This document provides details on a federal solicitation opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The solicitation number is 36C26323R0042 for project Y1DA--618-18-108 Prevent Legionella Ph3 36C263-23-AP-0103. The description provided is for Prevent Legionella Phase 3. The solicitation concerns requirements for products or services to prevent Legionella bacteria as part of a multi-phase project run by VHA VISN 23. Specific requirements are not included in the attached file, but rather other documentation presumably provides more details on technical specifications, response deadlines, and evaluation criteria.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL ABBREVIATIONS
AD AREA DRAIN
A.F.F. ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING
STATION
AHU AIR HANDLING UNIT
ANB ACID NEUTRALIZING BASIN
AP ACCESS PANEL
ARCH ARCHITECT
AS AIR SEPARATOR
BD BUTTERFLY DAMPER
B/ G
BELOW GRADE
BTU BRITISH THERMAL UNIT
BWV BACKWATER VALVE
CCF HUNDRED CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CLG CEILING
CO CLEAN OUT
CONTR CONTRACTOR
CONV CONVECTOR
CUH CABINET UNIT HEATER
CW COLD WATER
DB DECIBEL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DISCH DISCHARGE
DMPR DAMPER
DN DOWN
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
EAT ENTERING AIR TEMPERATURE
EDR EQUIVALENT DIRECT RADIATION
EP ELECTRIC-PNEUMATIC
EWC ELECTRIC WATER
COOLER
EWTENTERING WATER TEMPERATURE
EXH EXHAUST
EXP EXPANSION
F FAHRENHEIT
FC FAN COIL
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FLR FLOOR
FLEX FLEXIBLE
FM FIRE MAIN
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET OR FOOT
F&T FLOAT AND THERMOSTATIC
FTG FOOTING
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HD HEAD
HOA HANDS-OFF-AUTOMATIC
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATION,
AND AIR CONDITIONING
HYD HYDRANT
HW HOT WATER
GCO GRADE CLEANOUT
INSUL INSULATION
INV INVERT
KW KILOWATT
LAT LEAVING AIR
TEMPERATURE
LAV LAVATORY
LWT LEAVING WATER TEMPERATURE
MBH BTU PER HOUR (THOUSANDS)
MCF THOUSAND CUBIC
FEET
MH MANHOLE
NC
NOISE CRITERIA OR
NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP OR
DIFFERENCE
PE PNEUMATIC-ELECTRIC
PLBG PLUMBING
PRV
PRESSURE REDUCING VALVE
OR POWER ROOF VENTILATOR
PSIA POUNDS/SQ INCH ABSOLUTE
PSIG POUNDS/SQ INCH
GAUGE
PVC POLY VINYL CHLORIDE
RA RETURN AIR
RCP REINFORCED CONCRETE
PIPE
RD ROOF DRAIN
RECIRC RECIRCULATING
REG REGISTER
RET RETURN
RH RELATIVE HUMIDITY
RHT REHEAT
RHC REHEAT COIL
RHW RECIRCULATED HOT WATER
RM ROOM
RPM REVOLUTIONS PER MINUTE
RPZ
REDUCED ZONE
BACKFLOW PREVENTER
SA SUPPLY AIR
SAN SANITARY
SCFM CFM, STANDARD
CONDITIONS
SD SMOKE DAMPER
SP STATIC PRESSURE
SPECS SPECIFICATIONS
SUP SUPPLY
SQ SQUARE
STM STEAM
TD TEMPERATURE DIFFERENCE
TEMP TEMPERATURE
TONS TONS OF REFRIGERATION
T-STAT THERMOSTAT
TYP TYPICAL
UB UP-BLAST
UG UNDERGROUND
UH UNIT HEATER
UR URINAL
V SANITARY VENT
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY
DRIVE
VOL VOLUME
W SANITARY WASTE
W/ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WH WALL HYDRANT
W/0 WITHOUT
WTR WATER
PLUMBING
ACID VENT BELOW GRADE
ACID VENT ABOVE GRADE
ACID WASTE BELOW GRADE
ACID WASTE ABOVE
GRADE
DEIONIZED WATER
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER (TEMP.
INDICATED)
DOMESTIC RECIRC. HOT WATER
HARD COLD WATER
OVERFLOW STORM DRAIN BELOW
GRADE
OVERFLOW STORM DRAIN ABOVE
GRADE
REVERSE OSMOSIS WATER
SANITARY VENT BELOW GRADE
SANITARY VENT ABOVE
GRADE
SANITARY WASTE
SANITARY SEWER
SOIL DRAINAGE TILE
SOFTENED COLD WATER
SOFTENED HOT WATER
TEMPERED WATER
STORM DRAIN BELOW GRADE
STORM DRAIN ABOVE GRADE
WELL WATER
EXISTING PLUMBING TO REMAIN
EXISTING PLUMBING TO
REMOVED
AV
AV
A W A W
DI
HARD
SDT
OSD
RO
V
V
SS
W
SOFT
SHW
TW
OSD
SD
SD
WW
MECHANICAL PIPING
BOILER FEED
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COMPRESSED AIR (PSI
INDICATED)
CONDENSATE DRAIN
CONDENSER WATER
SUPPLY
CONDENSER WATER RETURN
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
FUEL OIL FILL
GLYCOL SUPPLY
GLYCOL RETURN
HEAT RECOVERY SUPPLY
HEAT RECOVERY RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
LABORATORY VACUUM
LABORATORY AIR
LIQUIFIED PETROLEUM GAS
NATURAL GAS (PSI INDICATED)
PLANT VACUUM
PUMPED CONDENSATE
RADIATION WATER SUPPLY
RADIATION WATER RETURN
REFRIGERANT LIQUID
BF
CWS
CW
R
10#A
CD
FOS
LV
GS
GR
HRS
HRR
HWR
HWS
LA
LPG
2#G
FOF
PV
PC
RADS
CS
CR
FOR
FOV
RADR
RL
REFRIGERANT SUCTION
REFRIGERANT HOT GAS BYPASS
REHEAT WATER SUPPLY
REHEAT WATER RETURN
REMOTE RADIATOR
SUPPLY
REMOTE RADIATOR RETURN
SECONDARY HEATING WATER
SUPPLY
SECONDARY HEATING WATER
RETURN
SNOW MELT SUPPLY
SNOW MELT RETURN
STEAM SUPPLY (PSI INDICATED)
STEAM RETURN (PSI INDICATED)
EXISTING PIPING TO REMAIN
RRS
RS
RHG
RHR
RHS
RRR
SHWS
SHWR
SMS
SMR
10#STM
10#R
EXISTING PIPING TO BE
REMOVED
PLUMBING /PIPING
ELBOW DOWN
PIPE CAP
ELBOW UP
TEE, OUTLET UP
TEE, OUTLET DOWN
CONNECTION, BOTTOM
CONNECTION, TOP
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLEXIBLE CONNECTION
PIPE ANCHOR
ALIGNMENT GUIDE
CHECK VALVE
SHUTOFF VALVE
PLUG VALVE
COMBINATION BALANCE VALVE
AND FLOW METER
STRAINER
STRAINER W/BLOWDOWN
CAP AND VALVE
PRESSURE REDUCING VALVE
(SETTING AS NOTED, PSI)
MECHANICAL SYMBOLS LEGEND
MEDICAL GAS
MEDICAL VACUUM
WASTE ANESTHETIC GAS DISPOSAL
CARBON DIOXIDE
OXYGEN
NITROGEN
NITROUS OXIDE
MEDICAL AIR
WAGD
CO2
O
N
MV
N2O
MA
CONTROLS
AQUA STAT TAMPERPROO
F
THERMOSTAT
HUMIDISTAT OR R.H. SENSOR
REFRIGERANT SENSOR
SMOKE DETECTOR
SPACE TEMPERATURE
SENSOR
STATIC PRESSURE
SENSOR
DUCTWORK
SUPPLY AIR
RETURN AIR
EXHAUST AIR
STANDARD BRANCH, NO
SPLITTER - SUPPLY FLOW TO
RIGHT - RETURN/EXHAUST FLOW
BELLMOUTH WITH BALANCING
DAMPER
FLEXIBLE DUCT
TURNING VANES
FLEXIBLE CONNECTION
MANUAL VOLUME DAMPER
MOTORIZED DAMPER
FIRE DAMPER & ACCESS
PANEL
SMOKE DAMPER &
ACCESS PANEL
COMBINATION FIRE/SMOKE
DAMPER & ACCESS PANEL
SUPPLY GRILLE OR REGISTER
T T
P P
ROOM
PRESSURE
MONITOR
H
R
SD
TS
SP
T THERMOSTAT
THERMOSTAT W/GUARDT
EXPANSION JOINT
AUTOMATIC CONTROL VALVE, 2-WAY
AUTOMATIC CONTROL VALVE, 3-WAY
AUTOMATIC AIR VENT
MANUAL AIR VENT
PRESSURE RELIEF/SAFETY
VALVES(SETTING AS NOTED, PSI)
DRAIN VALVE
BALL VALVE
BUTTERFLY VALVE
GLOBE ANGLE VALVE
0. S.& Y. VALVE
REDUCED PRESSURE ZONE
BACK FLOW PREVENTER
SOLENOID VALVE
FLOW LIMITING VALVE
DIAPHRAGM
GLOBE VALVE
REFRIGERANT SIGHT GLASS
GAS PRESSURE REGULATOR VALVE
BACKWATER VALVE
REFRIGERANT DRYER
FLOW DIRECTION
FLOW DIRECTION W/PITCH
DUPLEX STRAINER
PIPE UNION
PIPE FLANGE
PUMP
THERMOMETER
PRESSURE/TEMPERATURE TEST
PORT
STEAM TRAP (TYPE INDICATED)
FLOW MEASURING STATION
(FLOW INDICATED)
FLOW SWITCH
PRESSURE GAUGE W/PIGTAIL &
PETCOCK
PRESSURE SWITCH
SHOCK ABSORBER
ELBOW
FLOOR DRAIN
DRAIN ABOVE
FLOOR SINK
WALL HYDRANT
HOSE BIBB
TEE
WALL CLEANOUT
ROOF DRAIN
CATCH BASIN
MANHOLE
HB
RETURN DUCT UP, NEGATIVE
PRESSURE
SUPPLY DIFFUSER/REGISTER
BLANKOFF INDICATED
RETURN OR EXHAUST GRILLE
OR REGISTER
SUPPLY DUCT UP, POSITIVE
PRESSURE
EXHAUST DUCT UP, NEGATIVE
PRESSURE
RETURN GRILLE/REGISTER
EXHAUST GRILLE/REGISTER
LINEAR DIFFUSER
CONCENTRIC DUCT
TRANSITION
ECCENTRIC DUCT TRANSITION
RECTANGULAR-TO-ROUND
DUCT TRANSITION
VAV BOX
REHEAT COIL
VAV BOX W/REHEAT COIL
DUCT OFFSETS
DUCT CUTLINE
M
FD
VERTICALHORIZONTA
L
FD
SD
VERTICAL
VERTICALHORIZONTA
L
FSD FSD
RETURN DUCT DN, NEGATIVE
PRESSURE
SUPPLY DUCT DN, POSITIVE
PRESSURE
EXHAUST DUCT DN, NEGATIVE
PRESSURE
DROPRISE
ANNOTATION
(4)A-12"
GRILLE, REGISTER, &
DIFFUSER IDENTIFICATION
QUANTIT
Y
CFM
TYPE
SIZE
X X
X X
X X
X X
DETAIL NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
EQUIP DESIGNATION
EQUIP NUMBER
POINT OF CONNECTION, NEW TO EXISTING
POINT OF DISCONNECTION
FIRE PROTECTION
DFP
F FIRE PROTECTION
FIRE PROTECTION (DRY SYSTEM)
POST INDICATOR VALVE (PIV)
FIRE HYDRANT WITH SHUTOFF VALVE
RECESSED FIRE DEPT CABINET
SURFACE MOUNTED FIRE DEPT CABINET
FIRE PROTECTION RISER
UPRIGHT SPRINKLER HEAD W/GUARD
PENDANT SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
BUTTERFLY VALVE W/TAMPER SWITCH
DETECTOR CHECK W/BYPASS METER
GRADE FIRE DEPT CONNECTION
FLUSH FIRE DEPT CONNECTION
FIRE DEPT VALVE W/CAP AND CHAIN
O.S. & Y. VALVE W/TAMPER
SWITCH
DRY PIPE VALVE
PREACTION VALVE
GPM
AM
S
FS
PS
TS
FDVC
FDVC
FDV
TS
SD
HORIZONTA
L
GAS COCK VALVE
CLEANOUT
WH
GR GRILLE
VAV VARIABLE AIR
VOLUME
VTR VENT THROUGH ROOF
CARBON MONOXIDE SENSORCO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:2
:1
A M
MECHANICAL TITLE SHEET PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG/KP CH/DL618-14-118
1356-PP001
SHEET LIST LEGIONELLA 3
Sheet Number Sheet Name
1356-PP001 MECHANICAL TITLE SHEET
1356-PP002 MECHANICAL GENERAL NOTES
1356-PP003 MECHANICAL KEY NOTES
1356-PP100A BUILDING 70 - BASEMENT LEVEL - AREA A - DOMESTIC WATER PLAN
1356-PP100B BUILDING 70 - BASEMENT LEVEL - AREA B - DOMESTIC WATER PLAN
1356-PP100C BUILDING 70 - BASEMENT LEVEL - AREA C - DOMESTIC WATER PLAN
1356-PP100D BUILDING 70 - BASEMENT LEVEL - AREA D - DOMESTIC WATER PLAN
1356-PP100E BUILDING 70 - BASEMENT LEVEL - AREA E - DOMESTIC WATER DEMOLITION PLAN
1356-PP100F BUILDING 70 - BASEMENT LEVEL - AREA F - DOMESTIC WATER PLAN
1356-PP110A BUILDING 70 - FIRST LEVEL - AREA A - DOMESTIC WATER PLAN
1356-PP110B BUILDING 70 - FIRST LEVEL - AREA B - DOMESTIC WATER PLAN
1356-PP110C BUILDING 70 - FIRST LEVEL - AREA C - DOMESTIC WATER PLAN
1356-PP110D BUILDING 70 - FIRST LEVEL - AREA D - DOMESTIC WATER PLAN
1356-PP110E BUILDING 70 - FIRST LEVEL - AREA E - DOMESTIC WATER PLAN
1356-PP110F BUILDING 70 - FIRST LEVEL - AREA F - DOMESTIC WATER PLAN
1356-PP110G BUILDING 70 - FIRST LEVEL - AREA G - DOMESTIC WATER PLAN
1356-PP110H BUILDING 70 - FIRST LEVEL - AREA H - DOMESTIC WATER PLAN
1356-PP120A BUILDING 70 - SECOND LEVEL - AREA A - DOMESTIC WATER PLAN
1356-PP120B BUILDING 70 - SECOND LEVEL - AREA B - DOMESTIC WATER PLAN
1356-PP120C BUILDING 70 - SECOND LEVEL - AREA C - DOMESTIC WATER PLAN
1356-PP120D BUILDING 70 - SECOND LEVEL - AREA D - DOMESTIC WATER PLAN
1356-PP120E BUILDING 70 - SECOND LEVEL - AREA E - DOMESTIC WATER PLAN
1356-PP120F BUILDING 70 - SECOND LEVEL - AREA F - DOMESTIC WATER PLAN
1356-PP120G BUILDING 70 - SECOND LEVEL - AREA G - DOMESTIC WATER PLAN
1356-PP120H BUILDING 70 - SECOND LEVEL - AREA H - DOMESTIC WATER PLAN
1356-PP130A BUILDING 70 - THIRD LEVEL - AREA A - DOMESTIC WATER PLAN
1356-PP130B BUILDING 70 - THIRD LEVEL - AREA B - DOMESTIC WATER PLAN
1356-PP130C BUILDING 70 - THIRD LEVEL - AREA C - DOMESTIC WATER PLAN
1356-PP130D BUILDING 70 - THIRD LEVEL - AREA D - DOMESTIC WATER PLAN
1356-PP130E BUILDING 70 - THIRD LEVEL - AREA E - DOMESTIC WATER PLAN
1356-PP130F BUILDING 70 - THIRD LEVEL - AREA F - DOMESTIC WATER PLAN
1356-PP130G BUILDING 70 - THIRD LEVEL - AREA G - DOMESTIC WATER PLAN
1356-PP130H BUILDING 70 - THIRD LEVEL - AREA H - DOMESTIC WATER PLAN
1356-PP140A BUILDING 70 - FOURTH LEVEL - AREA A - DOMESTIC WATER PLAN
1356-PP140B BUILDING 70 - FOURTH LEVEL - AREA B - DOMESTIC WATER PLAN
1356-PP140C BUILDING 70 - FOURTH LEVEL - AREA C - DOMESTIC WATER PLAN
1356-PP140D BUILDING 70 - FOURTH LEVEL - AREA D - DOMESTIC WATER PLAN
1356-PP140E BUILDING 70 - FOURTH LEVEL - AREA E - DOMESTIC WATER PLAN
1356-PP140F BUILDING 70 - FOURTH LEVEL - AREA F - DOMESTIC WATER PLAN
1356-PP140G BUILDING 70 - FOURTH LEVEL - AREA G - DOMESTIC WATER PLAN
1356-PP140H BUILDING 70 - FOURTH LEVEL - AREA H - DOMESTIC WATER PLAN
1356-PP101.0 BASEMENT INTERSTITIAL - OVERALL - DOMESTIC WATER LOOP REPLACEMENT PLAN
1356-PP101.1 BASEMENT INTERSTITIAL - PHASE 1 - DOMESTIC WATER PLAN
1356-PP101.2 ALL LEVELS - PHASE 1 - ENLARGED RISER "G" COLD WATER REPLACEMENT PLANS
1356-PP102.1 BASEMENT INTERSTIAL - PHASE 2 - DOMESTIC WATER PLAN
1356-PP102.2 ALL LEVELS - PHASE 2 - ENLARGED SHAFT 4 COLD WATER REPLACEMENT PLANS
1356-PP103.1 BASEMENT INTERSTITIAL - PHASE 3 - DOMESTIC WATER PLAN
1356-MP104.1 BASEMENT INTERSTITIAL - PHASE 4 - HYDRONIC PIPING PLAN
1356-PP104.1 BASEMENT INTERSTITIAL - PHASE 4 - DOMESTIC WATER PLAN
1356-PP104.2 BASEMENT INTERSTITIAL - PHASE 4.4 - DOMESTIC WATER PLAN
1356-PP105.1 BASEMENT INTERSTITIAL - PHASE 5 - DOMESTIC WATER PLAN
1356-PP105.2 BASEMENT - PHASE 5 - ENLARGED SHAFT 3 COLD WATER REPLACEMENT PLANS
1356-PP105.3 LEVELS 1-4 - PHASE 5 - ENLARGED SHAFT 3 COLD WATER REPLACEMENT PLANS
1356-PP106.1 BASEMENT INTERSTITIAL - PHASE 6 - DOMESTIC WATER PLAN
1356-PP106.2 ALL LEVELS - PHASE 6 - ENLARGED RISER "M" COLD WATER REPLACEMENT PLANS
1356-PP107.1 BASEMENT INTERSTITIAL - PHASE 7 - DOMESTIC WATER PLAN
1356-PP107.2 BASEMENT - PHASE 7 - ENLARGED SHAFT 7 COLD WATER REPLACEMENT PLANS
1356-PP107.3 LEVELS 1-4 - PHASE 7 - ENLARGED SHAFT 7 COLD WATER REPLACEMENT PLANS
1356-MP108.1 BASEMENT INTERSTITIAL - PHASE 8 - HYDRONIC DEMOLITION PIPING PLAN
1356-PP108.1 BASEMENT INTERSTITIAL - PHASE 8.1 - DOMESTIC WATER PLAN
1356-PP108.2 BASEMENT INTERSTITIAL - PHASE 8.3 - DOMESTIC WATER PLAN
1356-PP108.3 BASEMENT INTERSTITIAL - PHASES 8.3 AND 8.4 - DOMESTIC WATER PLAN
1356-PP108.4 BASEMENT - PHASE 8 - ENLARGED SHAFT 6 COLD WATER REPLACEMENT PLANS
1356-PP108.5 ALL LEVELS - PHASE 8 - ENLARGED SHAFT 6 COLD WATER REPLACEMENT PLANS
1356-PP108.6 BASEMENT INTERSTITIAL - PHASE 8 - DOMESTIC WATER PLAN
1356-PP500 PLUMBING DETAILS
1356-PP501 PLUMBING DETAILS
1356-PP600 PLUMBING SCHEDULES
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
11/30/2022
Revisions: Date:
A.
B.
C.
D.
E.
F.
FULL PLUMBING RISER OR LARGE BUILDING OUTAGES:
ANY DOMESTIC WATER OUTAGE NEEDED FOR REPLACEMENT OF MAIN
RISER VALVES, REFER TO DRAWINGS AND NOTES REQUIRING TO SHUT
DOWN AND DRAIN ENTIRE PLUMBING RISERS FOR A DURATION IN TIME.
CONTRACTOR SHALL SCHEDULE WEEKEND HOURS (MAXIMUM OF 12
HOUR TIME LIMIT) TO SHUT DOWN RISER / SYSTEM AND DRAIN FOR
INSTALLATION OF NEW VALVES. IF CONTRACTOR OPTS TO ALSO
PERFORM ADDITIONAL TASK (EXAMPLE - REPLACEMENT OF TAKE-OFF
VALVES) DURING THE SAME MAJOR OUTAGE TO AVOID ADDITIONAL
MINOR OUTAGES THAN IT WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO PROVIDE MULTIPLE PLUMBING CREWS SO THAT
DURATION OF TIME REQUESTED IS NOT EXTENDED FOR ADDITIONAL
WORK BEING PERFORMED SIMULTANEOUSLY. PROVIDE VA WITH CLEAR
PLAN SHOWING WHERE EACH CREW WILL BE LOCATED DURING EACH
TIME SLOT OF OUTAGE, AND DEFINE HOW CREWS MAY BE PERFORMING
MULTIPLE TASKS OR BEING USED FOR EMERGENCY SUPPORT OF
OTHER CREWS.
PROVIDE THE VA WITH A MINIMUM OF THIRTY(30) DAYS ADVANCE
NOTICE OF EACH MAJOR RISER OUTAGE TO COORDINATE IMPACT ON
STAFF AND TEMPORARY MEASURES REQUIRED FOR PATIENT CARE.
VA FACILITIES SHALL PROVIDE TEMPORARY MEANS FOR CHEMICAL
HAND WASHING SHALL BE PROVIDED AT ALL STAFF AND PATIENT
LAVATORIES AND HAND WASHING SINKS.
VA FACILITIES WILL NEED TO COORDINATE AND REVIEW NEEDS FOR
EACH IMPACTED DEPARTMENT. SPECIAL CONSIDERATION SHOULD BE
GIVEN FOR THE FOLLOWING AREAS THAT MAY REQUIRE TEMPORARY
SERVICES OR BOTTLED WATER FOR USE DURING OUTAGE;
I. SPS DEPARTMENT
II. EMERGENCY DEPARTMENT
III. SURGERY
IV. ALL INPATIENT CARE AREAS
V. FOOD SERVICE
VI. LAUNDRY
VII. PHARMACY
CONTRACTOR WILL BE RESPONSIBLE TO FLUSH ALL LINES THAT WERE
DRAINED TO A DRY CONDITION. RISER OUTAGES CAN LIMIT AMOUNT OF
DRAINING BY ISOLATING EACH FLOOR (IF TAKE-OFF VALVES ARE NOT
BEING REPLACED DURING SAME OUTAGE, OTHERWISE THOSE AREA
WILL REQUIRE FLUSHING ALSO). FLUSH ALL AFFECTED LINES FOR A
MINIMUM OF 30 MINUTES PRIOR TO OPENING TO REMAINDER OF
SYSTEM. COORDINATE ANY WATER QUALITY READINGS WITH
INFECTION CONTROL STAFF IF REQUESTED UPON COMPLETION OF
FLUSHING AFFECTED SYSTEMS.
LARGE SCALE OUTAGES (MORE THAN 8 FIXTURES):
ANY OUTAGES REQUIRED FOR AN ENTIRE DEPARTMENT, OR LARGER
GROUPS OF ROOMS.
CONTRACTOR SHALL SCHEDULE WEEKEND HOURS OR PREMIUM
OVERTIME AFTER NORMAL BUSINESS HOURS (MAXIMUM OF 24 HOUR
TIME LIMIT) TO SHUT DOWN AFFECTED AREA AND DRAIN FOR
INSTALLATION OF NEW VALVES OR PLUMBING FIXTURE MODIFICATIONS.
COORDINATE OUTAGE WITH VA REPRESENTATIVE A MINIMUM OF
FIFTEEN(15) DAYS IN ADVANCE OF OUTAGE.
VA SHALL PROVIDE TEMPORARY HAND WASHING ALTERNATIVE FOR
AFFECTED AREAS AND POST SIGNAGE TO NOT USE FIXTURES DURING
POSTED HOURS OF OUTAGE.
OUTAGES SHORTER THAN 4 HOURS IN DURATION MIGHT BE ABLE TO BE
PERFORMED DURING NORMAL HOURS WITH APPROVAL BY VA
REPREESENTATIVE. BUT CONTRACTOR SHOULD ASSUME OVERTIME
REQUIREMENTS AND COORDINATION OF INFECTION CONTROL
MEASURES FOR ALL WORK THAT OCCURS DIRECTLY WITHIN PATIENT
CARE AREAS OF FACILITY.
CONTRACTOR WILL BE RESPONSIBLE TO FLUSH ALL LINES THAT WERE
DRAINED TO A CLEAN CONDITION. FLUSH ALL AFFECTED LINES FOR A
MINIMUM OF 30 MINUTES PRIOR TO OPENING TO REMAINDER OF
SYSTEM. COORDINATE ANY WATER QUALITY READINGS WITH
INFECTION CONTROL STAFF IF REQUESTED UPON COMPLETION OF
FLUSHING AFFECTED SYSTEMS.
SMALL SCALE OUTAGES (LESS THAN 8 FIXTURES):
SMALLER AREAS WITHOUT CRITICAL NEED FOR WATER CAN BE
PERFORMED DURING NORMAL BUSINESS HOURS IF COORDINATED
WITH VA A MINIMUM OF TWO (2) WEEKS IN ADVANCE.
VA MAY ONLY BE ABLE TO PROVIDE ACCESS TO 1 OR 2 SPACES AT A
TIME (EXAMPLE - OCCUPIED INPATIENT ROOM DEPARTMENTS).
CONTRACTOR WILL NEED TO ASSUME MULTIPLE VISITS THROUGH A
POTENTIALLY LONG TIME FRAME IN ORDER TO GAIN ACCESS TO ALL
SPACES WHEN OPEN/UNOCCUPIED. CONTRACTOR TO PLAN FOR
SEVERAL RETURN VISITS TO EACH DEPARTMENT TO COORDINATE
AROUND THEIR SCHEDULES.
CONTRACTOR SHOULD ASSUME OVERTIME REQUIREMENTS AND
COORDINATION OF INFECTION CONTROL MEASURES FOR ALL WORK
THAT OCCURS DIRECTLY WITHIN PATIENT CARE AREAS OF FACILITY.
CONTRACTOR WILL BE RESPONSIBLE TO FLUSH ALL LINES THAT WERE
DRAINED TO A DRY CONDITION. FLUSH ALL AFFECTED LINES FOR A
MINIMUM OF 30 MINUTES PRIOR TO OPENING TO REMAINDER OF
SYSTEM. COORDINATE ANY WATER QUALITY READINGS WITH
INFECTION CONTROL STAFF IF REQUESTED UPON COMPLETION OF
FLUSHING AFFECTED SYSTEMS.
SINGLE FIXTURE OUTAGES (1 FIXTURE - APPLY TO MAJORITY OF CASES)
COORDINATE ACCESS TO INDIVIDUAL ROOMS AND/OR FIXTURES WITH
DEPARTMENT MANAGERS AND VA COTR FOR THIS PROJECT.
IF STOP VALVES ON WALL SUFFUCUENTLY HOLD WATER, THEN NO
NEED TO PROVIDE ANY OUTAGE SIGNAGE OR COORDINATION SINCE
PLUMBER WILL BE ACTIVELY WORKING ON FIXTURE OUT OF SERVICE.
UPON COMPLETION OF MIXING VALVE ASSEMBLY INSTALLATION,
PLUMBER SHALL TEST OUTPUT OF VALVE AND ASJUST AS REQUIRED.
RECORD ALL TESTING RESULTS WITHIN AN OVERALL PROJECT LOG FILE
TO TURN OVER TO OWNER ON PROJECT COMPLETION.
FLUSH ALL 3/8" TUBING INSTALLED FOR MINIMUM OF 5 MINUTES, IF
FIXTURE HAS ANY AERATORS OR STRAINERS, CLEAN THOSE OUT AT
END OF FLUSHING SEQUENCE.
CLEAN SPACE TO ORIGINAL CONDITION ON COMPLETION.
CONTRACTOR OUTAGE RESPONSIBILITIES: INCLUDING, BUT NOT
LIMITED TO, THE FOLLOWING;
PROVIDE ADEQUATE NOTIFICATION AND SCHEDULING OF ALL
OUTAGES. REFER TO OUTAGE SIZE NOTES FOR ADVANCE
NOTIFICATION TIME REQUIRED FOR EACH TYPE OF OUTAGE.
PROVIDE A DETAILED TIME TABLE OF ENTIRE OUTAGE DURATION.
INCLUDE WHERE EACH PLUMBING CREW WILL BE LOCATED DURING
EACH HOUR OF OUTAGE.
PROVIDE A SAFETY PLAN FOR VA REVIEW WITH EMERGENCY
CONTINGENCY PLANNING FOR SCENARIOS THAT MAY OCCUR.
PROVIDE INFECTION CONTROL PLANNING PER INFECTION CONTROL
RISK ASSESSMENT (ICRA) REQUIREMENTS FOR EACH SPECIFIC AREA.
SETTING UP PRE-OUTAGE MEETINGS (WHEN REQUESTED) TO REVIEW
SCOPE OF OUTAGE WITH VA REPRESENTATIVES AND AFFECTED STAFF.
CONTRACTOR SHALL RECORD MEETING MINUTES AND DISTRIBUTE
ACCORDINGLY.
CONTRACTOR MAY BE REQUESTED TO PRODUCE COLOR DRAWINGS
TO REPRESENT AREAS AFFECTED BY EACH OUTAGE THAT VA MAY
UTILIZE FOR DISTRIBUTION TO DEPARTMENTS DURING COORDINATION
AND NOTIFICATION PHASE.
VA FACILITIES REPRESENTATIVE OUTAGE RESPONSIBILITIES:
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING;
NOTIFICATION OF ALL AFFECTED DEPARTMENTS OF STAFF AND
PLANNING FOR TEMPORARY WATER FOR PATIENT CARE OR
EQUIPMENT.
GENERATING INFECTION CONTROL RISK ASSESSMENT (ICRA) FORMS
FOR EACH SPECIFIC AREA AFFECTED WITHIN OUTAGE. SUBMIT TO
CONTRACTOR IN TIMELY FASHION TO PROVIDE THE OPPORTUNITY TO
REACT TO ANY SPECIAL REQUIREMENTS OR CONSIDERATIONS.
ASSISTING CONTRACTOR IN LOCATING ISOLATION VALVES, AND
SYSTEM DRAINS, REQUIRED FOR ISOLATION OF PIPING TO BE MODIFIED
DURING OUTAGE.
HAVING AT LEAST ONE(1) FACILITY REPRESENTATIVE ON SITE TO
ASSIST CONTRACTOR WITH LOCATING VALVES AND/OR
TROUBLESHOOTING ISSUES THAT MAY ARISE DURING OUTAGE.
SMALL OUTAGES VA / CONTRACTORMAJOR OUTAGES LARGE OUTAGES
A.
B.
C.
D.
E.
F.
A.
B.
C.
D.
E.
F.
G.
H.
I.
A.
B.
C.
D.
E.
F.
A.
B.
C.
D.
A.
B.
C.
D.
E.
F.
G.
H.
FOR ALL AREAS THAT THE INFECTION CONTROL REPRESENTATIVE
DEEMS AS HIGH RISK WITHIN THE CORRESPONDING INFECTION
CONTROL RISK ASSESSMENT (ICRA) THE FOLLOWING MINIMUM
REQUIREMENTS SHALL BE MAINTAINED WHILE PERFORMING WORK:
PROVIDE AIRLOCK VESTIBULE INTO CONSTRUCTION AREA. SECOND
DOOR MAY BE THE EXISTING ACCESS INTO SPACE WITH AIRLOCK
VESTIBULE CONSTRUCTED OF A POLY BARRIER WITH ZIPPER ENTRY.
PROVIDE SIGNAGE ON DOOR TO RESTRICT ACCESS TO ONLY THOSE
INVOLVED WITH CONSTRUCTION ACTIVITIES OR INSPECTIONS.
POSITION PORTABLE HEPA FILTERS BOTH INSIDE CONSTRUCTION AREA,
AND JUST OUTSIDE OF AIRLOCK VESTIBULE ENTRY POINT.
PROVIDE VISIBLE ROOM PRESSURE INDICATOR AT CONSTRUCTION
ENTRY POINT. CONTRACTOR WILL BE RESPONSIBLE TO KEEP A FULL
RECORD OF DAILY PRESSURIZATION LEVELS AND CONFIRM AREA IS
ALWAYS ABOVE -0.01" WC NEGATIVE PRESSURIZATION AT ALL TIMES.
REMOVE ANY SENSITIVE EQUIPMENT FROM WITHIN CONSTRUCTION
BOUNDARIES. IF EQUIPMENT CANNOT BE TEMPORARILY RELOCATED,
THEN CONTRACTOR SHALL TIGHTLY SEAL EACH PIECE TO GUARANTEE
PROTECTION AGAINST DUST GENERATED IN SPACE.
COORDINATE ACCESS TO/FROM CONSTRUCTION SITE WITH
DEPARTMENT MANAGER AND PERFORM ANY TRANSPORT OF
DEMOLISHED MATERIALS DURING PREMIUM HOURS IF NECESSARY.
CONFIRM ACCEPTABLE LIMITS OF NOISE WITH DEPARTMENT MANAGER
AND ANY APPLICABLE TIME SCHEDULES WHERE NO NOISE, OR LIMITED
WORK, COULD BE ENFORCED.
CLEAN SPACE AFTER EACH WORK SHIFT. UPON COMPLETION OF WORK
ALL TEMPORARY BARRIERS AND AIRLOCKS SHALL BE COMPLETELY
REMOVED AND CLEANED TO ORIGINAL CONDITION. COORDINATE
TERMINAL CLEANING WITH VA REPRESENTATIVES PRIOR TO TURNING
BACK OVER TO HOSPITAL USE.
FOR ALL AREAS THAT THE INFECTION CONTROL REPRESENTATIVE
DEEMS AS MODERATE RISK WITHIN THE CORRESPONDING INFECTION
CONTROL RISK ASSESSMENT (ICRA) THE FOLLOWING MINIMUM
REQUIREMENTS SHALL BE MAINTAINED WHILE PERFORMING WORK:
CLOSE DOOR TO SPACE AND SEAL PERIMETER WITH TAPE, TEMPORARY
GASKETING, OR POLY SHEETING AS REQUIRED TO HOLD A TIGHT SEAL.
IF THE PLUMBING FIXTURE(S) BEING MODIFIED IS IN AN OPEN AREA
WHERE STAFF OR PATIENTS ARE LOCATED THEN CONTRACTOR WILL
PROVIDE A POLY BARRIER AROUND ENTIRE WORK ZONE WITH HEPA
FILTERS ON BOTH INSIDE, AND OUTSIDE, OF ENCLOSURE.
PROVIDE SIGNAGE ON DOOR TO RESTRICT ACCESS TO ONLY THOSE
INVOLVED WITH CONSTRUCTION ACTIVITIES OR INSPECTIONS.
UTILIZE A MOBILE HEPA FILTER(S) TO BE WITHIN 15' OF ANY AREA
WHERE WALL ANCHORS ARE BEING DRILLED, OR OTHER DUST
FORMING ACTIVITIES WILL OCCUR, TO MANAGE DUST AND
CONSTRUCTION DEBRIS WITHIN SPACE.
COVER ALL SENSITIVE EQUIPMENT WITHIN ROOM WITH POLY SHEETING
TO PROTECT FOR DUST AND DEBRIS. OR ALTERNATELY A TEMPORARY
POLY BARRIER, WITH ENTRY ZIPPER, CAN BE INSTALLED DIRECTLY
AROUND THE AREA(S) REQUIRING MODIFICATION.
UPON COMPLETION OF WORK REMOVE ALL POLY BARRIERS, COVERS,
TAPE OR GASKETING, AND MATERIALS USED DURING CONSTRUCTION.
CLEAN SPACE TO ORIGINAL CONDITION PRIOR TO TURNING OVER TO VA
STAFF FOR USE AND/OR FINAL TERMINAL CLEANING.
FOR ALL AREAS THAT THE INFECTION CONTROL REPRESENTATIVE
DEEMS AS LOW RISK WITHIN THE CORRESPONDING INFECTION
CONTROL RISK ASSESSMENT (ICRA) THE FOLLOWING MINIMUM
REQUIREMENTS SHALL BE MAINTAINED WHILE PERFORMING WORK:
KEEP DOOR CLOSED TO ROOM OR SPACE WHENEVER WORK IS BEING
PERFORMED. NO TAPE OR SEALING OF DOOR PERIMETER WILL BE
REQUIRED.
PROVIDE SIGNAGE ON DOOR TO RESTRICT ACCESS TO ONLY THOSE
INVOLVED WITH CONSTRICTION ACTIVITIES OR INSPECTIONS.
UTILIZE A MOBILE HEPA FILTER TO BE WITHIN 15' OF ANY AREA WHERE
WALL ANCHORS ARE BEING DRILLED, OR OTHER DUST FORMING
ACTIVITIES WILL OCCUR, TO MANAGE DUST AND CONSTRUCTION
DEBRIS WITHIN SPACE.
FULLY CLEAN AREA UPON COMPLETION OF WORK.
ICRA - LOW RISKICRA - HIGH RISK ICRA - MODERATE
A.
B.
C.
D.
E.
F.
A.
B.
C.
D.
ULTIMATELY THE FINAL DETERMIONATION OF ALL RISK WILL BE
DECIDED BY THE INFECTION CONTROL REPRESENTATIVE FOR VA,
AND/OR THE COTR FOR THIUS PROJECT. BIDS SHALL FOLLOW
DIRECTION GIVEN BELOW THROUGHOUT THESE DRAWINGS.
REFER TO 'KEY NOTES - ICRA RATINGS OF SPACES' FOUND IN LOWER
LEFT HAND CORNER OF DRAWING 1356-PP003 WHICH WILL DEFINE
EACH SPECIFIC FIXTURE MODIFICATION KEY NOTE WITH ONE OF THE
THREE RISK LEVELS DEFINED WITHIN THIS DRAWING PACKAGE.
CONSTRUCTION PROCEDURES TO BE FOLLOWED FOR ALL THREE RISK
LEVELS ARE DEFINED ON THIS DRAWING 1356-PP002.
IN ADDITION AN 'INFECTION CONTROL RISK ASSESSMENT' (ICRA) FORM
HAS BEEN PROVIDED FOR CONTRACOR REFERENCE ON DRAWING 1356-
GC001. IT WILL BE THE CONTRACTOR'S RESPONSIBLITY TO FILL OUT
THESE FORMS PRIOR TO WORK IN ANY AREA TO CONFIRM RISK
ASSESSMENT ASSIGNED WITHIN THESE DOCUMENTS IS APPROPRIATE.
FLOOR PLANS LAYOUTS OF BASEMENT THROUGH FOURTH LEVEL HAVE
BEEN PROVIDED ON DRAWING 1356-GC100, 1356-GC110, 1356-GC120,
1356-GC130, AND 1356-GC140 TO SHOW WHERE EACH DEPARTMENT IN
THIS MEDICAL FACILITY ARE LOCATED, ALONG WITH APPROXIMATE
BOUNDARIES OF THOSE FUNCTIONS. CONTRACOTR MAY USE THESE
DRAWINGS FOR REFERENCE WHILE PLANNING FOR SCHEDULED
ACCESS TO AREAS AND/OR ROOMS WITHIN THOSE DEPERATRMENT TO
COMPLETE SCOPE OF WORK INDICATED ON DRAWINGS.
CONTRACTOR SHALL ALSO USE THESE REFERENCES WILL SHEDULING
RISER OUTAGES THAT OCCUR DURING THE PHASED REPLACEMENT OF
8" DOMESTIC WATER PIPING LOOP AND ASSOCIATED TAKE-OFF PIPIJNG
TO MAJOR PLUMBING RISERS. REFER TO NOTES ON THOSE PHASED
DRAWINGS ABOUT PROVISIONS FOR TEMPORARY SINKS AND/OR
CONNECTIONS TO DEPARTMENTS TO ALLOW FOR CONTINUATION OF
WATER SERVICE TO CRITICAL AREAS DURING THOSE WEEKEND
PLUMBING RISER OUTAGES.
RISK IDENTIFICATION
A.
B.
C.
D.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
C R e v it P ro je c ts
\V A
B u ild in g
P h a s e
M e c h a n ic a l ja s o n g o tt w a lt
.r v t
/3 /2
:2
:0
A M
MECHANICAL GENERAL NOTES PREVENT LEGIONELLA,
PHASE III
MINNEAPOLIS
618-14-118
11/30/2022 JG/KP CH/DL618-14-118
1356-PP002
41360DATE REG. NO.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS PREPARED BY ME
OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
JASON GOTTWALT, P.E.
61 CLOSE MAIN LOOP VALVES, ON INBOARD SIDE OF RISER TAKE-OFF, AS
REQUIRED TO MINIMIZE WATER OUTAGE IN SYSTEM DURING
INSTALLATION OF HOT/RECIRC LOOP SPLITTING VALVES, AND
CORRESPONDING MID SECTION DRAINS.
IF INBOARD VALVES NOTED IN KEY NOTE #61 DO NOT SUFFICIENTLY
HOLD, THAN CONTRACTOR TO WORK CLOSELY WITH VA
REPRESENTATIVE TO CLOSE OUTBOARD SIDE VALVES AND
COORDINATE APPROPRIATE SCHEDULE FOR OUTAGE TO RISER #1,
LAUNDRY, WAREHOUSE, AND OTHER IMPACTED BASEMENT AREAS.
ALL WORK TO BE PERFORMED DURING OVERTIME OR WEEKEND
HOURS TO LIMIT IMPACT ON FACILITY. REFER TO NOTES ON THESE
DRAWING ASSOCIATED TO 'MAJOR OUTAGES' FOR PLANNING
PURPOSES.
IF INBOARD VALVES NOTED IN KEY NOTE #61 DO NOT SUFFICIENTLY
HOLD, THAN CONTRACTOR TO WORK CLOSELY WITH VA
REPRESENTATIVE TO CLOSE OUTBOARD SIDE VALVES AND
COORDINATE APPROPRIATE SCHEDULE FOR OUTAGE TO PORTION OF
BASEMENT LEVEL AND ENTIRE RISER #4 AND RISER #7. ALL WORK TO
BE PERFORMED DURING OVERTIME OR WEEKEND HOURS TO LIMIT
IMPACT ON FACILITY. REFER TO NOTES ON THESE DRAWING
ASSOCIATED TO 'MAJOR OUTAGES' FOR PLANNING PURPOSES. REFER
TO TWO ALTERNATE METHODS OF VALVE REPLACEMENT IN KEY NOTES
BELOW WHICH MAY BE DETERMINED BY AMOUNT OF ACTUAL LEAKAGE
WITNESSED.
PRIOR TO DEMOLITION OF EXISTING VALVES, INSTALL 2" DRAIN INTO
COLD WATER MAIN, 1-1/4" DRAIN IN HOT WATER, AND 3/4" DRAIN IN
RECIRC PIPING BETWEEN RISER ISOLATION VALVES AND VERIFY AN
ACCEPTABLE LEAKAGE WITHIN ISOLATED SECTION OF PIPING LOOP
MAIN BETWEEN EXISTING GATE VALVES. REVIEW LEAKAGE RATE WITH
ENGINEER OF RECORD AND VA PLUMBING SHOP FOR FINAL APPROVAL
OF ACCEPTABLE RISK PRIOR TO VALVE REPLACEMENT INDICATED.
THE INDICATED 8" COLD WATER ISOLATION GATE VALVE TO BE
LABELED AS LOOP SPLIT DEVICE. HOWEVER, THE CONTRACTOR SHALL
LEAVE THIS VALVE OPEN IN A LOOP ARRANGEMENT FOR COLD WATER
SYSTEM (NOT CLOSING IT OFF LIKE HOT/RECIRC LOOP SPLIT).
INSTALL, OR REPLACE, 4" HOT WATER ISOLATION VALVE WITH A TRIPLE
OFFSET HIGH PERFORMANCE BUTTERFLY VALVE. UTILIZE ONE OF THE
TWO METHODS DESCRIBED BELOW.
INSTALL, OR REPLACE, 2-1/2" CIRCULATING WATER ISOLATION VALVE
USING A FULL PORT BALL VALVE.
PROVIDE FULL SIZED 2-1/2" CROSSOVER CIRCULATION PIPE AT END OF
SPLIT LOOP THAT WAS CREATED WITH NEW VALVES. INSTALL A 2"
CIRCUIT SETTER VALVE WITH ISOLATION ON EITHER SIDE FOR SERVICE
AND CHECK VALVE TO PREVENT BACKFLOW CONDITION, REFER TO
DRAWING DETAILS. COORDINATE FINAL BALANCE WITH ENGINEER OF
RECORD, ASSUME THAT BALANCE WILL REQUIRE ADJUSTMENT UP TO
FOUR(4) TIMES DURING PROCESS OF PROJECT PHASING.
WORK SCOPE ABOVE WILL DRAMATICALLY IMPACT EXISTING BALANCE
OF RECIRCULATION SYSTEM THROUGHOUT BUILDING 70. PROJECT
BIDS SHALL INCLUDE A BALANCING CONTRACTOR TO PERFORM THE
FULL SYSTEM REBALANCING (MULTIPLE TIMES) FOR THE HOT WATER
CIRCULATION SYSTEM DURING THESE KEY MILESTONE EVENTS
DESCRIBED BELOW.
• INITIAL BALANCE DATA: PRIOR TO STARTING ANY SYSTEM
MODIFICATION BALANCING CONTRACTOR SHALL OBTAIN OVERALL
FLOW READINGS, PUMP INLET/OUT PRESSURE DIFFERENTIAL
(BOTH LOCATIONS), AND INITIAL TROUBLESHOOTING OF EXISTING
TEMPERATURE SENSORS READING COLD (LESS THAN 124
DEGREES). SUBMIT INITIAL REPORT TO ENGINEER-OF-RECORD.
• NOTE THAT ACTUAL CLOSURE OF VALVES INSTALLED ABOVE TO
SPLIT HOT/RECIRC LOOPS WILL NOT OCCUR UNTIL AFTER FINAL
PHASE 8 OF COLD WATER LOOP REPLACEMENT IS COMPLETE.
HOWEVER, AFTER EACH PHASE INVOLVING RISER PIPING
REPLACEMENT THE BALANCING OF RECIRC SYSTEMS SHALL BE
RECHECKED AND CONFIRMED BY USING TEMPERATURE SENSORS
FOR EACH CIRCUIT SETTER. INTENT WOULD BE FOR PLUMBING
CONTRACTOR TO HAVE ALL CIRCUIT SETTER REPLACEMENT FOR
THAT RISER (BBI 3001) REPLACED PRIOR, OR DURING, THE PHASE
OUTAGE THAT DISCONNECTS AND RECONNECTS THAT PIPING AS
SHOWN IN THE PHASING DRAWINGS FOR COLD LOOP
REPLACEMENT.
1. PHASES 1 THROUGH 8 EACH REQUIRING BALANCING/REPORTS.
2. CHECKING OF ADJACENT RISERS TO VERIFY NO NEGATIVE
IMPACT TO THEIR PREVIOUS RECIRC BALANCE.
• AFTER ALL EIGHT(8) PHASES OF COLD WATER LOOP, AND RISER,
REPLACEMENTS ARE COMPLETED, THEN CONTRACTOR SHALL
PHYSICALLY CLOSE VALVES INSTALLED ABOVE TO SPLIT LOOPS
INTO NORTH/SOUTH HALVES OF BUILDING 70. BALANCING
CONTRACTOR SHALL THEN PERFORM A COMPREHENSIVE FINAL
BALANCE OF ENTIRE BUILDING AND SUBMIT RECIRCULATION FLOW
VALUES FOR ALL CIRCUIT SETTERS.
21 VERIFY NETWORK ADDRESS OF ALL PREVIOUSLY INSTALLED
TEMPERATURE SENSORS THROUGHOUT BUILDING. TESTING METHOD
SHALL SEND TEST SIGNAL AT EACH SENSOR WIRE AND VERIFY IT IS
APPROPRIATELY AND ACCURATELY LABELED AND LOCATED ON
BUILDING AUTOMATION COMPUTER. CONTROLS CONTRACTOR TO
KEEP AN ACCURATE LOG OF ALL SENSORS AND GUARANTEE ALL
ADDRESSES ARE CORRECT EVEN IF MISTAKES ARE FOUND AFTER
STANDARD 1-YEAR CONTRACTOR WARRANTY CYCLE. REFER TO TABLE
ON DRAWING 1356-PP501 FOR COMPLETE LIST OF EXISTING
TEMPERATURE SENSORS.
IN ADDITION TO ABOVE, CONTROLS CONTRACTOR SHALL ALSO
PROVIDE TREND LOGGING OF ALL SENSORS THROUGHOUT PROJECT
TO RECORD DEVIATIONS AND IMPACT OF PROJECT MODIFICATIONS.
RECORDS SHALL BE KEPT AND PROVIDED TO ENGINEER OR VA
REPRESENTATIVE UPON REQUEST. INCLUDE COMPACT DISC WITH
DIGITAL FILES OF ALL TREND LOGS RECORDED DURING
CONSTRUCTION TO TURN IN WITH PROJECT CLOSE-OUT DOCUMENTS.
THIS PORTION OF WORK ASSOCIATED WITH TREND LOGGING SHALL BE
PERFORMED UNDER BASE BID CONTRACT.
BBI 4001 (BASE BID)
GENERAL DESCRIPTION: SPLIT BASEMENT LEVEL HOT AND
RECIRCULATION DOMESTIC WATER LOOPS INTO TWO HALVES TO
ELIMINATE POTENTIAL FOR STAGNANT SECTIONS OF PIPING WITH
LIMITED FLOW DUE TO EQUALIZED PRESSURE IN LOOP.
UNDER BASE BID, PERFORM THE FOLLOWING;
BBI 2001
REFER TO DRAWINGS 1356-PP101.0 THROUGH 1356-PP108.6 (22
DRAWING IN TOTAL) FOR COMPLETION OF PHASED REPLACEMENT OF
GALVANIZED PIPING AND SYSTEM COMPONENTS / EQUIPMENT.
BBI 6001 (BASE BID)
GENERAL DESCRIPTION: VERIFY NETWORK ADDRESSES OF ALL
PREVIOUSLY INSTALLED TEMPERATURE SENSORS.
UNDER ACCEPTANCE OF THIS ALTERNATE, PERFORM THE FOLLOWING;
31 REPLACE EXISTING 1/2" BALANCING VALVE WITH NEW CIRCUIT SETTER,
CHECK VALVE, AND BALL VALVES ON EITHER END TO ISOLATE ENTIRE
ASSEMBLY FOR SERVICE, REFER TO DETAILS WITHIN THIS DRAWING
PACKAGE. CONTRACTOR WILL NEED TO TEMPORARILY ISOLATE
CIRCULATING WATER TO LARGE AREA OF BUILDING (if possible) OR
COORDINATE OUTAGE. IF OUTAGE IS REQUIRED THEN REFER TO
NOTES AND GUIDELINES IDENTIFIED WITHIN THIS DRAWING PACKAGE
FOR COORDINATION WITH VA REPRESENTATIVE. REINSULATE AND
REPLACE ALL DAMAGED OR MISSING INSULATION AFTER COMPLETION
OF WORK. TAG CIRCUIT SETTER ASSEMBLY WITH NUMBER
DESIGNATED BY VA FACILITIES BY PROVIDING LAMINATE SIGNAGE PER
SPECIFICATION REQUIREMENTS. BALANCE EACH ASSEMBLY TO
APPROXIMATELY 1 GPM UNLESS SPECIFICALLY NOTED OTHERWISE.
RELOCATE EXISTING DDC TEMPERATURE SENSOR IF REQUIRED.
SAME AS KEY NOTE #31 EXCEPT FOR A 3/4" SIZE ASSEMBLY. REFER TO
DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.
SAME AS KEY NOTE #31 EXCEPT FOR A 1" SIZE ASSEMBLY. REFER TO
DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.
SAME AS KEY NOTE #31 EXCEPT FOR A 1-1/4" SIZE ASSEMBLY. REFER
TO DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.
SAME AS KEY NOTE #31 EXCEPT FOR A 1-1/2" SIZE ASSEMBLY. REFER
TO DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.
SAME AS KEY NOTE #31 EXCEPT FOR A 2" SIZE ASSEMBLY. REFER TO
DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.
BBI 3001 (BASE BID)
GENERAL DESCRIPTION: REPLACEMENT OF ALL EXISTING CIRCUIT
SETTER BALANCING VALVES WITH NEW ASSEMBLIES INCLUDING
CHECK VALVE AND ISOLATION VALVES FOR SERVICING.
UNDER BASE BID, PERFORM THE FOLLOWING;
41 THIS KEY NOTE IS FOR CONTRACTOR REFERENCE ONLY. VALVES ARE
HIGHLIGHTED FOR REFERENCE ONLY IN PLANNING OUTAGES TO
AREAS OF EACH FLOOR IF REQUIRED FOR PLUMBING MODIFICATIONS
INDICATED WITHIN THESE DRAWINGS. CONTRACTOR WILL BE
RESPONSIBLE TO VERIFY CONDITIONS OF EXISTING VALVES AND
PROVIDE VA FACILITIES PROPER NOTIFICATION OF OUTAGE PER
REQUIREMENTS ON DRAWING 1356-PP002.
ANY DISCREPANCIES OF VALVE SIZES, OR LOCATIONS, INDICATED
SHALL BE IDENTIFIED ON FINAL AS-BUILT DRAWING DOCUMENTATION
UTILIZED FOR UPDATING OF VA REFERENCE MATERIALS AND INCLUDE
WITHIN CLOSE OUT DOCUMENTS.
EXISTING VALVES
GENERAL DESCRIPTION: EXISTING TAKE-OFF VALVES AT EACH FLOOR
ARE PLANNED FOR REPLACEMENT UNDER A SEPARATE CONTRACT
THAT MAY, OR MAY NOT, BE COMPLETED IN TIME FOR THIS PROJECT.
EXISTING VALVES MAY LEAK AND COULD REQUIRE SOME
INTERMEDIATE MEASURES TO ISOLATE OR DRAIN DURING SYSTEM
MODIFICATIONS IDENTIFIED WITHIN THIS DRAWING PACKAGE.
IF CONTRACTOR FINDS TAKE-OFF VALVES THAT DO NOT ADEQUATELY
HOLD THEN VA FACILITIES WILL EITHER REPLACE OR REPAIR THOSE
VALVES. OTHERWISE ADDITIONAL COMPENSATION REQUESTS MAY BE
REVIEWED FOR CONTRACTOR PROPOSED ALTERNATIVES BASED ON
EACH ENCOUNTERED SCENARIO. (THIS NOTE DOES NOT APPLY TO
LARGE EXISTING BASE OF RISER VALVES THAT MAY HAVE LEAKAGE.
SEE NOTES FROM 'VALVE UPGRADES' PORTION OF THIS DRAWING FOR
SUGGESTED METHODS OF DEALING WITH THAT SITUATION WHILE
REPLACING PIPING MAINS, AND RISER VALVES, ON LOWER LEVEL.)
1D
BBI 1001-1011 (BASE BID)
GENERAL DESCRIPTION: INSTALLATION OF MIXING VALVES, OR
FIXTURES WITH BUILT-IN SCALD PROTECTION, AT EVERY PLUMBING
FIXTURE WITHIN BUILDING 70. NOTE THAT THIS ALTERNATE WILL BE
BROKEN DOWN INTO PRICING 'PER RISER'. CONTRACTOR TO SUBMIT
SEPARATED LINE ITEM COSTS FOR FIXTURES ASSOCIATED WITH EACH
NEW RECIRCULATION ZONE AND BROKEN APART AS FOLLOWS;
BBI 1001 - RISER 'M' AND ASSOCIATED BASEMENT AREAS
BBI 1002 - RISER #2 AND ASSOCIATED BASEMENT AREAS
BBI 1003 - RISER #3 AND ASSOCIATED BASEMENT AREAS
BBI 1004 - RISER 'A' AND ASSOCIATED BASEMENT AREAS
BBI 1005 - RISER #7 AND ASSOCIATED BASEMENT AREAS
BBI 1006 - RISER #4 AND ASSOCIATED BASEMENT AREAS
BBI 1007 - RISER 'E' AND ASSOCIATED BASEMENT AREAS
BBI 1008 - RISER #6 AND ASSOCIATED BASEMENT AREAS
BBI 1009 - RISER 'J' AND ASSOCIATED BASEMENT AREAS
BBI 1010 - RISER 'K' AND ASSOCIATED BASEMENT AREAS
BBI 1011 - RISER 'G' AND ASSOCIATED BASEMENT AREAS
SITUATION #1: COUNTER MOUNTED LAVATORY IN THE FOLLOWING
ROOM TYPE
PUBLIC TOILET ROOM
REPLACE LAVATORY FIXTURE WITH SINGLE HANDLE FAUCET (WITH
INTEGRATED THERMOSTATIC MIXING VALVE RATED FOR 180 DEG. F
WATER TEMPERATURE, ASSE 1070 COMPLIANT): UTILIZE ONE OF THE
FOLLOWING NEW FIXTURES (OR APPROVED EQUIVALENT);
SINGLE HOLE = CHICAGO 410-T41E2805ABCP, 0.5 GPM
4" C-C = CHICAGO 420-T41E2805ABCP, 0.5 GPM
8" C-C = USE SINGLE HOLE FIXTURE WITH CHROME PLUG COVERS
ALSO PROVIDE FINAL CONNECTIONS TO EACH REPLACED FAUCET
WITH 3/8" CHROME PLATED BRASS TUBING WITH TRAP WRAP
INSTALLED OVER ALL EXPOSED PIPING. COORDINATE ACCESS WITH VA
REPRESENTATIVE TO EACH PUBLIC RESTROOM AS REQUIRED.
SITUATION #2: WALL HUNG LAVATORY IN THE FOLLOWING ROOM
TYPE
PUBLIC TOILET ROOM
SAME AS ABOVE (SITUATION #1) EXCEPT PROVIDE PVC SHROUD UNDER
EACH EXISTING WALL HUNG LAV TO CONCEAL TRAP/PIPING, TRUBRO
LAVATORY SHIELD OR EQUAL. VERIFY EACH WALL HUNG LAV MODEL
PRIOR TO ORDERING SHROUD AND TRIM UNDERSIDE AS REQUIRED TO
A MAXIMUM ALLOWABLE 1/8" GAP TO BE CAULKED UPON COMPLETION.
SECURE SHROUD TO WALL WITH VELCRO STRIPS.
SITUATION #3: COUNTER MOUNTED LAVATORY / SINK IN THE
FOLLOWING ROOM TYPES
PATIENT TOILET ROOM
STAFF ROOM
TREATMENT ROOM
KITCHEN
WORK ROOM
PROCESS ROOM
CORRIDOR
PRIVATE ROOM
EXISTING FIXTURE TO REMAIN. PROVIDE EACH LAV / SINK WITH AN
UNDER COUNTER MOUNTED MIXING VALVE (ASSE 1070 COMPLIANT),
WATTS SERIES LFUSG-B OR SIMILAR. MIXING VALVE SHALL BE
CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE AND
INSTALLED WITHIN A SERVICEABLE LOCATION. PERFORM ALL
CONNECTIONS UNDER SINK TO / FROM MIXING VALVE AND FIXTURE
WITH 3/8" CHROME PLATED BRASS TUBING.
SITUATION #4: WALL HUNG LAVATORY / SINK - FAUCET WITH HANDLE(S)
IN THE FOLLOWING ROOM TYPES
PATIENT TOILET ROOM
STAFF ROOM
TREATMENT ROOM
KITCHEN
WORK ROOM
CORRIDOR
HOUSEKEEPING (Reference only - no alterations required)
PRIVATE ROOM
SAME AS ABOVE (SITUATION #3) EXCEPT PROVIDE PVC SHROUD UNDER
EACH EXISTING WALL HUNG LAV / SINK TO CONCEAL NEW MIXING
VALVE, TRUBRO LAVATORY SHIELD OR EQUAL. VERIFY EACH WALL
HUNG LAV / SINK MODEL PRIOR TO ORDERING SHROUD AND TRIM
UNDERSIDE AS REQUIRED TO A MAXIMUM ALLOWABLE 1/8" GAP TO BE
CAULKED. SECURE SHROUD TO WALL WITH VELCRO STRIPS.
SITUATION #5: WALL HUNG LAVATORY / SINK,
FLOOR MOUNT OR WALL MOUNT SINK -
FAUCET WITH FOOT PEDALS OR KNEE CONTROL IN THE FOLLOWING
ROOM TYPES
STAFF ROOM
TREATMENT ROOM
KITCHEN
WORK ROOM
PROCESS ROOM
CORRIDOR
HOUSEKEEPING (Reference only - no alterations required)
PRIVATE ROOM
EXISTING FIXTURE TO REMAIN. PROVIDE UNDER LAV / SINK MOUNTED
MIXING VALVE (ASSE 1070 COMPLIANT), WATTS SERIES LFUSG-B OR
SIMILAR. MIXING VALVE SHALL BE CAPABLE OF HANDLING 180 DEG. F
WATER TEMPERATURE. UTILIZE EXISTING HOT & COLD WATER STOP
VALVES ON WALL TO REDUCE OR ELIMINATE ANY OUTAGE
REQUIREMENTS. OTHERWISE COORDINATE MINOR SERVICE OUTAGE
WITH AFFECTED AREAS AS REQUIRED DURING INSTALLATION.
SITUATION #6: SHOWER / BATHTUB IN THE FOLLOWING ROOM TYPES
PATIENT TOILET ROOM (Reference only - no alterations required)
STAFF ROOM (Reference only - no alterations required in this phase)
VERIFY AND RECORD MODEL NUMBER OF SHOWER VALVE ASSEMBLY
AND SUBMIT TO ENGINEER TO VERIFY EXISTING SHOWER / TUB VALVE
HAS BUILT-IN SCALD PROTECTION IN COMPLIANCE WITH ASSE 1016.
IF EXISTING MIXING VALVE IS DETERMINED NON-COMPLIANT THAN
CONTRACTOR SHALL PROVIDE MIXING VALVE TO PROTECT INCOMING
HOT WATER TO EXISTING SHOWER. MIXING VALVE SHALL BE ASSE
1070 COMPLIANT AND INSTALLED WITHIN WALL CAVITY TO BE
ACCESSIBLE VIA REMOVABLE ACCESS PANEL OR STEEL RECESSED
BOX TO CONTAIN MIXING VALVE, WATTS SERIES LFUSG-B OR SIMILAR.
BASE BID SHALL INCLUDE THIRTY-SIX(36) MIXING VALVE INSTALLATIONS
AS DESCRIBED ABOVE.
1A
2D
4D
2A
ROOM TYPE:
1. PUBLIC TOILET ROOM
2. PATIENT TOILET ROOM
3. STAFF ROOM (TOILET, LOCKERS, BREAK, OFFICE, CONFERENCE, ETC.)
4. TREATMENT ROOM (EXAM, PROCEDURE, SURGERY, IMAGING, PREP/RECOVERY, ETC.)
5. KITCHEN (DINING)
6. WORK ROOM (MEDS, SOILED UTILITY, NOURISH / NUTRITION, NURSE STATION, CLEAN, ETC.)
7. PROCESS ROOM (LAB, STERILIZER, WATER TREATMENT, ETC.)
8. CORRIDOR
9. HOUSEKEEPING
0. PRIVATE ROOM (PATIENT BED, VISITOR BED, ON CALL, ETC.)
FIXTURE DESCRIPTION:
A. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE FAUCET
B. WALL HUNG LAV / SINK: DECK MOUNT SPOUT, 2 FOOT PEDALS
C. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT 2 HANDLE EYEWASH FAUCET D. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT 2 HANDLE FAUCET E. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT SPOUT, 2 FOOT PEDALS F. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT EYEWASH SPOUT, 2 FOOT PEDALS G. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 2 HANDLE FAUCET H. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT SPOUT, 2 FOOT PEDALS I. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 2 HANDLE EYEWASH FAUCET J. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 1 HOLE LAB FAUCET ASSEMBLY
W/2 HANDLES
K. CEILING MOUNT EMERGENCY SHOWER
L. FLOOR MOUNT EMERGENCY COMBINATION SHOWER & EYEWASH
M. WALL MOUNT EMERGENCY EYEWASH
N. DECK MOUNT EMERGENCY EYEWASH
O. SHOWER ENCLOSURE: WALL MOUNT SHOWER FAUCET
P. BATHTUB: WALL MOUNT TUB / SHOWER FAUCET
Q. CABINET ASSEMBLY WITH BUILT-IN SINK & FAUCET
R. FLOOR MOUNT OR WALL MOUNT SINK: WALL MOUNT 2 HANDLE FAUCET
S. WALL MOUNT 2 COMPARTMENT SS SCRUB SINK ASSEMBLY
T. HOPPER (FLUSHING RIM SINK)
U. FLOOR MOUNT 2 COMPARTMENT SS SINK: (2) WALL MOUNT 2 HANDLE FAUCET
V. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT SINGLE HANDLE FAUCET
W. WALL HUNG LAV / SINK: DECK MOUNT EYEWASH SPOUT, 2 FOOT PEDALS
X. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT SINGLE HANDLE FAUCET Y. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT 2 HANDLE FAUCET Z. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT EYEWASH SPOUT, 2 FOOT PEDALS
AA. WALL HUNG LAV / SINK: WALL MOUNT SPOUT, 2 FOOT PEDALS
BB. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE EYEWASH FAUCET
CC. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE FAUCET, 2 FOOT PEDALS
DD. WALL HUNG LAV / SINK: DECK MOUNT SPOUT, KNEE CONTROL
EE. WALL MOUNT 1 COMPARTMENT SS SCRUB SINK ASSEMBLY
FF. FLOOR MOUNT EMERGENCY EYEWASH
GG. DROP IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT 2 HANDLE EYEWASH FAUCET
HH. SHOWER ENCLOSURE: WALL MOUNT SECURITY SHOWER ASSEMBLY
II. WALL MOUNT SS SECURITY LAV ASSEMBLY
JJ. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT SPOUT, 2 FOOT PEDALS KK. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): WALL MOUNT 2 HANDLE FAUCET LL. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): WALL MOUNT 1 HANDLE FAUCET
MM. FLOOR MOUNT OR WALL MOUNT SINK: WALL MOUNT SPOUT, KNEE CONTROL
NN. FLOOR MOUNT OR WALL MOUNT SINK: DECK MOUNT SINGLE HANDLE CONTROL, HOSE & SPRAY ASSEMBLY OO. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): WALL MOUNT 2 HANDLE FAUCET
PP. FLOOR MOUNT OR WALL MOUNT SINK: WALL MOUNT 2 HANDLE FAUCET & PRE-RINSE SPRAY
QQ. WALL MOUNT HOSE STATION WITH MIXING VALVE
RR. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT SINGLE HANDLE EYEWASH
FAUCET
SS. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 1 HOLE PRE-RINSE SPRAY
FAUCET W/2 HANDLES
TT. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE EYEWASH FAUCET, 2 FOOT PEDALS
UU. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 2 HANDLE FAUCET, 2 FOOT
PEDALS
VV. FLOOR MOUNT SS SECURITY LAV ASSEMBLY
MIXED TEMP PLUMBING FIXTURE KEY NOTES:
ROOM TYPE, FIXTURE DESCRIPTION,
RISER NUMBER
ROOM TYPE
(NUMBERS 0-9) FIXTURE DESCRIPTION
(LETTERS A-VV)
BBI RISER NUMBER
(NUMBERS 1001-1012)0A -1
1Y
3D 3G 3J 3X 3Y
4G 4H 4J
6D 6E 6G 6J 6V
7D
8D 8E 8G
0D 0G
3A
3B
4A
6A
8A
9B
2O 2P
3O
4B
6B
8B
BBI 1001 - 1012 (cont.)
SITUATION #8: INDEPENDENT EMERGENCY FIXTURES IN THE
FOLLOWING ROOM TYPES
STAFF ROOM
TREATMENT ROOM
KITCHEN
WORK ROOM
PROCESS ROOM
CORRIDOR
EXISTING FIXTURE AND ASSOCIATED MIXING VALVE TO REMAIN.
SITUATION #9: FLOOR MOUNTED, COUNTER MOUNTED OR WALL HUNG
LAVATORY / SINK - WALL MOUNTED FAUCET IN THE FOLLOWING ROOM
TYPES
TREATMENT ROOM
KITCHEN
WORK ROOM
PROCESS ROOM
CORRIDOR
HOUSEKEEPING (Reference only - no alterations required)
PRIVATE ROOM
EXISTING FIXTURE TO REMAIN. PROVIDE MIXING VALVE (ASSE 1070
COMPLIANT) WITHIN WALL CAVITY TO BE ACCESSIBLE VIA REMOVABLE
PANEL, WATTS SERIES LFUSG-B OR SIMILAR. MIXING VALVE SHALL BE
CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE. EXISTING
HOT AND COLD WATER STOP VALVES ON WALL MAY REMAIN AND BE
UTILIZED TO REDUCE OR ELIMINATE OUTAGE REQUIREMENTS.
SITUATION #10: SECURITY SHOWER IN THE FOLLOWING ROOM TYPES
PATIENT TOILET ROOM
STAFF ROOM
EXISTING SHOWER VALVE TO REMAIN. PROVIDE MIXING VALVE (ASSE
1070 COMPLIANT) WITHIN WALL CAVITY TO BE ACCESSIBLE VIA
REMOVABLE ACCESS PANEL OR STEEL RECESSED BOX, WATTS SERIES
LFUSG-B OR EQUIVALENT. MIXING VALVE SHALL BE CAPABLE OF
HANDLING 180 DEG. F WATER TEMPERATURE. ACCESS PANEL OR
STEEL RECESSED BOX SHALL BE SECURITY TYPE (ANTI-LIGATURE WITH
SECURITY SCREWS).
SITUATION #11: WALL HUNG SS SECURITY LAV ASSEMBLY IN THE
FOLLOWING ROOM TYPES
PATIENT TOILET ROOM
EXISTING FIXTURE TO REMAIN. PROVIDE MIXING VALVE (ASSE 1070
COMPLIANT) WITHIN WALL CAVITY TO BE ACCESSIBLE VIA REMOVABLE
PANEL, WATTS SERIES LFUSG-B OR EQUIVALENT. MIXING VALVE SHALL
BE CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE. ACCESS
PANEL SHALL BE SECURITY TYPE (ANTI-LIGATURE WITH SECURITY
SCREWS).
SITUATION #12: HOSE & SPRAY ASSEMBLIES, FAUCETS WITH PRE-RINSE
SPRAY, HOSE STATIONS IN THE FOLLOWING ROOM TYPES
KITCHEN
PROCESS ROOM
EXISTING HIGH TEMPERATURE FIXTURE TO REMAIN.
SITUATION #13: FLOOR MOUNT SS SECURITY LAV ASSEMBLY IN THE
FOLLOWING ROOM TYPES
PATIENT TOILET ROOM
EXISTING FIXTURE TO REMAIN. PROVIDE MIXING VALVE (ASSE 1070
COMPLIANT), WATTS SERIES LFUSG-B OR SIMILAR, INSTALLED WITHIN
SECURE COMPARTMENT BELOW LAV. MIXING VALVE SHALL BE
CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE. EXISTING
HOT AND COLD WATER STOP VALVES MAY REMAIN (IF LOCATED WITHIN
SECURE COMPARTMENT) TO AVOID WATER OUTAGE. OTHERWISE
COORDINATE MINOR SERVICE OUTAGE WITH AFFECTED AREAS AS
REQUIRED DURING INSTALLATION.
4R
6Q 6R 6T 6AA
7R 7U
9R
0R
ICRA RATING OF SPACES
IN GENERAL, THE FOLLOWING FIXTURE TAGS SHALL HAVE THE
ASSOCIATED INFECTION CONTROL RISK ASSESSMENT (ICRA) RATING
APPLIED TO THOSE AREAS. CONFIRM EACH AREA WITH INFECTION
CONTROL REPRESENTATIVE AND REFER TO NOTES ON DRAWING 70-
PP002 FOR MINIMUM REQUIREMENTS TO BE MAINTAINED IN EACH WORK
ZONE. COORDINATE SCHEDULING/ACCESS OF EACH SPACE WITH
DEPARTMENT REPRESENTATIVE A MINIMUM OF 2-WEEKS IN ADVANCE
(EACH DEPARTMENT MAY REQUEST ADDITIONAL TIME IF NEEDED,
DEPENDING ON TYPE OF PATIENT CARE WITHIN THAT AREA).
1. PUBLIC TOILET ROOM:
• MODERATE RISK
2. PATIENT TOILET ROOM:
• MODERATE TO HIGH RISK (confirm with ICRA)
3. STAFF ROOM (TOILET, LOCKERS, BREAK, OFFICE, CONFERENCE, ETC.)
• LOW RISK
4. TREATMENT ROOM (EXAM, PROCEDURE, SURGERY, IMAGING,
PREP/RECOVERY, ETC.)
• MODERATE TO HIGH RISK (confirm with ICRA)
5. KITCHEN
• HIGH RISK
6. WORK ROOM (MEDS, SOILED UTILITY, NOURISH / NUTRITION, NURSE
STATION, CLEAN, ETC.)
• MODERATE RISK
7. PROCESS ROOM (LAB, STERILIZER, WATER TREATMENT, ETC.)
• HIGH RISK
8. CORRIDOR
• CONFIRM WITH ICRA BASED ON ADJACENT AREAS
9. HOUSEKEEPING
• LOW RISK
0. PRIVATE ROOM (PATIENT BED, VISITOR BED, ON CALL, ETC.)
• MODERATE TO HIGH RISK (confirm with ICRA)
1D1A 1Y
2A
4C
3D 3G 3J 3M 3O
4D 4E 4F
6C 6D 6E 6F 6G
7B 7D
8B 8D 8E
0A 0B
2D 2G
3A 3B
4A 4B
6A 6B
8A
0D 0G
2O 2P
3P
4G 4H 4I 4J 4M
6H 6I 6J
7G
8J
7H
4N 4R
6K
7I 7J
8K 8N
2Y
6L 6N 6Q 6R
7L 7M
9A
0R
4M 4N
6FF
7L 7M
8K 8N
2G
4S
4V
4AA
4CC
4FF
6H
7Q
9A
4E 4Y
4EE
4JJ
3P
3V
3M
2HH
3HH
2II
2HH 2II
3V 3X 3Y 3HH
4S 4V 4W 4Y
LIST BELOW OF VALVE SIZES AND QUANTITIES ON EACH LEVEL IS FOR
REFERENCE ONLY. CROSS CHECK WITH PLANS AND SITE CONDITIONS.
M-RISER (located near gridline EE-29)
• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor (east): 4” CW, 2” HW, & ¾” RECIRC valves
• Second Floor (south): 3” CW, 2.5” HW, & 1¼” RECIRC valves
• Third Floor: 4” CW, 2” HW, & 1” RECIRC valves
• Fourth Floor (north): 2.5” CW, 1.5” HW, & ¾” RECIRC valves
• Fourth Floor (south): 2” CW, 2” HW, & ¾” RECIRC valves SHAFT #2 RISER (located near gridline W-25)
• First Floor: 3” CW, 2.” HW, & ¾” RECIRC valves
• Second Floor: 3” CW, 2.5” HW, & 1” RECIRC valves
• Third Floor: 3” CW, 2.5” HW, & 3/4” RECIRC valves
• Fourth Floor (north): 1.5” CW, 1” HW, & ½” RECIRC valves
• Fourth Floor (south): 1.5” CW, ¾” HW, & ½” RECIRC valves SHAFT #3 RISER (located near gridline U-23)
• First Floor: 2.5” CW, 1.5” HW, & ¾” RECIRC valves
• Second Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Third Floor: 2” CW, 1.5” HW, & ½” RECIRC valves
• Fourth Floor: 2” CW, ¾” HW, & ¾” RECIRC valves A-RISER (located near gridline L-29)
• First Floor: 3” CW, 2” HW, & 1” RECIRC valves
• Second Floor (west): 3” CW, 2” HW, & 1” RECIRC valves
• Second Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves
• Third Floor (west): 3” CW, 2” HW, & ¾” RECIRC valves
• Third Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves
• Fourth Floor (west): 1” CW, ½” HW, & ½” RECIRC valves
• Fourth Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves SHAFT #7 RISER (located near gridline Z-20)
• First Floor: 3” CW, 2” HW, & 3/4” RECIRC valves
• Second Floor: 3” CW, 2” HW, & 3/4” RECIRC valves
• Third Floor: 3” CW, 2” HW, & 3/4” RECIRC valves
• Fourth Floor: 3” CW, 2” HW, & 3/4” RECIRC valves SHAFT #4 RISER (located near gridline M-20)
• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Third Floor: 3” CW, 1.5” HW, & ¾” RECIRC valves
• Fourth Floor: 3” CW, 2” HW, & ¾” RECIRC valves E-RISER (located near gridline B-21)
• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor: 2.5” CW, 2” HW, & 1.5” RECIRC valves
• Third Floor: 4” CW, 2” HW, & ¾” RECIRC valves
• Fourth Floor: 3” CW, 2.5” HW, & ¾” RECIRC valves SHAFT #6 RISER (located near gridline U-13)
• First Floor: 1.5” CW, 1.25” HW, & ¾” RECIRC valves
• Second Floor: 4” CW, 2” HW, & 1” RECIRC valves
• Third Floor: 3” CW, 2.5” HW, & ¾” RECIRC valves
• Fourth Floor: 2.5” CW, 1” HW, & ½” RECIRC valves J-RISER (located near gridline EE-10)
• First Floor(east): 2.5” CW, 2” HW, & ¾” RECIRC valves
• First Floor(north): 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor (north): 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves
• Third Floor (north): 2” CW, 2” HW, & ¾” RECIRC valves
• Third Floor (south): 2.5” CW, 2” HW, & ¾” RECIRC valves
• Fourth Floor (north): 2” CW, 2” HW, & ¾” RECIRC valves
• Fourth Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves K-RISER (located near gridline W-8)
• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Third Floor: 3” CW, 2” HW, & ¾” RECIRC valves
• Fourth Floor: 3” CW, 2.5” HW, & ¾” RECIRC valves G-RISER (located near gridline H-9)
• First Floor(west): 3” CW, 2” HW, & ¾” RECIRC valves
• First Floor(north): 3” CW, 2” HW, & 1.5” RECIRC valves
• Second Floor (west): 3” CW, 2” HW, & ¾” RECIRC valves
• Second Floor (north): 2” CW, 1.5” HW, &…