Attachment_D_-_REVISED_Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- B-2-26-31
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This is a revised architectural drawing set for the South Central Regional Wastewater Treatment Facility roof replacement project being procured by Brevard County Purchasing Services on behalf of the Public Works Department/Facilities Construction. The project involves the complete removal and replacement of the modified bitumen roof system at the facility located at 10001 North Wickham Road, Melbourne, Florida. The scope of work includes tearoff of the existing roof to the structural concrete deck, installation of a new 1/8" tapper system, installation of a 2-ply white Soprema brand modified bitumen rolled roofing system, installation of new wall flashing with termination bars and stainless-steel counter flashing, removal and replacement of the existing lightning protection system, and installation of an exterior ladder. The drawings include a lightning protection plan with detailed specifications for air terminal details, bonding and splicing details, and exhaust fan/vent details. The project is scheduled for a non-mandatory pre-bid walkthrough on March 4, 2026 at 10:00 AM, with a question deadline of March 11, 2026 at 5:00 PM, and sealed bids due by March 25, 2026 at 10:00 AM. Contractors must complete the project within 45 calendar days from Notice to Proceed, including a 14-day permitting period, with an additional 30 calendar days allowed for final completion.
Qualified contractors must hold a current State of Florida or Brevard County contractor license as a Roofing Contractor, General Contractor, or Building Contractor, and must provide a minimum of five references from similar projects completed within the past three years. Bids must include a notarized bid invitation form, completed price sheet, and a bid bond equal to 5% of the proposed bid amount. For contracts exceeding $200,000, a Public Construction Bond equal to 100% of the contract price is required within five days of award notice. The contractor shall provide a 20-year Manufacturer's No Dollar Limit Total System Roofing Warranty and one-year contractor warranty on labor, with all pricing to remain firm for 90 days from bid opening and include FOB Destination with all shipping, handling, packing, delivery charges, and fuel surcharges. Required insurance includes General Liability Insurance, Auto Liability Insurance, and Workers' Compensation insurance with specified limits. Soprema is identified as the Basis of Design, though alternative manufacturers may be substituted with pre-bid approval. The County is exempt from federal excise taxes and all sales taxes. No specific set-asides for disadvantaged enterprises or minority-owned businesses are identified in the procurement documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabulation_-_Names_Only.pdf | ||
| Addendum_2.pdf | ||
| Addendum_1.pdf | ||
| Inv_&_Specs_B22614.pdf | ||
| Attachment_B_-_Drawings.pdf | ||
| Attachment_C_-_Substitution_Request_Form.pdf | ||
| Attachment_A_-_General_Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.17.2026
Shad L Traylor Digitally signed by Shad L Traylor DN: CN=Shad L Traylor, dnQualifier=A01410D000001879FE2E57A00033021, O=Florida, C=US Reason: I am the author of this document Date: 2026.03.17 10:24:37-04'00'
1'
4" 1'
4"
1'
4"
RITCH GRISSOM
MEMORIAL
WETLANDS
COUNTY OWNED)
GENERAL NOTES:
N
. W
IC
KH
AM
R O
AD
, M
EL
BO
U R
N E, F
LO
R
ID
A
R
EV
D
AT
E
R
EV
IS
IO
N
D R
AW
IN
G T
IT
LE
01-07-26
250099
PROJ. NO. :
SCALE:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DRAWING NO.:
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
C
EN
TE
R
BR
EV
AR
D
C O
U N
TY
S
O U
TH
C
EN
TR
AL
W
W
TP
ENGINEER OF RECORD
PE #55008
DAVID E. ALLEY, PE
PE #55008
WW
W.
CE
GE
NG
INE
ER
ING
.C
OM
ME
LB
OU
RN
E, FL
EA
U G
AL
LIE
BL
VD
, S
UIT
E A
TEL
. 3
.25
3.1
C.
O.
A.
C on su lti ng E ng in ee rs
CO
NS
TR
UC
TI
ON
EN
GI
NE
ER
IN
G
GR
OU
P
PLAN NOTES:
E-100
DEA
MAJ
MAJ
AS NOTED
LI
G
H
TN
IN
G
P R
O
TE
C
TI
O N
P
LA
N A
N D
D
ET
AI
LS
GENERAL REQUIREMENTS
ELECTRICAL NOTES
SUBMITTALSABBREVIATIONS:
ALTERATION NOTES
PROJECT COMPLETION REQUIREMENTS
AIR TERMINAL DETAIL "A" TYPICAL BONDING / SPLICING DETAILSEXH. FAN / VENT DETAIL "B"
LIGHTNING PROTECTION PLAN N
KEY PLAN N
BID
SET
Digitally signed by David E Alley
Date:
2026.01.08
13:46:35-05'00'
| WWTF Reroof Electrical IFP 1-7-2026.pdf |
| WWTF Reroof Architectural Revision 1 3-16-2026.pdf |
File details come from the government source that posted it. Updated .