Attachment D - Field Devices To Be Replaced on Boiler 2.pdf

PDF 3 MB Posted

Attached to
J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS
Solicitation number
36C24226Q0816
Issued by

About this file

This document is an attachment listing field devices on Boiler 2 that are to be replaced as part of a boiler replacement/upgrade project.

The attachment identifies 53 field devices distributed across six subsystems: Gas Train, Gas Pilot, LPG Pilot, #2 Oil Train, Atomizing Steam, Feedwater, Steam, Combustion Air, and Flue Gas. Each device is catalogued with a tag number, descriptive name, device ID number (where applicable), control panel assignment (SCADA, BMS, or TITAN), and panel point reference. Devices to be replaced in kind include transmitters (gas flow, pressure, temperature, water flow, steam flow), solenoid valves, shutoff valves, damper actuators, safety switches, pressure cutoff switches, analyzers, and related control equipment. Notable devices include gas flow orifice transmitter GT-FIT-P-1118, gas header pressure transmitter GT-FIT-P-1100, oil burner pressure transmitter OIL-PIT-P-11124, and oxygen analyzer ZR22/ZR402. The contractor is required to verify field conditions during installation to ensure compatibility and proper replacement of all identified devices. Devices highlighted in yellow indicate items requiring in-kind replacement verification.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Typewritten Text = Field devices to be replaced in kind. Contractor shall verify in field

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Typewritten Text Attachment D - Field Devices on Boiler 2 To Be Replaced

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

VHAMORANDERE

Highlight

File details come from the government source that posted it. Updated .