This solicitation is for design and construction services for the P903 Joint Mobility Processing Center at NSA Souda Bay, Greece. The Naval Facilities Engineering Command is seeking proposals for the project, which includes design refresh and construction of a new facility. Offerors must be able to provide architectural, mechanical, electrical, structural and civil engineering services. The closing date for proposals is listed as April 5, 2023. The specifications cover requirements for various construction materials and systems, including concrete, metals, thermal and moisture protection, openings, finishes, specialties, electrical power distribution and lighting.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Joint Mobility Processing
Facility P-903 Design Refresh
Issue for Bid and Construction
Specifications Volume 3
NSA Souda Bay, Greece
PREPARED FOR:
NAVFAC ATLANTIC
April 05, 2023
N6247018F4001
Photo: Courtesy of Jeremy Avnet (brainsik)
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Specifications
Desi gn Refres h Issue for Bid and Construction
(Sections 26 27 14.00 20 - 41 70 00)
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
STAMP PAGE - 1
NAVFAC ATLANTIC
WORK ORDER NO.1568016
Specifications Stamp Page
P-903 Joint Mobility Processing Facility
At the
Souda Bay, Crete Design Refresh Final (Signed and Sealed)
April 05, 2023
PREPARED BY:
CH2M
5701 Cleveland Street Virginia Beach, VA 23462
N6247017D5004, N6247018F4001
Architectural: Maureen Kussler, RA Mechanical: Drew Velleca, PE Civil:
Structural:
Landscape Arch
Irene Nath, PE Laura Presley, PE Linda Cyra-Korsgaard, RL
Electrical:
Fire Protection:
Mark Ossanna, PE Jeff McLaughlin, PE
April 4, 2023
P903 JOINT MOBILITY PROCESSING FACILITY 1568016
Design Refresh Issue for Bid and Construction 05 April 2023
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 73 04 08/08 SUPPLEMENTARY CONDITIONS FOR PROJECTS
IN MEDITERRANEAN AREA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REPORTING
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 08/11 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DI VI SI ON 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
VOLUME 1 of 3
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
06 61 16 08/20 SIMULATED STONE (SOLID QUARTZ)
FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 13 73 02/11 SLIDING METAL DOORS
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 32 13 08/20, CHG 1: 02/22 ALUMINUM SLIDING GLASS DOORS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 39 54 08/09 BLAST RESISTANT DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
PROJECT TABLE OF CONTENTS Page 2
VOLUME 2 of 3
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
DI VI SI ON 11 - EQUI PMENT
11 13 19.13 08/09, CHG 1: 05/19 LOADING DOCK LEVELERS
DI VI SI ON 12 - FURNI SHI NGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 21 26 02/16, CHG 1: 08/18 COLD-STORAGE ROOMS (PREFABRICATED
PANEL TYPE)
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00.00 20 02/21, CHG 1: 05/21 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 21 23 08/17 HYDRONIC PUMPS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
PROJECT TABLE OF CONTENTS Page 3
23 64 26 08/09, CHG 5: 11/19 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE AND LIFE SAFETY
TO INCLUDE FIRE ALARM REPORTING
SYSTEM, FIRE SUPPRESSION SYSTEM AND
FIRE PUMP CONTROL SYSTEM
25 05 11.23 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS BUILDING CONTROL
SYSTEMS TO INCLUDE HVAC, BUILDING
LIGHTING SYSTEM AND ELECTRICAL SYSTEM
- GENERATOR
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 11 16 11/21 SECONDARY UNIT SUBSTATIONS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 31 00 05/15 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 23 00.00 20 02/11 EXCAVATION AND FILL
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION
PROJECT TABLE OF CONTENTS Page 4
VOLUME 3 of 3
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 AGGREGATE BASE COURSE AND/OR GRADED
CRUSHED AGGREGATE BASE COURSE FOR
FLEXIBLE PAVING
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 14 13.13 11/19 INTERLOCKING PRECAST CONCRETE UNIT
PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 52 00 04/06 SYNTHETIC TURF
32 84 24 08/11 IRRIGATION SPRINKLER SYSTEMS
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP
(NON-HYDRANT)
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 56 10 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 70 00 03/23 COVER PURCHASE DESCRIPTION FOR A
CONVEYOR SYSTEM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
SECTION 26 27 14.00 20
ELECTRICITY METERING
02/ 21, CHG 1: 05/ 21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
HELLENIC ORGANIZATION FOR STANDARDIZATION (ELOT)
ELOT 60364 (2020) Requirement for electrical installations
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
IEEE C37.90.1 (2013) Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
IEEE C57.13 (2016) Standard Requirements for Instrument Transformers
1.2 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Drawings ; G
SD-03 Product Data
Electricity Meters ; G
The most recent meter product data must be submitted as a Technical Data Package and must be licensed to the project site.
Any software must be submitted on CD-ROM and three hard copies of the software user manual must be submitted for each piece of software provided.
Current Transformer ; G
Potential Transformer ; G
External Communications Devices; G
Configuration Software ; G
SECTION 26 27 14.00 20 Page 1
The most recent version of the configuration software for each type (manufacturer and model) must be submitted as a Technical Data Package and must be licensed to the project site. Software must be submitted on CD-ROM and three hard copies of the software user manual must be submitted for each piece of software provided.
SD-06 Test Reports
Acceptance Checks and Tests ; G
System Functional Verification ; G
Building Meter Installation Sheet, per Building ; G
Completed Meter Installation Schedule ; G
Completed Meter Data Schedule ; G
Meter Configuration Template ; G
Contractor must fill in the meter configuration template and submit to the Activity for concurrence.
Meter Configuration Report ; G
The meter configuration report must be submitted as a Technical Data Package.
SD-10 Operation and Maintenance Data
Electricity Meters and Accessories , Data Package 5; G
Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein.
SD-11 Closeout Submittals
System Functional Verification ; G
1.3 QUALITY ASSURANCE
1.3.1 Installation Drawings
Drawings must be provided in hard-copy and three electronic format, and must include but not be limited to the following:
a. Wiring diagrams with terminals identified of advanced meter, current transformers, potential transformers, protocol modules, communications interfaces, Ethernet connections, telephone lines.
For each typical meter installation, provide a diagram.
b. Three-line diagram, including meters, switch(es), current transformers, potential transformers, protocol modules, communications interfaces, Ethernet connections, telephone outlets, and fuses. For each typical meter installation, provide a diagram.
1.3.2 Standard Products
Provide materials and equipment that are products of manufacturers
SECTION 26 27 14.00 20 Page 2 regularly engaged in the production of such products which are of equal material, design and workmanship. Products must have been in satisfactory commercial or industrial use for one year prior to bid opening. The one-year period must include applications of equipment and materials under similar circumstances and of similar size. The product, or an earlier release of the product, must have been on sale on the commercial market through advertisements, manufacturers catalogs, or brochures during the prior one-year period. Where two or more items of the same class of equipment are required, these items must be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.3.3 Material and Equipment Manufacturing Data
Products manufactured more than 1 year prior to date of delivery to site must not be used, unless specified otherwise.
1.4 MAINTENANCE
1.4.1 Additions to Operation and Maintenance Data
In addition to requirements of Data Package 5, include the following on the actual electricity meters and accessories provided:
a. A condensed description of how the system operates
b. Block diagram indicating major assemblies
c. Troubleshooting information
d. Preventive maintenance
e. Prices for spare parts and supply list
1.5 WARRANTY
The equipment items and software must be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment and software on a regular and emergency basis during the warranty period of the contract.
1.6 SYSTEM DESCRIPTION
1.6.1 System Requirements
Electricity metering, consisting of meters and associated equipment, will be used to record the electricity consumption and other values as described in the requirements that follow and as shown on the drawings.
Communication system requirements are contained in a separate specification section as identified in paragraph COMMUNICATIONS INTERFACES.
1.6.2 Selection Criteria
Metering components and software are part of a system that includes the physical meter, data recorder function and communications method. Every building site identified must include sufficient metering components to measure the electrical parameters identified and to store and communicate the values as required.
SECTION 26 27 14.00 20 Page 3
Provide a self-contained electronic programmable power meters. The meter provided for Substation 11 shall be Schnieder Electric ION 8650. Provide Schnieder Electric ION 7650 for submetering .
Turn field programming device over to the Contracting Officer at completion of project. Coordinate meter to system requirements.
PART 2 PRODUCTS
2.1 ELECTRICITY METERS AND ACCESSORIES
Provide meter(s) and connect the meter(s) to the existing AMI DAS. The contractor must use the existing government laptop computers to configure the meter using existing software loaded on the computer. The contractor will not be allowed to modify any software or add any additional software to the computer. Alternatively, the government will configure the meter(s), which must be compatible with the existing system, using existing software. Contractor must insure that the meter(s) will transmit the specified data to the DAS. The current meters being used by the government are: ION 8650C.
2.1.1 Physical and Common Requirements
a. Provide metering system components in accordance with the Metering System Schedule shown in this specification. Provide Meter configuration template .
b. Meter for Substation 11 must have IP 54 minimum enclosure for surface mounting with bottom or rear penetrations.
c. Surge withstand capability must conform to IEEE C37.90.1 .
d. Use 4 sq. mm (XHHW, or equivalent) wiring with ring lugs for all meter connections. Color code and mark the conductors as follows:
(1) Red - Phase A CT - C1
(2) Orange - Phase B CT - C2
(3) Brown - Phase C CT - C3
(4) Gray with white stripe - neutral current return - C0
(5) Black - Phase A voltage - V1
(6) Yellow - Phase B voltage - V2
(7) Blue - Phase C voltage - V3
(8) White - Neutral voltage
2.1.2 Potential Transformer Requirements
a. Meter must be capable of connection to the service voltage phases and magnitude being monitored. If the meter is not rated for the service voltage, provide suitable potential transformers to send an acceptable voltage to the meter.
b. Voltage input must be optically isolated to 2500 volts DC from signal and communications outputs. Components must meet or exceed
IEEE C37.90.1 .
c. Provide a pull-out type fuse block containing one fuse per phase, Class RK type, to protect the voltage input to the meter. Size fuses as recommended by the meter manufacturer. Fusing must either be
SECTION 26 27 14.00 20 Page 4 inside the secondary compartment of the transformer or inside the same enclosure as the CT shorting device.
d. Potential transformers will be used to convert 400 volt inputs.
Potential transformers must be rated indoor or outdoor, as required for the specific application. Voltage rating must provide 120 volts, wye-connected, 3 phase, 4 wire, 50 Hz, insulation class, 600 volts.
Potential transformers BIL must be 10 kV and must have an accuracy class of 0.3 at burdens w, x, and y. Thermal rating must be 500 VA.
e. The Contractor must be responsible for determining the actual voltage ratio of each potential transformer for medium voltage applications.
Transformer must conform to IEEE C57.13 and the following requirements.
(1) Type: Dry type, of two-winding construction.
(2) Weather: Outdoor or indoor rated for the application.
(3) Frequency: Nominal 50 Hz.
(4) Accuracy: Plus or minus 0.3 percent at 50 Hz.
f. Potential transformers installed inside switchgear and panels must be rated for interior use. Voltage rating must provide 120 volts, wye-connected, 3 phase, 4 wire, 50 Hz, insulation class, 600 volts.
Potential transformers BIL must be a minimum of 10 kV, and have an insulation class and BIL rating that equals or exceeds the ratings of the associated switchgear. Potential transformers must have an accuracy class of 0.15 at burdens w, x, and y. Thermal rating must be 500 VA. Potential transformers must be accessed from the front and mounted in a metering section.
2.1.3 Current Transformer Requirements
a. Current transformer must be installed with a rating as shown.
b. Current transformers must have an Accuracy Class of 0.15 (with a maximum error of plus/minus 0.3 percent at 5.0 amperes) when operating within the specified rating factor.
c. Current transformers must be solid-core, bracket-mounted for new installations using ring-tongue lugs for electrical connections.
Current transformers must be accessible and the associated wiring must be installed in an organized and neat workmanship arrangement.
Current transformers that are retrofitted onto existing switchgear busbar can be a busbar split-core design.
d. Current transformers must have:
(1) Insulation Class: All 600 volt and below current transformers must be rated 10 KV BIL.
(2) Frequency: Nominal 50 Hz.
(3) Burden: Burden class must be selected for the load.
(4) Phase Angle Range: 0 to 60 degrees.
SECTION 26 27 14.00 20 Page 5
e. Meter must accept current input from standard instrument transformers (5A secondary current transformers).
f. Current inputs must have a continuous rating in accordance with
IEEE C57.13 .
2.2 COMMUNICATIONS INTERFACES
Meter must have two-way communication with the existing data acquisition system (DAS). Provide a communications interface utilizing both wireless and CAT 6 as shown.
Provide interfacing software if a meter is used that is different than the existing meters at the Activity to ensure compatibility within the metering system.
2.3 SPARE PARTS
Provide the following spare parts:
a. Communications interface - one for each type used.
PART 3 EXECUTION
3.1 INSTALLATION
Electrical installations must conform to IEEE C2 , ELOT 60364 (National Electrical Code), and to the requirements specified herein. Provide new equipment and materials unless indicated or specified otherwise.
3.1.1 Scheduling of Work and Outages
The Contract Clauses must govern regarding permission for power outages, scheduling of work, coordination with Government personnel, and special working conditions.
3.1.2 Configuration Software
The standard meter must include the latest available version of firmware and software. Meter must either be programmed at the factory or must be programmed in the field. Meters must have a password that must be provided to the contracting officer upon project completion. When field programming is performed, turn field programming device over to the Contracting Officer at completion of project. When interfacing software is used for a meter that is different than the existing meters in use at the Activity, turn the software over to the Contracting Officer at completion of the project.
3.2 FIELD QUALITY CONTROL
Perform the following acceptance checks and tests on all installed meters.
3.2.1 Performance of Acceptance Checks and Tests
Perform in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests.
a. Meter Assembly
SECTION 26 27 14.00 20 Page 6
(1) Visual and mechanical inspection .
(a) Compare equipment nameplate data with specifications and approved shop drawings.
(b) Inspect physical and mechanical condition. Confirm the meter is firmly seated in the socket, the socket is not abnormally heated, the display is visible, and the ring and seal on the cover are intact.
(c) Inspect all electrical connections to ensure they are tight.
For Class 200 services, verify tightness of the service conductor terminations for high resistance using low-resistance ohmmeter, or by verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method.
(d) Record model number, serial number, firmware revision, software revision, and rated control voltage.
(e) Verify operation of display and indicating devices.
(f) Record password and user log-in for each meter.
(g) Verify grounding of metering enclosure.
(h) Set all required parameters including instrument transformer ratios, system type, frequency, power demand methods/intervals, and communications requirements. Verify that the CT ratio and the PT ratio are properly included in the meter multiplier or the programming of the meter. Confirm that the multiplier is provided on the meter face or on the meter.
(i) Provide building meter installation sheet, per building for each facility. See example Graphic E-S1.
(j) Provide the completed meter installation schedule for the installation if multiple meters are to be used. See example Graphic E-S2
(k) Provide the completed meter data schedule for the installation if multiple meters are to be used. See example Graphic E-S3.
(2) Electrical tests .
(a) Apply voltage or current as appropriate to each analog input and verify correct measurement and indication.
(b) Confirm correct operation and setting of each auxiliary input/output feature including mechanical relay, digital, and analog.
(c) After initial system energization, confirm measurements and indications are consistent with loads present.
(d) Make note of, and report, any "Error-Code" or "Caution-Code" on the meter's display.
(3) Provide meter configuration report .
SECTION 26 27 14.00 20 Page 7
b. Current Transformers
(1) Visual and mechanical inspection.
(a) Compare equipment nameplate data with specification and approved shop drawings.
(b) Inspect physical and mechanical condition.
(c) Verify correct connection, including polarity.
(d) Inspect all electrical connections to ensure they are tight.
(e) Verify that required grounding and shorting connections provide good contact.
(2) Electrical Tests .
Verify proper operation by reviewing the meter configuration report.
c. Potential Transformers
(1) Visual and mechanical inspection.
(a) Verify potential transformers are rigidly mounted.
(b) Verify potential transformers are the correct voltage.
(c) Verify that adequate clearances exist between the primary and secondary circuit.
(2) Electrical Tests.
(a) Verify by the meter configuration report that the polarity and phasing are correct.
3.2.2 System Functional Verification
Verify that the installed meters are working correctly in accordance with the meter configuration report:
a. The correct meter form is installed.
b. All voltage phases are present.
c. Phase rotation is correct.
d. Phase angles are correct.
e. The new meter accurately measures power magnitude and direction, and can communicate as required by paragraph COMMUNICATIONS INTERFACES.
-- End of Section --
SECTION 26 27 14.00 20 Page 8
SECTION 26 28 01.00 10
COORDINATED POWER SYSTEM PROTECTION
10/07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 242 (2001; Errata 2003) Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems - Buff Book
IEEE 399 (1997) Brown Book IEEE Recommended Practice for Power Systems Analysis
IEEE 1584 IEEE Guide For Performing Arc-Flash Hazard Calculations
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
NFPA 70E (2021) Standard for Electrical Safety in the Workplace
EUROPEAN COMMITTEE FOR STANDARDIZATION (CEN/CENELEC)
EN 61439 (2021) Low-voltage switchgear and controlgear assemblies. General rules
HELLENIC ORGANIZATION FOR STANDARDIZATION (ELOT)
ELOT 60364 (2020) Requirement for electrical installations
1.2 SYSTEM DESCRIPTION
The power system covered by this specification consists of: Substation 11 with main and feeder breakers supplying main service to the building, a generator, a photovoltaic system, main switchboard, and all other interior electrical distribution located within the building (including but not limited to: UPSs, Panelboards, Harmonic Mitigating Transformers, and Plug-in busways).
1.3 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are
SECTION 26 28 01.00 10 Page 1 for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Fault Current Analysis ; G
Protective Device Coordination Study ; G
Equipment ; G
System Coordinator
Protective Relays ; G
Installation
Fault Current and Protective Device Coordination study must be submitted for approval prior to panelboard and switchgear in order to validate product compliance.
Arc Flash Study ; G
SD-06 Test Reports
Field Testing
SD-07 Certificates
Devices and Equipment
1.4 QUALITY ASSURANCE
1.4.1 System Coordinator
System coordination, recommended ratings and settings of protective devices, and design analysis shall be accomplished by a registered professional electrical power engineer with a minimum of 3 years of current experience in the coordination of electrical power systems.
Submit verification of experience and license number, of a registered Professional Engineer as specified above. Experience data shall include at least five references for work of a magnitude comparable to this contract, including points of contact, addresses and telephone numbers.
1.4.2 System Installer
Calibration, testing, adjustment, and placing into service of the protective devices shall be accomplished by a manufacturer's product field service engineer or independent testing company with a minimum of two years of current product experience in protective devices.
1.5 DELIVERY, STORAGE, AND HANDLING
Devices and equipment shall be visually inspected when received and prior to acceptance from conveyance. Protect stored items from the environment in accordance with the manufacturer's published instructions. Damaged items shall be replaced.
SECTION 26 28 01.00 10 Page 2
1.6 PROJECT/SITE CONDITIONS
Submit certificates attesting that all devices or equipment meet the requirements of the contract documents. Devices and equipment furnished under this section shall be suitable for the site conditions.
PART 2 PRODUCTS
2.1 STANDARD PRODUCT
Provide protective devices and equipment which are the standard product of a manufacturer regularly engaged in the manufacture of the product and that essentially duplicate items that have been in satisfactory utility type use for at least two years prior to bid opening. Submit data consisting of manufacturer's time-current characteristic curves for individual protective devices, recommended settings of adjustable protective devices, and recommended ratings of non-adjustable protective devices.
2.2 NAMEPLATES
Provide nameplates to identify all protective devices and equipment.
Nameplate information shall be in accordance with EN 61439 .
2.3 CORROSION PROTECTION
Metallic materials shall be protected against corrosion. Ferrous metal hardware shall be zinc or chrome-plated.
2.4 COORDINATED POWER SYSTEM PROTECTION
Analyses shall be prepared to demonstrate that the equipment selected and system constructed meet the contract requirements for ratings, coordination, and protection. They shall include a load flow analysis, a fault current analysis , arc flash analysis, and a protective device coordination study . Submit the study along with protective device equipment submittals. No time extensions or similar contact modifications will be granted for work arising out of the requirements for this study.
Approval of protective devices proposed will be based on recommendations of this study. The Government shall not be held responsible for any changes to equipment, device ratings, settings, or additional labor for installation of equipment or devices ordered and/or procured prior to approval of the study. The studies shall be performed by a registered professional engineer with demonstrated experience in power system coordination in the last 3 years. Provide a list of references complete with points of contact, addresses and telephone numbers. The selection of the engineer is subject to the approval of the Contracting Officer.
2.4.1 Scope of Analyses
The fault current analysis, and protective device coordination study shall begin at: the primary of each unit substation transformer and continue through all electrical distribution equipment within the building rated for 100 Amperes or more and to where the fault availability is 5,000 amperes (symmetrical) or less.
2.4.2 Determination of Facts
The time-current characteristics, features, and nameplate data for each
SECTION 26 28 01.00 10 Page 3 existing protective device shall be determined and documented. Coordinate with the installation for fault current availability at the site.
2.4.3 Single Line Diagram
A single line diagram shall be prepared to show the electrical system buses, devices, transformation points, and all sources of fault current (including generator and motor contributions). A fault-impedance diagram or a computer analysis diagram may be provided. Each bus, device or transformation point shall have a unique identifier. If a fault-impedance diagram is provided, impedance data shall be shown. Location of switches, breakers, and circuit interrupting devices shall be shown on the diagram together with available fault data, and the device interrupting rating.
2.4.4 Fault Current Analysis
2.4.4.1 Method
The fault current analysis shall be performed in accordance with methods described in IEEE 242 , and IEEE 399 .
2.4.4.2 Data
Actual data shall be utilized in fault calculations. Bus characteristics and transformer impedance shall be those proposed. Data shall be documented in the report.
2.4.4.3 Fault Current Availability
Balanced three-phase fault, bolted line-to-line fault, and line-to-ground fault current values shall be provided at each voltage transformation point and at each power distribution bus. The maximum and minimum values of fault available at each location shall be shown in tabular form on the diagram or in the report.
2.4.5 Coordination Study
The study shall demonstrate that the maximum possible degree of selectivity has been obtained between devices specified, consistent with protection of equipment and conductors from damage from overloads and fault conditions. The study shall include a description of the coordination of the protective devices in this project. A written narrative shall be provided describing: which devices may operate in the event of a fault at each bus; the logic used to arrive at device ratings and settings; situations where system coordination is not achievable due to device limitations (an analysis of any device curves which overlap);
coordination between upstream and downstream devices; and relay settings.
Recommendations to improve or enhance system reliability, and detail where such changes would involve additions or modifications to the contract and cost damages (addition or reduction) shall be provided. Composite coordination plots shall be provided on log-log graph paper.
2.4.6 Study report
a. The report shall include a narrative describing: the analyses performed; the bases and methods used; and the desired method of coordinated protection of the power system.
b. The study shall include descriptive and technical data for existing
SECTION 26 28 01.00 10 Page 4 devices and new protective devices proposed. The data shall include manufacturers published data, nameplate data, and definition of the fixed or adjustable features of the existing or new protective devices.
c. The report shall document existing power system data including time-current characteristic curves and protective device ratings and settings.
d. The report shall contain fully coordinated composite time-current characteristics curves for each bus in the system, as required to ensure coordinated power system protection between protective devices or equipment. The report shall include recommended ratings and settings of all protective devices in tabulated form.
e. The report shall provide the calculation performed for the analyses, including computer analysis programs utilized. The name of the software package, developer, and version number shall be provided.
2.5 ARC FLASH STUDY
a. Perform arc flash hazard study after short circuit and protective device coordination study has been completed, reviewed and accepted.
b. Perform arc flash study in accordance with NFPA 70E and IEEE 1584 .
c. Base Calculation: For each major part of electrical power system (switch boards, panelboards, etc.), determine the following:
(1) Flash hazard protection boundary.
(2) Limited approach boundary.
(3) Restricted approach boundary.
(4) Prohibited approach boundary.
(5) Incident energy level.
(6) Personal protection equipment (PPE) hazard/risk category.
(7) Type of PPE required.
d. Produce arc flash warning labels that list items in Paragraph Base Calculation and the following additional items:
(1) Bus name.
(2) Bus voltage.
e. Produce bus detail sheets that list items in Paragraph Base Calculation and the following additional items:
(1) Bus name.
(2) Upstream protective device name, type, and settings.
(3) Bus line-to-line voltage.
SECTION 26 28 01.00 10 Page 5
f. Produce arc flash evaluation summary sheet listing the following additional items:
(1) Bus name.
(2) Upstream protective device name, type, settings.
(3) Bus line-to-line voltage.
(4) Bus bolted fault.
(5) Protective device bolted fault current.
(6) Arcing fault current.
(7) Protective device trip/delay time.
(8) Breaker opening time.
(9) Solidly grounded column.
(10) Equipment type.
(11) Gap.
(12) Arc flash boundary.
(13) Working distance.
(14) Incident energy.
(15) Required protective fire rated clothing type and class.
g. Analyze short circuit, protective device coordination, and arc flash calculations and highlight equipment that is determined to be underrated or causes incident energy values greater than 40 cal/cm 2.
Propose approaches to reduce energy levels.
h. Prepare report summarizing arc flash study with conclusions and recommendations which may affect integrity of electric power distribution system. As a minimum, include the following:
(1) Equipment manufacturer's information used to prepare study.
(2) Assumptions made during study.
(3) Reduced copy of one-line drawing; 279 mm by 432 mm maximum.
(4) Arc flash evaluations summary spreadsheet.
(5) Bus detail sheets.
(6) Arc flash warning labels printed in color on adhesive backed labels.
i. Arc Flash Warning Labels:
(1) Printed in multicolor on adhesive backed labels. An example is located following end of Section in "Supplement" Article.
SECTION 26 28 01.00 10 Page 6
(2) Install arc flash warning labels on equipment as specified in this Section and in the Contract Documents.
(3) Completely remove any existing arc flash warning labels and adhesive and replace with new labels as identified within this specification section.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with details of the work, verify dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
3.2 INSTALLATION
Submit procedures including diagrams, instructions, and precautions required to properly install, adjust, calibrate, and test the devices and equipment. Install protective devices in accordance with the manufacturer's published instructions and in accordance with the requirements of NFPA 70 , ELOT 60364 and IEEE C2 .
3.3 FIELD TESTING
Prior to field tests, submit the proposed test plan consisting of complete field test procedure, tests to be performed, test equipment required, and tolerance limits, and complete testing and verification of the ground fault protection equipment, where used. Submit performance test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, upon completion and testing of the installed system. Each test report shall indicate the final position of controls.
3.3.1 General
Perform field testing in the presence of the Contracting Officer. Notify the Contracting Officer 7 days prior to conducting tests. Furnish all materials, labor, and equipment necessary to conduct field tests. Perform all tests and inspections recommended by the manufacturer unless specifically waived by the Contracting Officer. Maintain a written record of all tests which includes date, test performed, personnel involved, devices tested, serial number and name of test equipment, and test results.
3.3.2 Safety
Provide and use safety devices such as rubber gloves, protective barriers, and danger signs to protect and warn personnel in the test vicinity.
Replace any devices or equipment which are damaged due to improper test procedures or handling.
3.3.3 Molded-Case Circuit Breakers
Circuit breakers shall be visually inspected, operated manually, and connections checked for tightness. Current ratings shall be verified and adjustable settings incorporated in accordance with the coordination study.
SECTION 26 28 01.00 10 Page 7
3.3.4 Power Circuit Breakers
3.3.4.1 General
Visually inspect the circuit breaker and operate the circuit breaker manually; adjust and clean primary contacts in accordance with manufacturer's published instructions; check tolerances and clearances;
check for proper lubrication; and ensure that all connections are tight.
For electrically operated circuit breakers, verify operating voltages on closing and tripping coils. Verify fuse ratings in control circuits;
electrically operate the breaker, where applicable; and implement settings in accordance with the coordination study.
3.3.5 Protective Relays
Protective relays shall be visually and mechanically inspected, adjusted, tested, and calibrated in accordance with the manufacturer's published instructions. Submit data including calibration and testing procedures and instructions pertaining to the frequency of calibration, inspection, adjustment, cleaning, and lubrication. Tests shall include pick-up, timing, contact action, restraint, and other aspects necessary to ensure proper calibration and operation. Relay settings shall be implemented in accordance with the coordination study. Relay contacts shall be manually or electrically operated to verify that the proper breakers and alarms initiate.
SECTION 26 28 01.00 10 Page 8
SECTION 26 29 23
ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 1000 VOLTS
02/ 20, CHG 1: 05/ 21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
EUROPEAN COMMITTEE FOR STANDARDS (EN)
EN 60529 (1992+A2:2013) Degrees of protection provided by enclosures (IP code)
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 519 (2014) Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems
IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 60034 (2023) Rotating electrical machines - ALL PARTS
IEC 60947-2 (2016+AMD1:2019) CSVConsolidated version.
Low-voltage switchgear and controlgear - Part 2:
Circuit-breakers
IEC 61000-3-12 (2012) Electromagnetic Compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16 A and </=75 A per phase
IEC 61800 (2022) Adjustable speed electrical power drive systems. (All applicable parts)
IEC 62208 (2011) Empty enclosures for low-voltage switchgear and controlgear assemblies - General requirements
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 7 (2020) Adjustable-Speed Drives
SECTION 26 29 23 Page 1
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
47 CFR 15 Radio Frequency Devices
HELLENIC ORGANIZATION FOR STANDARDIZATION (ELOT)
ELOT 60364 (2020) Requirements for electrical installations
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM applies to this section with additions and modifications specified herein.
1.3 SYSTEM DESCRIPTION
1.3.1 Performance Requirements
1.3.1.1 Electromagnetic Interference Suppression
Computing devices, as defined by 47 CFR 15 and IEC 61800 rules and regulations, must be certified to comply with the requirements for class A computing devices and labeled.
1.3.1.2 Electromechanical and Electrical Components
Ensure electrical and electromechanical components of the Adjustable Speed Drive (ASD) do not cause electromagnetic interference to adjacent electrical or electromechanical equipment while in operation.
1.3.2 Electrical Requirements
1.3.2.1 Power Line Surge Protection
IEEE C62.41.1 and IEEE C62.41.2 , IEEE 519 , IEC 61000-3-12 Control panel must have surge protection, included within the panel to protect the unit from damaging transient voltage surges. Surge protective device must be mounted near the incoming power source and properly wired to all three phases and ground. Fuses must not be used for surge protection.
1.3.2.2 Sensor and Control Wiring Surge Protection
I/O functions as specified must be protected against surges induced on control and sensor wiring installed outdoors and as shown. Test the inputs and outputs in both normal mode and common mode using the following two waveforms:
a. A 10 microsecond by 1000 microsecond waveform with a peak voltage of 1500 volts and a peak current of 60 amperes.
b. An 8 microsecond by 20 microsecond waveform with a peak voltage of 1000 volts and a peak current of 500 amperes.
1.4 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 26 29 23 Page 2
SD-02 Shop Drawings
Schematic Diagrams ; G
Interconnecting Diagrams ; G
Installation Drawings ; G
As-Built Drawings ; G
SD-03 Product Data
Adjustable Speed Drives ; G
Wires and Cables
Equipment Schedule
SD-06 Test Reports
ASD Test
Performance Verification Tests
Endurance Test
SD-08 Manufacturer's Instructions
Installation instructions
SD-09 Manufacturer's Field Reports
ASD Test Plan ; G
Standard Products
SD-10 Operation and Maintenance Data
Adjustable Speed Drives , Data Package 4
1.5 QUALITY ASSURANCE
1.5.1 Schematic Diagrams
Submit diagrams showing circuits and device elements for each replaceable module. Schematic diagrams of printed circuit boards are permitted to group functional assemblies as devices, provided that sufficient information is provided for government maintenance personnel to verify proper operation of the functional assemblies.
1.5.2 Interconnecting Diagrams
Show interconnections between equipment assemblies, and external interfaces, including power and signal conductors. Include for enclosures and external devices.
1.5.3 Installation Drawings
Show floor plan of each site, with ASD's and motors indicated. Indicate
SECTION 26 29 23 Page 3 ventilation requirements, adequate clearances, and cable routes. Submit drawings for government approval prior to equipment construction or integration. Immediately record modifications to original drawings made during installation for inclusion into the as-built drawings .
1.5.4 Equipment Schedule
Provide schedule of equipment supplied. Schedule must provide a cross reference between manufacturer data and identifiers indicated in shop drawings. Schedule must include the total quantity of each item of equipment supplied and data indicating compatibility with motors being driven. For complete assemblies, such as ASD's, provide the serial numbers of each assembly, and a sub-schedule of components within the assembly. Provide recommended spare parts listing for each assembly or component.
1.5.5 Installation Instructions
Provide installation instructions issued by the manufacturer of the equipment, including notes and recommendations, prior to shipment to the site. Provide operation instructions prior to acceptance testing.
1.5.6 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening including applications of equipment and materials under similar circumstances and of similar size.
b. Have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.6 DELIVERY AND STORAGE
Store delivered equipment to protect from the weather, humidity and temperature variations, dirt and dust, or other contaminants.
1.7 WARRANTY
The complete system must be warranted by the manufacturer for a period of one year. Repair or replace any component failing to perform its function as specified and documented at no additional cost to the Government.
Items repaired or replaced must be warranted for an additional period of at least one year from the date that it becomes functional again, as specified in FAR 52.246-21 Warranty of Construction.
1.8 MAINTENANCE
1.8.1 Spare Parts
Manufacturers provide spare parts in accordance with recommended spare
SECTION 26 29 23 Page 4 parts list.
1.8.2 Operation and Maintenance Data
Provide in…