDICATED. ALTERNATE LOCATIONS FOR ACCESSING THE ROOM MAY BE SUGGESTED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE GOVERNMENT FOR APPROVAL. USE COVERED DUMPSTERS AND WATER MISTING TO MINIMIZE DUST GENERATION FROM WASTE HANDLING.

SCAFFOLDING SHALL BE INSPECTED DAILY, PRIOR TO USE, AND DOCUMENTED ON INSPECTION TAG AND NOTED IN DAILY LOG.

5. IF A LOWER ROOF IS USED AS ACCESS TO A HIGHER ROOF, THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE LOWER ROOF AND REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR. THE WARRANTY OF THE LOWER ROOF SHALL BE MAINTAINED

DURING ALL WORK.

6. THE CONTRACTOR SHALL PROVIDE WINDOW PROTECTION AT SITES WHERE SCAFFOLDING AND DUMPSTERS ARE ADJACENT TO

WINDOWS. WINDOWS SHALL BE PROTECTED AT THESE LOCATIONS WITH MINIMUM 3

4" PLYWOOD COVERING THE WINDOWS FOR

THE DURATION OF THE ROOFING WORK.

7. GASOLINE OR DIESEL POWERED EQUIPMENT USED FOR DEMOLITION OR INSTALLATION IS SPECIFICALLY PROHIBITED. ONLY

PROPANE POWERED OR ELECTRIC POWERED EQUIPMENT IS ALLOWED TO BE USED ON THE ROOF.

8. WRAP AIR INTAKES WITH MERV 7 FILTER FABRIC PRIOR TO THE START OF DEMOLITION. MAINTAIN FILTER FABRIC DURING THE

ENTIRE REPLACEMENT PROCESS.

9. DEMOLISH EXISTING LIGHTNING PROTECTIONS SYSTEM, LEAVING GROUNDING POINTS INTACT FOR REUSE.

10. REMOVE AND DISPOSE OF AGGREGATE BALLAST.

11. REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM AND INSULATION DOWN TO THE CONCRETE DECK.

12. REMOVE AND REPLACE ALL ROOF DRAINS AND ASSOCIATED STORM DRAIN PIPING TO A MINIMUM OF 4' BELOW THE ROOF DECK

OR UP TO AND INCLUDING THE NEAREST FITTING (Y,EL, ETC.).

13. PREPARE ALL ROOF DECK PENETRATIONS AND ROOF MOUNTED EQUIPMENT TO RECEIVE NEW FLASHING, PITCH POCKETS, ETC.

EQUIPMENT BEING SUPPORTED BY THE ORIGINAL ROOFING/INSULATION SYSTEM SHALL BE PROVIDED WITH NEW BLOCKING (INCOMPRESSIBLE INSULATION, STEEL OR FIRE TREATED WOOD) TO MAINTAIN THE EQUIPMENT AT ORIGINAL ELEVATION ON THE ROOF. NEW BLOCKING WILL BE FLASHED TO MAINTAIN THE INTEGRITY OF THE NEW ROOFING SYSTEM.

14. INSTALL NEW VAPOR BARRIER, PROFILED INSULATION, AND MULTI-PART MODIFIED SBS BITUMEN ROOFING SYSTEM IN

ACCORDANCE WITH THE SPECIFICATIONS.

15. INSTALL NEW FLASHING AND/OR PITCH POCKETS FOR ALL PENETRATIONS FOR ROOF MOUNTED EQUIPMENT.

16. INSTALL NEW BALLASTED ROOF GUARDRAIL SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. THE BALLASTED GUARDRAIL

SHALL BE LOCATED 3' FROM THE EDGE OF THE ROOF. AT LOCATIONS WHERE THE GUARDRAIL SYSTEM TERMINATES AT A VERTICAL WALL, THE END OF THE GUARDRAIL SYSTEM WILL BE FIXED TO THE VERTICAL WALL.

17. INSTALL NEW WALKWAY MATS IN SIZE AND CONFIGURATION AS SHOWN ON DRAWINGS.

18. INSTALL NEW UL MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM. THE DESIGN AND CONFIGURATION OF THE LIGHTNING

PROTECTION SYSTEM IS DELEGATED TO THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE CONFIGURATION OF THE LIGHTNING PROTECTION SYSTEM TO THE VA FOR APPROVAL PRIOR TO INSTALLATION.

19. AT THE COMPLETION OF A ROOFING AREA, THE CONTRACTOR IS RESPONSIBLE FOR CLEANING THE AREA AROUND JOBSITE OF ANY BLOWN OR DROPPED DEBRIS THAT HAS FALLEN ON THE GROUND OR ON ANY LOWER LEVEL ROOFS.

PROJECT SPECIFIC NOTES

A. EXISTING EXHAUST FAN. REPLACE CURB FLASHING AROUND ROOF CURB.

B. EXISTING RADIO ANTENNA. RELOCATED ANTENNA TO COMPLETE ROOF REPLACEMENT WORK. CARE SHOULD BE EXERCISED

TO NOT INTERRUPT SATELLITE CONNECTIVITY.

SYMBOLS

RD - EXISTING ROOF DRAIN

NIC - NOT IN CONTRACT

RDRD

RDRD

4A ROOF AREA

LOWER ROOF

(3A)

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE ROOFS AND

FLASHING

VAMC RICHMOND, VA

03-09-2023

BUILDING 509

ROOF PLAN

Scale: 1/4"=1'-0"

A500

GENERAL NOTES

1. NOT ALL ROOF EQUIPMENT OR PENETRATIONS ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ROOF CONDITIONS AND INCLUDE ALL ROOF EQUIPMENT AND/OR PENETRATIONS IN THE BID PRICE.

2. INSPECT FALL PROTECTION ANCHOR POINTS. ANY ANCHOR POINTS THAT DO NOT PASS INSPECTION SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR POSSIBLE REPLACEMENT. ALL PERSONNEL MUST USE FALL PROTECTION WHEN WORKING ON THE ROOF WITH AN UNPROTECTED EDGE. EDGE PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH OSHA §1926.501(b)(10), EXCEPT THAT A WARNING LINE WITH SAFETY MONITORING SYSTEM OR A SAFETY MONITORING SYSTEM ONLY

IS EXPRESSLY PROHIBITED.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .