Attachment F - 09-6774947 Recap Family Housing PMDS V7.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
Recapitalize Family Housing, Station Portage, U. S. Coast Guard Station Portage, Dollar Bay, MI
Solicitation number
70Z04725RPCNI0002
Issued by

About this file

This document is a Real Property Project Management Data Sheet (PMDS) for a federal construction project to recapitalize family housing at the U.S. Coast Guard Station in Portage, Michigan.

The project will construct new multiplex family housing consisting of (4) three-bedroom and (3) four-bedroom units across two separate buildings, along with a new playground, parking lot, equipment storage building, and residential septic system upgrades. The project will demolish the existing family housing units and modify various infrastructure assets. The total estimated construction cost is $5.9 million. The project has three optional add-ons: 1) design and construct one 3-bedroom housing unit, 2) design and construct one duplex with two 3-bedroom units, and 3) design and construct one maintenance building. This opportunity is limited to DHS, NMACC III, Pool II contract holders, with an expected performance period from award to beneficial occupancy.

View the file

Other files

File Type Posted
70Z04725RPCNI0002 _Amendment 0007.pdf PDF
70Z04725RPCNI0002_Amendment 0006.pdf PDF
70Z04725RPCNI0002_Amendment 0005.pdf PDF
70Z04725RPCNI0002 _Amendment 0004.pdf PDF
Portage Housing Site Visit_Sign In.pdf PDF
70Z04725RPCNI0002_Amendment 0003.pdf PDF
70Z04725RPCNI0002_Amendment 0002.pdf PDF
70Z04725RPCNI0002_Amendment 0001.pdf PDF
Attachment C - 92120 Multi-Mission Station -1997.pdf PDF
TO Announcement_70Z04725RPCNI0002.pdf PDF
Drawing Format and Handling Job Guide (JG 36-51 73 15-02).pdf PDF
Attachment D - Portage Housing NEPA CATEX.pdf PDF
Attachment M - X3888 Construct Six Housing Units.zip ZIP file
Attachment G - CSTO Family Housing Design.pdf PDF
Attachment E - FDCC ENVIRONMENTAL COMPLIANCE INSPECTION (July 2022).pdf PDF
Appendix D- LEED for HOMES.pdf PDF
Drawing Stds and Management (CSTO 36-51 73 15-01).pdf PDF
DBA_Building_Houghton County.pdf PDF
Appendix A_Exterior Wall Detail.pdf PDF
Attachment A - Geotechnical Report_05JAN24.pdf PDF
Attachment K - USCG Station Portage Environmental Report.pdf PDF
Attachment J - Fire Flow Report Osceola Twp.pdf PDF
Attachment I - USCG Station Portage Survey.pdf PDF
Attachment L - Radon Report.pdf PDF
Attachment B - STA_Portage_Crawl_Space_Repairs-2008.pdf PDF
Appendices_Attach_CAD Files.zip ZIP file
Appendix B_ Roof Design.pdf PDF
6774947_Final_Housing ReCap_StaPortage_MI_updated_11-12-24.pdf PDF
Appendix C_BSD-135_Ice Dams.pdf PDF
Attachment H - CSTO New Building Design and Construction.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PMDS V7

Real Property Project Management Data Sheet (PMDS)
Project Title:Recapitalize Family HousingFR Project #:TBDEstablish CIP Project
Landlord Name:CG STA PORTAGECity:Dollar BayState:MISAM Parent Project #:09-6774947Original CAP Package
Landlord ATU-OPFAC:30405Site# (SUID):1984Site (SUID) Name:CG STA PORTAGE16 Digit Obligation DOC ID
(OE Only). Construction & DesignSupplemental CAP Package
Project Funding InformationExpense Project
Funding Information
(Line of Accounting)Funding YearFunding AmountProjected Completion DateType of Funding (Use Dropdown)PMDS Type

(Use Pick-List)

AGCYRGNAPPRLIMAFCPECC
ACI
AFC-43
MASI
AFC-30
Project Description
Construct new Multiplex Acompanied Housing at US CG STA Portage, Dollar Bay, MI to meet Family Housing Design CSTO Standards and HMSA-Lite requirements. Housing will consist of (4) three-bedroom and (3) four-bedroom housing units in two separate structures (2 four bedroom + 2 three bedroom units in one building, and 1 four bedroom + 2 three bedroom units in the other building) at CG STA Portage, MI. A new playground, parking lot, equipment storage building, concrete pads for two existing storage sheds and a residential septic system expansion will be included. Replace Housing Fence (Less than 6 FT) with a new housing fence (6 FT and above).
Asset Affected by Project - Detailed Breakdown
DEMOLISH/ REMOVE (100% Asset Disposal - No Partials)
RPUIDASSET NAMEB/L/SPRV ($K)CHILD PROJ#DISPOSAL DATECOST%CCNOTES
11851Fasmily Quarters #1 (4BR)B$70609-6774947
11852Fasmily Quarters #2 (3BR)B$59809-6774947
11853Fasmily Quarters #3 (4BR)B$70609-6774947
11854Fasmily Quarters #4 (3BR)B$58809-6774947
11855Fasmily Quarters #5 (3BR)B$59809-6774947
11856Fasmily Quarters #6 (3BR-HDCP)B$63109-6774947
854449Housing PlaygroundS$29409-6774947
810941Interior Fence and Wall (Less than 6 FT)S$21,57909-6774947
MODIFY (All Modifications Regardless of Impact to Size or Function)
RPUIDASSET NAMEB/L/SPRV ($K)CHILD PROJ#EXIST SIZEFINAL SIZEUMCOST%CCNOTES (Describe Changes)
42449Heat Gas Distribution LineS$46,04309-67749471,4212,421LF
42484Storm Drainage - SewerS$53,92009-67749475271,027LF
42486Septic Tank, Drain Field, and Lagoon - HousingS$7,77009-67749471,00040,000GA
42447Sidewalk and Walkway, SurfacedS$46,43809-67749475671,367SY
42483Sewer and Industrial Waste LineS$27,30509-67749474001,400LF
42487Water Distribution Line, PotableS$157,32809-67749471,5682,568LF
811192Electrical Power Distribution Lines, UndergroundS$1,362,47609-67749475,0186,018LF
42446Paved Vehicle ParkingS$52,62509-67749479381,538SY
42450Telephone SereviceS$38,41009-67749470.30.3MI
NEW (100% New Construction or Other Acquisition)
RPUIDASSET NAMEB/L/SCATCODECHILD PROJ#SIZEUoMDIS (Acquired)COST%CCNOTES
Family Housing - Multiplex As Shown Below09-6774947
4 Bedroom UnitB7110309-67749473,289GSF
4 Bedroom UnitB7110309-67749473,289GSF
4 Bedroom UnitB7110309-67749473,289GSF
3 Bedroom UnitB7110309-67749472,386GSF
3 Bedroom UnitB7110309-67749472,386GSF
3 Bedroom UnitB7110309-67749472,386GSF
3 Bedroom UnitB7110309-67749472,386GSF
Personal Garage (Equipment Storage Building)B7141009-6774947800GSF
Housing PlaygroundS7502409-67749471EA
Interior Fence and Wall (6 FT and Above)S8721509-67749472,000LF
Housing Storage Buildings (2 buildings)S7141009-6774947126SF$9,329$4,664.50 each
Legend:RPUID = Real Property Unique IdentifierCATCODE = Category CodeDIS = Date in Service = "Date Acquired" for New AssetsCC = Construction Cost
PRV = Plant Replacement ValueUM or UoM = Unit of Measure%CC = % of Total Const CostB/L/S = Building or Land or Structure (Choose one)
RPAS PMDS Notes Updates
Notes:
RPAS SignatureDate
Direct Cost Capitalized Asset Accepted for Completion: For Accounting Use Only
ASSET NAMEDIRECT COSTDISOPFACRPUIDNOTES
PMDS Approval
TitleOffice SymbolSignature and Date
CAP PKG PreparerCG-438 CAT
Project ManagerFDCC/CEU
Business Finance Manager/Resource ManagerCG-438
ReviewerCG-845
ApproverCG-845
FINCEN FRFINCEN-FR
PMDS Version #7

AC&I Project Cost

PMDS ATTACHMENT
FDCC REAL PROPERTY COST SUMMARY (RPCS) SHEET
PROJECT TITLEERROR:#REF!SFRL No.ERROR:#REF!
Benefitting Unit(s)FR Project No.ERROR:#REF!
LandlordERROR:#REF!CityERROR:#REF!StateERROR:#REF!SAM No.ERROR:#REF!
Lndlrd ATU-OPFACERROR:#REF!Installation No.Site NumberERROR:#REF!DateFunding YearERROR:#REF!
Acquisition TypeBidDsgn-Bld8AGovt. Est.Funding Source
Project StatusActiveCompleteClosedAwardFinal Direct Cost
PART I - SURVEY AND DESIGN
Project ManagerUnitPhone No.
Government S&D EstimateDate
Awarded S&D AmountDate
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
S&D Funded AmountS&D Funded Amount
S&D Amount Spent to DateS&D Amount Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/Contractor:Vendor/Contractor:
Accounting LineAccounting Line
FPD Document IDFPD Document ID
S&D Funded AmountS&D Funded Amount
S&D Amount Spent to DateS&D Amount Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
S&D Funded AmountS&D Funded Amount
S&D Amount Spent to DateS&D Amount Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
S&D Funded AmountS&D Funded Amount
S&D Amount Spent to DateS&D Amount Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
S&D Funded AmountS&D Funded Amount
S&D Amount Spent to DateS&D Amount Spent to Date
PMDS ATTACHMENT - Page #2
FDCC REAL PROPERTY COST SUMMARY (RPCS) SHEET
PROJECT TITLEERROR:#REF!SFRL No.ERROR:#REF!
Benefitting Unit(s)CIP Project No.ERROR:#REF!
LandlordERROR:#REF!CityERROR:#REF!StateERROR:#REF!SAM No.ERROR:#REF!
Lndlrd ATU-OPFACERROR:#REF!Installation No.Site NumberERROR:#REF!DateFunding YearERROR:#REF!
Acquisition TypeBidDsgn-Bld8AGovt. Est.Funding Source
Project StatusActiveCompleteClosedAwardFinal Direct Cost
PART II - CONSTRUCTION
Project ManagerUnitPhone No.
Government Const. EstimateDate
Awarded Const. AmountDate
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
Const. Funded AmountConst. Funded Amount
Const. Amnt Spent to DateConst. Amnt Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/Contractor:Vendor/Contractor:
Accounting LineAccounting Line
FPD Document IDFPD Document ID
Const. Funded AmountConst. Funded Amount
Const. Amnt Spent to DateConst. Amnt Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
Const. Funded AmountConst. Funded Amount
Const. Amnt Spent to DateConst. Amnt Spent to Date
Contract No.Contract No.
Task Order No.Task Order No.
Vendor/ContractorVendor/Contractor
Accounting LineAccounting Line
FPD Document IDFPD Document ID
Const. Funded AmountConst. Funded Amount
Const. Amnt Spent to DateConst. Amnt Spent to Date
PART III - PROJECT COMPLETION
DIRECT PROGRAM COSTS AC&I (SHORE OR MASI)DIRECT PROGRAM COSTS OE (AFC43)PROJECT COSTTOTAL COMPLETION PROJECT COST
S & D CostS & D Cost
Govt. Estimate DBGovt. Estimate DBProject Award Date:Funded:
Design Award CostDesign Award CostProject BOD date:Expended:
Construction Award CostConstruction Award CostProject Completion date:Balance:
Total Const. Cost (CC)Total Const. Cost (CC)TOTAL DIRECT COST
Furniture /EqptFurniture /EqptTOTAL IN-DIRECT COST
ElectronicsElectronics
Inspection SrvcsInspection Srvcs
Other TravelOther TravelOTHER
TOTAL DIRECT CST$0.00TOTAL DIRECT CST$0.00TOTAL PROJECT COST$0.00
Other TravelOther TravelOTHER
TOTAL DIRECT CST$0.00TOTAL DIRECT CST$0.00TOTAL PROJECT COST$0.00