Attachment F - dwg11of24.pdf
PDF 785 KB Posted
- Solicitation number
- N6247023R0009
About this file
This document contains construction drawings for an inbound baggage conveyor, outbound baggage conveyor, and cargo conveyor system at a Joint Mobility Processing Center. The drawings depict the layout and dimensions of the conveyor systems, including baggage claim and build-up areas, x-ray equipment, control panels, safety features and maintenance pits. The related federal contract opportunity is solicitation number N6247023R0009 from the Department of the Navy Naval Facilities Engineering Command for work on the P903 Joint Mobility Processing Center at NSA Souda Bay, Greece. The solicitation seeks offers for the design and construction of the conveyor systems and other facilities shown in the drawings.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAGGAGE CLAIM
BAGGAGE
BREAKDOWN
BAGGAGE
BUILDUP
RAISED PLATFORM
(TYPICAL)
FACE PANELS
(TYPICAL)
ES
ES
ES
ES
ES ES
MOTOR CONTROL PANEL
& OPERATOR CONTROL PANEL
ES - EMERGENCY STOP
4' [1218]
44'-23 4"
[13479]
4' [1218]
40'-71 4"
[12374]
9'-71 4"
[2926]
MOTOR
LOCATION OCP
(PEDESTAL
MOUNTED)
POWER PANEL
(MP-1-3, REFERENCE ELECTRICAL
CONSTRUCTION DRAWINGS)
OCP
(PEDESTAL
MOUNTED)
AIR FORCE MATERIEL COMMAND
PLAN NORTH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
UNCLASSIFIED
CE
CH
CG
K
G
CA
CB
5 8 14
B C
KEYPLAN:
ΣΧΕ∆ΙΟ ΚΛΕΙ∆Ι:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
UNCLASSIFIED
MH101
IN
B
O U
N D
B
AG
G A
G E
C O
N
VE
YO
R
APPROVED BY: PAM COWDEN, P.E.
FEAD BRANCH HEAD
VIA SAT-TO FORM
BAGGAGE
BUILDUP
STAND-ALONE SCALE
(TYPICAL)
O C
P
OCP
O C
P O
C P
OPERATOR CONTROL
PANEL (TYPICAL)
MOTOR CONTROL PANEL
& OPERATOR CONTROL PANEL
23'-43 4"
[7129]
X-RAY
ASTROPHYSICS
XIS-100XDX
(NOT IN CONTRACT)
10'-31 2"
[3138]
10' [3048]
23'-93 4"
[7257]
POWER PANEL
(MP-2-1, REFERENCE ELECTRICAL
CONSTRUCTION DRAWINGS)
KEYPLAN:
ΣΧΕ∆ΙΟ ΚΛΕΙ∆Ι:
CA
CB
CE
CH
CG
K
G
5 8 14
B C
AIR FORCE MATERIEL COMMAND
PLAN NORTH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
UNCLASSIFIED
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
UNCLASSIFIED
MH102
O U
TB
O
U N
D B
A G
G
AG
E C
O N
VE
YO
R
APPROVED BY: PAM COWDEN, P.E.
CARGO BAY
FIXED PALLET
STOPS (TYPICAL)
SAFETY RAMPS
(TYPICAL)
BOLLARD
(TYPICAL)
CONVEYOR SUPPORT
SYSTEM
K-LOADER K-LOADER K-LOADER
CONVEYOR FORKTINE
DEFLECTORS
(TYPICAL)
STAIRWAY
(TYPICAL)
REMOVABLE PALLET
STOP RECEPTACLES
(TYPICAL)
12'-71 2"
[3846]
46'-61 4"
[14179]
22'-2" [6753]
18'-11" [5763]
FORKTINE FRAME
PROTECTORS
(TYPICAL)
LIFT PIT CENTERED ON
OVERHEAD DOOR
PALLET PIT
11'-11 2"
[3392]
11'-73 4"
[3548]
LIFT FORKTINE
DEFLECTORS
(TYPICAL)
MAINTENANCE PIT
53'-111 4"
[16440]
KEYPLAN:
ΣΧΕ∆ΙΟ ΚΛΕΙ∆Ι:
CA
CB
CE
CH
CG
K
G
5 8 14
B C
AIR FORCE MATERIEL COMMAND
PLAN NORTH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
UNCLASSIFIED
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
UNCLASSIFIED
MH103
C
AR
G O
C O
N
VE
YP
R
S Y
ST
EM
APPROVED BY: PAM COWDEN, P.E.
| MH101 - INBOUND BAGGAGE CONVEYOR |
| MH102 - OUTBOUND BAGGAGE CONVEYOR |
| MH103 - CARGO CONVEYPR SYSTEM |
File details come from the government source that posted it. Updated .