ATTACHMENT_F_-_GUARANTEE_FOR_IRRIGATION_SYSTEM.pdf
PDF 67 KB Posted
- Solicitation number
- 012-3044004-EB
- Issued by
- Orange County, San Francisco City, California
About this file
This is a guarantee document for an irrigation system upgrade project issued by the County of Orange, California, Community Resources division, in connection with a competitive bidding solicitation for Smart Irrigation Controllers and Master Valve/Flow Sensor with Professional Services. The document establishes the warranty terms for the irrigation controller upgrade to be furnished and installed at Mile Square Regional Park Phase 1. The guarantee covers defects in materials and workmanship for a period of one year from the date of acceptance, with the contractor obligated to repair or replace any defects at no additional cost to the County within a reasonable timeframe following written notice. The contractor must also repair any damage resulting from such corrective work.
The guarantee document includes provisions requiring the contractor to execute the document upon project acceptance, with signature fields for the contractor's authorized representative, title, address, phone number, and the date of acceptance. In the event the contractor fails to complete required repairs or replacements within a reasonable time period determined by the County, the County is authorized to perform the work at the contractor's expense, with costs due upon demand. This attachment forms part of the formal contract executed between the County and the awarded bidder for the irrigation system upgrade project.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F: GUARANTEE FOR IRRIGATION SYSTEM
We hereby guarantee that the irrigation controller upgrade we have furnished and installed is free from defects in materials and workmanship, and the work has been completed in accordance with the Drawings and Specifications, ordinary wear and tear, unusual abuse, or neglect excepted. We agree to repair or replace any defects in material or workmanship which may develop during the period of one (1) year from date of acceptance and to repair or replace any damage resulting from the repairing or replacing of such defects at no additional costs to the County. We shall make such repairs or replacements within a reasonable time, as determined by the County, after receipt of written notice. In the event of our failure to make such repairs or replacements within a reasonable time after receipt of written notice from the County, we authorize the County to proceed to have said repairs or replacements made at our expense and we will pay the costs and charges therefore upon demand.
PROJECT NAME: Mile Square Reginal Park – Phase 1 Irrigation Controller Upgrade
PROJECT LOCATION: Mile Square Reginal Park
SIGNATURE:
SIGNED BY:
TITLE:
CONTRACTOR’S ADDRESS:
CONTRACTOR’S PHONE NO:
DATE OF ACCEPTANCE:
File details come from the government source that posted it. Updated .