Attachment D.9 Drawings 9 of 10 (6 Pages).pdf
PDF 18 MB Posted
- Solicitation number
- 36C26323R0042
About this file
This document provides details for a federal contract solicitation. The solicitation number is 36C26323R0042 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 for preventative Legionella services. The solicitation seeks to address Phase 3 of project 618-18-108 to prevent Legionella bacterial growth in water systems. Specific drawings related to the project work are provided in Attachment D.9, though their contents are not disclosed. The solicitation appears to require Legionella prevention services from contractors in order to protect water quality and safety at VA facilities.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY NOTES: GENERAL NOTES:
TS
TST
S T
S
T S
T S
TS
T S
TS
T
S
TS
TS
TS
TS
T S
TS
TS
T S
TS
TS
TS
T S
T S
TS
TS
TS
TS
NOTE THAT THESE KEY NOTES ARE SPECIFIC TO THIS DRAWING (DO
NOT REFER TO MASTER KEY NOTES ON SHEET 1356-PP003). NOT ALL
KEY NOTES ARE UTILIZED AND MAY HAVE GAPS OF MISSING NOTE
NUMBERS TO KEEP GROUPS OF TEN NOTES AVAILABLE PER PHASE.
SHUT-OFF VALVE #10.C AND VALVE #11.B TO ISOLATE SECTION OF
PIPING INDICATED FOR REMOVAL. REFER TO GENERAL NOTES FOR
PROVISIONS TO BE TAKEN TO VERIFY ANY EXISTING VALVE LEAKAGE.
ONCE ISOLATED, REMOVE SECTION OF 8" GALVANIZED PIPING LOOP.
CUT INTO SECTIONS SMALL ENOUGH TO TRANSPORT TO LOADING
DOCK AREA FOR REMOVAL. INCLUDE DEMOLITION OF EXISTING
SUPPORTS MOUNTED TO PIPING RACKS, NEW PIPING WILL BE
SUPPORTED ONTO EXISTING RACK STRUCTURE BUT SHOULD BE
PROVIDED WITH NEW PIPE CLAMPS.
NOT USED THROUGH KEY NOTE
INSTALL NEW SECTION OF 8" SCHEDULE 10 STAINLESS STEEL PIPING TO
REPLACE PREVIOUSLY REMOVED. INSTALL IN EXACT SAME LOCATION
AS REMOVED SECTION OF PIPING. PROVIDE NEW SUPPORT CLAMPS
ON EXISTING PIPING RACK AS REQUIRED.
PROVIDE TEMPORARY END CAPS AT EITHER SIDE OF NEW PIPING
SECTION. FIRST PERFORM A PRESSURE TEST ON PIPING SECTION PER
SPECIFICATION REQUIREMENTS, AND THEN STERILIZE PIPING USING
CHLORINE SOLUTION FOR AT LEASE 24 HOURS PRIOR TO FLUSHING.
INCLUDE DRAIN/FILL VALVES ON EITHER END TO ACCOMPLISH.
INSULATE ENTIRE LENGTH OF PIPING PER SPECIFICATION
REQUIREMENTS. INCLUDE CONTINUOUS PVC COVERING THROUGHOUT
AND PREPARE ENDS FOR EXTENSION TO NEXT SUB-PHASE PIPING
WHICH WILL INCLUDE INSULATING ALL VALVE BODIES.
NOT USED THROUGH KEY NOTE
SHUT-OFF VALVE 7.C AND VALVE G.B (BOTH FURTHER OUT TO NEXT
ADJACENT RISER VALVES OUTSIDE THE EXTENTS OF THIS PHASE
DRAWING) TO ISOLATE RISER J AND RISER FOR VALVE REPLACEMENT.
REFER TO GENERAL NOTES FOR PROVISIONS TO BE TAKEN TO VERIFY
ANY EXISTING VALVE LEAKAGE AND AREAS THAT WILL BE AFFECTED BY
THIS MAJOR WATER OUTAGE.
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAKE-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 5" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
10 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAKE-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 5" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
10 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAKE-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 4" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
10 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
DURING OUTAGE, INSTALL THERMOWELLS ON BOTH HOT AND COLD
WATER MAINS TO ACCEPT AN INSERTION TYPE TEMPERATURE SENSOR
TO BE INTEGRATED INTO BUILDING AUTOMATION SYSTEM FOR
INFORMATION MONITORING AND TRENDING.
INSTALL STRAP ON TEMPERATURE SENSORS INDICATE ON
RECIRCULATION PIPING. REPAIR ANY DAMAGED OR REMOVED
INSULATION ON COMPLETION.
ONCE VALVE INSTALLATION IS COMPLETED, INSULATE ALL AFFECTED
PIPING AND NEW VALVE BODIES COMPLETELY. COVER EVERYTHING
WITH PVC JACKET COVERS AND SEAL AS REQUIRED. INSULATION CAN
OCCUR DURING NORMAL HOURS AFTER OUTAGE COMPLETION, BUT
SHOULD NOT BE DELAYED FOR ANY MORE THAN 3 BUSINESS DAYS.
REROUTING 8" COLD WATER MAIN TO WEST AS INDICATED WILL TRAVEL
THROUGH SOME HEAVILY CONGESTED SPACES. HOWEVER, THIS WILL
BE NECESSARY TO GET OVER TO THE OPEN WAREHOUSE AREA
WHERE ROUTING OF NEW PIPING MAIN WILL BE MUCH EASIER.
AT THIS POINT PIPING LEAVES THE INTERSTITIAL SPACE AND INTO AN
OPEN WAREHOUSE AREA. SCISSOR LIFTS WILL BE REQUIRED FOR
WORKING IN AREA OF HIGH STRUCTURE, AND ALL WORK EFFORT IN
THIS AREA SHALL BE DURING OVERTIME TO AVOID INTERFERENCE
WITH WAREHOUSE STAFF AND FUNCTION.
NOTE THAT NEW STAINLESS STEEL COLD WATER MAIN ROUTED
ACROSS CORRIDOR SHALL BE HIGH ABOVE ALL OTHER SERVICES.
CONTRACTOR TO REVIEW ACCESSIBILITY TO THIS AREA TO CONFIRM
SITE CONDITIONS PRIOR TO BID.
PHASE 8.1 (PREINSTALLATION) - DETAIL 1 AND 10-19 SERIES KEY NOTES):
APPROACH WITHIN THIS PHASE WILL BE SLIGHTLY DIFFERENT THAN
PREVIOUS PHASES 1-3 IN THAT THE NEW STAINLESS STEEL PIPING MAINS
WILL BE PREINSTALLED AND TESTED PRIOR TO DEMOLITION OF EXISTING
MAINS. REFER TO DETAIL 1 ON THIS DRAWING FOR LOCATION OF NEW
SECTION OF PIPING LOOP ON OPPOSITE NORTH WALL WITHIN AVAILABLE
SPACE OF EXISTING PIPING RACK ON THAT SIDE.
PHASE 8.2.1 (RISER J VALVE REPLACEMENT - 30+ SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF RISER J AND REPLACE EXISTING 5" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• BASEMENT: AMMS - WAREHOUSE, SPD.
• FIRST FLOOR: MECHANICAL ROOM 1J, MENTAL HEALTH CLINIC,
PSYCHIATRIC ADMINISTRATION, EDUCATION, SUBSTANCE ABUSE CLINIC.
• SECOND FLOOR: MECHANICAL ROOM 2J, ON-CALL, PRIMARY CARE
CLINIC, SICU, SURGERY-RECOVERY SURGERY-WAITING
• THIRD FLOOR: MECHANICAL ROOM 3J, CARDIOLOGY -
CATH/OFFICES/CARIOLOGY HOLDING/ECHO/EP LAB, PRIMARY CARE -
MEDICAL OFFICES, MEDICAL RESEARCH.
• FOURTH FLOOR: MECHANICAL ROOM 4J, POLYTRAUMA INPATIENT UNIT,
MEDICAL RESEARCH, CENTRAL STAFF LOCKERS, VOL SVC AMERICAN
LEGION
PHASE 8.2.2 (RISER K VALVE REPLACEMENT - 30+ SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF RISER K AND REPLACE EXISTING 5" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• FIRST FLOOR: MECHANICAL ROOM 1K, BEHAVIORAL MED BEDS,
REHABILITATION MEDICAL SERVICE, CENTRAL STAFF LOCKERS,
PSYCHIATRIC ADMINISTRATION, SOCIAL WORK, EDUCATION
• SECOND FLOOR: MECHANICAL ROOM 2K, INPATIENT SURGICAL BEDS, 23
HOUR OBSERVATION BEDS, CENTRAL STAFF LOCKERS, SURGERY-
STAFF, IMAGING STORAGE
• THIRD FLOOR: MECHANICAL ROOM 3K, INPATIENT MEDICAL BEDS,
CENTRAL STAFF LOCKER, CARDIOLOGY-STAFF, ON-CALL.
• FOURTH FLOOR: MECHANICAL ROOM 4K, ACS (PRIMARY) - POLYTRAUMA
OUTPATIENT / ADMIN, OUT LEASED SPACE - AFGE, CLINICAL SERVICES
ADMINISTRATION, NURSING SERVICE ADMIN, MEDICAL RESEARCH.
PHASE 8.2.3 (SHAFT 6 VALVE REPLACEMENT - 30+ SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF SHAFT 6 AND REPLACE EXISTING 4" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• BASEMENT: CENTRAL STAFF LOCKERS, ENGINEERING, NUTRITION /
FOOD SERVICE, AMMS - WAREHOUSE
• FIRST FLOOR: NUTRITION / FOOD SERVICE, MENTAL HEALTH REHAB,
SPECIALTY CARE SCHOOL OF ANESTHESIA, PROVIDERS LOUNGE,
FITNESS CENTER, RECREATIONAL THERAPY
• SECOND FLOOR: SURGERY - STAFF, EDUCATION, PSYCHOLOGY, SOCIAL
WORK, VETERANS ASSISTANCE / SERVICE ORGANIZATIONS, CHAPLAIN
SERVICE, EDUCATION.
• THIRD FLOOR: ACS (PRIMARY) - RESPIRATORY THERAPY, MICU BEDS,
CARDIOLOGY - CATH LAB, ON-CALL
• FOURTH FLOOR: MCCR - BUSINESS OFFICE, FISCAL, VOLUNTARY
SERVICE, ENVIRONMENTAL MANAGEMENT.
PHASE 8.3 (DEMO):
REFER TO DRAWING PP108.2 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.4 (WATER HEATER INSTALLATION / FINAL CONNECTIONS):
REFER TO DRAWING PP108.3 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
ISOLATION OF MAIN PIPING LOOP SECTIONS:
PERFORM THE FOLLOWING PROCEDURE STEPS TO PROPERLY ISOLATE
EACH SECTION OF PIPING LOOP AS DESCRIBED IN PHASING SEQUENCES,
1) SHUT-OFF ISOLATION VALVES ON INTERIOR SIDE OF LOOP BEING
MODIFIED OR REMOVED TO MAINTAIN SERVICES TO ALL RISERS.
2) REMOVE SECTION OF PIPING, OR TAP TEMPORARY DRAIN CONNECTION
TO VERIFY VALVES ARE HOLDING FOR A MINIMUM PERIOD OF 24 HOURS.
3) IF NO VALVE LEAKAGE, OR MINIMAL AMOUNT, IS WITNESSED THAN
PROCEED TO PIPING MODIFICATION AND/OR DEMOLITION SCOPE OF WORK
IDENTIFIED.
4) IF MODERATE OR SIGNIFICANT VALVE LEAKAGE IS WITNESSED THAN
PROVIDE 1.5" VALVE TAP WITH THREADED CONNECTION TO HOSE TO
NEAREST MECHANICAL ROOM DRAIN DISCHARGE LOCATION. THIS
TEMPORARY DRAIN CONNECTION AND HOSE SHALL BE REMOVED ONCE
NEW RISER VALVE REPLACEMENTS ARE COMPLETED.
---CONTRACTOR WILL BE RESPONSIBLE TO KEEP ON SITE AT LEAST FOUR(4)
SETS OF 1.5" VALVES WITH THREADED CONNECTIONS AND TWO(2) 250' LONG
HOSES OF 1.5" DIAMETER IN SIZE.
CONTRACTOR ALLOWANCE FOR TEMP FIXTURES OR WATER SERVICES:
ASSUME THAT DURING THE COURSE OF THE 8 PHASE DOMESTIC WATER
LOOP REPLACEMENT THAT SPECIFIC AREAS WILL REQUIRE TEMPORARY
SINKS AND/OR EXTENSION OF TEMPORARY WATER SERVICES TO THEIR
DEPARTMENT. CONTRACTORS SHALL INCLUDE THE FOLLOWING
ALLOWANCES WITHIN THEIR BASE BID TO ACCOMMODATE THOSE
REQUESTS WHEN THEY ARISE DURING OUTAGE COORDINATION WITH VA
FACILITIES.
• INCLUDE UP TO TWELVE(12) TEMPORARY SINK FIXTURES TIED INTO AN
ADJACENT RISER SERVICE. EACH SINK WILL REQUIRE UP TO 50' OF
COPPER PIPE FOR WATER CONNECTIONS, OTHERWISE HOSE WILL BE
UTILIZED IF DISTANCE EXCEEDS THAT SPECIFIED AMOUNT OF PIPING.
• INCLUDE FOUR(4) TEMPORARY BACK-UP WATER CONNECTIONS FOR
COLD WATER SERVICE TO AN ENTIRE DEPARTMENT. TEMPORARY COLD
WATER MAIN SHALL BE ASSUMED AT 2" SIZE AND EXTEND A MAXIMUM OF
250' TO CONNECT INTO AN ADJACENT RISER SERVICE.
• NOTE THAT THE ABOVE IS FOR ENTIRE PROJECT, NOT PER PHASE.
WXYZAABBCCDDEEFFGGHHJJ
HH'
SHAFT 7
RISER J
BM-123F
STAIR
1356-PP108.1
1356-PP108.3
2 1356-PP108.1
7.C
7.B
J.B'
J.C'
J.A'
J.B
J.A
J.C
K.B'
K.C'
K.A'
K.B
K.A K.C
1356-PP108.1
TO SHAFT 6
TO RISER K
1356-PP108.2
8" CW
WORK INDICATED PAST
THIS POINT IS INSIDE
WAREHOUSE DURING
OVERTIME HOURS.
38 WORK INDICATED PAST
THIS POINT IS INSIDE
WAREHOUSE DURING
OVERTIME HOURS.
C W
8" CW
C W
8" CW 8" CW
REFER TO DRAWING 1356-PP108.3
FOR ADDITIONAL WORK WITHIN THIS
J-PUMP MECHANICAL ROOM
DDEE
J.B'
J.A'
J.C'
J.B
J.A
J.C
30 REFER TO DETAIL
2/1356-PP107 FOR
VALVE LOCATION.
REFER TO DETAIL
2/1356-PP101.1 FOR
VALVE LOCATION.
2" HW
3/4" RHW
3" CW
5" CW UP
1 1/2" RHW UP
4" HW UP
4" HW
1 1/2" RHW
5" CW
4" HW
2 1/2" RHW
8" CW
8" CW
5" CW
8" CW
8" CW
2 1/2" RHW
4" HW
W
K.B'
K.B
K.A
K.A'
K.C
K.C'
REFER TO DETAIL
2/1356-PP107 FOR
VALVE LOCATION.
REFER TO DETAIL
2/1356-PP101.1 FOR
VALVE LOCATION.
5" CW
1 1/2" RHW
4" HW
5" CW
8" CW
8" CW
8" CW
8" CW
2 1/2" RHW
4" HW
X
6.B
6.C
6.A
6.A'
6.B'
6.C'
REFER TO DETAIL
2/1356-PP101.1 FOR
VALVE LOCATION.
REFER TO DETAIL
2/1356-PP107 FOR
VALVE LOCATION.
4" CW
8" CW
2 1/2" RHW
4" HW
3" HW
1 1/4" RHW
8" CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
C
E
G
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:4
:4
A M
BASEMENT INTERSTITIAL - PHASE
8.1 - DOMESTIC WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP108.1
1/16" = 1'-0"
PHASE 8.1 - NEW
1/4" = 1'-0"
ENLARGED - PHASE 8.2.1
1/4" = 1'-0"
ENLARGED - PHASE 8.2.2
1/4" = 1'-0"
ENLARGED - PHASE 8.2.3
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
11/30/2022
Revisions: Date:
KEY NOTES:
GENERAL NOTES:
NOTE THAT THESE KEY NOTES ARE SPECIFIC TO THIS DRAWING (DO
NOT REFER TO MASTER KEY NOTES ON SHEET 1356-PP003). NOT ALL
KEY NOTES ARE UTILIZED AND MAY HAVE GAPS OF MISSING NOTE
NUMBERS TO KEEP GROUPS OF TEN NOTES AVAILABLE PER PHASE.
NOT USED THROUGH KEY NOTE
SHUT-OFF VALVE #7.C AND VALVE #6.B' TO ISOLATE SECTION OF PIPING
INDICATED FOR REMOVAL. REFER TO GENERAL NOTES FOR
PROVISIONS TO BE TAKEN TO VERIFY ANY EXISTING VALVE LEAKAGE.
ONCE ISOLATED, REMOVE SECTION OF 8" GALVANZED PIPING LOOP.
CUT INTO SECTIONS SMALL ENOUGH TO TRANSPORT TO LOADING
DOCK AREA FOR REMOVAL. INCLUDE DEMOLITION OF EXISTING
SUPPORTS MOUNTED TO PIPING RACKS, NEW PIPING WILL BE
SUPPORTED ONTO EXISTING RACK STRUCTURE BUT SHOULD BE
PROVIDED WITH NEW PIPE CLAMPS.
PHASE 8.1 (PREINSTALLATION):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2.1 (RISER J VALVE REPLACEMENT):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2.2 (RISER K VALVE REPLACEMENT):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2.3 (SHAFT 6 VALVE REPLACEMENT):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.3 (DEMO - REFER TO DETAIL 1 AND 30+ SERIES KEY NOTES):
AFTER ALL NEW PIPING HAS BEEN INSTALLED AND RECONNECTED INTO
MAIN LOOP, THEN THE EXISTING GALVANIZED 8" COLD WATER PIPING MAIN
MAY REMOVED. SINCE ALL OUTAGES WERE PERFORMED IN PREVIOUS
PHASE THERE WILL BE NO RESTRICTIONS OR OUTAGE COORDINTION
NECESSARY DURING THIS SUB-PHASE.
PHASE 8.4 (WATER HEATER INSTALLATION / FINAL CONNECTIONS):
REFER TO DRAWING PP108.3 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
ISOLATION OF MAIN PIPING LOOP SECTIONS:
PERFORM THE FOLLOWING PROCEDURE STEPS TO PROPERLY ISOLATE
EACH SECTION OF PIPING LOOP AS DESCRIBED IN PHASING SEQUENCES,
1) SHUT-OFF ISOLATION VALVES ON INTERIOR SIDE OF LOOP BEING
MODIFIED OR REMOVED TO MAINTAIN SERVICES TO ALL RISERS.
2) REMOVE SECTION OF PIPING, OR TAP TEMPORARY DRAIN CONNECTION
TO VERIFY VALVES ARE HOLDING FOR A MINIMUM PERIOD OF 24 HOURS.
3) IF NO VALVE LEAKAGE, OR MINIMAL AMOUNT, IS WITNESSED THAN
PROCEED TO PIPING MODIFICATION AND/OR DEMOLITION SCOPE OF WORK
IDENTIFIED.
4) IF MODERATE OR SIGNIFICANT VALVE LEAKAGE IS WITNESSED THAN
PROVIDE 1.5" VALVE TAP WITH THREADED CONNECTION TO HOSE TO
NEAREST MECHANICAL ROOM DRAIN DISCHARGE LOCATION. THIS
TEMPORARY DRAIN CONNECTION AND HOSE SHALL BE REMOVED ONCE
NEW RISER VALVE REPLACEMENTS ARE COMPLETED.
---CONTRACTOR WILL BE RESPONSIBLE TO KEEP ON SITE AT LEAST FOUR(4)
SETS OF 1.5" VALVES WITH THREADED CONNECTIONS AND TWO(2) 250' LONG
HOSES OF 1.5" DIAMETER IN SIZE.
CONTRACTOR ALLOWANCE FOR TEMP FIXTURES OR WATER SERVICES:
ASSUME THAT DURING THE COURSE OF THE 8 PHASE DOMESTIC WATER
LOOP REPLACEMENT THAT SPECIFIC AREAS WILL REQUIRE TEMPORARY
SINKS AND/OR EXTENSION OF TEMPORARY WATER SERVICES TO THEIR
DEPARTMENT. CONTRACTORS SHALL INCLUDE THE FOLLOWING
ALLOWANCES WITHIN THEIR BASE BID TO ACCOMODATE THOSE REQUESTS
WHEN THEY ARISE DURING OUTAGE COORDINATION WITH VA FACILITIES.
• INCLUDE UP TO TWELVE(12) TEMPORARY SINK FIXTURES TIED INTO AN
ADJACENT RISER SERVICE. EACH SINK WILL REQUIRE UP TO 50' OF
COPPER PIPE FOR WATER CONNECTIONS, OTHERWISE HOSE WILL BE
UTILIZED IF DISTANCE EXCEEDS THAT SPECIFIED AMOUNT OF PIPING.
• INCLUDE FOUR(4) TEMPORARY BACK-UP WATER CONNECTIONS FOR
COLD WATER SERVICE TO AN ENTIRE DEPARTMENT. TEMPORARY COLD
WATER MAIN SHALL BE ASSUMED AT 2" SIZE AND EXTEND A MAXIMUM OF
250' TO CONNECT INTO AN ADJACENT RISER SERVICE.
• NOTE THAT THE ABOVE IS FOR ENTIRE PROJECT, NOT PER PHASE.
1 29
WXYZAABBCCDDEEFFGGHHJJ
HH'
J.B'
J.A'
J.C'
J.B
J.C
J.A
K.B
K.A
K.A'
K.B'
K.C'
K.C
7.C
7.B
6.B
6.B'
6.A'
6.A
6.C
6.C'
1356-PP108.2
BP.E
7.A
BP.B
BP.A
BP.C
DD EE
8" CW
8" CW
2 1/2" RHW
4" HW
2" HW
3/4" RHW 3" CW
3" HPS
4" PC
6" HPS
2 1/2" CHW
4" HW
9 8
8" CW
8" CW
8" CW
8" CHWS
8" CHWS
8" CW
8" CW
EXISTING
INCOMING
WATER
SERVICE
8" CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
C
E
G
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:4
:1
A M
BASEMENT INTERSTITIAL - PHASE
8.3 - DOMESTIC WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP108.2
1/16" = 1'-0"
PHASE 8.3 - DEMO
NO SCALE
PHASE 7 ELEVATION - WEST INTERSTITIAL 3
NO SCALE
PHASE 8 ELEVATION - MECHANICAL ROOM WATER SERVICE
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
T S
T S
T S
T S
T S
KEY NOTES:GENERAL NOTES:GENERAL NOTES:
T S
T S
T S
XYZAABBCC
1356-PP108.2
SWH
70-SW-01
STEAM PRESSURE REDUCING STATION
INSTALLED UNDER HIGH PRESSURE
STEAM HEADER, SEE DRAWING MP801.1
DWP
70-SW-02
DWP
70-SW-01
6" CW
6" CW
8" CW
C W
C W
8" CW 8" CW
C
W4" HW
C W
/2
/2
C H
W
8" CW
C W
4" HW 4" HW
C W
NOTE THAT DOUBLE DASHED LINES REPRESENT A STRUCTURAL
MEZZANINE PLATFORM. PIPING SHOWN IS BOTH ABOVE AND BELOW.
NOTE THAT THESE KEY NOTES ARE SPECIFIC TO THIS DRAWING (DO
NOT REFER TO MASTER KEY NOTES ON SHEET 1356-PP003). NOT ALL
KEY NOTES ARE UTILIZED AND MAY HAVE GAPS OF MISSING NOTE
NUMBERS TO KEEP GROUPS OF TEN NOTES AVAILABLE PER PHASE.
REFER TO ISOLATION NOTES FOR THIS AREA AS SHOWN ON DRAWING
PP108.2 PRIOR TO PERFDORMING ANY DEMOLITION WORK SHOWN.
ONCE AREA IS ISOLATED, AND ENTIRE BUILDING SUPPORTED FROM
SECONDARY 6" SERVICE IN NORTHEAST QUADRANT FOR MIMUM OF 1-
WEEK, THAN COORDINATE DISCONNECITON OF THIS SERVICE WITH
WATER UTILITY REPRESENTATIVE.
REMOVE EXISTING RPZ BACKFLOW PREVENTORS. NOTE THAT BOTH
SETS OF 8" RPZ ASSEMBLIES WILL BE FULLY DISPOSED OR RECYCLED
BY MECHANICAL CONTRACTOR.
DISCONNECT SMALL SERVICE PIPING TO FROM WATER SAMPLING
EQUIPMENT MOUNTED ON WALL TO REMAIN. REFER TO NEW
DRAWINGS FOR RECONNECTION AND CERTIDFICATION OF THIS
EXISTING WATER MONITORING SYSTEM.
NOTE WHERE WELL WATER WAS PREVIOUSLY DISCONNECTION FROM
POTABLE WATER SERVICE. REMOVE SECTION OF 8" DEAD LEG PIPING
BACK TO IRRIGATION WATER TAKE-OFF AND PROVIDE NEW CAP TO
CLEAN UP PIPING IN AREA. (NOTE THAT ANY UNUSED PIPING
DISCOVERED WITHIN MECHANICAL ROOM ASSOCIATED WITH DOMESTIC
WATER SYSTEM SHOULD BE DEMOLISHED.)
SALVAGE EXISTING WATER FLOW METER AND CORRESPONDING
CONTROLLER. NOTE THAT BOTH PROBE AND CONTROLLER WILL NEED
TO BE RELOCATED AND REINSTALLED, REFER TO DRAWING PP108.4.
DISCONNECT PIPING TO EXISTING BOOSTER PUMP SYSTEM TO REMAIN.
REMOVE ASSOCIATE BYPASS VALVE AND ALL OTHER PIPING
COMPONENTS. REFER TO DRAWING PP108.4 FOR RECONNECTION.
REMOVE EXISTING 6" PIPING SERVICE TO COOLING TOWER MAKE-UP
WATER BACKFLOW ASSEMBLY. RPZ ASSEMBLY TO REMAIN BUT
SHOULD BE ALTERED BY ADDING A FULL SIZE 6" TEE FOR FUTURTE
INSTALLATION OF REDUDNANT RPZ ASSEMBLIES.
REMOVE BOTH (X2) EXISTING HOT WATER HEAT EXCHANGERS AND
CONTROLLERS. ALL ASSOCIATED VALVES AND COMPONENTS SHALL
BE FULLY REMOVED AND DISPOSED OF BY CONTRACTOR. CLEAN UP
MEZZANINE AREA AND PATCH AREAS OF FLOOR GRATING CAUSED BY
DEMOLITION (VISIT SITE TO CONFIRM CONDITIONS PRIOR TO BID).
REMOVE EXISTING RECIRCULATION PUMP AND STAND. NOTE THAT
AFTER DISCONNECTION OF THIS RECIRCULATION SYSTEM THAT ENTIRE
BUILDING MAY SIGNIFICANTLY TREND OUT OF BALANCE. INTENT
WOULD BE FOR CONTRACTOR TO HAVE ALL TEMPERATURE SENSORS
FOR EACH RECIRCULATION LOOP APPROPRIATELY VERIFIED AND
ADDRESSED WITHIN BAS SYSTEM (SEE KEY NOTE #21 ON DRAWING
PP03). CONTRACTOR SHALL UTILIZE THESE TEMPERATURE SENSORS
TO MAKE ADJUSTMENTS ON SYSTEM TO COMPENSATE FOR PERIOD OF
TIME WITH REDUCED RECIRCULATION FLOW ORIGINATING ONLY FROM
SOUTHWEST PUMP.
REMOVE SET OF THREE(3) VALVES AT THIS LOCATION. CONFIRM IF VA
WOULD LIKE TO SALVAGE THESE VALVES BEFORE DISPOSAL.
NOTE THAT EXISTING 8" COLD WATER MAIN IS ROUTED HIGH ABOVE
MANY OTHER PIPING SERVICES MAKING REMOVAL DIFFICULT TO
ACHIEVE. CONTRACTOR SHALL REVIEW SITE PRIOR TO BID AND
ASSUME THAT CUTTING OF THIS PIPE INTO MANY SMALL SECTIONS FOR
FULL DEMOLITION WILL BE REQUIRED. ABANDONING ANY OLD PIPING IN
PLACE WILL NOT BE PERMITTED.
EXISTING HOT WATER FLOW METER TO REMAIN. REPAIR DAMAGED
INSULATION IN THIS AREA OF HOT WATER PIPING.
NOT USED THROUGH KEY NOTE
NOTE THAT PLUMBING KEY NOTES 20 THROUGH 29 BELOW ARE
ASSOCIATED WITH DETAIL 2/PP108.3 ON THIS DRAWING. CLOSELY
COORDINATE INSTALLATION SCHEDULE OF WATER HEATER WITH VA
FACILITIES TO CLOSELY MONITOR EXISTING SYSTEMS THAT WILL
TEMPORARILY SUPPORT THE ENTIRE BUILDING.
STEAM REDUCING STATION SHOWN ON THIS DRAWING FOR
REFERENCE ONLY. REFER TO DRAWING MP108.1 FOR ALL STEAM
PIPING INSTALLATION NOTES AND DETAILS.
INSTALL THREE(3) FULL SIZE 4" STAINLESS STEEL TRIPLE OFFSET
BUTTERFLY VALVEs TO ISOLATE HOT WATER SERVICE FROM NEW
WATER HEATER SYSTEM. NOTE TO PROVIDE THIS VALVE DURING
WEEKEND OUTAGE WHEN CROSS-OVER PIPING CONNECTION TO
RISERS ARE INSTALLED.
COORDINATE A SECONDARY OUTAGE, SEPARATE FROM WEEKEND
OUTAGE OF RISERS '7' AND 'J' (PLUS SOUTHWEST QUADRANT OF
LOWER LEVEL) SHOWN IN DRAWING PP108.1. DURING THIS OUTAGE OF
SHAFT '#6' INSTALL SECTION OF 6" PIPING BETWEEN POINTS OF
DISCONNECT, ALONG WITH FULL SIZE 6" VALVES SHOWN ON EITHER
SIDE AND 4" TAKE-OFF VALVE INSIDCATED.
PROVIDE TWO(2) RECIRCULATION PUMPS VERTICALLY STACKED IN A
PARALLEL PIPING CONFIGURATION WITH DUAL ISOLATION VALVES ON
EITHER SIDE AND FULL SIZED STRAINERS WITH BLOW-DOWN VALVES.
INCLUDE PRESSURE AND TEMPERATURE GAUGES ON BOTH SIDES OF
DUAL RECIRCULATION PUMP ASSEMBLIES.
POINT OF CONNECTION FOR COLD WATER MAKE-UP TO NEW WATER
HEATERS FROM ISOLATION VALVE INSTALLED DURING PHASE 8.1 (SEE
DRAWING PP108.1). CONTRACTOR TO TEST, STERILIZE, AND
THOROUGHLY FLUSH NEW PIPING AND WATER HEATER SYSTEM PRIOR
TO ENGAGING INTO SERVICE.
VERIFY ADEQUATE SPACE FROM ANY OBSTRUCTIONS FOR PULLING
TUBE BUDLES OUT HORIZONTALLY. COORDINATE ALL OTHER SERVICE
ACCESS WITH VA FACILITIES REPRESENTATIVES.
CONNECT INTO EXISTING 8" PRIMARY WATER SERVICE AT THIS
LOCATION. ALL PIPIJNG INSTALLED BEYOND THIS POINT SHALL BE
SCHEDULE 10 STAINLESS STEEL WITH ROLL-GROOVED FITTINGS AND
STAINLESS VALVES AND COMPONENTS SPECIFIED.
PROVIDE 1" WATER CONNECTIONS TO EXISTING INCOMING WATER
SAMPLING EQUIPMENT. UPON COMPLETION OF WORK RECALIBRATE
EXISTING EQUIPMENT (NOTE THAT THIS IS SYSTEM SYSTEM SPECIFIED
FOR SECONDARY SERVICE ON DRAWING PP104.1).
PROVIDE FULL SIZED 8" TRIPLE OFFSET BUTTERFLY VALVE PRIOR TO
RECONNECTION TO EXISTING BUFFER TANK TO ALLOW FOR
REPLACEMENT OR REMOVAL AT A FUTURE DATE (NIC).
EXTEND 6" STAINLESS STEEL PIPING TO EXISTING COOLING TOWER
BACKFLOW ASSEMBLY. CONNECT TO EXISTING RPZ WITH FULL SIZED 6"
TEE HAVING BOTTOM LEG CAPPED FOR POTENTIAL INSTALLATION OF
REDUNDANT BACKFLOW ASSEMBLY IN FUTURE (NIC).
REFER TO DRAWING PP108.1 FOR INSTALLATION OF NEW 8" WATER
MAIN THROUGH J-PUMP ROOM PRIOR TO DEMOLITION OF EXISTING.
NOTE THAT UPDATED LOCATION WILL BE BELOW ALL EXISTING PIPING
SERVICES DUE TO ACCESSIBILITY ISSUE FOR CURRENT ROUTE. PIPING
OFFSETS WILL BE REQUIRED TO AVOID EXISTING PIPING AND/OR
EQUIPMENT, CONTRACTOR TO VERIFY SITE CONDITIONS PRIOR TO
BIDDING.
REINSTALL PREVIOUSLY REMOVED FLOW METER (SEE KEY NOTE #5) AT
APPROXIMATE LOCATION. CALBRATE/TEST ON COMPLETION.
PROVIDE TWO(2) 8" RPZ ASSEMBLIES IN PARALLEL CONSTRUCTED OF
304 STAINLESS STEEL OR BETTER. MOUNT EACH OF THE ASSEMBLIES
AT APPROXIMATELY 30" ABOVE FLOOR LEVEL. ANGLE VALVE STEMS ON
EITHER SIDE AS REQUIRED FOR ACCESSIBILITY. REFER TO OUTLINE
SPECIFICATION BELOW.
DUAL RPZ VALVE SPECIFICATION - Refer to drawing PP104.1 for outline specification for Watts Series 994, or equal coupled with either stainless steel body OS&Y valves or stainless triple offset butterfly valves.
PHASE 8.3 (DEMO - J-PUMP ROOM EQUIPMENT REMOVAL):
REFER TO THIS DRAWING PP108.3 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS FOR DISCONNECTION OF MAIN WATER SERVICE AND EXISTING
WATER HEATERS/ETC, NOTE THAT ALL MEASURES IDENTIFIED IN PREVIOUS
PHASE TO ISOLATE THIS SECTION OF PIPING LOOP AND NOTIFY VA OF
OVERALL SCHEDULE FOR INTERIM LAFE SAFETY MEASURES WHILE ONLY
HAVING A SINGLE WATER SERVICE AND WATER HEATER PREVIOUSLY
INSTALLED DURING PHASE 4 OF THIS PROJECT.
PHASE 8.4 (WATER HEATER INSTALLATION AND FINAL CONNECTIONS):
MECHANICAL CONTRACTOR MAY SCHEDULE AND PERFORM
PREINSTALLATION OF EQUIPMENT AND PIPING DURING PHASES 5 THROUGH
8 AND MAKE ALL FINAL CONNECTIONS DURING THIS PHASE 8.4 SERVICE
OUTAGE. ALL CONTROLS AND PIPING COMPONENTS SHALL BE FULLY
TESTED AND COMMISSIONED DURING PHASE 8 AND READY TO BE SHIFTED
ONLINE PRIOR TO COMPLETION OF THIS FINAL PROJECT PHASE.
PHASE 8.1 (PREINSTALLATION):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2.1 (RISER J VALVE REPLACEMENT):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2.2 (RISER K VALVE REPLACEMENT):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2.3 (SHAFT 6 VALVE REPLACEMENT):
REFER TO DRAWING PP108.1 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
PHASE 8.2 (DEMO - MAIN LOOP):
REFER TO DRAWING PP108.2 DRAWINGS FOR DESCRIPTIVE NOTES AND
DETAILS OF THIS PHASE THAT IS DEFINED ON THAT DRAWING.
XYZAABBCC
EXISTING 6" MAKE-UP WATER
TO COOLING TOWER RPZ
EXISTING 8" MAIN SERVICE REDUNDANT
BACKFLOW PREVENTORS (SEE NOTES)
EXISTING INCOMING WATER
SAMPLE MONITOR - SEE NOTE
EXISTING PRESSURE
BOOSTER PUMP TO REMAIN
REFER TO DRAWING PP108.2 FOR
DEMOLITION OF THIS COLD WATER
MAIN THROUGH J-PUMP ROOM SHOWN.
REFER TO DRAWING PP108.2 FOR
DEMOLITION OF THIS COLD WATER
MAIN THROUGH J-PUMP ROOM SHOWN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
E
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:4
:3
A M
BASEMENT INTERSTITIAL -
PHASES 8.3 AND 8.4 - DOMESTIC
WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP108.3
1/4" = 1'-0"
ENLARGED - PHASE 8.4
1/4" = 1'-0"
ENLARGED DEMOLITION PLUMBING PLAN - PHASE 8.4
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
T S
T S
T S
T S
KEY NOTES:GENERAL NOTES:
UVWX
SHAFT 6
1" RHW UP
3" HW UP
4" CW UP
4" CW UP
1 1/4" RHW
3" HW
4" CW
C W
H W
/4
R
H W
2 1/2" HW
2 1/2" CW
R H
W
H W
C W
C W
1/2" RHW
2 1/2" HW
2 1/2" CW
UVWX
C W
2 1/2" CW
C W
2 1/2" CW
4" CW UP
4" CW UP
3" HW UP
1" RHW UP
1 1/4" RHW
3" HW
4" CW
H W
/4
R
H W
2 1/2" HW
R H
W
H W
2 1/2" HW
1/2" RHW
6.A'
6.C'
6.B'
4 5
1 BEFORE OUTAGE: ROUTE NEW SHAFT 6 PIPING PARALLEL TO
EXISTING PIPING TO LEVEL ABOVE.
DURING OUTAGE: REMOVE AND REPLACE MAIN PIPING BETWEEN
VALVES 6.B AND 6.C. MAKE FINAL CONNECTION TO NEW SHAFT 6
PIPING. ABANDON EXISTING COLD WATER RISER PIPING TO BE
DEMOLISHED AFTER ALL SHAFT 6 FINAL CONNECTIONS ARE MADE
AND OUTAGE IS COMPLETE. CONTRACTOR TO VERIFY PIPE SIZING
AND OUTAGE AREAS PRIOR TO CONSTRUCTION.
AFTER OUTAGE: REFER TO ASSOCIATED LEVEL DEMOLITION VIEW
AND KEY NOTE 2.
AFTER OUTAGE: REMOVE ABANDONED COLD WATER RISER PIPING.
DEADLEG OR ABANDONED PIPING SHALL NOT REMAIN.
NORTH-SOUTH ROUTED SECTION OF PIPING WITHIN CORRIDOR WITH
HIGH CEILINGS (NOT INSIDE INTERSTITIAL SPACE). NOTE THAT NEW
ROUTE WOULD BE BELOW EXISTING PIPING AND/OR DUCTWORK
WITHIN CORRIDOR, COORDINATE PIPING SUPPORTS FROM
STRUCTURE AS REQUIRED.
PENETRATE CORRIDOR WALL AT APPROXIMATE LOCATION INDICATED
TO ENTER INTO INTERSTITIAL SPACE PAST THIS POINT.
WITHIN INTERSTITIAL SPACE ROUTE PARALLEL PIPING COLD WATER
MAIN FURTHER NORTH THAN CURRENT ROUTING TO AVOID SOME
CONGESTION OF EXISTING MECHANICAL/ELECTRICAL/DATA TRAY
SERVICES. THIS SECTION WEST-TO-EAST ROUTING OF PIPING WILL
HAVE LIMITED ACCESS, BOTH FOR NEW INSTALLATION AND
DEMOLITION OF EXISTING (PER KEY NOTE #8 BELOW).
REFER TO DRAWING 1356-PP108.5 FOR CONTINUATION AND
INSTALLATION OF NEW COLD WATER RISER PARALLEL TO EXISTING.
EXISTING COLD WATER MAIN TO BE REMOVED IS ABOVE LAYERS OF
CONDUIT, PIPING, ETC ABOVE CORRIDOR. CONTRACTOR TO NOTE OF
LIMITED ACCESSIBILITY AND POTENTIAL FOR CUTTING PIPING INTO
VERY SMALL PIECES TO ALLOW FOR REMOVAL. FIELD VERIFY
EXISTING CONDITIONS.
EXISTING COLD WATER MAIN WITHIN INTERSTITIAL AREA SURROUNDS
BY DUCTWORK, ESPECIALLY WHEN CLOSEST TO SHAFT #6.
CONTRACTOR MAY BE REQUIRED TO DISCONNECT AND RECONNECT
EXISTING DUCTWORK TO ALLOW ACCESS FOR FULL PIPING
REMOVAL. COORDINATE ASSOCIATED OUTAGES AS REQUIRED WITH
VA COTR.
A.
B.
C.
D.
E.
F.
THE OUTLINE OF 'MEANS-AND-METHODS' NOTES BELOW FOR VERTICAL
COLD WATER RISER REPLACEMENTS INDICATED WITHIN THESE
DRAWINGS IS NOT INTENDED TO BE ALL-INCLUSIVE OF EFFORT
REQUIRED BY CONTRACTOR. NOR ARE THESE NOTES AND/OR
SUGGESTIONS MEANT TO LIMIT CONTRACTORS FROM DEVELOPING
THEIR OWN APPROACH THAT MAY BE CONSIDERED MORE COST
EFFECTIVE OR SAFE. THESE NOTES ARE MAINLY MEANT TO QUALIFY
EXISTING CONDITIONS AND DEFINE MINIMUM LEVEL OF PLANNING
REQUIRED BY VA FOR EACH OF THESE TIME SENSITIVE OUTAGES.
NO MAJOR WATER OUTAGE SHALL LAST MORE THAN 12 HOURS IN
DURATION. PLUMBING CONTRACTOR TO DETERMINE ADEQUATE
NUMBER OF PLUMBER CREWS REQUIRED TO PERFORM MULTIPLE
TASKS SIMULTANEOUSLY DURING OUTAGES. ALL OUTAGES SHALL BE
ASSUMED TO BE PERFORMED DURING WEEKEND OR NIGHT OVERTIME
HOURS WHEN BIDDING THIS PROJECT.
VERTICAL RISER REPLACEMENT (TYPE 1 - WITHIN MECHANICAL ROOM)
• FOR RISERS WITHIN MECHANICAL ROOMS, CONTRACTOR SHALL
CORE DRILL HOLES THROUGH FLOOR ADJACENT TO EXISTING
PLUMBING RISER FOR NEW INSTALLATION. EXISTING FLOOR
PENETRATIONS AND/OR SLEEVE SHALL BE PATCHED FLUSH TO
EXISTING FLOOR AS REQUIRE UPON DEMOLITION OF THOSE RISERS.
• EXISTING TAKE-OFF VALVES MAY REQUIRE RELOCATION FOR
CONNECTION INTO NEW RISER. VERIFY ADEQUATE ACCESS TO ALL
TAKE-OFF VALVES AND PROVIDE WITH NEW LAMINATE SIGNAGE.
ANY VALVES FOUND AT INACCESSIBLE LOCATIONS SHALL BE
RELOCATED BY CONTRACTOR.
• REFER TO BBI 3001 FOR REPLACEMENT OF ALL CIRCUIT SETTER
VALVES WITHIN ENTIRE BUILDING. PLUMBING CONTRACTOR MAY
OPT TO HAVE DEDICATED CREWS ASSIGNED TO THIS TASK DURING
RISER OUTAGE TO LIMIT NUMBER OF SECONDARY OUTAGES
REQUIRED. HOWEVER, IF ENOUGH PLUMBERS ARE AVAILABLE TO
ACHIEVE THIS DURING LIMITED OUTAGE TIMEFRAME, THAN REFER
TO GENERAL NOTES ON DRAWING PP002 FOR 'LARGE OUTAGES' TO
PERFORM PRIOR TO THE MAJOR RISER OUTAGE.
VERTICAL RISER REPLACEMENT (TYPE 2 - WITHIN ENCLOSED SHAFT)
• IN GENERAL, MAJOR RATED SHAFTS SHOWN IN THESE DRAWINGS
HAVE EXISTING FULL SIZED ACCESS DOOR FROM BASE OF SHAFT
ON FIRST FLOOR LEVEL. HOWEVER, THAT IS TYPICALLY THE ONLY
ACCESS INTO THESE SHAFTS THAT ARE FULLY OPEN (NO
INTERMEDIATE FLOOR STRUCTURES) UP THROUGH PENTHOUSE
LEVEL WHERE RATED WALLS ARE BUILT-UP WITH LID (TYPICALLY
12'+) WITHIN ENCLOSED PENTHOUSE LEVEL.
• IN ORDER TO GAIN ACCESS TO TOP OF SHAFT, CONTRACTOR WILL
BE REQUIRED TO FURNISH AND INSTALL FIRE RATED DOOR
ASSEMBLIES FROM PENTHOUSE LEVEL. THESE DOORS MAY BE
USED IN CONJUNCTION OF RIGGING FOR BOSUN CHAIRS FROM TOP
OF SHAFT IF CONTRACTOR DEEMS THAT AS SAFE AFTER REVIEW
WITH THEIR INTERNAL SAFETY OFFICIAL.
• IN ADDITION TO ACCESS ON TOP LEVEL OF SHAFT, CONTRACTOR
WILL HAVE OPPORTUNITIES TO INSTALL 24"X24" OR 48"X24" FIRE
RATED ACCESS PANELS ON ANY OTHER LEVEL REQUIRED (BUT
ONLY FROM INTERSTITIAL SPACE, INSTALLATION OF ACCESS
PANELS FROM PATIENT CARE AREAS WILL NOT BE PERMITTED).
• CONTRACTOR WILL BE REQUIRED TO PROVIDE THEIR OWN
SCAFFOLDING REQUIRED AT EACH LEVEL TO INSTALL NEW COLD
WATER RISERS ADJACENT TO EXISTING PRIOR TO SWITCHOVER
OUTAGE. SCAFFOLDS SHOULD BE STRATEGICALLY PLACE TO
ALLOW ACCESS FOR RECONNECTION TO FLOOR TAKE-OFF PIPING
INSIDE OF EACH SHAFT.
• EXISTING CONDITION PDF SKETCHES ARE PROVIDED ON DRAWINGS
WHERE WORK INSIDE CONFINED AREAS OF RATED SHAFTS IS
REQUIRED. THESE SKETCHES ARE FOR CONTRACTOR REFERENCE
ONLY AND MAY NOT FULLY INDICATE ALL SERVICES WITHIN SHAFT
ENCLOSURES. CONTRACTOR WILL BE REQUIRED TO FIELD VERIFY
ACTUAL SITE CONDITIONS OF EACH SHAFT WHILE DEVELOPING
ACCESS AND SAFETY PLANNING.
NOTE THAT SOME AREAS HAVE EXISTING COPPER MAINS INTENDED TO
REPLACE GALVANIZED RISERS. HOWEVER THESE MAINS WERE
INSTALLED UP TO 15-25 YEARS AGO AND THEIR INTEGRITY IS
QUESTIONABLE. CONTRACTOR MAY UTILIZE THE EXISTING ROUTE, AND
CORRESPONDING SUPPORT HANGERS, BUT MUST FULLY REMOVE ALL
ABANDONED/UNUSED COPPER PIPING MAINS. ONCE OFF SITE THE
CONTRACTOR MAY TAKE OWNERSHIP OF PIPING FOR RECYCLING OR
REPURPOSING, BUT IT SHALL NOT BE UTILIZED WITHIN THIS PROJECT.
NO EXISTING PIPING WILL BE ALLOWED TO BE LEFT ABANDONED. SOME
AREAS HAVE RESTRICTIVE ACCESS DUE TO SURROUNDING PIPES
AND/OR STRUCTURE AND MAY REQUIRE TEMPORARY REMOVAL OF
PIPING OR DUCTWORK TO GAIN ACCESS FOR DEMOLITION.
CONTRACTOR TO ASSUME SOME LEVEL OF DISCONNECT/RECONNECT
OF EXISTING SERVICES TO GAIN ACCESS FOR COMPLETE DEMOLITION
OF EXISTING PIPING, OR INSTALLATION OF NEW PIPE IN CONGESTED
AREAS. REFER TO DRAWING NOTES FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
E
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:4
:4
A M
BASEMENT - PHASE 8 - ENLARGED
SHAFT 6 COLD WATER
REPLACEMENT PLANS
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP108.4
1/8" = 1'-0"
BASEMENT - SHAFT 6 REPLACEMENT DEMO
1/8" = 1'-0"
BASEMENT - SHAFT 6 REPLACEMENT NEW
NO SCALE
SHAFT 6 - BASEMENT DETAIL
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
T S
KEY NOTES:GENERAL NOTES:
UV
4" CW UP & DN
4" CW UP & DN
3" HW UP & DN
1" RHW UP & DN
1 1/2" CW
UV
4" CW UP & DN
4" CW UP & DN
3" HW UP & DN
1" RHW UP & DN
1 1/2" CW
UV
4" CW DN
4" CW DN
2 1/2" HW DN
1" RHW DN
4" CW UP
4" CW UP
2" HW UP
3/4" RHW UP
3" CW
1" HW
3/4" RHW
UV
1" RHW DN
3" HW DN
4" CW DN
4" CW DN
4" CW UP
4" CW UP
2" HW UP
3/4" RHW UP
3" CW
UV
3/4" RHW
2" HW3" CW
4" CW DN
2 1/2" CW UP
4" CW DN
2 1/2" CW UP
3/4" RHW DN
1/2" RHW UP
2" HW DN
1" HW UP
UV
4" CW DN
2 1/2" CW UP
4" CW DN
2 1/2" CW UP
3/4" RHW DN
1/2" RHW UP
2" HW DN
1" HW UP
3" CW
2" HW
3/4" RHW
UV
2 1/2" CW DN
2 1/2" CW DN
1" HW DN
1/2" RHW DN
UV
2 1/2" CW DN
2 1/2" CW DN
1" HW DN
1/2" RHW DN
1 BEFORE OUTAGE: ROUTE NEW SHAFT 6 PIPING PARALLEL TO
EXISTING PIPING TO LEVEL ABOVE. EXTEND NEW TAKEOFFS TO
EXISTING BRANCH TAKEOFFS AND PREPARE FOR NEW CONNECTION.
DURING OUTAGE: DISCONNECT EXISTING BRANCH TAKEOFFS AND
REMOVE TAKEOFF PIPING. MAKE TAKEOFF FINAL CONNECTIONS.
ABANDON EXISTING COLD WATER RISER PIPING TO BE DEMOLISHED
AFTER ALL SHAFT 6 FINAL CONNECTIONS ARE MADE AND OUTAGE IS
COMPLETE. CONTRACTOR TO VERIFY PIPE SIZING AND OUTAGE
AREAS PRIOR TO CONSTRUCTION.
AFTER OUTAGE: REFER TO ASSOCIATED LEVEL DEMOLITION VIEW
AND KEY NOTE 2.
AFTER OUTAGE: REMOVE ABANDONED COLD WATER RISER PIPING.
DEADLEG OR ABANDONED PIPING SHALL NOT REMAIN.
A.
B.
C.
D.
E.
F.
THE OUTLINE OF 'MEANS-AND-METHODS' NOTES BELOW FOR VERTICAL
COLD WATER RISER REPLACEMENTS INDICATED WITHIN THESE
DRAWINGS IS NOT INTENDED TO BE ALL-INCLUSIVE OF EFFORT
REQUIRED BY CONTRACTOR. NOR ARE THESE NOTES AND/OR
SUGGESTIONS MEANT TO LIMIT CONTRACTORS FROM DEVELOPING
THEIR OWN APPROACH THAT MAY BE CONSIDERED MORE COST
EFFECTIVE OR SAFE. THESE NOTES ARE MAINLY MEANT TO QUALIFY
EXISTING CONDITIONS AND DEFINE MINIMUM LEVEL OF PLANNING
REQUIRED BY VA FOR EACH OF THESE TIME SENSITIVE OUTAGES.
NO MAJOR WATER OUTAGE SHALL LAST MORE THAN 12 HOURS IN
DURATION. PLUMBING CONTRACTOR TO DETERMINE ADEQUATE
NUMBER OF PLUMBER CREWS REQUIRED TO PERFORM MULTIPLE
TASKS SIMULTANEOUSLY DURING OUTAGES. ALL OUTAGES SHALL BE
ASSUMED TO BE PERFORMED DURING WEEKEND OR NIGHT OVERTIME
HOURS WHEN BIDDING THIS PROJECT.
VERTICAL RISER REPLACEMENT (TYPE 1 - WITHIN MECHANICAL ROOM)
• FOR RISERS WITHIN MECHANICAL ROOMS, CONTRACTOR SHALL
CORE DRILL HOLES THROUGH FLOOR ADJACENT TO EXISTING
PLUMBING RISER FOR NEW INSTALLATION. EXISTING FLOOR
PENETRATIONS AND/OR SLEEVE SHALL BE PATCHED FLUSH TO
EXISTING FLOOR AS REQUIRE UPON DEMOLITION OF THOSE RISERS.
• EXISTINGT TAKE-OFF VALVES MAY REQUIRE RELOCATION FOR
CONNECTION INTO NEW RISER. VERIFY ADEQUATE ACCESS TO ALL
TAKE-OFF VALVES AND PROVIDE WITH NEW LAMINATE SIGNAGE.
ANY VALVES FOUND AT INACCESSIBLE LOCATIONS SHALL BE
RELOCATED BY CONTRACTOR.
• REFER TO CLIN 3001 FOR REPLACEMENT OF ALL ICRCUIT SETTER
VALVES WITHIN ENTIRE BUILDING. PLUMBING CONTRACTOR MAY
OPT TO HAVE DEDICATED CREWS ASSIGNED TO THIS TASK DURING
RISER OUTAGE TO LIMIT NUMBER OF SECONDARY OUTAGES
REQUIRED. HOWEVER, IF ENOUGH PLUMBERS ARE AVAILABLE TO
ACHIEVE THIS DURING LIMITED OUTAGE TIMEFRAME, THAN REFER
TO GENERAL NOTES ON DRAWING PP002 FOR 'LARGE OUTAGES' TO
PERFORM PRIOR TO THE MAJOR RISER OUTAGE.
VERTICAL RISER REPLACEMENT (TYPE 2 - WITHIN ENCLOSED SHAFT)
• IN GENERAL, MAJOR RATED SHAFTS SHOWN IN THESE DRAWINGS
HAVE EXISTING FULL SIZED ACCESS DOOR FROM BASE OF SHAFT
ON FIRST FLOOR LEVEL. HOWEVER, THAT IS TYPICALLY THE ONLY
ACCESS INTO THESE SHAFTS THAT ARE FULLY OPEN (NO
INTERMEDIATE FLOOR STRUCTURES) UP THROUGH PENTHOUSE
LEVEL WHERE RATED WALLS ARE BUILT-UP WITH LID (TYPICALLY
12'+) WITHIN ENCLOSED PENTHOUSE LEVEL.
• IN ORDER TO GAIN ACCESS TO TOP OF SHAFT, CONTRACTOR WILL
BE REQUIRED TO FURNSIH AND INSTALL FIRE RATED DOOR
ASSEMBLIES FROM PENTHOUSE LEVEL. THESE DOORS MAY BE
USED IN CONJUCTION OF RIGGING FOR BOSUN CHAIRS FROM TOP
OF SHAFT IF CONTRACTOR DEEMS THAT AS SAFE AFTER REVIEW
WITH THEIR INTERNAL SAFETY OFFICIAL.
• IN ADDITION TO ACCESS ON TOP LEVEL OF SHAFT, CONTRACTOR
WILL HAVE OPPORTUNITIES TO INSTALL 24"X24" OR 48"X24" FIRE
RATED ACCESS PANELS ON ANY OTHER LEVEL REQUIRED (BUT
ONLY FROM INTERSTITIAL SPACE, INSTALLATION OF ACCESS
PANELS FROM PATIENT CARE AREAS WILL NOT BE PERMITTED).
• CONTRACTOR WILL BE REQUIRED TO PROVIDE THEIR OWN
SCAFFOLDING REQUIRED AT EACH LEVEL TO INSTALL NEW COLD
WATER RISERS ADJACENT TO EXISTING PRIOR TO SIOWTCHOVER
OUTAGE. SCAFFOLDS SHOULD BE STRATEGICALLY PLACE TO
ALLOW ACCESS FOR RECONNECTION TO FLOOR TAKE-OFF PIPING
INSIDE OF EACH SHAFT.
• EXISTING CONDITION PDF SKETCHES ARE PROVIDED ON DRAWINGS
WHERE WORK INSIDE CONFINED AREAS OF RATED SHAFTS IS
REQUIRED. THESE SKETCHES ARE FOR CONTRACTOR REFERENCE
ONLY AND MAY NOT FULLY INDICATE ALL SERVICES WITHIN SHAFT
ENCLOSURES. CONTRACTOR WILL BE REQUIRED TO FIELD VERIFY
ACTUAL SITE CONDITIONS OF EACH SHAFT WHILE DEVELOPING
ACCESS AND SAFETY PLANNING.
NOTE THAT SOME AREAS HAVE EXISTING COPPER MAINS INTENDED TO
REPLACE GALVANIZED RISERS. HOWEVER THESE MAINS WERE
INSTALLED UP TO 15-25 YEARS AGO AND THEIR INTEGRITY IS
QUESTIONABLE. CONTRACTOR MAY UTILIZE THE EXISTING ROUTE, AND
CORRESPONDING SUPPORT HANGERS, BUT MUST FULLY REMOVE ALL
ABANDONED/UNUSED COPPER PIPING MAINS. ONCE OFF SITE THE
CONTRACTOR MAY TAKE OWNERSHIP OF PIPING FOR RECYLCING OR
REPURPOSING, BUT IT SHALL NOT BE UTILIZED WITHIN THIS PROJECT.
NO EXISTING PIPING WILL BE ALLOWED TO BE LEFT ABANDONED. SOME
AREAS HAVE RESTRICITVE ACCESS DUE TO SURROUNDING PIPES
AND/OR STRUCTURE AND MAY REQUIRE TEMPORARY REMOVAL OF
PIPING OR DUCTWORK TO GAIN ACCESS FOR DEMOLITION.
CONTRACTOR TO ASSUME SOME LEVEL OF DISCONNECT/RECONNECT
OF EXISTING SERVICES TO GAIN ACCCESS FOR COMPLETE DEMOLITION
OF EXISTING PIPING, OR INSTALLATION OF NEW PIPE IN CONGESTED
AREAS. REFER TO DRAWING NOTES FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
E
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:5
:4
A M
ALL LEVELS - PHASE 8 -
ENLARGED SHAFT 6 COLD WATER
REPLACEMENT PLANS
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP108.5
1/8" = 1'-0"
FIRST LEVEL - SHAFT 6 REPLACEMENT DEMO
1/8" = 1'-0"
FIRST LEVEL - SHAFT 6 REPLACEMENT NEW
1/8" = 1'-0"
SECOND LEVEL - SHAFT 6 REPLACEMENT DEMO
1/8" = 1'-0"
SECOND LEVEL - SHAFT 6 REPLACEMENT NEW
1/8" = 1'-0"
THIRD LEVEL - SHAFT 6 REPLACEMENT DEMO
1/8" = 1'-0"
THIRD LEVEL - SHAFT 6 REPLACEMENT NEW
1/8" = 1'-0"
FOURTH LEVEL - SHAFT 6 REPLACEMENT DEMO
1/8" = 1'-0"
FOURTH LEVEL - SHAFT 6 REPLACEMENT NEW
NO SCALE
SHAFT 6 - FIRST LEVEL DETAIL
NO SCALE
SHAFT 6 - SECOND LEVEL DETAIL
NO SCALE
SHAFT 6 - THIRD LEVEL DETAIL
NO SCALE
SHAFT 6 - FOURTH LEVEL DETAIL
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
GENERAL NOTES:
CONNECTION
TO PREVIOUS
PHASE
BP.C
BP.B
BP.A
7.C
7.B
7.A
8" CW
8" CW
8" CW
J.B
J.C
J.A
CONNECTION
TO RISER "J"
TAKE-OFF AND TRIPLE
VALVE ASSEMBLY FOR
CONNETION TO
EXISTING WATER
SERVICE. REFER TO
1356-PP108.3.
6.C
6.A
6.B
TAKE-OFF AND VALVE
FOR CONNETION TO
NEW WATER HEATERS.
REFER TO 1356-PP108.3.
4" CW
1 1/4" RHW
4" CW
3" HW
4" CW
3" CW
2 1/2" CW
4" CW UP
3" HW UP
1" RHW UP
2 1/2" CW
8" CW K.B
K.A
K.C
8" CW
CONNECTION
TO PHASE 1.
TO RISER K
CONNECTION TO
EXISTING RISER K
PIPING
8" CW
8" CW
ISOLATION OF MAIN PIPING LOOP SECTIONS:
PERFORM THE FOLLOWING PROCEDURE STEPS TO PROPERLY ISOLATE
EACH SECTION OF PIPING LOOP AS DESCRIBED IN PHASING SEQUENCES,
1) SHUT-OFF ISOLATION VALVES ON INTERIOR SIDE OF LOOP BEING
MODIFIED OR REMOVED TO MAINTAIN SERVICES TO ALL RISERS.
2) REMOVE SECTION OF PIPING, OR TAP TEMPORARY DRAIN CONNECTION
TO VERIFY VALVES ARE HOLDING FOR A MINIMUM PERIOD OF 24 HOURS.
3) IF NO VALVE LEAKAGE, OR MINIMAL AMOUNT, IS WITNESSED THAN
PROCEED TO PIPING MODIFICATION AND/OR DEMOLITION SCOPE OF WORK
IDENTIFIED.
4) IF MODERATE OR SIGNIFICANT VALVE LEAKAGE IS WITNESSED THAN
PROVIDE 1.5" VALVE TAP WITH THREADED CONNECTION TO HOSE TO
NEAREST MECHANICAL ROOM DRAIN DISCHARGE LOCATION. THIS
TEMPORARY DRAIN CONNECTION AND HOSE SHALL BE REMOVED ONCE
NEW RISER VALVE REPLACEMENTS ARE COMPLETED.
---CONTRACTOR WILL BE RESPONSIBLE TO KEEP ON SITE AT LEAST FOUR(4)
SETS OF 1.5" VALVES WITH THREADED CONNECTIONS AND TWO(2) 250' LONG
HOSES OF 1.5" DIAMETER IN SIZE.
CONTRACTOR ALLOWANCE FOR TEMP FIXTURES OR WATER SERVICES:
ASSUME THAT DURING THE COURSE OF THE 8 PHASE DOMESTIC WATER
LOOP REPLACEMENT THAT SPECIFIC AREAS WILL REQUIRE TEMPORARY
SINKS AND/OR EXTENSION OF TEMPORARY WATER SERVICES TO THEIR
DEPARTMENT. CONTRACTORS SHALL INCLUDE THE FOLLOWING
ALLOWANCES WITHIN THEIR BASE BID TO ACCOMODATE THOSE REQUESTS
WHEN THEY ARISE DURING OUTAGE COORDINATION WITH VA FACILITIES.
• INCLUDE UP TO TWELVE(12) TEMPORARY SINK FIXTURES TIED INTO AN
ADJACENT RISER SERVICE. EACH SINK WILL REQUIRE UP TO 50' OF
COPPER PIPE FOR WATER CONNECTIONS, OTHERWISE HOSE WILL BE
UTILIZED IF DISTANCE EXCEEDS THAT SPECIFIED AMOUNT OF PIPING.
• INCLUDE FOUR(4) TEMPORARY BACK-UP WATER CONNECTIONS FOR
COLD WATER SERVICE TO AN ENTIRE DEPARTMENT. TEMPORARY COLD
WATER MAIN SHALL BE ASSUMED AT 2" SIZE AND EXTEND A MAXIMUM OF
250' TO CONNECT INTO AN ADJACENT RISER SERVICE.
• NOTE THAT THE ABOVE IS FOR ENTIRE PROJECT, NOT PER PHASE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
C
E
G
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:5
:5
A M
BASEMENT INTERSTITIAL - PHASE
8 - DOMESTIC WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP108.6
NO SCALE
PHASE 8 - ISOMETRIC VIEW
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
| 1356-PP108-1 - BASEMENT INTERSTITIAL - PHASE 8-1 - DOMESTIC WATER PLAN |
| 1356-PP108-2 - BASEMENT INTERSTITIAL - PHASE 8-3 - DOMESTIC WATER PLAN |
| 1356-PP108-3 - BASEMENT INTERSTITIAL - PHASES 8-3 AND 8-4 - DOMESTIC WATER PLAN |
| 1356-PP108-4 - BASEMENT - PHASE 8 - ENLARGED SHAFT 6 COLD WATER REPLACEMENT PLANS |
| 1356-PP108-5 - ALL LEVELS - PHASE 8 - ENLARGED SHAFT 6 COLD WATER REPLACEMENT PLANS |
| 1356-PP108-6 - BASEMENT INTERSTITIAL - PHASE 8 - DOMESTIC WATER PLAN |