Attachment B Price Schedule Breakdown (1 Page).pdf
PDF 86 KB Posted
- Solicitation number
- 36C26323R0042
About this file
This document contains a price schedule breakdown sheet and details of a related federal contract opportunity. The price schedule breakdown sheet is for Prevent Legionella Phase 3 Project Number 618-18-108 and lists proposed pricing by construction division including general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, conveying equipment, fire suppression, plumbing, heating, ventilating and air conditioning, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, miscellaneous costs, profit, overhead, and a grand total.
The related federal contract opportunity is solicitation number 36C26323R0042 for Prevent Legionella Phase 3 project 36C263-23-AP-0103 through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Breakdown Sheet Project Title: Prevent Legionella Phase 3 Project Number: 618-18-108
Contractor:
Division # Division Title Base Project 1 General Requirements 2 Existing Conditions 3 Concrete 4 Masonry 5 Metals 6 Wood, Plastics and Composites 7 Thermal and Moisture Protection 8 Openings 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 14 Conveying Equipment Subtotal General Building Construction $
21 Fire Suppression 22 Plumbing 23 Heating, Ventilating and Air Conditioning 25 Integrated Automation 26 Electrical 27 Communications 28 Electronic Safety and Security Subtotal Mechanical and Electrical $
31 Earthwork 32 Exterior Improvements 33 Utilities 34 Transportation Subtotal Site Improvements $
Miscellaneous (Contractor shall identify any costs included)
Subtotal All Divisions & Miscellaneous (if any) $ Profit Overhead Proposal Grand Total $
File details come from the government source that posted it. Updated .