Attachment E - HECO-12 - Schedule of Values.xlsx

XLSX spreadsheet 158 KB Posted

Attached to
Piedmont and Tidewater Dormitories Roofing Replacement - 247-221547
Solicitation number
59722
Issued by
Fairfax County, Falls Church City, Virginia

About this file

This document is a solicitation for construction services for the removal and replacement of the roofing systems on the Piedmont and Tidewater dormitory buildings at a university located in Virginia. The project involves removing the existing asphalt shingle roofing, underlayment, flashings, and roof penetrations, and replacing them with a new asphalt shingle roofing system. Additional insulation will also be installed in the attic spaces. The existing built-up roofing on the low roof connecting the two buildings will be removed and replaced with a fully-adhered EPDM roofing system. The buildings will remain occupied during construction, and occupants and pedestrians must be protected at all times.

The solicitation is being issued by the Commonwealth of Virginia on behalf of Fairfax County and the City of Falls Church. No specific pricing terms, set-asides, or incumbents are mentioned. The project is funded through state and local sources, but the specific amounts and sources are not provided. The contract term and any renewal options are also not specified.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warnings

GEORGE MASON UNIVERSITYHECO - 12
(Revised 01/2016)
SCHEDULE OF VALUES and CERTIFICATE FOR PAYMENT
Before using this Excel form, please read the following:

If you use Excel 2003, Macro Security must be set to "Medium" !

Check the Excel macro security settings, by picking Tools, Macro, and Security from the
main Excel menu. If macro security is set at "High" or "Very High", change it to "Medium"
and then immediately close Excel. When Excel is reopened, the new macro security
setting will take effect. If you get a message to "Enable" or "Disable" macros, pick "Enable".

If you use Excel 2007, you must save this as a "Macro-Enabled Worksheet".

Users may …

Users may add, edit, or delete data in the those cells which are highlighted in yellow. (e.g.,)
Users may insert rows by using the Insert New Row button only !
Users may format cells (e.g., bold, underline, italic, font size, etc.)
Users may format rows (e.g., adjust the row height, etc.)

Users should not …

Users should not modify these worksheets in any manner, other than as noted above !
Users should not "unprotect" these worksheets !
Users should not delete rows in these worksheets !
Users should not enter data directly into any cells that are not highlighted in yellow. Many of the white cells
contain formulas which may be accidentally overwritten if spreadsheet is unprotected and data is entered directly
into the white cells.
WARNING:Doing any of the above "should not" actions can compromise the integrity of the HECO-12 worksheet
by overwriting or deleting data and/or formulas. It is not the responsibility of the VCU staff to
help correct worksheets which have been corrupted by users not heeding the above warnings.

It is highly recommended users make backup copies before starting each new pay request !

After reading this page, click here to go to the MAIN MENU.

Instructions

GEORGE MASON UNIVERSITYHECO - 12
(Revised 11/2016)
SCHEDULE OF VALUES and CERTIFICATE FOR PAYMENT

MAIN MENU and GENERAL INSTRUCTIONS

Before proceeding, please click here to read important warnings.

Complete each step below in the order listed.If you need assistance, click here.
1.Make a backup copy of this Excel file
before proceeding to the next step.
For questions regarding Retainage, refer to the notes included within Step 3.
2.
3.New users, please review the instructions
below before completing Parts B & C.

4.

5.

6.

To view the complete "Building Element" classification structure used in PART B, click here.
7.
8.Save each monthly submittal with a unique file name.
( for example: Project 999-99999 Pay Request 1, Project 999-99999 Pay Request 2, .... )

9. Sign and submit the HECO-12.

NEXT MONTH - Repeat Steps 1 through 9.

Enter project and contract information.

Prep the HECO-12 form for new pay period.

Complete HECO-12, PART B.

(Original Contract Line Items) View Instructions For Completing Part B View Instructions For Completing Part C Complete HECO-12, PART C.

(Construction Change Orders) Review HECO-12, PART A.

(Summary and Certification Page) Print the HECO-12.

Print these instructions

Assistance

(Revised 11/2016)
If you need assistance:
For projects constructed under the provisions of the Higher Education Restructuring Act,
please direct ALL questions to that institution, otherwise:
For content or procedural questions, such as contingency reductions, contact the Agency Project
Manager or their Architectural/Engineering Consultant, as appropriate.
For problems with the Excel spreadsheet, proper, please enter the information below and e-mail this
complete Excel file as an attachment to the following e-mail address:capout@dgs.virginia.gov
( Please recall that it is not the responsibility of the DGS staff to help users correct worksheets which
have been corrupted by user's failure to heed the warnings provided earlier. )
Your Name:
Phone Number:
E-mail address:
Agency Project Mgr:
Phone Number:
E-mail address:

Question or Description of Problem:

Return to Main Menu mailto:capout@dgs.virginia.gov General Project Info STEP 2 - Enter Project and Contract Information

A )Enter the following:
Project Number:
Project Title:
Institution/Agency Name:Geroge Mason University
Location of Work:
A/E Firm Name:
Contractor Name:
Contractor FEIN:
( FEIN = Fed. Employer Identification Number )
GMU PO #
GMU WO #

Date Contract Executed

Month:
Day:
Year:
NOTE:Once the above project and contract information have been entered, unless there are any changes,
STEP 2 can be bypassed on future monthly updates.
B )

Return to Main Menu Information to complete these cells may be found on the excuted "Contract Award Letter"

Initialize

STEP 3 - Prepare the HECO-12 for New Pay Period
WARNING: Run the Initialize Macro only once before beginning each
new monthly pay request. See the explanation below.
Today is:2/22/24
A )NOTE: This form was last initialized on:8/24/07
B )Update the following data:
Pay Request Number:1

For Pay Period Beginning:

For Pay Period Ending:

Pay Request Submittal Date:

Contractor Representative:

Retainage Percentage:* 5.0%

C ) * Retainage is initially set at the default value of 5%. With the Owner's PRE-APPROVAL, the retainage percentage may be adjusted. DO NOT ADJUST the retainage value UNTIL AFTER the INITIALIZE macro is run.

For the final pay request, adjusting the retainage value to 0%, AFTER the INITIALIZE macro is run, will release remaining retainage, if approved by the Owner.

Initializing Explained ---- what is does and how it works:

Initializing is designed to save the user considerable time and effort.

Initializing the HECO-12 Form runs a macro (an automated procedure) which prepares the HECO-12
for data entry for each new pay application. The macro copies all of the data from the
"Current Value to Date" column to the "Previous Value to Date" column as shown in the
example below.

This step must be done to compute the correct values for the current pay request.

Example:VALUE OF WORK COMPLETED
PREVIOUSVALUECURRENT
TOTALVALUETHISVALUEPERCENT
VALUETO DATEREPORTTO DATECOMPLETE
Before initializing:$ 100.00$ 20.00$ 10.00$ 30.0030%
Cells with a yellow background
allow data input by the user.
After initializing:$ 100.00$ 30.00$ - 0$ 30.0030%
Cells with a white background are
calculated cells. These cells are "locked"
After updating %:$ 100.00$ 30.00$ 20.00$ 50.0050%to prevent the user from accidentially
overwriting the embedded formulas.

The "Initialize" macro copies all "Current Value to Date" entries to the "Previous Value to Date" column.

After the initializing macro is run, you can now update the "Percent Complete" column to reflect new progress.

After updating the "Percent Complete" column, the new "Current Value to Date" amount is calculated by
a formula which multiplies the "Percent Complete" by the "Total Value".
Another formula calculates the "Value This Report" amount by subtracting the "Previous Value
to Date" amount from the "Current Value to Date" amount.

Return to Main Menu a a b c d b c d Run the INITIALIZE macro.

(see explanation below)

PART A

STEP 6 - Review PART ANOTE: All information on the PART A page is updated from entries made in the other steps.
Return to General InstructionsIf any information on the PART A summary appears incorrect, return to the appropriate step
and make changes as required.
GMU (Form HECO-12)SCHEDULE OF VALUESPAYMENT REQUEST NO.1
(Rev. 06/02/2017)and
PART APERIOD BEGINNING DATE:12/31/1899
SUMMARY AND CERTIFICATIONCERTIFICATE FOR PAYMENTPERIOD ENDING DATE:12/31/1899
PROJECT CODE:
AGENCY NAME:Geroge Mason University
PROJECT TITLE:
GMU PO#:0
VALUE OF WORK COMPLETED
PREVIOUSVALUECURRENT
TOTALVALUETHISVALUEPERCENT
VALUETO DATEREPORTTO DATECOMPLETE
ABCD = B + CE = D / A
Original Contract Line Items (from HECO-12, PART B)$ - 0$ - 0$ - 0$ - 00%
Approved Change Orders (from HECO-12, PART C)$ - 0$ - 0$ - 0$ - 00%
ADJUSTED CONTRACT TOTAL$ - 0$ - 0$ - 0$ - 00%
RetainageRetainage Percentage:5.0%$ - 0$ - 0$ - 0
NET REQUISTION AMOUNT$ - 0$ - 0$ - 0
Amount Requested
CONTRACTOR CERTIFICATION
The undersigned Contractor requests payment of that portion of the contract price shown on the last line
of the foregoing Schedule of Values, and represents and warrants to the Owner that: (1) the data shown on the
Schedule of Values is accurate and correct; (2) the Work covered by this Certificate has been completed in
accordance with the Contract Documents; (3) all previous progress payments received from Owner on account of Work done
under this Contract have been applied to discharge in full (except for allowable retainage) all obligations of Contractor
incurred in connection with Work covered by prior Certificates for Payment ( not applicable for Pay Request 1 ) ;
(4) title to all materials and equipment for which payment is requested in this Certificate, whether or not incorporated
in said Work, will pass to Owner at time of payment free and clear of all liens, claims, security interests and
encumbrances (except such materials and equipment which are covered by a Bond previously accepted by Owner).

FEIN #: *** enter FEIN in Step 2 *** Contractor:

Date:December 31, 1899By:
signature
Typed Name:*** enter Contractor Representative's Name in Step 3 ***

ARCHITECT/ENGINEER CERTIFICATION

This is to certify that, in accordance with the terms of a contract for Project Number executed
the day of , by and between, ,
the contractor, and the Commonwealth of Virginia, Geroge Mason University,
the Owner, for work at , there is due to the Contractor the amount of
No Dollars and No Cents $.00

Architect/Engineer:

By:
signatureprinted namedate
AGENCY ACTION
Amount approved for payment this certificate is:
No Dollars and No Cents

Dollars ( ) $.00 )

By:
signaturetitledate
By:
signaturetitledate

PART B

STEP 4 - Complete PART B

George Mason University (Form HECO-12)SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENTPAYMENT REQUEST NO.1
(Rev. 06/02/2017)PROJECT CODE:GMU PO#:0.00
PART BAGENCY NAME:Geroge Mason UniversityPERIOD BEGINNING DATE:12/31/1899
ORIGINAL CONTRACT LINE ITEMSPROJECT TITLE:PERIOD ENDING DATE:12/31/1899
DESCRIPTIONVALUE OF WORK COMPLETED
PREVIOUSVALUECURRENTDMBE
ITEMBUILDINGADDITONALTOTALVALUETHISVALUEPERCENTVENDORCERTIFICATE
NO.ELEMENTDESCRIPTIONVALUETO DATEREPORTTO DATECOMPLETENAMESWMNUMBER
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
Do not insert rows below this point !$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN

TOTAL ORIGINAL CONTRACT $ - 0 $ - 0 $ - 0 $ - 0 0%

Original Contract Line Items Page &P of &N Date Printed: &D

Review PART B Instructions Insert New Row Before pressing the "Insert New Row" button, first click on a cell highlighted in yellow. When you then press the "Insert New Row" button, a new row will be added immediately above the selected cell.

PART C

STEP 5 - Complete PART C

GMU (Form HECO-12)SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENTPAYMENT REQUEST NO.1
(Rev. 06/02/2017)PROJECT CODE:GMU PO#:0.00
PART CAGENCY NAME:Geroge Mason UniversityPERIOD BEGINNING DATE:12/31/1899
CONSTRUCTION CHANGE ORDERSPROJECT TITLE:PERIOD ENDING DATE:12/31/1899
VALUE OF WORK COMPLETED
CHNGPREVIOUSVALUECURRENTDMBE
ORD.ITEMTOTALVALUETHISVALUEPERCENTVENDORCERTIFICATE
NO.DESCRIPTIONVALUETO DATEREPORTTO DATECOMPLETENAMESWMNUMBER
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN
Do not insert rows below this point !$ - 0$ - 0$ - 0$ - 00%NNN
$ - 0$ - 0$ - 0$ - 00%NNN

TOTAL APPROVED CHANGE ORDERS $ - 0 $ - 0 $ - 0 $ - 0 0%

Approved Change Orders Page &P of &N Date Printed: &D

Review PART C Instructions Insert New Row Before pressing the "Insert New Row" button, first click on a cell highlighted in yellow. When you then press the "Insert New Row" button, a new row will be added immediately above the selected cell.

Print STEP 7 - Print the HECO-12

Print PART A only ( Summary and Certification page ) Print PART B only ( Original Contract Line Items ) Print PART C only ( Construction Change Orders ) Return to Main Menu Print the Complete HECO-12 ( PARTS A, B and C )

PART B Instructions

PART B Instructions

The ORIGINAL CONTRACT line items ( and progress for same ) are entered in PART B of the HECO-12 form.
Below is an example PART B with detailed instructions shown in red.
( Scroll down this page to view the step-by-step instructions. )
DESCRIPTIONVALUE OF WORK COMPLETED
PREVIOUSVALUECURRENTDMBE
ITEMBUILDINGADDITIONALTOTALVALUETHISVALUEPERCENTVENDORCERTIFICATE
NO.ELEMENTDESCRIPTIONVALUETO DATEREPORTTO DATECOMPLETENAMESWMNUMBER
$ - 0$ - 0$ - 0$ - 00%NNN
1$ - 0$ - 0$ - 0$ - 00%NNN
Enter a unique number for each line item. ( Examples: 1, 2, 3….. 1A, 1B, 1C…… 100, 200, 300….. 100.1, 100.2, 100.3. ) No specific format is mandated for Item Number field.
1B1010 Floor Construction2nd Floor$ - 0$ - 0$ - 0$ - 00%NNN
Select a Building Element from the ASTM Uniformat list. Building Elements may be entered multiple times.
Enter additional description of the work item ( e.g., floor, wing, etc.), as needed, to provide sufficient detail for progress to be assessed.
( For Example: 1st Floor, 2nd Floor, …., East Wing, West Wing, …., Chiller A, Chiller B, …. etc.)
1B1010 Floor Construction3rd Floor$ - 0$ - 0$ - 0$ - 00%NNN
If payment will be sought for material stored off-site, labor and material must be entered on separate lines.
100 LB1010 Floor ConstructionStructural Steel Material$ - 0$ - 0$ - 0$ - 00%NNN
100 MB1010 Floor ConstructionStructural Steel Installation$ - 0$ - 0$ - 0$ - 00%NNN
Enter the original contract value for each line item.
100 LB1010 Floor ConstructionStructural Steel Material$ 5,675.00$ - 0$ - 0$ - 00%NNN
Do not enter data in these three columns. (These values are computed by worksheet formulas. )
500G2020 Parking LotsLot A$ 30,000.00$ 5,000.00$ 10,000.00$ 15,000.0050%NNN
Enter the total progress (percent complete) for each line item.
501G2020 Parking LotsLot B$ 50,000.00$ 10,000.00$ 27,500.00$ 37,500.0075%NNN
If subcontractor is a Small (S), Woman (W), or Minority (M) - owned business, enter vendor name, and Yes (Y) or No (N) for S, W, M status.
502G2020 Parking LotsLot C$ 30,000.00$ 10,000.00$ 20,000.00$ 30,000.00100%Smith's Paving ServicesYNN99999-999
If subcontractor is a Small (S), Woman (W), or Minority (M) - owned business, enter their Department of Minority Business Enterprise (DMBE) certificate number.

Original Contract Line Items Page &P of &N Date Printed: &D

Proceed to PART B to add items and update progress Return to Main Menu

PART C Instructions

PART C Instructions

The CONSTRUCTION CHANGE ORDERS ( and progress for same ) are entered in PART C of the HECO-12 form.
Below is an example PART C with detailed instructions shown in red.
( Scroll down this page to view the step-by-step instructions. )
VALUE OF WORK COMPLETED
CHNGPREVIOUSVALUECURRENTDMBE
ORD.ITEMTOTALVALUETHISVALUEPERCENTVENDORCERTIFICATE
NO.DESCRIPTIONVALUETO DATEREPORTTO DATECOMPLETENAMESWMNUMBER
$ - 0$ - 0$ - 0$ - 00%NNN
1ADDITIONAL LANDSCAPING$ 10,000.00$ - 0$ - 0$ - 00%NNN
Enter the Change Order Number. ( Examples: 1, 2, 3…..). Additional identifying numbers and/or letters may be added as shown in examples below as needed.
1aADDITIONAL LANDSCAPING - Additional trees and shrubs$ 6,000.00$ - 0$ - 0$ - 00%NNN
1bADDITIONAL LANDSCAPING - Extend irrigation system$ 4,000.00$ - 0$ - 0$ - 00%NNN
If necessary to provide more detail for a specific Change Order, use multiple lines for each component as needed.
3EPDM Roofing$ - 0$ - 0$ - 0$ - 00%NNN
Enter a Change Order description. ( Line items must be broken out in a sufficient level of detail to allow Owner and A/E to assess progress. )
If payment will be sought for material stored off-site, labor and material must be entered on separate lines.
4 LStructural Steel - Installation$ - 0$ - 0$ - 0$ - 00%NNN
4 MStructural Steel - Materials$ - 0$ - 0$ - 0$ - 00%NNN
Enter the scheduled value for each Change Order or component thereof.
5 LStructural Steel - Installation$ 5,675.00$ - 0$ - 0$ - 00%NNN
Do not enter data in these three columns. (These values are computed by worksheet formulas. )
6.1Pave Parking Lot A$ 30,000.00$ 5,000.00$ 10,000.00$ 15,000.0050%NNN
Enter the total progress (percent complete) for each line item.
6.2Pave Parking Lot B$ 50,000.00$ 10,000.00$ 27,500.00$ 37,500.0075%NNN
If subcontractor is a Small (S), Woman (W), or Minority (M) - owned business, enter vendor name, and Yes (Y) or No (N) for S, W, M status.
6.3Pave Parking Lot C$ 30,000.00$ 10,000.00$ 20,000.00$ 30,000.00100%Smith's Paving ServicesYNN99999-999
If subcontractor is a Small (S), Woman (W), or Minority (M) - owned business, enter their Department of Minority Business Certificate (DMBE) certificate number.

Original Contract Line Items Page &P of &N Date Printed: &D

Proceed to PART C to add items and update progress Return to Main Menu

Days

first
second
third
fourth
fifth
sixth
seventh
eighth
ninth
tenth
eleventh
twelfth
thirteenth
fourteenth
fifthteenth
sixteenth
seventeenth
eighteenth
nineteenth
twentieth
twenty-first
twenty-second
twenty-third
twenty-fourth
twenty-fifth
twenty-sixth
twenty-seventh
twenty-eighth
twenty-ninth
thirtieth
thirty-first

Code

Use the Level III classification to describe Building Elements in the Schedule of Values.
Extracted, with permission, from ASTM E1557-09 Standard Classification for Building Elements and Related Sitework-UNIFORMAT II, copyright ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428. A copy of the complete standard may be obtained from ASTM International, www.astm.org.

( Click here to visit astm.org )

Level ILevel IILevel III
Code
A SubstructureA10 FoundationsA1010 Standard Foundations
A1020 Special Foundations
A1030 Slab on Grade
A20 Basement ConstructionA2010 Basement Excavation
A2020 Basement Walls
B ShellB10 SuperstructureB1010 Floor Construction
B1020 Roof Construction
B20 Exterior EnclosureB2010 Exterior Walls
B2020 Exterior Windows
B2030 Exterior Doors
B30 RoofingB3010 Roof Coverings
B3020 Roof Openings
C InteriorsC10 Interior ConstructionC1010 Partitions
C1020 Interior Doors
C1030 Fittings
C20 StairsC2010 Stair Construction
C2020 Stair Finishes
C30 Interior FinishesC3010 Wall Finishes
C3020 Floor Finishes
C3030 Ceiling Finishes
D ServicesD10 ConveyingD1010 Elevators & Lifts
D1020 Escalators & Moving Walks
D1090 Other Conveying Systems
D20 PlumbingD2010 Plumbing Fixtures
D2020 Domestic Water Distribution
D2030 Sanitary Waste
D2040 Rain Water Drainage
D2090 Other Plumbing Systems
D30 HVACD3010 Energy Supply
D3020 Heat Generating Systems
D3030 Cooling Generating Systems
D3040 Distribution Systems
D3050 Terminal & Package Units
D3060 Controls & Instrumentation
D3070 System Testing & Balancing
D3090 Other HVAC Systems & Equipment
D40 Fire ProtectionD4010 Sprinklers
D4020 Standpipes
D4030 Fire Protection Specialties
D4090 Other Fire Protection Systems
D50 ElectricalD5010 Electrical Service & Distribution
D5020 Lighting and Branch Wiring
D5030 Communications & Security
D5090 Other Electrical Systems
E Equipment & FurnishingsE10 EquipmentE1010 Commercial Equipment
E1020 Institutional Equipment
E1030 Vehicular Equipment
E1090 Other Equipment
E20 FurnishingsE2010 Fixed Furnishings
E2020 Movable Furnishings
F Special Construction & DemolitionF10 Special ConstructionF1010 Special Structures
F1020 Integrated Construction
F1030 Special Construction Systems
F1040 Special Facilities
F1050 Special Controls and Instrumentation
F20 Selective Building DemolitionF2010 Building Elements Demolition
F2020 Hazardous Components Abatement
G Sitework & UtilitiesG10 Site PreparationG1010 Site Clearing
G1020 Site Demolition and Relocations
G1030 Site Earthwork
G1040 Hazardous Waste Removal
G20 Site ImprovementsG2010 Roadways
G2020 Parking Lots
G2030 Pedestrian Paving
G2040 Site Development
G2050 Landscaping
G30 Site Mechanical UtilitiesG3010 Water Supply
G3020 Sanitary Sewer
G3030 Storm Sewer
G3040 Heating Distribution
G3050 Cooling Distribution
G3060 Fuel Distribution
G3090 Other Site Mechanical Utilities
G40 Site Electrical UtilitiesG4010 Electrical Distribution
G4020 Site Lighting
G4030 Site Communications & Security
G4090 Other Site Electrical Utilities
G90 Other Site ConstructionG9010 Services and Pedestrian Tunnels
G9090 Other Site Systems & Equipment
*Z Gen'l. Cond. / OH&PZ Gen'l. Cond. / OH&PZ0000 General Conditions / Gen'l Requirements, OH & P
* -The last entry above is not part of the referenced ASTM Uniformat II classification standard.
Click here to view PART B costs summarized by Building Element.

Return to Main Menu http://www.astm.org/

ELEMENT SUMMARY

DSUM FORMULAS FOR DATA COLLECTION FROM PART BELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENTELEMENT
A1010 Standard FoundationsA1020 Special FoundationsA1030 Slab on GradeA2010 Basement ExcavationA2020 Basement WallsB1010 Floor ConstructionB1020 Roof ConstructionB2010 Exterior WallsB2020 Exterior WindowsB2030 Exterior DoorsB3010 Roof CoveringsB3020 Roof OpeningsC1010 PartitionsC1020 Interior DoorsC1030 FittingsC2010 Stair ConstructionC2020 Stair FinishesC3010 Wall FinishesC3020 Floor FinishesC3030 Ceiling FinishesD1010 Elevators & LiftsD1020 Escalators & Moving WalksD1090 Other Conveying SystemsD2010 Plumbing FixturesD2020 Domestic Water DistributionD2030 Sanitary WasteD2040 Rain Water DrainageD2090 Other Plumbing SystemsD3010 Energy SupplyD3020 Heat Generating SystemsD3030 Cooling Generating SystemsD3040 Distribution SystemsD3050 Terminal & Package UnitsD3060 Controls & InstrumentationD3070 System Testing & BalancingD3090 Other HVAC Systems & EquipmentD4010 SprinklersD4020 StandpipesD4030 Fire Protection SpecialtiesD4090 Other Fire Protection SystemsD5010 Electrical Service & DistributionD5020 Lighting and Branch WiringD5030 Communications & SecurityD5090 Other Electrical SystemsE1010 Commercial EquipmentE1020 Institutional EquipmentE1030 Vehicular EquipmentE1090 Other Equipment
Original CO-12 Contract Values, summarized by Building Element000000000000000000000000000000000000000000000000
PROJECT CODE:
AGENCY NAME:Geroge Mason University
PROJECT TITLE:

LEVEL I SUMMARY

CODE DESCRIPTION AMOUNT

ASubstructure- 0
BShell- 0
CInteriors- 0
DServices- 0
EEquipment & Furnishings- 0
FSpecial Construction & Demolition- 0
GSitework & Utilities- 0
ZGen'l. Cond. / Gen'l. Reqmnts / OH&P- 0
TOTAL- 0

LEVEL II SUMMARY

CODEDESCRIPTIONAMOUNT
A10Foundations- 0
A20Basement Construction- 0
B10Superstructure- 0
B20Exterior Enclosure- 0
B30Roofing- 0
C10Interior Construction- 0
C20Stairs- 0
C30Interior Finishes- 0
D10Conveying- 0
D20Plumbing- 0
D30HVAC- 0
D40Fire Protection- 0
D50Electrical- 0
E10Equipment- 0
E20Furnishings- 0
F10Special Construction- 0
F20Selective Building Demolition- 0
G10Site Preparation- 0
G20Site Improvements- 0
G30Site Mechanical Utilities- 0
G40Site Electrical Utilities- 0
G90Other Site Construction- 0
Z00Gen'l. Cond. / Gen'l. Reqmnts / OH&P- 0
TOTAL- 0

LEVEL III SUMMARY

CODEDESCRIPTIONAMOUNT
A1010Standard Foundations- 0
A1020Special Foundations- 0
A1030Slab on Grade- 0
A2010Basement Excavation- 0
A2020Basement Walls- 0
B1010Floor Construction- 0
B1020Roof Construction- 0
B2010Exterior Walls- 0
B2020Exterior Windows- 0
B2030Exterior Doors- 0
B3010Roof Coverings- 0
B3020Roof Openings- 0
C1010Partitions- 0
C1020Interior Doors- 0
C1030Fittings- 0
C2010Stair Construction- 0
C2020Stair Finishes- 0
C3010Wall Finishes- 0
C3020Floor Finishes- 0
C3030Ceiling Finishes- 0
D1010Elevators & Lifts- 0
D1020Escalators & Moving Walks- 0
D1090Other Conveying Systems- 0
D2010Plumbing Fixtures- 0
D2020Domestic Water Distribution- 0
D2030Sanitary Waste- 0
D2040Rain Water Drainage- 0
D2090Other Plumbing Systems- 0
D3010Energy Supply- 0
D3020Heat Generating Systems- 0
D3030Cooling Generating Systems- 0
D3040Distribution Systems- 0
D3050Terminal & Package Units- 0
D3060Controls & Instrumentation- 0
D3070System Testing & Balancing- 0
D3090Other HVAC Systems & Equipment- 0
D4010Sprinklers- 0
D4020Standpipes- 0
D4030Fire Protection Specialties- 0
D4090Other Fire Protection Systems- 0
D5010Electrical Service & Distribution- 0
D5020Lighting and Branch Wiring- 0
D5030Communications & Security- 0
D5090Other Electrical Systems- 0
E1010Commercial Equipment- 0
E1020Institutional Equipment- 0
E1030Vehicular Equipment- 0
E1090Other Equipment- 0
E2010Fixed Furnishings- 0
E2020Movable Furnishings- 0
F1010Special Structures- 0
F1020Integrated Construction- 0
F1030Special Construction Systems- 0
F1040Special Facilities- 0
F1050Special Controls and Instrumentation- 0
F2010Building Elements Demolition- 0
F2020Hazardous Components Abatement- 0
G1010Site Clearing- 0
G1020Site Demolition and Relocations- 0
G1030Site Earthwork- 0
G1040Hazardous Waste Removal- 0
G2010Roadways- 0
G2020Parking Lots- 0
G2030Pedestrian Paving- 0
G2040Site Development- 0
G2050Landscaping- 0
G3010Water Supply- 0
G3020Sanitary Sewer- 0
G3030Storm Sewer- 0
G3040Heating Distribution- 0
G3050Cooling Distribution- 0
G3060Fuel Distribution- 0
G3090Other Site Mechanical Utilities- 0
G4010Electrical Distribution- 0
G4020Site Lighting- 0
G4030Site Communications & Security- 0
G4090Other Site Electrical Utilities- 0
G9010Services and Pedestrian Tunnels- 0
G9090Other Site Systems & Equipment- 0
H0000Gen'l. Cond. / Gen'l. Reqmnts / OH&P- 0
TOTAL- 0