ATTACHMENT D_Submittal Register.pdf

PDF 118 KB Posted

Attached to
Gavins Point Powerhouse Drain Rehab
Solicitation number
W9128F26QA054
Issued by

About this file

This is a Submittal Items checklist for a U.S. Army Corps of Engineers solicitation for powerhouse drain rehabilitation work at Gavins Point Dam.

The document outlines required submissions organized by submittal designation (SD) number, with corresponding quality control codes and approval authority. Pre-construction submissions (SD-01) include safety and compliance documentation such as Activity Hazard Analysis, Abbreviated Accident Prevention Plan, contractor employee and vehicle identification, proof of insurance, training sign-in sheets (AT Level I, iWATCH, CorpsWatch), E-Verify documentation, criminal checks, identity verification, SSHO/QC resume, work plan and schedule, environmental controls plan, quality control plan, and technician qualifications for CCTV and CIPP installation. Design and product submissions (SD-03) require CIPP product data, design calculations, quality control documentation, and system warranty information. Inspection and testing submissions (SD-09) include pre-cleaning CCTV inspection, pre-installation CCTV inspection, post-installation (warranty) CCTV inspection/acceptance report, daily quality control reports, and post-installation water quality test results. Final closeout submissions (SD-11) require record of disposal and as-built documentation. All items are tracked with Date In, QC Code, Date Out, and QA Code fields for project management purposes. The approval authority for each item is designated as either G-AO (Government-Approve Only) or G-DO (Government-Determine Only).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

Submittal Items Solicitation # W9128F-26-Q-A054

Powerhouse Drain Rehab

May 2026

Gavins Point Dam

Project Office

SD No

Description

Date In

QC Code

Date Out

QA Code

Status

SD-01 Activity Hazard Analysis (AHA); G-AO

SD-01 Abbreviated Accident Prevention Plan (APP); G-AO

SD-01 Identification of Contractor Employees & Vehicles; G-AO

SD-01 Proof of Insurance for Contractors and Subcontractors; G-AO

SD-01 AT Level I Training Sign In Sheets; G-AO

SD-01 iWATCH and/or CorpsWatch Training Sign In Sheets; G-AO

SD-01 E-Verify; G-AO

SD-01 Criminal Check and Identity Verification; G-AO

SD-01 SSHO / QC Resume; G-AO

SD-01 Work Plan and Schedule; G-AO

SD-01 Environmental Controls Plan; G-AO

SD-01 Quality Control Plan; G-AO

SD-01 CCTV Technician's Qualifications; G-AO

SD-01 CIPP Installer's Qualifications; G-AO

SD-03 CIPP Product Data, Design Calculations, and Quality Control; G-DO

SD-03 CIPP System Warranty; G-AO

SD-09 Pre-Cleaning CCTV Inspection; G-DO

SD-09 Pre-Installation CCTV Inspection; G-DO

SD-09 Post-Installation (Warranty) CCTV Inspection / Acceptance Report; G-DO

SD-09 Daily Quality Control (CQC) Reports ; G-AO

SD-09 Post-Installation Water Quality Test Results; G-AO

SD-11 Record of Disposal; G-AO

SD-11 As-Built; G-AO

File details come from the government source that posted it. Updated .