ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf
PDF 67 KB Posted
- Solicitation number
- 012-3044004-EB
- Issued by
- Orange County, San Francisco City, California
About this file
This is a Guarantee for Irrigation System document issued by the County of Orange, California, for the Mile Square Regional Park Phase 1 Irrigation Controller Upgrade project. The guarantee covers the procurement and installation of smart irrigation controllers and master valve/flow sensor equipment with professional services. The contractor warrants that all furnished and installed equipment is free from defects in materials and workmanship and that work has been completed in accordance with project drawings and specifications. The guarantee period extends for one year from the date of acceptance, during which the contractor agrees to repair or replace any defects at no additional cost to the County. The contractor must complete all repairs or replacements within a reasonable timeframe as determined by the County following written notice of defects. Should the contractor fail to make timely repairs or replacements, the County is authorized to procure such services independently and charge all associated costs and expenses to the contractor.
The document serves as a contractual commitment mechanism ensuring quality assurance and contractor accountability throughout the one-year warranty period following project acceptance. The guarantee specifically applies to the irrigation controller upgrade at Mile Square Regional Park and requires the contractor's signature, title, address, phone number, and the date of acceptance. This guarantee aligns with the broader IFB #012-3044004-EB solicitation requirements, which mandate eight HydroPoint WeatherTRAK OptiFlow XR smart irrigation controllers with ten-year warranty coverage and service plans, establishing a comprehensive quality assurance framework that extends beyond the standard one-year guarantee period outlined in this attachment.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F: GUARANTEE FOR IRRIGATION SYSTEM
We hereby guarantee that the irrigation controller upgrade we have furnished and installed is free from defects in materials and workmanship, and the work has been completed in accordance with the Drawings and Specifications, ordinary wear and tear, unusual abuse, or neglect excepted. We agree to repair or replace any defects in material or workmanship which may develop during the period of one (1) year from date of acceptance and to repair or replace any damage resulting from the repairing or replacing of such defects at no additional costs to the County. We shall make such repairs or replacements within a reasonable time, as determined by the County, after receipt of written notice. In the event of our failure to make such repairs or replacements within a reasonable time after receipt of written notice from the County, we authorize the County to proceed to have said repairs or replacements made at our expense and we will pay the costs and charges therefore upon demand.
PROJECT NAME: Mile Square Reginal Park – Phase 1 Irrigation Controller Upgrade
PROJECT LOCATION: Mile Square Reginal Park
SIGNATURE:
SIGNED BY:
TITLE:
CONTRACTOR’S ADDRESS:
CONTRACTOR’S PHONE NO:
DATE OF ACCEPTANCE:
File details come from the government source that posted it. Updated .