Attachment D.6 Drawings 6 of 10 (6 Pages).pdf
PDF 17 MB Posted
- Solicitation number
- 36C26323R0042
About this file
This document provides details for a federal contract solicitation. The solicitation number is 36C26323R0042 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 for preventative Legionella services. The solicitation seeks to address Phase 3 of project 618-18-108 to prevent Legionella bacterial growth through maintenance and inspection of the facility's water systems. The attachment includes drawing number 6 of 10 related to the required plumbing and piping schematics. No pricing, response deadline or award date are specified in this document.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABCDEFGNPQRSTUVWXYZAABBCCDDEEFFGGHHJJKKLLMMNNPP
HH'
RISER E
RISER M
SHAFT 2
SHAFT 3
RISER A
SHAFT 7
SHAFT 4
RISER G
RISER K
SHAFT 6
RISER J
1356-PP101.1
1356-PP102.1
1356-PP103.1
1356-PP104.1
1356-PP105.1
1356-PP106.1
1356-PP107.1
1356-PP108.1
HJKLM
- PHASE 1
- PHASE 2
- PHASE 3
- PHASE 4
- PHASE 5
- PHASE 6
- PHASE 7
- PHASE 8
PHASING LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
A B
C D
E F
G
H
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:3
:5
A M
BASEMENT INTERSTITIAL -
OVERALL - DOMESTIC WATER
LOOP REPLACEMENT PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP101.0
1/32" = 1'-0"
70 - BASEMENT INTERSTIAL - OVERALL - DOMESTIC WATER LOOP REPLACEMENT PLAN
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
11/30/2022
Revisions: Date:
TS
TS
KEY NOTES:
GENERAL NOTES:
TS
TS
T S
T S
TS
G.B
G.C
G.A
5" CW UP
8" CW
8" CW
2 1/2" RHW
4" HW
K.C'
K.A'
K.B'
RISER G
1 1/2" RHW UP
4" HW UP
TO BE
REPLACED
IN NEXT
PHASE
8" CW
G
RISER G
G.A
G.B 31
G.A
G.C
1 1/2" CW
DRAIN
REFER TO DETAIL 2/1356-PP101.1
FOR VALVE LOCATION.
REFER TO DETAIL 1/1356-PP102
FOR VALVE LOCATION.
8" CW
8" CW
8" CW
8" CW
5" CW
H
H W
/2
C H
W
NOTE THAT THESE KEY NOTES ARE SPECIFIC TO THIS DRAWING (DO
NOT REFER TO MASTER KEY NOTES ON SHEET 1356-PP003). NOT ALL
KEY NOTES ARE UTILIZED AND MAY HAVE GAPS OF MISSING NOTE
NUMBERS TO KEEP GROUPS OF TEN NOTES AVAILABLE PER PHASE.
SHUT-OFF VALVE K.C AND VALVE G.B TO ISOLATE SECTION OF PIPING
INDICATED FOR REMOVAL. REFER TO GENERAL NOTES FOR
PROVISIONS TO BE TAKEN TO VERIFY ANY EXISTING VALVE LEAKAGE.
ONCE ISOLATED, REMOVE SECTION OF 8" GALVANZED PIPING LOOP.
CUT INTO SECTIONS SMALL ENOUGH TO TRANSPORT TO LOADING
DOCK AREA FOR REMOVAL. INCLUDE DEMOLITION OF EXISTING
SUPPORTS MOUNTED TO PIPING RACKS, NEW PIPING WILL BE
SUPPORTED ONTO EXISTING RACK STRUCTURE BUT SHOULD BE
PROVIDED WITH NEW PIPE CLAMPS.
NOT USED THROUGH KEY NOTE
INSTALL NEW SECTION OF 8" SCHEDULE 10 STAINLESS STEEL PIPING TO
REPLACE PREVIOUSLY REMOVED. INSTALL IN EXACT SAME LOCATION
AS REMOVED SECTION OF PIPING. PROVIDE NEW SUPPORT CLAMPS
ON EXISTING PIPING RACK AS REQUIRED.
PROVIDE TEMPORARY END CAPS AT EITHER SIDE OF NEW PIPING
SECTION. FIRST PERFORM A PRESSURE TEST ON PIPING SECTION PER
SPECIFICATION REQUIREMENTS, AND THEN STERILIZE PIPING USING
CHLORINE SOLUTION FOR AT LEASE 24 HOURS PRIOR TO FLUSHING.
INCLUDE DRAIN/FILL VALVES ON EITHER END TO ACCOMPLISH.
INSULATE ENTIRE LENGTH OF PIPING PER SPECIFICATION
REQUIREMENTS. INCLUDE CONTINUOUS PVC COVERING THROUGHOUT
AND PREPARE ENDS FOR EXTENSION TO NEXT SUB-PHASE PIPING
WHICH WILL INCLUDE INSULATING ALL VALVE BODIES.
NOT USED THROUGH KEY NOTE
SHUT-OFF VALVE #K.C AND VALVE #4.B (BOTH FURTHER OUT TO NEXT
ADJACENT RISER VALVES OUTSIDE THE EXTENTS OF THIS PHASE
DRAWING) TO ISOLATE THIS RISER G FOR VALVE REPLACEMENT.
REFER TO GENERAL NOTES FOR PROVISIONS TO BE TAKEN TO VERIFY
ANY EXISTING VALVE LEAKAGE AND AREAS THAT WILL BE AFFECTED BY
THIS MAJOR WATER OUTAGE.
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAKE-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 5" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
40 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
DURING OUTAGE, INSTALL THERMOWELLS ON BOTH HOT AND COLD
WATER MAINS TO ACCEPT AN INSERTION TYPE TEMPERATURE SENSOR
TO BE INTEGRATED INTO BUILDING AUTOMATION SYSTEM FOR
INFORMATION MONITORING AND TRENDING.
INSTALL STRAP ON TEMPERATURE SENSORS INDICATE ON
RECIRCULATION PIPING. REPAIR ANY DAMAGED OR REMOVED
INSULATION ON COMPLETION.
ONCE VALVE INSTALLATION IS COMPLETED, INSULATE ALL AFFECTED
PIPING AND NEW VALVE BODIES COMPLETELY. COVER EVERYTHING
WITH PVC JACKET COVERS AND SEAL AS REQUIRED. INSULATION CAN
OCCUR DURING NORMAL HOURS AFTER OUTAGE COMPLETION, BUT
SHOULD NOT BE DELAYED FOR ANY MORE THAN 3 BUSINESS DAYS.
PHASE 1.1 (DEMO - REFER TO DETAIL 1 AND 10-19 SERIES KEY NOTES):
THE EXISTING GALVANIZED 8" COLD WATER PIPING MAIN TO BE REMOVED
BETWEEN INTERIOR VALVES OF RISERS INDICATED IN KEY NOTES. REFER
TO WORK SEQUENCE DESCRIBED IN 'ISOLATION OF MAIN PIPING LOOP
SECTIONS' BELOW TO EITHER CONFIRM EXISTING VALVES DO NOT LEAK, OR
FOLLOW GUIDELINE PROVISIONS TO BE TAKEN IF THEY ARE FOUND
DEFECTIVE. NO OUTAGES WILL BE REQUIRED DURING THIS SUB-PHASE
WITH MAIN LOOP CONTINUALLY SERVING BOTH SIDES.
PHASE 1.2 (BUILD-BACK - REFER TO DETAIL 2 AND 20-29 SERIES KEY NOTES):
INSTALL NEW PIPING IN SAME LOCATION AS REMOVED SECTION OF 8" COLD
WATER MAIN. MAY REUTILIZE EXISTING PIPING RACK FOR PIPING
SUPPORTS. REFER TO KEY NOTES FOR ADDITIONAL INFORMATION RELATED
TO INSTALLATION.
PHASE 1.3 (RISER VALVE REPLACEMENT - 30+ SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF RISER G AND REPLACE EXISTING 5" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• FIRST FLOOR: HOSPICE/PALLIATIVE, NURSING HOME CARE, MENTAL
HEALTH - PTSR & PPH, CENTRAL STAFF LOCKERS
• SECOND FLOOR: AMBULATORY CARE SERVICE, CENTRAL STAFF
LOCKERS 2C114B, INPATIENT SURGICAL BED, CENTRAL STAFF LOKERS
2H111A
• THIRD FLOOR: INPATIENT MEDICAL BEDS AND HEM/ONC TREATMENT
PRIMARY CARE, CENTRAL STAFF LOCKERS 3C114C, INPATIENT MEDICAL
BEDS, CENTRAL STAFF LOCKERS 3H117D
• FOURTH FLOOR: AMBULATORY CARE SERVICE - PRIMARY CARE
WOMEN'S CLINIC, AMBULATORY CARE SERVICE - SPECIALTY CARE
ONCOLOGY, GERIATRIC CLINIC, EXENDED CARE & REHAB
ISOLATION OF MAIN PIPING LOOP SECTIONS:
PERFORM THE FOLLOWING PROCEDURE STEPS TO PROPERLY ISOLATE
EACH SECTION OF PIPING LOOP AS DESCRIBED IN PHASING SEQUENCES,
1) SHUT-OFF ISOLATION VALVES ON INTERIOR SIDE OF LOOP BEING
MODIFIED OR REMOVED TO MAINTAIN SERVICES TO ALL RISERS.
2) REMOVE SECTION OF PIPING, OR TAP TEMPORARY DRAIN CONNECTION
TO VERIFY VALVES ARE HOLDING FOR A MINIMUM PERIOD OF 24 HOURS.
3) IF NO VALVE LEAKAGE, OR MINIMAL AMOUNT, IS WITNESSED THAN
PROCEED TO PIPING MODIFICATION AND/OR DEMOLITION SCOPE OF WORK
IDENTIFIED.
4) IF MODERATE OR SIGNIFICANT VALVE LEAKAGE IS WITNESSED THAN
PROVIDE 1.5" VALVE TAP WITH THREADED CONNECTION TO HOSE TO
NEAREST MECHANICAL ROOM DRAIN DISCHARGE LOCATION. THIS
TEMPORARY DRAIN CONNECTION AND HOSE SHALL BE REMOVED ONCE
NEW RISER VALVE REPLACEMENTS ARE COMPLETED.
---CONTRACTOR WILL BE RESPONSIBLE TO KEEP ON SITE AT LEAST FOUR(4)
SETS OF 1.5" VALVES WITH THREADED CONNECTIONS AND TWO(2) 250' LONG
HOSES OF 1.5" DIAMETER IN SIZE.
CONTRACTOR ALLOWANCE FOR TEMP FIXTURES OR WATER SERVICES:
ASSUME THAT DURING THE COURSE OF THE 8 PHASE DOMESTIC WATER
LOOP REPLACEMENT THAT SPECIFIC AREAS WILL REQUIRE TEMPORARY
SINKS AND/OR EXTENSION OF TEMPORARY WATER SERVICES TO THEIR
DEPARTMENT. CONTRACTORS SHALL INCLUDE THE FOLLOWING
ALLOWANCES WITHIN THEIR BASE BID TO ACCOMODATE THOSE REQUESTS
WHEN THEY ARISE DURING OUTAGE COORDINATION WITH VA FACILITIES.
• INCLUDE UP TO TWELVE(12) TEMPORARY SINK FIXTURES TIED INTO AN
ADJACENT RISER SERVICE. EACH SINK WILL REQUIRE UP TO 50' OF
COPPER PIPE FOR WATER CONNECTIONS, OTHERWISE HOSE WILL BE
UTILIZED IF DISTANCE EXCEEDS THAT SPECIFIED AMOUNT OF PIPING.
• INCLUDE FOUR(4) TEMPORARY BACK-UP WATER CONNECTIONS FOR
COLD WATER SERVICE TO AN ENTIRE DEPARTMENT. TEMPORARY COLD
WATER MAIN SHALL BE ASSUMED AT 2" SIZE AND EXTEND A MAXIMUM OF
250' TO CONNECT INTO AN ADJACENT RISER SERVICE.
• NOTE THAT THE ABOVE IS FOR ENTIRE PROJECT, NOT PER PHASE.
8" CW
2 1/2" RHW
4" HW
2" SOFT
10" HPS
4" PC
5" CHWR
10" CHWR
10" CHWS
8" CHWR
8" CHWS8" CHWR
8" CHWS
GH
2" SOFT
4" HW
2 1/2" RHW
8" CW10" HPS
4" PC
5" CHWR
10" CHWR
10" CHWS
8" CHWS
8" CHWR
8" CHWS
8" CHWR
GNPQRSTUVW
1356-PP101.1
1356-PP101.1
STACKED
K.B'
TO RISER K
K.A' K.C'
G.B
G.A
G.C
HJKLM
GNPQRSTUVW
1356-PP101.1
1356-PP101.1
STACKED
21 22
1356-PP101.1
K.C'
K.A'
K.B'
G.C
G.B
G.A
HJKLM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
F
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:3
:3
A M
BASEMENT INTERSTITIAL - PHASE
1 - DOMESTIC WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP101.1
NO SCALE
PHASE 1 - ISOMETRIC VIEW
1/4" = 1'-0"
ENLARGED - PHASE 1.3 - DOMESTIC WATER PLAN
NO SCALE
PHASE 1 ELEVATION - SOUTH TUNNEL
NO SCALE
PHASE 1 ELEVATION - EAST TUNNEL
1/16" = 1'-0"
PHASE 1.1 DEMO
1/16" = 1'-0"
PHASE 1.2 NEW
CONNECTION TO EXISTING
VALVE K.C'. VALVE K.C.' TO
BE REPLACED IN PHASE 8.
REFER TO 1356-PP108.1
FOR PHASE 8.
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
TS
T S
TS TS
C4-120
KEY NOTES:GENERAL NOTES:G
H
5" CW UP
5" CW UP
4" HW UP
1 1/2" RHW UP
G
G.B
G.C
H
5" CW UP
5" CW UP
4" HW UP
1 1/2" RHW UP
HJKL
1 1/2" RHW UP 4" HW UP
5" CW UP
5" CW UP
5" CW
5" CW
4" HW
1 1/2" RHW
5" CW DN
5" CW DN
1 1/2" RHW DN
4" HW DN
5" CW DN
HJKL
5" CW DN
1 1/2" RHW UP
4" HW UP
5" CW
5" CW
4" HW
1 1/2" RHW
1 1/2" RHW UP
4" HW UP
5" CW UP
5" CW UP
LM
LM
1 1/2" RHW DN
1 1/4" RHW UP 4" HW UP & DN
4" CW UP
5" CW DN
5" CW DN
4" CW UP
LM
LM
LM
LM
1 BEFORE OUTAGE: ROUTE NEW RISER "G" PIPING PARALLEL TO
EXISTING PIPING TO LEVEL ABOVE.
DURING OUTAGE: REMOVE AND REPLACE MAIN PIPING BETWEEN
VALVES G.B AND G.C. MAKE FINAL CONNECTION TO NEW RISER "G"
PIPING. ABANDON EXISTING COLD WATER RISER PIPING TO BE
DEMOLISHED AFTER ALL RISER "G" FINAL CONNECTIONS ARE MADE
AND OUTAGE IS COMPLETE.
AFTER OUTAGE: REFER TO ASSOCIATED LEVEL DEMOLITION VIEW AND
KEY NOTE 2.
AFTER OUTAGE: REMOVE ABANDONED COLD WATER RISER PIPING.
DEADLEG OR ABANDONED PIPING SHALL NOT REMAIN.
MAIN PIPING DEMOLITION INDICATED IS TO OCCUR IN THE NEXT PHASE.
REFER TO 1/1356-PP102.1.
BEFORE OUTAGE: ROUTE NEW RISER "G" PIPING PARALLEL TO
EXISTING PIPING TO LEVEL ABOVE. EXTEND NEW TAKEOFFS TO
EXISTING BRANCH TAKEOFFS AND PREPARE FOR NEW CONNECTION.
NOTE THAT THERE IS AN EXISTING 4" COPPER MAIN (NOT CONNECTED
AND EMPTY) THAT WAS PREVIOUSLY ROUTED AND ABANDINED
THROUGH THIS AREA. CONTRACTOR MAY UTILIZE EXISTING ROUTE
AND SUPPORT HANGERS, BUT MUST FULLY REMOVE EXISTING PIPING
THAT WAS NEVER UTILIZED. CONTRACTOR MAY RECYCLE THIS
MATERIAL TO BE REMOVED, BUT MAY NOT REUTILIZE THAT SALVAGED
PIPING FOR ANY PART OF THIS PROJECT.
NOTE THAT THE EXISTING COPPER PIPE TO BE REMOVED IS HIGH
WITHIN MECHANICAL ROOM AND ROUTED ABOVE LARGE EQUIPEMTN
(AHU'S/ETC). CONTRACTOR TO DETERMINE SCISSOR LIFT AND/OR
EQUIPMENT NEEDED FOR INSTALLATION/ACCESS.
DURING OUTAGE: DISCONNECT EXISTING BRANCH TAKEOFFS AND
REMOVE TAKEOFF PIPING. MAKE TAKEOFF FINAL CONNECTIONS.
ABANDON EXISTING COLD WATER RISER PIPING TO BE DEMOLISHED
AFTER ALL RISER "G" FINAL CONNECTIONS ARE MADE AND OUTAGE IS
COMPLETE.
AFTER OUTAGE: REFER TO ASSOCIATED LEVEL DEMOLITION VIEW AND
KEY NOTE 2.
A.
B.
C.
D.
E.
F.
THE OUTLINE OF 'MEANS-AND-METHODS' NOTES BELOW FOR VERTICAL
COLD WATER RISER REPLACEMENTS INDICATED WITHIN THESE
DRAWINGS IS NOT INTENDED TO BE ALL-INCLUSIVE OF EFFORT
REQUIRED BY CONTRACTOR. NOR ARE THESE NOTES AND/OR
SUGGESTIONS MEANT TO LIMIT CONTRACTORS FROM DEVELOPING
THEIR OWN APPROACH THAT MAY BE CONSIDERED MORE COST
EFFECTIVE OR SAFE. THESE NOTES ARE MAINLY MEANT TO QUALIFY
EXISTING CONDITIONS AND DEFINE MINIMUM LEVEL OF PLANNING
REQUIRED BY VA FOR EACH OF THESE TIME SENSITIVE OUTAGES.
NO MAJOR WATER OUTAGE SHALL LAST MORE THAN 12 HOURS IN
DURATION. PLUMBING CONTRACTOR TO DETERMINE ADEQUATE
NUMBER OF PLUMBER CREWS REQUIRED TO PERFORM MULTIPLE
TASKS SIMULTANEOUSLY DURING OUTAGES. ALL OUTAGES SHALL BE
ASSUMED TO BE PERFORMED DURING WEEKEND OR NIGHT OVERTIME
HOURS WHEN BIDDING THIS PROJECT.
VERTICAL RISER REPLACEMENT (TYPE 1 - WITHIN MECHANICAL ROOM)
• FOR RISERS WITHIN MECHANICAL ROOMS, CONTRACTOR SHALL
CORE DRILL HOLES THROUGH FLOOR ADJACENT TO EXISTING
PLUMBING RISER FOR NEW INSTALLATION. EXISTING FLOOR
PENETRATIONS AND/OR SLEEVE SHALL BE PATCHED FLUSH TO
EXISTING FLOOR AS REQUIRE UPON DEMOLITION OF THOSE RISERS.
• EXISTINGT TAKE-OFF VALVES MAY REQUIRE RELOCATION FOR
CONNECTION INTO NEW RISER. VERIFY ADEQUATE ACCESS TO ALL
TAKE-OFF VALVES AND PROVIDE WITH NEW LAMINATE SIGNAGE.
ANY VALVES FOUND AT INACCESSIBLE LOCATIONS SHALL BE
RELOCATED BY CONTRACTOR.
• REFER TO CLIN 3001 FOR REPLACEMENT OF ALL ICRCUIT SETTER
VALVES WITHIN ENTIRE BUILDING. PLUMBING CONTRACTOR MAY
OPT TO HAVE DEDICATED CREWS ASSIGNED TO THIS TASK DURING
RISER OUTAGE TO LIMIT NUMBER OF SECONDARY OUTAGES
REQUIRED. HOWEVER, IF ENOUGH PLUMBERS ARE AVAILABLE TO
ACHIEVE THIS DURING LIMITED OUTAGE TIMEFRAME, THAN REFER
TO GENERAL NOTES ON DRAWING PP002 FOR 'LARGE OUTAGES' TO
PERFORM PRIOR TO THE MAJOR RISER OUTAGE.
VERTICAL RISER REPLACEMENT (TYPE 2 - WITHIN ENCLOSED SHAFT)
• IN GENERAL, MAJOR RATED SHAFTS SHOWN IN THESE DRAWINGS
HAVE EXISTING FULL SIZED ACCESS DOOR FROM BASE OF SHAFT
ON FIRST FLOOR LEVEL. HOWEVER, THAT IS TYPICALLY THE ONLY
ACCESS INTO THESE SHAFTS THAT ARE FULLY OPEN (NO
INTERMEDIATE FLOOR STRUCTURES) UP THROUGH PENTHOUSE
LEVEL WHERE RATED WALLS ARE BUILT-UP WITH LID (TYPICALLY
12'+) WITHIN ENCLOSED PENTHOUSE LEVEL.
• IN ORDER TO GAIN ACCESS TO TOP OF SHAFT, CONTRACTOR WILL
BE REQUIRED TO FURNSIH AND INSTALL FIRE RATED DOOR
ASSEMBLIES FROM PENTHOUSE LEVEL. THESE DOORS MAY BE
USED IN CONJUCTION OF RIGGING FOR BOSUN CHAIRS FROM TOP
OF SHAFT IF CONTRACTOR DEEMS THAT AS SAFE AFTER REVIEW
WITH THEIR INTERNAL SAFETY OFFICIAL.
• IN ADDITION TO ACCESS ON TOP LEVEL OF SHAFT, CONTRACTOR
WILL HAVE OPPORTUNITIES TO INSTALL 24"X24" OR 48"X24" FIRE
RATED ACCESS PANELS ON ANY OTHER LEVEL REQUIRED (BUT
ONLY FROM INTERSTITIAL SPACE, INSTALLATION OF ACCESS
PANELS FROM PATIENT CARE AREAS WILL NOT BE PERMITTED).
• CONTRACTOR WILL BE REQUIRED TO PROVIDE THEIR OWN
SCAFFOLDING REQUIRED AT EACH LEVEL TO INSTALL NEW COLD
WATER RISERS ADJACENT TO EXISTING PRIOR TO SIOWTCHOVER
OUTAGE. SCAFFOLDS SHOULD BE STRATEGICALLY PLACE TO
ALLOW ACCESS FOR RECONNECTION TO FLOOR TAKE-OFF PIPING
INSIDE OF EACH SHAFT.
• EXISTING CONDITION PDF SKETCHES ARE PROVIDED ON DRAWINGS
WHERE WORK INSIDE CONFINED AREAS OF RATED SHAFTS IS
REQUIRED. THESE SKETCHES ARE FOR CONTRACTOR REFERENCE
ONLY AND MAY NOT FULLY INDICATE ALL SERVICES WITHIN SHAFT
ENCLOSURES. CONTRACTOR WILL BE REQUIRED TO FIELD VERIFY
ACTUAL SITE CONDITIONS OF EACH SHAFT WHILE DEVELOPING
ACCESS AND SAFETY PLANNING.
NOTE THAT SOME AREAS HAVE EXISTING COPPER MAINS INTENDED TO
REPLACE GALVANIZED RISERS. HOWEVER THESE MAINS WERE
INSTALLED UP TO 15-25 YEARS AGO AND THEIR INTEGRITY IS
QUESTIONABLE. CONTRACTOR MAY UTILIZE THE EXISTING ROUTE, AND
CORRESPONDING SUPPORT HANGERS, BUT MUST FULLY REMOVE ALL
ABANDONED/UNUSED COPPER PIPING MAINS. ONCE OFF SITE THE
CONTRACTOR MAY TAKE OWNERSHIP OF PIPING FOR RECYLCING OR
REPURPOSING, BUT IT SHALL NOT BE UTILIZED WITHIN THIS PROJECT.
NO EXISTING PIPING WILL BE ALLOWED TO BE LEFT ABANDONED. SOME
AREAS HAVE RESTRICITVE ACCESS DUE TO SURROUNDING PIPES
AND/OR STRUCTURE AND MAY REQUIRE TEMPORARY REMOVAL OF
PIPING OR DUCTWORK TO GAIN ACCESS FOR DEMOLITION.
CONTRACTOR TO ASSUME SOME LEVEL OF DISCONNECT/RECONNECT
OF EXISTING SERVICES TO GAIN ACCCESS FOR COMPLETE DEMOLITION
OF EXISTING PIPING, OR INSTALLATION OF NEW PIPE IN CONGESTED
AREAS. REFER TO DRAWING NOTES FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
F
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:3
:3
A M
ALL LEVELS - PHASE 1 -
ENLARGED RISER "G" COLD
WATER REPLACEMENT PLANS
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP101.2
1/8" = 1'-0"
BASEMENT - RISER G REPLACEMENT DEMO
1/8" = 1'-0"
BASEMENT - RISER G REPLACEMENT NEW
1/8" = 1'-0"
FIRST LEVEL - RISER G REPLACEMENT DEMO
1/8" = 1'-0"
FIRST LEVEL - RISER G REPLACEMENT NEW
1/8" = 1'-0"
SECOND LEVEL - RISER G REPLACEMENT DEMO
1/8" = 1'-0"
SECOND LEVEL - RISER G REPLACEMENT NEW
1/8" = 1'-0"
THIRD LEVEL - RISER G REPLACEMENT DEMO
1/8" = 1'-0"
THIRD LEVEL - RISER G REPLACEMENT NEW
1/8" = 1'-0"
FOURTH LEVEL - RISER G REPLACEMENT DEMO
1/8" = 1'-0"
FOURTH LEVEL - RISER G REPLACEMENT NEW
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
T S
TS
TS
TS
KEY NOTES: GENERAL NOTES:
T S
TS
TS
TS
TS
TS
TS
G
1 1/2" CW
DRAIN 34
4.C
4.B
REFER TO DETAIL
1/1356-PP103
FOR VALVE
LOCATION.
REFER TO DETAIL
2/1356-PP102
FOR VALVE
LOCATION.
8" CW
8" CW
8" CW
4" CW
H
C W
3" CW
C W
4" CW
3/4" CHW
/2
C H
W
H W
/2
/2
/2
H W
NOTE THAT ALL EXISTING PLUMBING
FIXTURES WITHIN SCI BUILDING
HAVE ALREADY BEEN RETROFIT
WITH MXING VALVES ON HOT WATER
SIDE FOR SCALD PROTECTION. FOR
CONTRACTOR REFERENCE ONLY.
/4
C
H W
H W
G.B
G.A
G.C
8" CW
2 1/2" RHW
4" HW
8" CW
3" CW
2" HW
3/4" RHW
EXISTING DOMESTIC
WATER SERVICE TO
SCI BUILDING
3" CW
4.B
4.A
4.C
8" CW
TO BE
REPLACED
IN NEXT
PHASE
4" CW
TO SHAFT 4. REFER
TO 1356.PP102.2 FOR
CONTINUATION.
NOTE THAT THESE KEY NOTES ARE SPECIFIC TO THIS DRAWING (DO
NOT REFER TO MASTER KEY NOTES ON SHEET 1356-PP003). NOT ALL
KEY NOTES ARE UTILIZED AND MAY HAVE GAPS OF MISSING NOTE
NUMBERS TO KEEP GROUPS OF TEN NOTES AVAILABLE PER PHASE.
SHUT-OFF VALVE G.C AND VALVE 4.B TO ISOLATE SECTION OF PIPING
INDICATED FOR REMOVAL. REFER TO GENERAL NOTES FOR
PROVISIONS TO BE TAKEN TO VERIFY ANY EXISTING VALVE LEAKAGE.
ONCE ISOLATED, REMOVE SECTION OF 8" GALVANZED PIPING LOOP.
CUT INTO SECTIONS SMALL ENOUGH TO TRANSPORT TO LOADING
DOCK AREA FOR REMOVAL. INCLUDE DEMOLITION OF EXISTING
SUPPORTS MOUNTED TO PIPING RACKS, NEW PIPING WILL BE
SUPPORTED ONTO EXISTING RACK STRUCTURE BUT SHOULD BE
PROVIDED WITH NEW PIPE CLAMPS.
PRIOR TO REMOVAL OF SECTION OF 8" PIPING LOOP (PER KEY NOTE #
11) THE SCI CONNECTION WILL NEED TO BE RELOCATED TO BETWEEN
RISER #4 TAKE-OFF VALVES. COORDINATE OUTAGE OF COLD WATER
TO ENTIRE SCI BUILDING PRIOR TO THIS DISCONNECT/RECONNECT.
NOT USED THROUGH KEY NOTE
INSTALL NEW SECTION OF 8" SCHEDULE 10 STAINLESS STEEL PIPING TO
REPLACE PREVIOUSLY REMOVED. INSTALL IN EXACT SAME LOCATION
AS REMOVED SECTION OF PIPING. PROVIDE NEW SUPPORT CLAMPS
ON EXISTING PIPING RACK AS REQUIRED.
PROVIDE TEMPORARY END CAPS AT EITHER SIDE OF NEW PIPING
SECTION. FIRST PERFORM A PRESSURE TEST ON PIPING SECTION PER
SPECIFICATION REQUIREMENTS, AND THEN STERILIZE PIPING USING
CHLORINE SOLUTION FOR AT LEASE 24 HOURS PRIOR TO FLUSHING.
INCLUDE DRAIN/FILL VALVES ON EITHER END TO ACCOMPLISH.
INSULATE ENTIRE LENGTH OF PIPING PER SPECIFICATION
REQUIREMENTS. INCLUDE CONTINUOUS PVC COVERING THROUGHOUT
AND PREPARE ENDS FOR EXTENSION TO NEXT SUB-PHASE PIPING
WHICH WILL INCLUDE INSULATING ALL VALVE BODIES.
PROVIDE NEW 3" TRIPLE OFFSET BUTTERFLY VALVE FOR SCI BUILDING
AT THIS LOCATION. REFER TO PHASE 3.1 FOR DEMOLITION AND
RELOCATION OF EXISTING WATER SERVICE PRIOR TO BEGINNING ANY
DEMOLITION. NOTE THAT SCI BUILDING WILL HAVE A SECOND OUTAGE
DURING PHASE 3.3 WHEN RISER #4 VALVES ARE REPLACED. (NOTE
THAT CONTRACTOR MAY OPT TO MOVE PHASE 3.3 AHEAD OF PHASE 3.1
IF THEY WANT TO AVOID MULTIPLE OUTAGES.)
NOT USED THROUGH KEY NOTE
SHUT-OFF VALVE G.C AND VALVE E.B (BOTH FURTHER OUT TO NEXT
ADJACENT RISER VALVES OUTSIDE THE EXTENTS OF THIS PHASE
DRAWING) TO ISOLATE THIS SHAFT 4 FOR VALVE REPLACEMENT.
REFER TO GENERAL NOTES FOR PROVISIONS TO BE TAKEN TO VERIFY
ANY EXISTING VALVE LEAKAGE AND AREAS THAT WILL BE AFFECTED BY
THIS MAJOR WATER OUTAGE.
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAK-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 4" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
40 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
DURING OUTAGE, INSTALL THERMOWELLS ON BOTH HOT AND COLD
WATER MAINS TO ACCEPT AN INSERTION TYPE TEMPERATURE SENSOR
TO BE INTEGRATED INTO BUILDING AUTOMATION SYSTEM FOR
INFORMATION MONITORING AND TRENDING.
INSTALL STRAP ON TEMPERATURE SENSORS INDICATE ON
RECIRCULATION PIPING. REPAIR ANY DAMAGED OR REMOVED
INSULATION ON COMPLETION.
ONCE VALVE INSTALLATION IS COMPLETED, INSULATE ALL AFFECTED
PIPING AND NEW VALVE BODIES COMPLETELY. COVER EVERYTHING
WITH PVC JACKET COVERS AND SEAL AS REQUIRED. INSULATION CAN
OCCUR DURING NORMAL HOURS AFTER OUTAGE COMPLETION, BUT
SHOULD NOT BE DELAYED FOR ANY MORE THAN 3 BUSINESS DAYS.
PHASE 2.1 (DEMO - REFER TO DETAIL 1 AND 10-19 SERIES KEY NOTES):
THE EXISTING GALVANIZED 8" COLD WATER PIPING MAIN TO BE REMOVED
BETWEEN INTERIOR VALVES OF RISERS INDICATED IN KEY NOTES. REFER
TO WORK SEQUENCE DESCRIBED IN 'ISOLATION OF MAIN PIPING LOOP
SECTIONS' BELOW TO EITHER CONFIRM EXISTING VALVES DO NOT LEAK, OR
FOLLOW GUIDELINE PROVISIONS TO BE TAKEN IF THEY ARE FOUND
DEFECTIVE. NO OUTAGES WILL BE REQUIRED DURING THIS SUB-PHASE
WITH MAIN LOOP CONTINUALLY SERVING BOTH SIDES.
PHASE 2.2 (BUILD-BACK - REFER TO DETAIL 2 AND 20-29 SERIES KEY NOTES):
INSTALL NEW PIPING IN SAME LOCATION AS REMOVED SECTION OF 8" COLD
WATER MAIN. MAY REUTILIZE EXISTING PIPING RACK FOR PIPING
SUPPORTS. REFER TO KEY NOTES FOR ADDITIONAL INFORMATION RELATED
TO INSTALLATION.
PHASE 2.3 (RISER VALVE REPLACEMENT - 30+ SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF SHAFT 4 AND REPLACE EXISTING 4" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• BASEMENT LEVEL: TELEPHONE OPERATORS (POLICE), CENTRAL STAFF
LOCKER, NUTRITION/FOOD SERVICE, PATHOLOGY.
• FIRST FLOOR: NURSING HOME CARE DINING, VOLUNTARY SERVICE,
CANTEEN SERVICE, TEPT CANTEEN, OUT LEASED SPACE
• SECOND FLOOR: AMBULATORY CARE SERVICE, REHABILITATION
MEDICAL SERVICE, SPECIALTY CARE - TELEMED, EDUCATION, RESEARCH
SERVICE, ON-CALL, IRM SERVICE.
• THIRD FLOOR: AMBULATORY CARE SERVICE: PRIMARY CARE, OFFICES:
INFECTIOUS DISEASE, RHEUMATOLOGY, METABOLIC-ENDOCRINE,
EDUCATION, PULIMINARY CARE, AMBULATORY CARE SERVICE - PRIMARY
CARE, RESPIRATORY THERAPY
• FOURTH FLOOR: SURGERY, EDUCATION, CLINICAL SERVICES
ADMINISTRATION, ENGINEERING SAFETY, DIRECTOR, REHABILITATION
MEDICAL SERVICE - SPEECH PATH, EEG/NEUROLOGY
ISOLATION OF MAIN PIPING LOOP SECTIONS:
PERFORM THE FOLLOWING PROCEDURE STEPS TO PROPERLY ISOLATE
EACH SECTION OF PIPING LOOP AS DESCRIBED IN PHASING SEQUENCES,
1) SHUT-OFF ISOLATION VALVES ON INTERIOR SIDE OF LOOP BEING
MODIFIED OR REMOVED TO MAINTAIN SERVICES TO ALL RISERS.
2) REMOVE SECTION OF PIPING, OR TAP TEMPORARY DRAIN CONNECTION
TO VERIFY VALVES ARE HOLDING FOR A MINIMUM PERIOD OF 24 HOURS.
3) IF NO VALVE LEAKAGE, OR MINIMAL AMOUNT, IS WITNESSED THAN
PROCEED TO PIPING MODIFICATION AND/OR DEMOLITION SCOPE OF WORK
IDENTIFIED.
4) IF MODERATE OR SIGNIFICANT VALVE LEAKAGE IS WITNESSED THAN
PROVIDE 1.5" VALVE TAP WITH THREADED CONNECTION TO HOSE TO
NEAREST MECHANICAL ROOM DRAIN DISCHARGE LOCATION. THIS
TEMPORARY DRAIN CONNECTION AND HOSE SHALL BE REMOVED ONCE
NEW RISER VALVE REPLACEMENTS ARE COMPLETED.
---CONTRACTOR WILL BE RESPONSIBLE TO KEEP ON SITE AT LEAST FOUR(4)
SETS OF 1.5" VALVES WITH THREADED CONNECTIONS AND TWO(2) 250' LONG
HOSES OF 1.5" DIAMETER IN SIZE.
CONTRACTOR ALLOWANCE FOR TEMP FIXTURES OR WATER SERVICES:
ASSUME THAT DURING THE COURSE OF THE 8 PHASE DOMESTIC WATER
LOOP REPLACEMENT THAT SPECIFIC AREAS WILL REQUIRE TEMPORARY
SINKS AND/OR EXTENSION OF TEMPORARY WATER SERVICES TO THEIR
DEPARTMENT. CONTRACTORS SHALL INCLUDE THE FOLLOWING
ALLOWANCES WITHIN THEIR BASE BID TO ACCOMODATE THOSE REQUESTS
WHEN THEY ARISE DURING OUTAGE COORDINATION WITH VA FACILITIES.
• INCLUDE UP TO TWELVE(12) TEMPORARY SINK FIXTURES TIED INTO AN
ADJACENT RISER SERVICE. EACH SINK WILL REQUIRE UP TO 50' OF
COPPER PIPE FOR WATER CONNECTIONS, OTHERWISE HOSE WILL BE
UTILIZED IF DISTANCE EXCEEDS THAT SPECIFIED AMOUNT OF PIPING.
• INCLUDE FOUR(4) TEMPORARY BACK-UP WATER CONNECTIONS FOR
COLD WATER SERVICE TO AN ENTIRE DEPARTMENT. TEMPORARY COLD
WATER MAIN SHALL BE ASSUMED AT 2" SIZE AND EXTEND A MAXIMUM OF
250' TO CONNECT INTO AN ADJACENT RISER SERVICE.
• NOTE THAT THE ABOVE IS FOR ENTIRE PROJECT, NOT PER PHASE.
G
8" CW
2 1/2" CHW
4" HW
2" HW
3" CW
3/4" RHW
H
2" SOFT
10" HPS
5" CHWR
8" CHWR
8" CHWS
2" HW
3/4" CHW
12" CHWS
12" CHWR
8" CHWR
8" CHWS
3" MPC
5" MPS3" HPS
G
TO SCI BLDG.
G.B
G.C
G.A
4.A'
4.C
4.B
H G
1356-PP102.1
1356-PP102.1
4.C
4.B
G.B
G.C
G.A
H
C W
C W
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
D
F
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:3
:0
A M
BASEMENT INTERSTIAL - PHASE 2
- DOMESTIC WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP102.1
1/4" = 1'-0"
ENLARGED - PHASE 2.3
NO SCALE
PHASE 2 - ISOMETRIC VIEW
NO SCALE
PHASE 2 ELEVATION - EAST TUNNEL
1/16" = 1'-0"
PHASE 2.1 DEMO
1/16" = 1'-0"
PHASE 2.2 NEW
CONNECTION
TO PREVIOUS
PHASE.
3" CW CONNECTION TO
SCI COLD WATER SERVICE
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
T S
T S
TS
TS
TS
TS
TS
TS
TS
KEY NOTES:GENERAL NOTES:
GN
1356-PP103.1
SHAFT 4
2 2 2
HJKLM
1" RHW UP
2 1/2" HW UP
4" CW UP
4" CW UP
C W
4" CW
2 1/2" HW
1" RHW
4" CW
GN
SHAFT 4
5 5
4.C
4.B
HJKLM
4" CW
1" RHW
2 1/2" HW
4" CW
/2
C W
1 1/4" CW3/4" CW
/2
C
W
3/4" CW
4" CW
4" CW UP
4" CW UP
2 1/2" HW UP
1" RHW UP
7 8
N
4" CW UP & DN
4" CW UP & DN
2 1/2" HW UP & DN
3/4" RHW UP & DN
M
N
4" CW UP & DN
4" CW UP & DN
2 1/2" HW UP & DN
3/4" RHW UP & DN
M
N
4" CW UP & DN 2
4" CW UP & DN
2" HW UP
2 1/2" HW DN
3/4" RHW UP & DN
M
N
4" CW UP & DN
4" CW UP & DN
2" HW UP
2 1/2" HW DN
3/4" RHW UP & DN
M
N
3" CW UP
4" CW DN
3" CW UP
4" CW UP
2" HW UP & DN
3/4" RHW UP & DN
M
N
3" CW UP & DN
3" CW UP & DN
2" HW UP & DN
3/4" RHW UP & DN
M
N
3/4" RHW DN
2" HW DN
3" CW DN
3" CW DN
M
N
3" CW DN
3" CW DN
2" HW DN
3/4" RHW DN
M
1 BEFORE OUTAGE: ROUTE NEW SHAFT 4 PIPING PARALLEL TO
EXISTING PIPING TO LEVEL ABOVE.
DURING OUTAGE: REMOVE AND REPLACE MAIN PIPING BETWEEN
VALVES 4.B AND 4.C. MAKE FINAL CONNECTION TO NEW SHAFT 4
PIPING. ABANDON EXISTING COLD WATER RISER PIPING TO BE
DEMOLISHED AFTER ALL SHAFT 4 FINAL CONNECTIONS ARE MADE
AND OUTAGE IS COMPLETE.
AFTER OUTAGE: REFER TO ASSOCIATED LEVEL DEMOLITION VIEW
AND KEY NOTE 2.
AFTER OUTAGE: REMOVE ABANDONED COLD WATER RISER PIPING.
DEADLEG OR ABANDONED PIPING SHALL NOT REMAIN.
MAIN PIPING DEMOLITION INDICATED IS TO OCCUR IN THE NEXT
PHASE. REFER TO 1/1356-PP102.1.
BEFORE OUTAGE: ROUTE NEW SHAFT 4 PIPING PARALLEL TO
EXISTING PIPING TO LEVEL ABOVE. EXTEND NEW TAKEOFFS TO
EXISTING BRANCH TAKEOFFS AND PREPARE FOR NEW CONNECTION.
DURING OUTAGE: DISCONNECT EXISTING BRANCH TAKEOFFS AND
REMOVE TAKEOFF PIPING. MAKE TAKEOFF FINAL CONNECTIONS.
ABANDON EXISTING COLD WATER RISER PIPING TO BE DEMOLISHED
AFTER ALL RISER "G" FINAL CONNECTIONS ARE MADE AND OUTAGE IS
COMPLETE.
AFTER OUTAGE: REFER TO ASSOCIATED LEVEL DEMOLITION VIEW
AND KEY NOTE 2.
DURING RISER OUTAGE: DISCONNECT FROM EXISTING COLD WATER
BRANCH AND MAKE FINAL CONNECTION FROM NEW COLD WATER
BRANCH MAIN AT POINT INDICTED ON PLAN. SEE PLAN FOR PIPE
SIZING. CONTRACTOR TO VERIFY PIPE SIZING AND OUTAGE AREAS
PRIOR TO CONSTRUCTION. REMOVE EXISTING PIPING BACK TO
BRANCH MAIN.
NEW 4" STAINLESS STEEL MAIN TO BE INSTALLED PARALLEL WITH
EXISITNG. NO MAJOR DUCTWORK OR PIPING OBSTRUCTIONS.
CONTRACTOR TO PROVIDE NEW SUPPORT HANGERS FOR PARALLEL
PATH. NOTE THAT MAJORITY OF ROUTE SHOWN IS ALONG SERVICE
WALKWAY, CONTRACTOR SHALL NOT IMPEED INTO WALKWAY
WITHOUT PERMISSION OF VA COTR. ALSO NOTE LOW VOLTAGE
TRAYS MAY PARTIALLY BLOCK ACCESS TO WHERE PIPING WILL BE
ROUTED, VERIFY SITE CONDITIONS.
NOTE THAT COLD WATER PIPING WILL NEED TO CROSS LOW
VOLTAGE CABLE TRAY AT THIS LOCATION. COORDINATE
MODIFICATION OF LOW VOLTAGE CABLE TRAYS IF REQUIRED.
CORE DRILL HOLE UP INTO SHAFT #4 AT THIS LOCATION, REFER TO
DETAILS 4 THROUGH 14 ON THIS DRAWING.
A.
B.
C.
D.
E.
F.
THE OUTLINE OF 'MEANS-AND-METHODS' NOTES BELOW FOR VERTICAL
COLD WATER RISER REPLACEMENTS INDICATED WITHIN THESE
DRAWINGS IS NOT INTENDED TO BE ALL-INCLUSIVE OF EFFORT
REQUIRED BY CONTRACTOR. NOR ARE THESE NOTES AND/OR
SUGGESTIONS MEANT TO LIMIT CONTRACTORS FROM DEVELOPING
THEIR OWN APPROACH THAT MAY BE CONSIDERED MORE COST
EFFECTIVE OR SAFE. THESE NOTES ARE MAINLY MEANT TO QUALIFY
EXISTING CONDITIONS AND DEFINE MINIMUM LEVEL OF PLANNING
REQUIRED BY VA FOR EACH OF THESE TIME SENSITIVE OUTAGES.
NO MAJOR WATER OUTAGE SHALL LAST MORE THAN 12 HOURS IN
DURATION. PLUMBING CONTRACTOR TO DETERMINE ADEQUATE
NUMBER OF PLUMBER CREWS REQUIRED TO PERFORM MULTIPLE
TASKS SIMULTANEOUSLY DURING OUTAGES. ALL OUTAGES SHALL BE
ASSUMED TO BE PERFORMED DURING WEEKEND OR NIGHT OVERTIME
HOURS WHEN BIDDING THIS PROJECT.
VERTICAL RISER REPLACEMENT (TYPE 1 - WITHIN MECHANICAL ROOM)
• FOR RISERS WITHIN MECHANICAL ROOMS, CONTRACTOR SHALL
CORE DRILL HOLES THROUGH FLOOR ADJACENT TO EXISTING
PLUMBING RISER FOR NEW INSTALLATION. EXISTING FLOOR
PENETRATIONS AND/OR SLEEVE SHALL BE PATCHED FLUSH TO
EXISTING FLOOR AS REQUIRE UPON DEMOLITION OF THOSE RISERS.
• EXISTINGT TAKE-OFF VALVES MAY REQUIRE RELOCATION FOR
CONNECTION INTO NEW RISER. VERIFY ADEQUATE ACCESS TO ALL
TAKE-OFF VALVES AND PROVIDE WITH NEW LAMINATE SIGNAGE.
ANY VALVES FOUND AT INACCESSIBLE LOCATIONS SHALL BE
RELOCATED BY CONTRACTOR.
• REFER TO CLIN 3001 FOR REPLACEMENT OF ALL ICRCUIT SETTER
VALVES WITHIN ENTIRE BUILDING. PLUMBING CONTRACTOR MAY
OPT TO HAVE DEDICATED CREWS ASSIGNED TO THIS TASK DURING
RISER OUTAGE TO LIMIT NUMBER OF SECONDARY OUTAGES
REQUIRED. HOWEVER, IF ENOUGH PLUMBERS ARE AVAILABLE TO
ACHIEVE THIS DURING LIMITED OUTAGE TIMEFRAME, THAN REFER
TO GENERAL NOTES ON DRAWING PP002 FOR 'LARGE OUTAGES' TO
PERFORM PRIOR TO THE MAJOR RISER OUTAGE.
VERTICAL RISER REPLACEMENT (TYPE 2 - WITHIN ENCLOSED SHAFT)
• IN GENERAL, MAJOR RATED SHAFTS SHOWN IN THESE DRAWINGS
HAVE EXISTING FULL SIZED ACCESS DOOR FROM BASE OF SHAFT
ON FIRST FLOOR LEVEL. HOWEVER, THAT IS TYPICALLY THE ONLY
ACCESS INTO THESE SHAFTS THAT ARE FULLY OPEN (NO
INTERMEDIATE FLOOR STRUCTURES) UP THROUGH PENTHOUSE
LEVEL WHERE RATED WALLS ARE BUILT-UP WITH LID (TYPICALLY
12'+) WITHIN ENCLOSED PENTHOUSE LEVEL.
• IN ORDER TO GAIN ACCESS TO TOP OF SHAFT, CONTRACTOR WILL
BE REQUIRED TO FURNSIH AND INSTALL FIRE RATED DOOR
ASSEMBLIES FROM PENTHOUSE LEVEL. THESE DOORS MAY BE
USED IN CONJUCTION OF RIGGING FOR BOSUN CHAIRS FROM TOP
OF SHAFT IF CONTRACTOR DEEMS THAT AS SAFE AFTER REVIEW
WITH THEIR INTERNAL SAFETY OFFICIAL.
• IN ADDITION TO ACCESS ON TOP LEVEL OF SHAFT, CONTRACTOR
WILL HAVE OPPORTUNITIES TO INSTALL 24"X24" OR 48"X24" FIRE
RATED ACCESS PANELS ON ANY OTHER LEVEL REQUIRED (BUT
ONLY FROM INTERSTITIAL SPACE, INSTALLATION OF ACCESS
PANELS FROM PATIENT CARE AREAS WILL NOT BE PERMITTED).
• CONTRACTOR WILL BE REQUIRED TO PROVIDE THEIR OWN
SCAFFOLDING REQUIRED AT EACH LEVEL TO INSTALL NEW COLD
WATER RISERS ADJACENT TO EXISTING PRIOR TO SIOWTCHOVER
OUTAGE. SCAFFOLDS SHOULD BE STRATEGICALLY PLACE TO
ALLOW ACCESS FOR RECONNECTION TO FLOOR TAKE-OFF PIPING
INSIDE OF EACH SHAFT.
• EXISTING CONDITION PDF SKETCHES ARE PROVIDED ON DRAWINGS
WHERE WORK INSIDE CONFINED AREAS OF RATED SHAFTS IS
REQUIRED. THESE SKETCHES ARE FOR CONTRACTOR REFERENCE
ONLY AND MAY NOT FULLY INDICATE ALL SERVICES WITHIN SHAFT
ENCLOSURES. CONTRACTOR WILL BE REQUIRED TO FIELD VERIFY
ACTUAL SITE CONDITIONS OF EACH SHAFT WHILE DEVELOPING
ACCESS AND SAFETY PLANNING.
NOTE THAT SOME AREAS HAVE EXISTING COPPER MAINS INTENDED TO
REPLACE GALVANIZED RISERS. HOWEVER THESE MAINS WERE
INSTALLED UP TO 15-25 YEARS AGO AND THEIR INTEGRITY IS
QUESTIONABLE. CONTRACTOR MAY UTILIZE THE EXISTING ROUTE, AND
CORRESPONDING SUPPORT HANGERS, BUT MUST FULLY REMOVE ALL
ABANDONED/UNUSED COPPER PIPING MAINS. ONCE OFF SITE THE
CONTRACTOR MAY TAKE OWNERSHIP OF PIPING FOR RECYLCING OR
REPURPOSING, BUT IT SHALL NOT BE UTILIZED WITHIN THIS PROJECT.
NO EXISTING PIPING WILL BE ALLOWED TO BE LEFT ABANDONED. SOME
AREAS HAVE RESTRICITVE ACCESS DUE TO SURROUNDING PIPES
AND/OR STRUCTURE AND MAY REQUIRE TEMPORARY REMOVAL OF
PIPING OR DUCTWORK TO GAIN ACCESS FOR DEMOLITION.
CONTRACTOR TO ASSUME SOME LEVEL OF DISCONNECT/RECONNECT
OF EXISTING SERVICES TO GAIN ACCCESS FOR COMPLETE DEMOLITION
OF EXISTING PIPING, OR INSTALLATION OF NEW PIPE IN CONGESTED
AREAS. REFER TO DRAWING NOTES FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
D
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:3
:0
A M
ALL LEVELS - PHASE 2 -
ENLARGED SHAFT 4 COLD WATER
REPLACEMENT PLANS
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP102.2
1/8" = 1'-0"
BASEMENT - SHAFT 4 REPLACEMENT DEMO
1/8" = 1'-0"
BASEMENT - SHAFT 4 REPLACEMENT NEW
1/8" = 1'-0"
FIRST LEVEL - SHAFT 4 REPLACEMENT DEMO
1/8" = 1'-0"
FIRST LEVEL SHAFT 4 REPLACEMENT NEW
1/8" = 1'-0"
SECOND LEVEL - SHAFT 4 REPLACEMENT DEMO
1/8" = 1'-0"
SECOND LEVEL - SHAFT 4 REPLACEMENT NEW
1/8" = 1'-0"
THIRD LEVEL - SHAFT 4 REPLACEMENT DEMO
1/8" = 1'-0"
THIRD LEVEL - SHAFT 4 REPLACEMENT NEW
1/8" = 1'-0"
FOURTH LEVEL - SHAFT 4 REPLACEMENT DEMO
1/8" = 1'-0"
FOURTH LEVEL - SHAFT 4 REPLACEMENT NEW
NO SCALE
SHAFT 4 - BASEMENT DETAIL
NO SCALE
SHAFT 4 - FIRST LEVEL DETAIL
NO SCALE
SHAFT 4 - SECOND LEVEL DETAIL
NO SCALE
SHAFT 4 - THIRD LEVEL DETAIL
NO SCALE
SHAFT 4 - FOUTH LEVEL DETAIL
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
TS
T S
KEY NOTES: GENERAL NOTES:
T S
TS
TS
TS TS
TS
TS
G
E.A
E.B
E.C
331 1/2" CW
DRAIN 34
TO RISER E
REFER TO DETAIL
1/1356-PP105
FOR VALVE
LOCATION.
REFER TO DETAIL
2/1356-PP102
FOR VALVE
LOCATION.
8" CW
8" CW
5" CW
H
H W
/2
C H
W
C W
5" CW
1 1/2" CHW
4" HW
8" CW
4" HW
2 1/2" RHW
4.B
4.A
4.C
8" CW
TO BE
REPLACED
IN NEXT
PHASE
E.C E.A
E.B
A.A
A.C
A.B 8" CW
8" CW
8" CW
8" CW
6" CW
REFER TO DETAIL
1/1356-PP105 FOR
VALVE LOCATION.
REFER TO DETAIL
2/1356-PP103 FOR
VALVE LOCATION.
J
5" CW
6" CW
6"
C W
NOTE THAT THESE KEY NOTES ARE SPECIFIC TO THIS DRAWING (DO
NOT REFER TO MASTER KEY NOTES ON SHEET 1356-PP003). NOT ALL
KEY NOTES ARE UTILIZED AND MAY HAVE GAPS OF MISSING NOTE
NUMBERS TO KEEP GROUPS OF TEN NOTES AVAILABLE PER PHASE.
SHUT-OFF VALVE 4.C AND VALVE E.B TO ISOLATE SECTION OF PIPING
INDICATED FOR REMOVAL. REFER TO GENERAL NOTES FOR
PROVISIONS TO BE TAKEN TO VERIFY ANY EXISTING VALVE LEAKAGE.
ONCE ISOLATED, REMOVE SECTION OF 8" GALVANIZED PIPING LOOP.
CUT INTO SECTIONS SMALL ENOUGH TO TRANSPORT TO LOADING
DOCK AREA FOR REMOVAL. INCLUDE DEMOLITION OF EXISTING
SUPPORTS MOUNTED TO PIPING RACKS, NEW PIPING WILL BE
SUPPORTED ONTO EXISTING RACK STRUCTURE BUT SHOULD BE
PROVIDED WITH NEW PIPE CLAMPS.
NOT USED THROUGH KEY NOTE
INSTALL NEW SECTION OF 8" SCHEDULE 10 STAINLESS STEEL PIPING TO
REPLACE PREVIOUSLY REMOVED. INSTALL IN EXACT SAME LOCATION
AS REMOVED SECTION OF PIPING. PROVIDE NEW SUPPORT CLAMPS
ON EXISTING PIPING RACK AS REQUIRED.
PROVIDE TEMPORARY END CAPS AT EITHER SIDE OF NEW PIPING
SECTION. FIRST PERFORM A PRESSURE TEST ON PIPING SECTION PER
SPECIFICATION REQUIREMENTS, AND THEN STERILIZE PIPING USING
CHLORINE SOLUTION FOR AT LEASE 24 HOURS PRIOR TO FLUSHING.
INCLUDE DRAIN/FILL VALVES ON EITHER END TO ACCOMPLISH.
INSULATE ENTIRE LENGTH OF PIPING PER SPECIFICATION
REQUIREMENTS. INCLUDE CONTINUOUS PVC COVERING THROUGHOUT
AND PREPARE ENDS FOR EXTENSION TO NEXT SUB-PHASE PIPING
WHICH WILL INCLUDE INSULATING ALL VALVE BODIES.
NOT USED THROUGH KEY NOTE
SHUT-OFF VALVE 4.C AND VALVE 2.B' (BOTH FURTHER OUT TO NEXT
ADJACENT RISER VALVES OUTSIDE THE EXTENTS OF THIS PHASE
DRAWING) TO ISOLATE RISER E FOR VALVE REPLACEMENT. REFER TO
GENERAL NOTES FOR PROVISIONS TO BE TAKEN TO VERIFY ANY
EXISTING VALVE LEAKAGE AND AREAS THAT WILL BE AFFECTED BY
THIS MAJOR WATER OUTAGE.
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAKE-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 5" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
40 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
DURING OUTAGE, INSTALL THERMOWELLS ON BOTH HOT AND COLD
WATER MAINS TO ACCEPT AN INSERTION TYPE TEMPERATURE SENSOR
TO BE INTEGRATED INTO BUILDING AUTOMATION SYSTEM FOR
INFORMATION MONITORING AND TRENDING.
INSTALL STRAP ON TEMPERATURE SENSORS INDICATE ON
RECIRCULATION PIPING. REPAIR ANY DAMAGED OR REMOVED
INSULATION ON COMPLETION.
ONCE VALVE INSTALLATION IS COMPLETED, INSULATE ALL AFFECT
PIPING AND NEW VALVE BODIES COMPLETELY. COVER EVERYTHING
WITH PVC JACKET COVERS AND SEAL AS REQUIRED. INSULATION CAN
OCCUR DURING NORMAL HOURS AFTER OUTAGE COMPLETION, BUT
SHOULD NOT BE DELAYED FOR ANY MORE THAN 3 BUSINESS DAYS.
NOT USED THROUGH KEY NOTE
SHUT-OFF VALVE E.C AND VALVE 2.B (BOTH FURTHER OUT TO NEXT
ADJACENT RISER VALVES OUTSIDE THE EXTENTS OF THIS PHASE
DRAWING) TO ISOLATE RISER A FOR VALVE REPLACEMENT. REFER TO
GENERAL NOTES FOR PROVISIONS TO BE TAKEN TO VERIFY ANY
EXISTING VALVE LEAKAGE AND AREAS THAT WILL BE AFFECTED BY
THIS MAJOR WATER OUTAGE.
ONCE RISER IS ISOLATED, REPLACE THE TWO(2) 8" VALVES ON EITHER
SIDE OF COLD WATER RISER TAKE-OFF VALVE WITH NEW STAINLESS 8"
TRIPLE OFFSET BUTTERFLY VALVES AND ALSO REPLACE THE THIRD
EXISTING 6" TAKE OFF VALVE WITH THE SAME MODEL VALVE AS MAIN
LOOP. INCLUDE A 1.5" STAINLESS STEEL BALL VALVE FOR DRAINING
RISER IN SECTION OF PIPING BETWEEN THESE THREE VALVES (ALSO
UTILIZE THIS OUTAGE TO CHANGE THAT SECTION OF PIPING WITH SCH
10 STAINLESS STEEL - NO STERILIZING REQUIRED TO SHORTEN
OUTAGE DURATION, BUT STILL THOROUGHLY FLUSH).
INCLUDE A 4" STAINLESS STEEL VALVE FOR TAKE-OFF TO WATER
HEATERS IN SECTION OF EXISTING PIPING TAKE-OFF.
DURING OUTAGE, INSTALL THERMOWELLS ON COLD WATER MAIN TO
ACCEPT AN INSERTION TYPE TEMPERATURE SENSOR TO BE
INTEGRATED INTO BUILDING AUTOMATION SYSTEM FOR INFORMATION
MONITORING AND TRENDING.
ONCE VALVE INSTALLATION IS COMPLETED, INSULATE ALL AFFECT
PIPING AND NEW VALVE BODIES COMPLETELY. COVER EVERYTHING
WITH PVC JACKET COVERS AND SEAL AS REQUIRED. INSULATION CAN
OCCUR DURING NORMAL HOURS AFTER OUTAGE COMPLETION, BUT
SHOULD NOT BE DELAYED FOR ANY MORE THAN 3 BUSINESS DAYS.
PROVIDE A 4" HOT WATER STAINLESS STEEL TRIPLE OFFSET
BUTTERFLY VALVE TO ISOLATE HOT WATER HEATER IN THIS AREA FOR
REPLACEMENT DURING PHASE 4, REFER TO DRAWING PP104.1.
PHASE 3.1 (DEMO - REFER TO DETAIL 1 AND 10-19 SERIES KEY NOTES):
THE EXISTING GALVANIZED 8" COLD WATER PIPING MAIN TO BE REMOVED
BETWEEN INTERIOR VALVES OF RISERS INDICATED IN KEY NOTES. REFER
TO WORK SEQUENCE DESCRIBED IN 'ISOLATION OF MAIN PIPING LOOP
SECTIONS' BELOW TO EITHER CONFIRM EXISTING VALVES DO NOT LEAK, OR
FOLLOW GUIDELINE PROVISIONS TO BE TAKEN IF THEY ARE FOUND
DEFECTIVE. NO OUTAGES WILL BE REQUIRED DURING THIS SUB-PHASE
WITH MAIN LOOP CONTINUALLY SERVING BOTH SIDES.
PHASE 3.2 (BUILD-BACK - REFER TO DETAIL 2 AND 20-29 SERIES KEY NOTES):
INSTALL NEW PIPING IN SAME LOCATION AS REMOVED SECTION OF 8" COLD
WATER MAIN. MAY REUTILIZE EXISTING PIPING RACK FOR PIPING
SUPPORTS. REFER TO KEY NOTES FOR ADDITIONAL INFORMATION RELATED
TO INSTALLATION.
PHASE 3.3 (RISER VALVE REPLACEMENT - 30-39 SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF RISER E AND REPLACE EXISTING 5" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• FIRST FLOOR: HOSPICE/PALLIATIVE, NURSING HOME CARE, EDUCATION
SERVICE, CENTRAL STAFF LOCKERS, MECHANICAL ROOM 1E
• SECOND FLOOR: AMBULATORY CARE SERVICE - PRIMARY CARE -
CCDOR, CENTRAL STAFF LOCKERS, AMBULATORY CARE SERVICE -
COLON-RECTAL, ORTHOPEDIC, MECHANICAL ROOM 2E
• THIRD FLOOR: CLINICAL SERVICES ADMINISTRATION GENERAL INTERNAL
MEDICINE OFFICES, AMBULATORY CARE SERVICE - PRIMARY CARE
STAFF OFFICES, EDUCATION, CENTRAL STAFF LOCKERS,
REHABILITATION MEDICAL SERVICE
• FOURTH FLOOR: AMBULATORY CARE SERVICE - PRIMARY CARE - AEU,
STDU, SPECIALTY CARE NEUROLOGY; DIRECTOR'S SUITE; MEDICAL CARE
COST; PRI CARE - CARDIOLOGY
PHASE 3.4 (RISER VALVE REPLACEMENT - 40+ SERIES KEY NOTES):
AREA SHOWN IN EXPANDED 1/4" = 1'-0" PLAN VIEW SHALL HAVE BOTH 8"
ISOLATION VALVES REPLACED WITH NEW TRIPLE OFFSET BUTTERFLY
VALVES. PLAN FOR OUTAGE OF RISER A AND REPLACE EXISTING 6" TAKE-
OFF VALVE AT SAME TIME. INCLUDE 1.5" DRAIN VALVE AT INTERSECTION
BETWEEN THREE(3) REPLACED VALVES. THIS SUB-PHASE WILL CAUSE A
LARGE DOMESTIC WATER OUTAGE FOR AREAS OF FACILITY THAT MAY BE
CRITICAL, CONTRACTOR SHALL REFER TO 'ALLOWANCE FOR TEMP
FIXTURES OR WATER SERVICES' BELOW FOR ACCOMMODATIONS NEEDED
FOR THOSE AREAS. OUTAGE WILL AFFECT THE FOLLOWING DEPARTMENTS
AND SHOULD BE CAREFULLY COORDINATED WITH VA FACILITIES;
• BASEMENT LEVEL: MECHANICAL ROOM BD, PATHOLOGY, EDUCATION,
MAS, PROSTHETICS,
• FIRST FLOOR: AMBULATORY CARE SERVICE (PRIMARY CARE), CANTEEN
SERVICE, LIBRARY, VOLUNTARY SERVICE, EDUCATION (AUDITORIA), MAS,
NURSING HOME CARE, TRANSITIONAL HOUSING, SECURITY ADMIN,
MECHANICAL ROOM 1D
• SECOND FLOOR: MECHANICAL ROOM 2D; DENTAL SERVICE, ACS
(SPECIALTY) - ENT, DERMATOLOGY, PODIATRY, COLON-RECTAL;
EDUCATION; SPECIALTY CARE - TELEMED; VOLUNTARY SERVICE.
• THIRD FLOOR: MECHANICAL ROOM 3D; DIALYSIS; EDUCATION; PRI
CARE - GI OFFICE; ACS (PRIMARY) - INFECTIONS DISEASE,
RHEUMATOLOGY, METABOLIC, PULMONARY, ALLERGY, CARDIAC,
DIABETES, DIABETES ED., DYSRNYTHMIA, EP CARDIAC DEVICE, GI-
GASTROENTEROLOGY HEPATITIS C SCREENING, IMP. STUDY, SC
CARDIAC, THERAPEUTICS, THYROID; IMAGING.
• FOURTH FLOOR: MECHANICAL ROOM 4D, EDUCATION, MEDICAL
RESEARCH, LIBRARY, HOME BASED PRIMARY CARE, PRI CARE - CALL
CENTER, DIRECTOR'S SUITE.
ISOLATION OF MAIN PIPING LOOP SECTIONS:
PERFORM THE FOLLOWING PROCEDURE STEPS TO PROPERLY ISOLATE
EACH SECTION OF PIPING LOOP AS DESCRIBED IN PHASING SEQUENCES,
1) SHUT-OFF ISOLATION VALVES ON INTERIOR SIDE OF LOOP BEING
MODIFIED OR REMOVED TO MAINTAIN SERVICES TO ALL RISERS.
2) REMOVE SECTION OF PIPING, OR TAP TEMPORARY DRAIN CONNECTION
TO VERIFY VALVES ARE HOLDING FOR A MINIMUM PERIOD OF 24 HOURS.
3) IF NO VALVE LEAKAGE, OR MINIMAL AMOUNT, IS WITNESSED THAN
PROCEED TO PIPING MODIFICATION AND/OR DEMOLITION SCOPE OF WORK
IDENTIFIED.
4) IF MODERATE OR SIGNIFICANT VALVE LEAKAGE IS WITNESSED THAN
PROVIDE 1.5" VALVE TAP WITH THREADED CONNECTION TO HOSE TO
NEAREST MECHANICAL ROOM DRAIN DISCHARGE LOCATION. THIS
TEMPORARY DRAIN CONNECTION AND HOSE SHALL BE REMOVED ONCE
NEW RISER VALVE REPLACEMENTS ARE COMPLETED.
---CONTRACTOR WILL BE RESPONSIBLE TO KEEP ON SITE AT LEAST FOUR(4)
SETS OF 1.5" VALVES WITH THREADED CONNECTIONS AND TWO(2) 250' LONG
HOSES OF 1.5" DIAMETER IN SIZE.
CONTRACTOR ALLOWANCE FOR TEMP FIXTURES OR WATER SERVICES:
ASSUME THAT DURING THE COURSE OF THE 8 PHASE DOMESTIC WATER
LOOP REPLACEMENT THAT SPECIFIC AREAS WILL REQUIRE TEMPORARY
SINKS AND/OR EXTENSION OF TEMPORARY WATER SERVICES TO THEIR
DEPARTMENT. CONTRACTORS SHALL INCLUDE THE FOLLOWING
ALLOWANCES WITHIN THEIR BASE BID TO ACCOMMODATE THOSE
REQUESTS WHEN THEY ARISE DURING OUTAGE COORDINATION WITH VA
FACILITIES.
• INCLUDE UP TO TWELVE(12) TEMPORARY SINK FIXTURES TIED INTO AN
ADJACENT RISER SERVICE. EACH SINK WILL REQUIRE UP TO 50' OF
COPPER PIPE FOR WATER CONNECTIONS, OTHERWISE HOSE WILL BE
UTILIZED IF DISTANCE EXCEEDS THAT SPECIFIED AMOUNT OF PIPING.
• INCLUDE FOUR(4) TEMPORARY BACK-UP WATER CONNECTIONS FOR
COLD WATER SERVICE TO AN ENTIRE DEPARTMENT. TEMPORARY COLD
WATER MAIN SHALL BE ASSUMED AT 2" SIZE AND EXTEND A MAXIMUM OF
250' TO CONNECT INTO AN ADJACENT RISER SERVICE.
• NOTE THAT THE ABOVE IS FOR ENTIRE PROJECT, NOT PER PHASE.
G
8" CW
2 1/2" CHW
4" HW
2" HW
H
10" HPS
2" SOFT
5" CHWR
8" CHWR
8" CHWS
12" CHWS
12" CHWR
8" CHWR
8" CHWS
5" MPS
3" MPC
4" PC
G
1356-PP103.1
4.C
E.C
E.A
E.B
H G
1356-PP103.1
RISER E
4.C
H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
D H
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:3
:4
A M
BASEMENT INTERSTITIAL - PHASE
3 - DOMESTIC WATER PLAN
PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG TM / JG618-14-118
1356-PP103.1
1/4" = 1'-0"
ENLARGED - PHASE 3.3 (RISER E)
NO SCALE
PHASE 3 - ISOMETRIC VIEW
1/4" = 1'-0"
ENLARGED - PHASE 3.4 (WATER HEATER TAKE-OFF AND RISER A)
NO SCALE
PHASE 3 ELEVATION - EAST TUNNEL
1/16" = 1'-0"
PHASE 3.1 - DEMO
1/16" = 1'-0"
PHASE 3.2 - NEW
CONNECTION
TO PREVIOUS
PHASE.
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
| 1356-PP101-0 - BASEMENT INTERSTITIAL - OVERALL - DOMESTIC WATER LOOP REPLACEMENT PLAN |
| 1356-PP101-1 - BASEMENT INTERSTITIAL - PHASE 1 - DOMESTIC WATER PLAN |
| 1356-PP101-2 - ALL LEVELS - PHASE 1 - ENLARGED RISER -G- COLD WATER REPLACEMENT PLANS |
| 1356-PP102-1 - BASEMENT INTERSTIAL - PHASE 2 - DOMESTIC WATER PLAN |
| 1356-PP102-2 - ALL LEVELS - PHASE 2 - ENLARGED SHAFT 4 COLD WATER REPLACEMENT PLANS |
| 1356-PP103-1 - BASEMENT INTERSTITIAL - PHASE 3 - DOMESTIC WATER PLAN |