Attachment_C_-_Substitution_Request_Form.pdf
PDF 71 KB Posted
- Solicitation number
- B-2-26-31
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This is a Substitution Request Form attachment for Brevard County Purchasing Services' roof replacement project at the South Central Regional Wastewater Treatment Facility in Melbourne, Florida. The form serves as the mechanism through which contractors may propose equivalent products or materials as alternatives to those specified in the original bid documents. Contractors submitting substitution requests must provide detailed information for each proposed equivalent item, including the item number, item description, manufacturer name, model number, and packaging quantities, along with supporting documentation such as cut sheets and data sheets. The form requires contractors to acknowledge that failure to submit exceptions indicates their commitment to supply all materials exactly as specified, and any proposed equivalent deemed a material deviation from specifications will result in mandatory bid rejection.
The substitution request form emphasizes that contractors submit proposed equivalents entirely at their own risk and that the form cannot be used to attach conditions, limitations, or other provisos to bids. Contractors must complete the form with their company name, address, telephone, fax information, and authorized signature. The Authority retains sole discretion to evaluate whether proposed substitutions constitute acceptable equivalents or material deviations from the contract specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabulation_-_Names_Only.pdf | ||
| Addendum_2.pdf | ||
| Attachment_D_-_REVISED_Drawings.pdf | ||
| Addendum_1.pdf | ||
| Inv_&_Specs_B22614.pdf | ||
| Attachment_B_-_Drawings.pdf | ||
| Attachment_A_-_General_Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C - SUBSTITUTION REQUEST FORM
Contractors must list exceptions for applicable items below. It shall be understood that if no exception is taken, the Contractor shall supply all material exactly as specified.
Contractors may list proposed equivalent items below for consideration by the Authority. Submittals must include the item number, item description, manufacturer’s name, model number, and packaging quantities for each product the Contractor proposes as a substitution including cut sheets, data sheets, or back-up documents, etc. This form may not be used to attach conditions, limitations, or other provisos to the bid.
Contractors are advised that any proposed equivalent or exception deemed to constitute a material deviation from the specifications shall result in mandatory rejection of the bid. Submission of proposed equivalents is entirely at the Contractor’s own risk.
Company Name
Address
Telephone Fax
Authorized Signature
Printed Signature
ATTACHMENT C - SUBSTITUTION REQUEST FORM
File details come from the government source that posted it. Updated .