ATTACHMENT B_CLIN BID SHEET1.pdf
PDF 86 KB Posted
- Attached to
- Gavins Point Powerhouse Drain Rehab
- Solicitation number
- W9128F26QA054
About this file
This is a Pricing Schedule template for a liner installation and restoration project. The schedule contains four contract line items (CLINs) structured as lump-sum job prices, with all parts, tools, labor, and equipment included in each line item. CLIN 0001 covers Preparatory and Site Setup Activities; CLIN 0002 addresses Pre-Lining Inspection, Cleaning, and Condition Assessment; CLIN 0003 encompasses Liner Preparation, Installation, and Quality Control; and CLIN 0004 includes Restoration, Demobilization, and Project Closeout. Each item is priced as a single job with a quantity of one.
The pricing instructions require that prices be entered for all individual items within the schedule. Submissions that provide only a total amount without individual line item pricing will be rejected. The Government reserves the right to verify all additions. In the event of discrepancies between individual job prices and the calculated total amount, the individual lump-sum prices will be treated as the submitted price and will take precedence over the total.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE
ITEM NO. DESCRIPTION QUANTITY UNIT AMOUNT
BASIC ITEMS
All parts, tools, labor, and equipment necessary to perform Preparatory and Site Setup Activities
Job
Pre-Lining Inspection, Cleaning, and Condition Assessment
Liner Preparation, Installation, and Quality Control
Restoration, Demobilization, and Project Closeout
TOTAL AMOUNT (CLIN 1 through 4) $
NOTES:
1. Prices must be entered on for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump-sum) prices and the total amount, the lump-sum prices will be considered the price submitted.
File details come from the government source that posted it. Updated .