Attachment E Deliverables.pdf
PDF 352 KB Posted
- Solicitation number
- P23001870
- Issued by
- Honolulu County, Hawaii
About this file
This document is an attachment to a Request for Proposal (RFP) issued by the State of Hawaii, Department of Labor and Industrial Relations (DLIR) for an Unemployment Insurance (UI) system modernization project. The RFP seeks qualified contractors to provide UI system modernization software and implementation services, including analysis and requirements finalization, design, development, integration and system testing, user acceptance testing, go-live, warranty, and ongoing maintenance and support. The contract will have defined deliverables, milestones, and phased implementation with specific percentage allocations of the contract value. Time-based deductions will apply for missed deadlines. The contract includes a 12-month warranty period and optional maintenance periods at DLIR's discretion.
The pricing structure includes a 20% holdback to be distributed at the end of the warranty period, and any defects or issues from a phased deployment will be covered under the warranty. The RFP also requires the contractor to provide a detailed implementation strategy, project management plan, staffing plan, testing plan, data migration and conversion strategy, interface implementation strategy, and other technical and operational documentation. The contractor must demonstrate expertise in cloud hosting, security, and data management best practices.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment E 1 RFP-23-01-UI
Attachment E – Deliverables
RFP-23-01-UI
Attachment E 2 RFP-23-01-UI
Deliverables
All Deliverables shall require DLIR approval before invoicing and payment. For Deliverables, the percentage allocation of the contract dollars are as follows:
Phase/Milestone % of Contract
Dollars Description
Analysis and
Requirements
Finalization
Fifteen (15%) Covers the detailed analysis and finalization of all functional and technical requirements and associated documentation.
Design, Development, Integration and System
Testing
Fifteen (15%) Covers detail design, coding and configuration, unit testing, quality assurance through Integration testing of all components. Including, System
Integration Testing of all system functionality and services such as reports, dashboards, correspondence, interfaces, etc. Also, includes system testing of non-functional requirements
UAT Fifteen (15%) Covers DLIR testing of the entire UI
System culminating in acceptance to proceed to Production deployment
Go-Live Thirty (30%) Covers the final preparation and then deployment of the System
Warranty Five (5%) Encompasses the fix of all defects that occur during the warranty period
Hold Back Twenty (20%) Hold Back
The contract price percentage allocations above will apply to any overall Phased Implementation as well.
It is paramount and vital that DLIR’s modernization project is on time and on budget, and as such the following percentage deduction, see table below, shall be applied and compounded per missed phase/milestone deadline defined in the Project Master Schedule (PMS), unless previously negotiated with DLIR.
Milestone
Percentage Deduction
One to Thirty Days Thirty-One to
Sixty Days
Sixty-One to One-
Hundred Twenty
Days
Analysis and
Requirements Finalization 5% 10% 15%
Design, Development, Integration and System
Testing
5% 10% 15%
Attachment E 3 RFP-23-01-UI
Milestone
Percentage Deduction
One to Thirty Days Thirty-One to
Sixty Days
Sixty-One to One-
Hundred Twenty
Days
UAT 5% 10% 20%
Go-Live 10% 20% 30%
Holdback
The State shall pay all invoiced amounts, less a 20% hold back, following receipt of invoice and a fully completed project milestone sign-off form. The distribution of the accumulation of all hold backs shall occur at the end of warranty when all defects have been fixed per DLIR approval, and all documentation is current at the point in time to the satisfaction and approval of
DLIR.
Warranty
Once the system is fully deployed (all benefits, appeals, and tax requirements have been met to
DLIR’s satisfaction and system is operating within DLIR’s SLAs) and accepted by DLIR, the system must deliver continuous performance and functionality. The Contractor shall, deliver a maintenance program that commences with a twelve-month (12) warranty period. The warranty period will continue seamlessly through the optional maintenance periods of the contract, at
DLIR’s discretion.
If the Contractor chooses to perform a phased deployment operating within DLIR’s SLA, then the Contractor shall warranty and maintain each partial deployment. Each partial deployment warranty and maintenance program will cease when the system is fully deployed. A new twelve-month (12) warranty period and maintenance program will then commence for the entire system when full system deployment occurs. Any defect or fix occurring within a phased deployment will be considered under warranty and need to be fixed by the Contractor at no cost. Further, for any subsequently deployed functionality or system requirements that creates a defect in a previously implemented phase, the fix shall be covered.
All defects that arise, or carry forward from go-live, shall be corrected by the Contractor after notification by DLIR to the Contractor. All defects, errors, or deficiencies shall be corrected by the Contractor within the time frames delineated in the Attachment A - Service Level
Agreements (SLAs).
Attachment E 4 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
1 Kick-off Meeting
Agenda, Presentation, and
Minutes
At a minimum, the agenda, presentation materials, and meeting minutes must be approved by DLIR.
Analysis and
Requirements
Finalization
2 Implementation
Strategy and Plan
At a minimum, the Strategy must:
• Include a strategy and schedule for replacing all in scope applications and for sustaining dependencies between legacy applications and replacement applications until the UI system is fully replaced.
• Include a detailed recommended implementation approach.
• If presenting a phased approach detail the strategy and schedule for keeping data in sync
• Describe how the recommended implementation strategy minimizes overall project risk, streamline costs, provide benefits, including rationale that supports the recommendation.
Analysis and
Requirements
Finalization
3 Project Management
Plan
At a minimum, the Project Management Plan must:
• Describe techniques for measuring project performance and progress in an objective manner.
• Detail all management processes, plans, controls, and reports for management of, including but not limited to: quality, communication, configuration, performance, issue escalation and risk, change management, product road map, correspondence, readiness, and maintenance and operations.
• Align with the Implementation
Strategy accepted by DLIR.
Analyses and
Requirements
Finalization
4 Project Master
Schedule
At a minimum, the Detailed WBS and Project
Master Schedule (PMS) must:
• Align with the Implementation
Strategy accepted by DLIR.
• Include all tasks, deliverables, Project
Status Reports, milestones, dependencies, and resources.
Analyses and
Requirements
Finalization
Attachment E 5 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Identify the project’s critical path.
• Describe technique for conducting what-if analyses as the project progresses.
• Collaborate with DLIR to incorporate
State personnel in day-to-day activities for the duration of the project.
• Consider the proper sequencing of the work required to result in a successful project that can be completed within the contract time.
• Be maintained in Microsoft Project or another software tool and version approved by DLIR.
• Be updated at least every two (2) weeks, with any major changes or on an agreed upon time frame, throughout the Project.
5 Staffing Plan At a minimum, the Staffing Plan must address all project tasks:
• Align with the Implementation
Strategy accepted by DLIR.
• Include both Contractor and DLIR resources.
• List all roles, responsibilities, knowledge, skills, abilities.
• Include a Project Organization Chart.
• Include a RACI Matrix.
• Detail the percent of time and duration for each DLIR staff person.
• Be updated periodically as agreed.
Analysis and
Requirements
Finalization
6 Test Master Plan At a minimum, the Plan must:
• Be stored in the project repository site.
• Updates must include:
o Any Test Plan updates to plans for the current or subsequent test process that have been agreed upon.
o Updated test results reported.
Analysis and
Attachment E 6 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone o Load Test results, including the parameters used to validate system performance.
o Performance Test results, including the parameters used to validate system performance.
o Accessibility Test results, including the volume of unique scripts and pass rate.
o Updated requirements traceability matrix tracing all test cases and processes to the relevant DLIR functional and non-functional requirements.
o Substantiation that Conduct
System Configuration/
Customization phase testing
Exit Criteria are achieved o A detailed definition of outstanding issues, if deviations from approved
UAT Exit Criteria are approved by DLIR.
7 Lessons Learned
Collection Process
At a minimum, the Process must:
• Describe how the lessons learned approach supports continuous improvement throughout the project.
• Describe how lessons learned will be captured and documented.
• Describe at what points in the project lessons learned will be evaluated
• Deliver the ongoing lessons learned to the DLIR PMO throughout the project evaluation points.
Analyses and
Requirements
Finalization
8 Requirements
Management Plan
At a minimum, the Plan must:
• Be stored in the project repository.
• Provide detailed definition of processes, approaches, and artifacts employed supporting requirements:
o Elicitation.
o Decomposition.
o Documentation o Change management.
Analysis and
Attachment E 7 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Ensure that the Requirements
Management Plan is implemented at project start and adhered to and incorporated throughout the full lifecycle of the project.
• Ensure customers, stakeholders, managers, developers, and users are all involved in the requirements management process.
• Ensure that a requirements configuration management process is implemented and that no changes are made to baselined requirements without performing a risk analysis, re-estimating impacts to cost and schedule, validation amongst the stakeholders, and obtain DLIR approval.
9 Training on all project tools
At a minimum, depending on the
Contractor’s solution, the training must provide a basic training for DLIR to effectively utilize the following but not limited tools:
• RTM tool
• Defect tracking tool
• Testing tools
Analysis and
Requirements
Finalization
10 Requirements
Workshops
At a minimum, the Requirements Workshops must:
• Be scheduled in a manner that ensures
DLIR Subject Matter Expert (SME) attendance.
• Be well organized and address business functions that invited SMEs can evaluate and define.
• Ensure agendas and supporting materials are distributed prior to the workshop to ensure participants are well prepared.
• Have remote capabilities, be recorded and minutes provided timely after each workshop.
• Follow the issue escalation plan identified in the Project Management
Plan.
Analysis and
Attachment E 8 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Be led by an experienced SME facilitator for the subject being discussed in the workshop.
• Include agendas and all supporting materials needed to support effective requirement decisions (solution demonstrations, design/workflow artifacts, etc.)
• Confirm, clarify, and document all requirements coming out of said workshops to the RTM.
11 Requirements
Baseline
At a minimum, the Requirements Baseline must:
• Include “as-is” and “to-be” requirements.
• Follow the Requirements Matrix excel spreadsheet.
• Be organized by release, iteration, or phase.
• Be documented in the project repository or the agreed upon ALM
• Be formally reviewed and approved by DLIR.
Analyses and
Requirements
Finalization
12 Requirements
Traceability Matrix
At a minimum, the Requirements Traceability
Matrix must:
• Map requirements to System Detailed
Design, test plans, test cases, and implementation/code artifacts.
• Support evaluation at each project phase that all requirements are defined and validated and that all design, test, and code artifacts support
DLIR needs.
• Be organized by release, iteration, or phase.
• Be documented in the project repository or the agreed upon ALM.
• Include a requirements finalization plan/process and finalized requirements
• Be formally reviewed and approved by DLIR.
Analyses and
Attachment E 9 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
13 System Design
Document
At a minimum, the Document must:
• Clearly specify how the current system will be replaced with a new system that provides existing functionality plus new functionality.
• Provide high-level logical, technical-level architecture documentation.
• Include a mapping of requirements.
• Specify all software and hardware to include versions, specifications, and interoperability with other software and hardware products.
• Specify the detailed design that comes out of the requirements workshops.
Analyses and
Requirements
Finalization
14 Software Purchase and Licensing Plan
At a minimum, the Plan must:
• Specify all types of software licenses required to operate the replacement
UI system.
• Identify the purpose of each software.
• Include the quantity of licenses required to fully operate the replacement UI system.
• Include the licenses cost, both initial and on-going, and describe what is included (e.g., permitted use, updates, upgrades, maintenance of software and hosting environment, etc.)
• Align acquisition schedule with the
PMS.
Analyses and
Requirements
Finalization
15 Environment/Infrast ructure Plan
At a minimum, the Plan must detail how the
Contractor plans to:
• Support the system design document.
• Include network device hardware and software inventory.
• Include network topology.
• Report on performance (utilization, errors, etc.) of network devices and ports.
• Identify any issues.
• Provide actionable recommendations to optimize infrastructure for the
Contractor’s solution
Analyses and
Attachment E 10 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Align network update schedule with the PMS.
16 Environment/Infrast ructure Report
At a minimum, the Report must contain the
Contractor’s findings to include:
• Ensure the network infrastructure is reliable, secure, and scalable to meet or exceed the expected demands associated with the Contractor’s solution.
• Network device hardware and software inventory.
• Network topology.
• Current performance (utilization, errors, etc.) of network devices and ports.
• Any issues.
• Contain actionable recommendations to optimize infrastructure for the
Contractor’s solution.
• Align network update schedule with the PMS.
Analyses and
Requirements
Finalization
17 Data
Migration/Conversio n Strategy and Plan
At a minimum, the Strategy and Plan must:
• Include:
o Initial assumptions for migration.
o Business rules/transformations logic involved in the migration
(Hawaii specific rules).
o Dependencies on other systems and data points.
o Impact to existing legacy systems during down-stream data extract.
o Validation/reconciliation requirements.
o Error handling.
o Test conditions.
o Risks/issues log.
o Rollback conditions.
o Data file handling o Detailed Cutover Plan.
• Start data migration activities as early as possible.
Analyses and
Attachment E 11 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Include all legacy data sources, data analysis, data mapping of all data fields from the current systems to the new system, and conversion methods.
• Clearly identify any data that will not be migrated, including an access strategy for non-migrated data.
• Include extract, transform, and load
(ETL) rules.
• Include a data dictionary.
• Specify ETL tool and version.
• Define default data values.
• Specify methods for data cleansing and removing duplicates.
• Include a design, configure, and test conversion and migration process with dry runs.
• Verify and validate multiple mock end-to-end migrations.
• Include regular reports of progress and issues to DLIR.
• Include testing and reporting.
• Describe how and when converted data will be run through all key processes, analyzed for errors and inconsistencies, and tracked until resolved
• Align data migration with the PMS.
18 Interface
Implementation
Strategy
At a minimum, the Strategy must:
• Start interface activities as early as possible.
• Identify interfaces already developed for other states.
• Define the interface architecture and technical specifications.
• Describe the approach for coordinating with stakeholders internal and external to DLIR to ensure they can meet Project deadlines.
• Describe the implementing and testing processes in detail.
Analyses and
Attachment E 12 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Emphasize testing as early in development as possible, including using mock data and files.
• Validate system interface processes using migrated data defined and planned in Attachment –
Requirements Traceability Matrix
[Interfaces] and align with the PMS.
19 Inventory of all
Required Reports and Ad Hoc Queries
At a minimum, the Inventory must:
• Plan and schedule report replacement in WBS to align with implementation schedule.
• Include queries which end users may run themselves.
Analyses and
Requirements
Finalization
20 Confirm and
Document
Requirements for
Reports and Ad Hoc
Queries
At a minimum, the Requirements must:
• Be documented in the project repository.
• Include all required reports and queries required by DLIR in approved inventory
• Specify the environment for reports and queries.
Analyses and
Requirements
Finalization
21 Configuration
Management Plan
At a minimum, the Plan must ensure:
• All critical development documents.
including but not limited to requirements, design, and code. are maintained under an appropriate level of control.
• Processes and tools are in place to identify code versions and to rebuild system configurations from source code.
• Processes and tools are in place to manage system changes, including formal logging of change requests and the review, prioritization and timely scheduling of maintenance actions
• Mechanisms are in place to prevent unauthorized changes being made to the system and to prevent authorized changes from being made to the wrong version.
Analyses and
Attachment E 13 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
22 Organizational
Change Management
Plan
At a minimum, the Plan must:
• Address the change management needs of both the UI Program and IT areas.
• Include an Organizational Readiness
Assessment, a Change Impact
Assessment, and a Gap Analysis.
• Include a Communication Plan.
• Describe the transition to maintenance plan.
• Include release notes.
• Include Readiness Checklist and
Readiness Kit\
• Identify, in collaboration with DLIR, the OCM’s manager/lead.
For implementation the Contractor must demonstrate they have:
• Reviewed Readiness Kit with DLIR leadership and implemented requested changes
• Completed all items on the Readiness
Checklist.
Analyses and
Requirements
Finalization
23 Technical
Documentation
Stored
At a minimum, the Contractor must demonstrate they successfully:
• Stored all technical documentation as directed by DLIR.
Analyses and
Requirements
Finalization
24 Training Plans for each IT and Business
Area
At a minimum, the Plans must:
• Include approach. schedule with all tasks, deliverables, dependencies, and resource requirements. identified risks, issues, and mitigation strategies.
• Include a System Configuration
Training Plan.
• Include a Technical Support Training
Plan.
• Describe the training materials, resource plan, and timeline in support of the State-wide rollout of the solution to DLIR staff.
• Include a Train-the-Trainer approach that leverages the existing DLIR
Training Staff for the solution’s
Analyses and
Attachment E 14 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone implementation Identify any
Contractor staffing resources that would be needed to supplement DLIR
Training staff.
25 Transition Plan At a minimum, the Plan must include the procedures and schedule under which:
• A seamless and transparent transition of data and operations will occur to a subsequent Contractor.
• The Contractor and DLIR will meet to review the status of Transition Plan activities and to resolve any issues.
• Outside Contractors will be notified of procedures to be followed during the transition.
• All DLIR Data and information, documents, mail, instruments, and other relevant information are transferred to DLIR, via secured means.
• Financial reconciliation of all funds.
• Any interim measures deemed necessary to ensure compliance with
Federal and State law and regulations are taken.
• The Contractor and DLIR will revisit the plan at least annually or as agreed upon with DLIR.
Analyses and
Requirements
Finalization
26 FedRAMP ATO Based on the proposal, if available, the
Contractor must provide certification from a
Federal Agency Sponsor that their cloud hosting solution has FedRAMP ATO for systems with a Moderate risk level.
If the Contractor is not FedRAMP certified, and in the cloud, the Contractor shall provide their plan for reaching that certification.
Analyses and
Requirements
Finalization
27 System Security Plan The Contractor must provide a plan to assess the information security controls implemented to determine whether they are operating as intended and the extent to which they are producing the desired results.
This plan must include:
Analyses and
Attachment E 15 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Security monitoring methods.
• Control measurement methodology.
• Data analysis/benchmarking.
• Data Security Plan.
• Continuous improvement cycle.
• Compliance with the Hawaii Security
Standards.
• Incident Response Plan.
• A reliable and timely process that will be taken to detect, respond to, and recover from information security incidents including, but not limited to:
o Cybercrime o Data loss o Privacy violations o Malware intrusions
• Reporting would include business groups impacted and statistical reports on outage impacts and network events. Adverse Events and Security
Incidents shall be reported rapidly with notification times subject to
DLIR approval.
• System Security Plan that outlines the preventative, detective, and corrective controls using the current NIST and compliance with IRS Publication
1075.
28 Database Plan At a minimum, the Plan must:
• Include licensing fees.
• Data modeling standards.
• Conceptual data model including entity classes and relationships, primary attributes, and associations as well as data structure diagram.
• Logical data model (LDM), including data integration approach, entity-relationship diagram, primary keys, foreign keys, attribute and relationship data.
• Physical data model (PDM), including tables, columns, column properties, keys, data types, validation rules, Analyses and
Attachment E 16 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone database triggers, stored procedures, access constraints, indices, views, optimization to meet performance requirements, and security-related components.
• DDL and Initialization database scripts for initial database creation.
29 Software
Development Plan
At a minimum, the Plan must:
• Be stored in the project repository.
• Include software configuration and development methodology and processes.
Analyses and
Requirements
Finalization
30 Product Quality
Metrics for Testing
At a minimum, the Product Quality Metrics must:
• Include MOTS configurations, data migration, and interfaces.
• Classify defect severity according to
DLIR.
• Establish the number of defects allowed in each class to exit each test review gate and enter the next test phase.
• Meet agreed-upon quality metrics.
Analyses and
Requirements
Finalization
31 Change Management
Log
At a minimum the log must have:
• Ongoing tracking for changes approved by the change control board
(CCB)
• Reporting at agreed upon intervals.
Design, Development, Integration and
System Testing
32 Final Approval of
System
Architecture
At a minimum the approval must:
• Identify all major architectural changes.
• Demonstrate the approvals obtained from DLIR.
Design, Development, Integration and
System Testing
33 Configured Tax
System
At minimum, the Contractor must:
• Demonstrate that the design meets the tax functionality requirements using the RTM.
Design, Development, Integration and
System Testing
34 Configured Benefits
System
At minimum, the Contractor must:
• Demonstrate that the design meets the benefits functionality requirements using the RTM.
Design, Development, Integration and
System Testing
35 Configured Appeals
System
At minimum, the Contractor must: Design, Development, Attachment E 17 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Demonstrate that the design meets the appeals functionality requirements using the RTM.
Integration and
System Testing
36 Coding adherence At a minimum the Contractor must:
• Provide code audit report.
Design, Development, Integration and
System Testing
37 Completed
Integration Testing
Checklist
At a minimum, the Checklist must:
• Document successful completion of all activities necessary to implement the software core system capabilities, simple and complex configurations, and custom developed software necessary to create a UI solution that meets DLIR’s requirements.
• Report results from all integration testing and prototype(s) that are a prerequisite to UAT.
• Demonstrate successful completion of all Technical Acceptance activities and Technical Acceptance Testing
Checklist items.
Design, Development, Integration and
System Testing
38 UAT Entry
Certification
At a minimum, the Contractor must meet:
• UAT entry criteria.
Design, Development, Integration and
System Testing
39 Migrate Data At a minimum, the migrated data must:
• Include existing legacy system data
• Meet all DLIR retention requirements.
• Successfully pass all verification and validation scenarios.
• Include testing and reporting.
• Align with the PMS in general and provides migrated data for validation during testing phases.
At a minimum, the Contractor must demonstrate they successfully:
• Conducted all data migration and testing activities.
• Tracked and corrected all defects
• Verified and validated mock migrations.
Design, Development, Integration and
System Testing
Attachment E 18 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
40 Test Cases and
Scripts
At a minimum, the Test Cases and Scripts must:
• Be stored in the project repository.
• Cover o Accessibility o DLIR-specific configurations o Data migration/mapping/cleansing o Interfaces.
o System performance o System security
• Be complete, with step-by-step procedures, required pre-existing events or triggers, and expected results.
Design, Development, Integration and
System Testing
41 UI System is Tested to proceed through review gates
At a minimum, the Contractor must demonstrate they successfully:
• Achieved agreed-upon quality metrics to exit one type of testing and enter the next type of testing. Obtained a go-no go decision from DLIR to exit one test phase and enter the next
Phase.
Design, Development, Integration and
System Testing
42 Automated Testing
Solutions Test Plan and Documentation
At a minimum, the Plan must:
• Be stored in the project repository.
• Align with the Implementation
Strategy accepted by DLIR.
• Describe the automated testing process.
• Include recommended tool(s), version number(s).
• Define the scope of automation.
• Include automation testbed preparation activities.
• Describe the schedule and timeline of scripting and script execution.
• Include developing and executing automated testing for the UI solution.
Design, Development, Integration and
System Testing
43 UAT Ready
Automated Testing
Solution
At a minimum, the Contractor must demonstrate they successfully:
• Prepared UAT Ready Automated
Testing Solution
Design, Development, Integration and
System Testing
Attachment E 19 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Conducted knowledge transfer sessions with DLIR Staff.
44 UAT Ready
Interfaces
At a minimum, the Contractor must demonstrate they successfully:
• Conducted all implementation and testing activities for UAT.
• Tracked and corrected all defects.
• Verified and validated interfaces
• Coordinated with stakeholders internal and external to DLIR.
Design, Development, Integration and
System Testing
45 UAT Ready
Replacement
Reports and
Queries
At a minimum, the Contractor must demonstrate they successfully:
• Conducted all report implementation and testing activities for UAT.
• Tracked and corrected all defects.
• Verified and validated data and results.
Design, Development, Integration and
System Testing
46 UAT Ready
Correspondence
At a minimum, the Contractor must demonstrate they successfully:
• Generated all system correspondence, including forms, etc., per DLIR specifications, for UAT.
Design, Development, Integration and
System Testing
47 Completed ETA
9177 Report
At a minimum, the Contractor must demonstrate they successfully:
• Verified that necessary system functions are available and/or that alternative solutions are developed to help avoid major disruption of services to UI customers and to prevent delays in paying UI benefits when due as identified in the ETA
9177 Report.
• Obtained certification by DLIR and submitted the Report to the U.S. DOL
ETA approximately 180 calendar days
(six (6) months) prior to the projected implementation “Go-Live” date.
Design, Development, Integration and
System Testing
48 UI System is Tested to Meet Agreed-
Upon Quality
Metrics
At a minimum, the Contractor must demonstrate they successfully:
• Met agreed-upon quality metrics before deployment to Production.
UAT
Attachment E 20 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Ensured test results are verified and documented, including formal logging of errors found in testing
• Established separate environments for production, development, and test with production data, not test data.
49 Completed Training At a minimum, the Contractor must demonstrate they successfully met the following, including but not limited to:
• Conducted all Train-the-Trainer training.
• System Configuration training
• Technical Support training.
Go-Live
50 Knowledge
Transfer
At a minimum, the Plan must:
• Provide DLIR Program business and
Technical staff the ability to operate, maintain, configure and modify the
System configurable areas with little or no involvement from the
Contractor.
• Specify methods and metrics for tracking progress in achieving training and knowledge transfer objectives.
• Include a plan of action to transfer that knowledge to DLIR Staff.
Go-Live
51 Annual Software
Maintenance and
Operations Support
Subscriptions
At a minimum, the Contractor must demonstrate they successfully:
• Are hosting and have always hosted, DR facilities, and all Hawaii data within the United States.
• Provided annual subscription, maintenance, and support for all environments.
• Provided upgrades, releases, and patches.
• Conducted Change Management activities.
• Provided updates to all System documentation.
• Provided updates to Training
Materials.
• Maintained Training environment capabilities.
Go-Live
Attachment E 21 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Provided at least one (1) full-time
Staff member, to function as a
Product Analyst
• Submitted Monthly Operations Status
Reports.
52 Implemented
Security Plan
At a minimum, the Contractor must demonstrate they successfully implemented all tasks outlined in the System Security Plan.
Go-Live
53 Completed
Transition Plan
At a minimum, the Contractor must demonstrate they successfully:
• Cooperated with any subsequent
Contractor.
• Provided a written plan that details disposition of DLIR Data and hand-off of services.
• Transferred the data in its custody to any subsequent Contractor, via secured means.
• Complied with audit verification that all data has been transferred that is necessary for record retention, access logging and investigation, confirming that no data is retained once the transfer is complete, received, and usability has been confirmed.
• Certified DLIR Data has been removed and sanitized from the
Contractor’s hosted solution.
• Returned any DLIR proprietary documentation to DLIR.
• Confirmed that any electronic copies of DLIR proprietary information stored on the Contractor’s equipment was transferred back to DLIR before being deleted.
Go-Live
54 Deployment and
Execution
At a minimum, the Contractor must demonstrate that for each deployment they successfully:
• Completed all items on the Readiness
Checklist.
• Completed all Day of Deployment
Action Items.
• Conducted dress rehearsal.
Go-Live
Attachment E 22 RFP-23-01-UI
Work Product
Deliverables Acceptance Criteria
Phases/
Milestone
• Published UAT results
• Acted on Go/No-Go Executive
Decision.
55 Day of Deployment and Execution
At a minimum, the Contractor must demonstrate that for each deployment they successfully:
• Identified Communications Officer and defined Communications Plan.
• Defined Command Center / Bridge
Line during each deployment.
• Identified day of deployment action items and reported status updates throughout the day.
• Enlisted support by DLIR IT team.
• Provided end user support.
• Created and implemented Help Ticket
Management Process
• Defined Roll Back Plan.
Go-Live
56 Go-Live
Certification
At a minimum, the Contractor must demonstrate they successfully completed and executed:
• Deployment Plan.
• Readiness checklist
• All DLIR specifications and approvals.
Go-Live
57 Warranty Acceptance Criteria will be defined in approved Change Requests and their associated Change Orders.
Warranty
File details come from the government source that posted it. Updated .