Attachment D.1 Drawings 1 of 10 (7 Pages).pdf

PDF 19 MB Posted

Attached to
Y1DA--618-18-108 Prevent Legionella Ph3 36C263-23-AP-0103
Solicitation number
36C26323R0042
Issued by

About this file

This document provides details on a federal solicitation opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The solicitation number is 36C26323R0042 for project Y1DA--618-18-108 Prevent Legionella Ph3 36C263-23-AP-0103. The description provided is for Prevent Legionella Phase 3. The solicitation concerns requirements for products or services to prevent Legionella bacteria as part of a multi-phase project run by VHA VISN 23. Specific requirements are not included in the attached file, but rather other documentation presumably provides more details on technical specifications, response deadlines, and evaluation criteria.

View the file

Other files

File Type Posted
Wage Determination MN20230117 updated 4.14.23.pdf PDF
36C26323R0042 0002.docx DOCX document
Site Visit Sign-in Sheet 4.20.23 (1 Page).pdf PDF
08 31 13 Access Doors and Frames (6 Pages).pdf PDF
36C26323R0042 618-18-108 Prevent Legionella Ph3 QA (2 Pages).pdf PDF
36C26323R0042 0001.docx DOCX document
Revised SOW 5.3.23 (4 Pages).pdf PDF
Attachment J VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance (2 Pages).pdf PDF
Attachment F Wage Determination MN20230117 (9 Pages).pdf PDF
Attachment D.6 Drawings 6 of 10 (6 Pages).pdf PDF
Attachment C Specifications 20230317 (474 Pages).pdf PDF
Attachment D.7 Drawings 7 of 10 (6 Pages).pdf PDF
Attachment E Brand Name Justification and Approval (1 Page)_Redacted.pdf PDF
Attachment D.3 Drawings 3 of 10 (5 Pages).pdf PDF
Attachment B Price Schedule Breakdown (1 Page).pdf PDF
Attachment D.10 Drawings 10 of 10 (6 Pages).pdf PDF
Attachment H Past Performance Questionnaire (3 Pages).docx DOCX document
Attachment I Questions Request Form (1 page).doc DOC document
Attachment D.4 Drawings 4 of 10 (4 Pages).pdf PDF
Attachment G VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D (6 pages).pdf PDF
Attachment D.8 Drawings 8 of 10 (6 Pages).pdf PDF
Attachment D.2 Drawings 2 of 10 (5 Pages).pdf PDF
Attachment A Final SOW (4 Pages).pdf PDF
36C26323R0042.docx DOCX document
Attachment D.5 Drawings 5 of 10 (12 Pages).pdf PDF
Attachment D.9 Drawings 9 of 10 (6 Pages).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATIONS

AD AREA DRAIN

A.F.F. ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING

STATION

AHU AIR HANDLING UNIT

ANB ACID NEUTRALIZING BASIN

AP ACCESS PANEL

ARCH ARCHITECT

AS AIR SEPARATOR

BD BUTTERFLY DAMPER

B/ G

BELOW GRADE

BTU BRITISH THERMAL UNIT

BWV BACKWATER VALVE

CCF HUNDRED CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CLG CEILING

CO CLEAN OUT

CONTR CONTRACTOR

CONV CONVECTOR

CUH CABINET UNIT HEATER

CW COLD WATER

DB DECIBEL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFUSER

DISCH DISCHARGE

DMPR DAMPER

DN DOWN

DR DRAIN

DS DOWNSPOUT

DWG DRAWING

EAT ENTERING AIR TEMPERATURE

EDR EQUIVALENT DIRECT RADIATION

EP ELECTRIC-PNEUMATIC

EWC ELECTRIC WATER

COOLER

EWTENTERING WATER TEMPERATURE

EXH EXHAUST

EXP EXPANSION

F FAHRENHEIT

FC FAN COIL

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FLR FLOOR

FLEX FLEXIBLE

FM FIRE MAIN

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET OR FOOT

F&T FLOAT AND THERMOSTATIC

FTG FOOTING

FTR FINNED TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLON

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HD HEAD

HOA HANDS-OFF-AUTOMATIC

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATION,

AND AIR CONDITIONING

HYD HYDRANT

HW HOT WATER

GCO GRADE CLEANOUT

INSUL INSULATION

INV INVERT

KW KILOWATT

LAT LEAVING AIR

TEMPERATURE

LAV LAVATORY

LWT LEAVING WATER TEMPERATURE

MBH BTU PER HOUR (THOUSANDS)

MCF THOUSAND CUBIC

FEET

MH MANHOLE

NC

NOISE CRITERIA OR

NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP OR

DIFFERENCE

PE PNEUMATIC-ELECTRIC

PLBG PLUMBING

PRV

PRESSURE REDUCING VALVE

OR POWER ROOF VENTILATOR

PSIA POUNDS/SQ INCH ABSOLUTE

PSIG POUNDS/SQ INCH

GAUGE

PVC POLY VINYL CHLORIDE

RA RETURN AIR

RCP REINFORCED CONCRETE

PIPE

RD ROOF DRAIN

RECIRC RECIRCULATING

REG REGISTER

RET RETURN

RH RELATIVE HUMIDITY

RHT REHEAT

RHC REHEAT COIL

RHW RECIRCULATED HOT WATER

RM ROOM

RPM REVOLUTIONS PER MINUTE

RPZ

REDUCED ZONE

BACKFLOW PREVENTER

SA SUPPLY AIR

SAN SANITARY

SCFM CFM, STANDARD

CONDITIONS

SD SMOKE DAMPER

SP STATIC PRESSURE

SPECS SPECIFICATIONS

SUP SUPPLY

SQ SQUARE

STM STEAM

TD TEMPERATURE DIFFERENCE

TEMP TEMPERATURE

TONS TONS OF REFRIGERATION

T-STAT THERMOSTAT

TYP TYPICAL

UB UP-BLAST

UG UNDERGROUND

UH UNIT HEATER

UR URINAL

V SANITARY VENT

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY

DRIVE

VOL VOLUME

W SANITARY WASTE

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT

W/0 WITHOUT

WTR WATER

PLUMBING

ACID VENT BELOW GRADE

ACID VENT ABOVE GRADE

ACID WASTE BELOW GRADE

ACID WASTE ABOVE

GRADE

DEIONIZED WATER

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER (TEMP.

INDICATED)

DOMESTIC RECIRC. HOT WATER

HARD COLD WATER

OVERFLOW STORM DRAIN BELOW

GRADE

OVERFLOW STORM DRAIN ABOVE

GRADE

REVERSE OSMOSIS WATER

SANITARY VENT BELOW GRADE

SANITARY VENT ABOVE

GRADE

SANITARY WASTE

SANITARY SEWER

SOIL DRAINAGE TILE

SOFTENED COLD WATER

SOFTENED HOT WATER

TEMPERED WATER

STORM DRAIN BELOW GRADE

STORM DRAIN ABOVE GRADE

WELL WATER

EXISTING PLUMBING TO REMAIN

EXISTING PLUMBING TO

REMOVED

AV

AV

A W A W

DI

HARD

SDT

OSD

RO

V

V

SS

W

SOFT

SHW

TW

OSD

SD

SD

WW

MECHANICAL PIPING

BOILER FEED

CHILLED WATER SUPPLY

CHILLED WATER RETURN

COMPRESSED AIR (PSI

INDICATED)

CONDENSATE DRAIN

CONDENSER WATER

SUPPLY

CONDENSER WATER RETURN

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

FUEL OIL FILL

GLYCOL SUPPLY

GLYCOL RETURN

HEAT RECOVERY SUPPLY

HEAT RECOVERY RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

LABORATORY VACUUM

LABORATORY AIR

LIQUIFIED PETROLEUM GAS

NATURAL GAS (PSI INDICATED)

PLANT VACUUM

PUMPED CONDENSATE

RADIATION WATER SUPPLY

RADIATION WATER RETURN

REFRIGERANT LIQUID

BF

CWS

CW

R

10#A

CD

FOS

LV

GS

GR

HRS

HRR

HWR

HWS

LA

LPG

2#G

FOF

PV

PC

RADS

CS

CR

FOR

FOV

RADR

RL

REFRIGERANT SUCTION

REFRIGERANT HOT GAS BYPASS

REHEAT WATER SUPPLY

REHEAT WATER RETURN

REMOTE RADIATOR

SUPPLY

REMOTE RADIATOR RETURN

SECONDARY HEATING WATER

SUPPLY

SECONDARY HEATING WATER

RETURN

SNOW MELT SUPPLY

SNOW MELT RETURN

STEAM SUPPLY (PSI INDICATED)

STEAM RETURN (PSI INDICATED)

EXISTING PIPING TO REMAIN

RRS

RS

RHG

RHR

RHS

RRR

SHWS

SHWR

SMS

SMR

10#STM

10#R

EXISTING PIPING TO BE

REMOVED

PLUMBING /PIPING

ELBOW DOWN

PIPE CAP

ELBOW UP

TEE, OUTLET UP

TEE, OUTLET DOWN

CONNECTION, BOTTOM

CONNECTION, TOP

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLEXIBLE CONNECTION

PIPE ANCHOR

ALIGNMENT GUIDE

CHECK VALVE

SHUTOFF VALVE

PLUG VALVE

COMBINATION BALANCE VALVE

AND FLOW METER

STRAINER

STRAINER W/BLOWDOWN

CAP AND VALVE

PRESSURE REDUCING VALVE

(SETTING AS NOTED, PSI)

MECHANICAL SYMBOLS LEGEND

MEDICAL GAS

MEDICAL VACUUM

WASTE ANESTHETIC GAS DISPOSAL

CARBON DIOXIDE

OXYGEN

NITROGEN

NITROUS OXIDE

MEDICAL AIR

WAGD

CO2

O

N

MV

N2O

MA

CONTROLS

AQUA STAT TAMPERPROO

F

THERMOSTAT

HUMIDISTAT OR R.H. SENSOR

REFRIGERANT SENSOR

SMOKE DETECTOR

SPACE TEMPERATURE

SENSOR

STATIC PRESSURE

SENSOR

DUCTWORK

SUPPLY AIR

RETURN AIR

EXHAUST AIR

STANDARD BRANCH, NO

SPLITTER - SUPPLY FLOW TO

RIGHT - RETURN/EXHAUST FLOW

BELLMOUTH WITH BALANCING

DAMPER

FLEXIBLE DUCT

TURNING VANES

FLEXIBLE CONNECTION

MANUAL VOLUME DAMPER

MOTORIZED DAMPER

FIRE DAMPER & ACCESS

PANEL

SMOKE DAMPER &

ACCESS PANEL

COMBINATION FIRE/SMOKE

DAMPER & ACCESS PANEL

SUPPLY GRILLE OR REGISTER

T T

P P

ROOM

PRESSURE

MONITOR

H

R

SD

TS

SP

T THERMOSTAT

THERMOSTAT W/GUARDT

EXPANSION JOINT

AUTOMATIC CONTROL VALVE, 2-WAY

AUTOMATIC CONTROL VALVE, 3-WAY

AUTOMATIC AIR VENT

MANUAL AIR VENT

PRESSURE RELIEF/SAFETY

VALVES(SETTING AS NOTED, PSI)

DRAIN VALVE

BALL VALVE

BUTTERFLY VALVE

GLOBE ANGLE VALVE

0. S.& Y. VALVE

REDUCED PRESSURE ZONE

BACK FLOW PREVENTER

SOLENOID VALVE

FLOW LIMITING VALVE

DIAPHRAGM

GLOBE VALVE

REFRIGERANT SIGHT GLASS

GAS PRESSURE REGULATOR VALVE

BACKWATER VALVE

REFRIGERANT DRYER

FLOW DIRECTION

FLOW DIRECTION W/PITCH

DUPLEX STRAINER

PIPE UNION

PIPE FLANGE

PUMP

THERMOMETER

PRESSURE/TEMPERATURE TEST

PORT

STEAM TRAP (TYPE INDICATED)

FLOW MEASURING STATION

(FLOW INDICATED)

FLOW SWITCH

PRESSURE GAUGE W/PIGTAIL &

PETCOCK

PRESSURE SWITCH

SHOCK ABSORBER

ELBOW

FLOOR DRAIN

DRAIN ABOVE

FLOOR SINK

WALL HYDRANT

HOSE BIBB

TEE

WALL CLEANOUT

ROOF DRAIN

CATCH BASIN

MANHOLE

HB

RETURN DUCT UP, NEGATIVE

PRESSURE

SUPPLY DIFFUSER/REGISTER

BLANKOFF INDICATED

RETURN OR EXHAUST GRILLE

OR REGISTER

SUPPLY DUCT UP, POSITIVE

PRESSURE

EXHAUST DUCT UP, NEGATIVE

PRESSURE

RETURN GRILLE/REGISTER

EXHAUST GRILLE/REGISTER

LINEAR DIFFUSER

CONCENTRIC DUCT

TRANSITION

ECCENTRIC DUCT TRANSITION

RECTANGULAR-TO-ROUND

DUCT TRANSITION

VAV BOX

REHEAT COIL

VAV BOX W/REHEAT COIL

DUCT OFFSETS

DUCT CUTLINE

M

FD

VERTICALHORIZONTA

L

FD

SD

VERTICAL

VERTICALHORIZONTA

L

FSD FSD

RETURN DUCT DN, NEGATIVE

PRESSURE

SUPPLY DUCT DN, POSITIVE

PRESSURE

EXHAUST DUCT DN, NEGATIVE

PRESSURE

DROPRISE

ANNOTATION

(4)A-12"

GRILLE, REGISTER, &

DIFFUSER IDENTIFICATION

QUANTIT

Y

CFM

TYPE

SIZE

X X

X X

X X

X X

DETAIL NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

EQUIP DESIGNATION

EQUIP NUMBER

POINT OF CONNECTION, NEW TO EXISTING

POINT OF DISCONNECTION

FIRE PROTECTION

DFP

F FIRE PROTECTION

FIRE PROTECTION (DRY SYSTEM)

POST INDICATOR VALVE (PIV)

FIRE HYDRANT WITH SHUTOFF VALVE

RECESSED FIRE DEPT CABINET

SURFACE MOUNTED FIRE DEPT CABINET

FIRE PROTECTION RISER

UPRIGHT SPRINKLER HEAD W/GUARD

PENDANT SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

BUTTERFLY VALVE W/TAMPER SWITCH

DETECTOR CHECK W/BYPASS METER

GRADE FIRE DEPT CONNECTION

FLUSH FIRE DEPT CONNECTION

FIRE DEPT VALVE W/CAP AND CHAIN

O.S. & Y. VALVE W/TAMPER

SWITCH

DRY PIPE VALVE

PREACTION VALVE

GPM

AM

S

FS

PS

TS

FDVC

FDVC

FDV

TS

SD

HORIZONTA

L

GAS COCK VALVE

CLEANOUT

WH

GR GRILLE

VAV VARIABLE AIR

VOLUME

VTR VENT THROUGH ROOF

CARBON MONOXIDE SENSORCO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

C R e v it P ro je c ts

\V A

B u ild in g

P h a s e

M e c h a n ic a l ja s o n g o tt w a lt

.r v t

/3 /2

:2

:1

A M

MECHANICAL TITLE SHEET PREVENT LEGIONELLA,

PHASE III

MINNEAPOLIS

618-14-118

11/30/2022 JG/KP CH/DL618-14-118

1356-PP001

SHEET LIST LEGIONELLA 3

Sheet Number Sheet Name

1356-PP001 MECHANICAL TITLE SHEET

1356-PP002 MECHANICAL GENERAL NOTES

1356-PP003 MECHANICAL KEY NOTES

1356-PP100A BUILDING 70 - BASEMENT LEVEL - AREA A - DOMESTIC WATER PLAN

1356-PP100B BUILDING 70 - BASEMENT LEVEL - AREA B - DOMESTIC WATER PLAN

1356-PP100C BUILDING 70 - BASEMENT LEVEL - AREA C - DOMESTIC WATER PLAN

1356-PP100D BUILDING 70 - BASEMENT LEVEL - AREA D - DOMESTIC WATER PLAN

1356-PP100E BUILDING 70 - BASEMENT LEVEL - AREA E - DOMESTIC WATER DEMOLITION PLAN

1356-PP100F BUILDING 70 - BASEMENT LEVEL - AREA F - DOMESTIC WATER PLAN

1356-PP110A BUILDING 70 - FIRST LEVEL - AREA A - DOMESTIC WATER PLAN

1356-PP110B BUILDING 70 - FIRST LEVEL - AREA B - DOMESTIC WATER PLAN

1356-PP110C BUILDING 70 - FIRST LEVEL - AREA C - DOMESTIC WATER PLAN

1356-PP110D BUILDING 70 - FIRST LEVEL - AREA D - DOMESTIC WATER PLAN

1356-PP110E BUILDING 70 - FIRST LEVEL - AREA E - DOMESTIC WATER PLAN

1356-PP110F BUILDING 70 - FIRST LEVEL - AREA F - DOMESTIC WATER PLAN

1356-PP110G BUILDING 70 - FIRST LEVEL - AREA G - DOMESTIC WATER PLAN

1356-PP110H BUILDING 70 - FIRST LEVEL - AREA H - DOMESTIC WATER PLAN

1356-PP120A BUILDING 70 - SECOND LEVEL - AREA A - DOMESTIC WATER PLAN

1356-PP120B BUILDING 70 - SECOND LEVEL - AREA B - DOMESTIC WATER PLAN

1356-PP120C BUILDING 70 - SECOND LEVEL - AREA C - DOMESTIC WATER PLAN

1356-PP120D BUILDING 70 - SECOND LEVEL - AREA D - DOMESTIC WATER PLAN

1356-PP120E BUILDING 70 - SECOND LEVEL - AREA E - DOMESTIC WATER PLAN

1356-PP120F BUILDING 70 - SECOND LEVEL - AREA F - DOMESTIC WATER PLAN

1356-PP120G BUILDING 70 - SECOND LEVEL - AREA G - DOMESTIC WATER PLAN

1356-PP120H BUILDING 70 - SECOND LEVEL - AREA H - DOMESTIC WATER PLAN

1356-PP130A BUILDING 70 - THIRD LEVEL - AREA A - DOMESTIC WATER PLAN

1356-PP130B BUILDING 70 - THIRD LEVEL - AREA B - DOMESTIC WATER PLAN

1356-PP130C BUILDING 70 - THIRD LEVEL - AREA C - DOMESTIC WATER PLAN

1356-PP130D BUILDING 70 - THIRD LEVEL - AREA D - DOMESTIC WATER PLAN

1356-PP130E BUILDING 70 - THIRD LEVEL - AREA E - DOMESTIC WATER PLAN

1356-PP130F BUILDING 70 - THIRD LEVEL - AREA F - DOMESTIC WATER PLAN

1356-PP130G BUILDING 70 - THIRD LEVEL - AREA G - DOMESTIC WATER PLAN

1356-PP130H BUILDING 70 - THIRD LEVEL - AREA H - DOMESTIC WATER PLAN

1356-PP140A BUILDING 70 - FOURTH LEVEL - AREA A - DOMESTIC WATER PLAN

1356-PP140B BUILDING 70 - FOURTH LEVEL - AREA B - DOMESTIC WATER PLAN

1356-PP140C BUILDING 70 - FOURTH LEVEL - AREA C - DOMESTIC WATER PLAN

1356-PP140D BUILDING 70 - FOURTH LEVEL - AREA D - DOMESTIC WATER PLAN

1356-PP140E BUILDING 70 - FOURTH LEVEL - AREA E - DOMESTIC WATER PLAN

1356-PP140F BUILDING 70 - FOURTH LEVEL - AREA F - DOMESTIC WATER PLAN

1356-PP140G BUILDING 70 - FOURTH LEVEL - AREA G - DOMESTIC WATER PLAN

1356-PP140H BUILDING 70 - FOURTH LEVEL - AREA H - DOMESTIC WATER PLAN

1356-PP101.0 BASEMENT INTERSTITIAL - OVERALL - DOMESTIC WATER LOOP REPLACEMENT PLAN

1356-PP101.1 BASEMENT INTERSTITIAL - PHASE 1 - DOMESTIC WATER PLAN

1356-PP101.2 ALL LEVELS - PHASE 1 - ENLARGED RISER "G" COLD WATER REPLACEMENT PLANS

1356-PP102.1 BASEMENT INTERSTIAL - PHASE 2 - DOMESTIC WATER PLAN

1356-PP102.2 ALL LEVELS - PHASE 2 - ENLARGED SHAFT 4 COLD WATER REPLACEMENT PLANS

1356-PP103.1 BASEMENT INTERSTITIAL - PHASE 3 - DOMESTIC WATER PLAN

1356-MP104.1 BASEMENT INTERSTITIAL - PHASE 4 - HYDRONIC PIPING PLAN

1356-PP104.1 BASEMENT INTERSTITIAL - PHASE 4 - DOMESTIC WATER PLAN

1356-PP104.2 BASEMENT INTERSTITIAL - PHASE 4.4 - DOMESTIC WATER PLAN

1356-PP105.1 BASEMENT INTERSTITIAL - PHASE 5 - DOMESTIC WATER PLAN

1356-PP105.2 BASEMENT - PHASE 5 - ENLARGED SHAFT 3 COLD WATER REPLACEMENT PLANS

1356-PP105.3 LEVELS 1-4 - PHASE 5 - ENLARGED SHAFT 3 COLD WATER REPLACEMENT PLANS

1356-PP106.1 BASEMENT INTERSTITIAL - PHASE 6 - DOMESTIC WATER PLAN

1356-PP106.2 ALL LEVELS - PHASE 6 - ENLARGED RISER "M" COLD WATER REPLACEMENT PLANS

1356-PP107.1 BASEMENT INTERSTITIAL - PHASE 7 - DOMESTIC WATER PLAN

1356-PP107.2 BASEMENT - PHASE 7 - ENLARGED SHAFT 7 COLD WATER REPLACEMENT PLANS

1356-PP107.3 LEVELS 1-4 - PHASE 7 - ENLARGED SHAFT 7 COLD WATER REPLACEMENT PLANS

1356-MP108.1 BASEMENT INTERSTITIAL - PHASE 8 - HYDRONIC DEMOLITION PIPING PLAN

1356-PP108.1 BASEMENT INTERSTITIAL - PHASE 8.1 - DOMESTIC WATER PLAN

1356-PP108.2 BASEMENT INTERSTITIAL - PHASE 8.3 - DOMESTIC WATER PLAN

1356-PP108.3 BASEMENT INTERSTITIAL - PHASES 8.3 AND 8.4 - DOMESTIC WATER PLAN

1356-PP108.4 BASEMENT - PHASE 8 - ENLARGED SHAFT 6 COLD WATER REPLACEMENT PLANS

1356-PP108.5 ALL LEVELS - PHASE 8 - ENLARGED SHAFT 6 COLD WATER REPLACEMENT PLANS

1356-PP108.6 BASEMENT INTERSTITIAL - PHASE 8 - DOMESTIC WATER PLAN

1356-PP500 PLUMBING DETAILS

1356-PP501 PLUMBING DETAILS

1356-PP600 PLUMBING SCHEDULES

41360DATE REG. NO.

I HEREBY CERTIFY THAT THIS PLAN,

SPECIFICATION OR REPORT WAS PREPARED BY ME

OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MINNESOTA.

JASON GOTTWALT, P.E.

11/30/2022

Revisions: Date:

A.

B.

C.

D.

E.

F.

FULL PLUMBING RISER OR LARGE BUILDING OUTAGES:

ANY DOMESTIC WATER OUTAGE NEEDED FOR REPLACEMENT OF MAIN

RISER VALVES, REFER TO DRAWINGS AND NOTES REQUIRING TO SHUT

DOWN AND DRAIN ENTIRE PLUMBING RISERS FOR A DURATION IN TIME.

CONTRACTOR SHALL SCHEDULE WEEKEND HOURS (MAXIMUM OF 12

HOUR TIME LIMIT) TO SHUT DOWN RISER / SYSTEM AND DRAIN FOR

INSTALLATION OF NEW VALVES. IF CONTRACTOR OPTS TO ALSO

PERFORM ADDITIONAL TASK (EXAMPLE - REPLACEMENT OF TAKE-OFF

VALVES) DURING THE SAME MAJOR OUTAGE TO AVOID ADDITIONAL

MINOR OUTAGES THAN IT WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO PROVIDE MULTIPLE PLUMBING CREWS SO THAT

DURATION OF TIME REQUESTED IS NOT EXTENDED FOR ADDITIONAL

WORK BEING PERFORMED SIMULTANEOUSLY. PROVIDE VA WITH CLEAR

PLAN SHOWING WHERE EACH CREW WILL BE LOCATED DURING EACH

TIME SLOT OF OUTAGE, AND DEFINE HOW CREWS MAY BE PERFORMING

MULTIPLE TASKS OR BEING USED FOR EMERGENCY SUPPORT OF

OTHER CREWS.

PROVIDE THE VA WITH A MINIMUM OF THIRTY(30) DAYS ADVANCE

NOTICE OF EACH MAJOR RISER OUTAGE TO COORDINATE IMPACT ON

STAFF AND TEMPORARY MEASURES REQUIRED FOR PATIENT CARE.

VA FACILITIES SHALL PROVIDE TEMPORARY MEANS FOR CHEMICAL

HAND WASHING SHALL BE PROVIDED AT ALL STAFF AND PATIENT

LAVATORIES AND HAND WASHING SINKS.

VA FACILITIES WILL NEED TO COORDINATE AND REVIEW NEEDS FOR

EACH IMPACTED DEPARTMENT. SPECIAL CONSIDERATION SHOULD BE

GIVEN FOR THE FOLLOWING AREAS THAT MAY REQUIRE TEMPORARY

SERVICES OR BOTTLED WATER FOR USE DURING OUTAGE;

I. SPS DEPARTMENT

II. EMERGENCY DEPARTMENT

III. SURGERY

IV. ALL INPATIENT CARE AREAS

V. FOOD SERVICE

VI. LAUNDRY

VII. PHARMACY

CONTRACTOR WILL BE RESPONSIBLE TO FLUSH ALL LINES THAT WERE

DRAINED TO A DRY CONDITION. RISER OUTAGES CAN LIMIT AMOUNT OF

DRAINING BY ISOLATING EACH FLOOR (IF TAKE-OFF VALVES ARE NOT

BEING REPLACED DURING SAME OUTAGE, OTHERWISE THOSE AREA

WILL REQUIRE FLUSHING ALSO). FLUSH ALL AFFECTED LINES FOR A

MINIMUM OF 30 MINUTES PRIOR TO OPENING TO REMAINDER OF

SYSTEM. COORDINATE ANY WATER QUALITY READINGS WITH

INFECTION CONTROL STAFF IF REQUESTED UPON COMPLETION OF

FLUSHING AFFECTED SYSTEMS.

LARGE SCALE OUTAGES (MORE THAN 8 FIXTURES):

ANY OUTAGES REQUIRED FOR AN ENTIRE DEPARTMENT, OR LARGER

GROUPS OF ROOMS.

CONTRACTOR SHALL SCHEDULE WEEKEND HOURS OR PREMIUM

OVERTIME AFTER NORMAL BUSINESS HOURS (MAXIMUM OF 24 HOUR

TIME LIMIT) TO SHUT DOWN AFFECTED AREA AND DRAIN FOR

INSTALLATION OF NEW VALVES OR PLUMBING FIXTURE MODIFICATIONS.

COORDINATE OUTAGE WITH VA REPRESENTATIVE A MINIMUM OF

FIFTEEN(15) DAYS IN ADVANCE OF OUTAGE.

VA SHALL PROVIDE TEMPORARY HAND WASHING ALTERNATIVE FOR

AFFECTED AREAS AND POST SIGNAGE TO NOT USE FIXTURES DURING

POSTED HOURS OF OUTAGE.

OUTAGES SHORTER THAN 4 HOURS IN DURATION MIGHT BE ABLE TO BE

PERFORMED DURING NORMAL HOURS WITH APPROVAL BY VA

REPREESENTATIVE. BUT CONTRACTOR SHOULD ASSUME OVERTIME

REQUIREMENTS AND COORDINATION OF INFECTION CONTROL

MEASURES FOR ALL WORK THAT OCCURS DIRECTLY WITHIN PATIENT

CARE AREAS OF FACILITY.

CONTRACTOR WILL BE RESPONSIBLE TO FLUSH ALL LINES THAT WERE

DRAINED TO A CLEAN CONDITION. FLUSH ALL AFFECTED LINES FOR A

MINIMUM OF 30 MINUTES PRIOR TO OPENING TO REMAINDER OF

SYSTEM. COORDINATE ANY WATER QUALITY READINGS WITH

INFECTION CONTROL STAFF IF REQUESTED UPON COMPLETION OF

FLUSHING AFFECTED SYSTEMS.

SMALL SCALE OUTAGES (LESS THAN 8 FIXTURES):

SMALLER AREAS WITHOUT CRITICAL NEED FOR WATER CAN BE

PERFORMED DURING NORMAL BUSINESS HOURS IF COORDINATED

WITH VA A MINIMUM OF TWO (2) WEEKS IN ADVANCE.

VA MAY ONLY BE ABLE TO PROVIDE ACCESS TO 1 OR 2 SPACES AT A

TIME (EXAMPLE - OCCUPIED INPATIENT ROOM DEPARTMENTS).

CONTRACTOR WILL NEED TO ASSUME MULTIPLE VISITS THROUGH A

POTENTIALLY LONG TIME FRAME IN ORDER TO GAIN ACCESS TO ALL

SPACES WHEN OPEN/UNOCCUPIED. CONTRACTOR TO PLAN FOR

SEVERAL RETURN VISITS TO EACH DEPARTMENT TO COORDINATE

AROUND THEIR SCHEDULES.

CONTRACTOR SHOULD ASSUME OVERTIME REQUIREMENTS AND

COORDINATION OF INFECTION CONTROL MEASURES FOR ALL WORK

THAT OCCURS DIRECTLY WITHIN PATIENT CARE AREAS OF FACILITY.

CONTRACTOR WILL BE RESPONSIBLE TO FLUSH ALL LINES THAT WERE

DRAINED TO A DRY CONDITION. FLUSH ALL AFFECTED LINES FOR A

MINIMUM OF 30 MINUTES PRIOR TO OPENING TO REMAINDER OF

SYSTEM. COORDINATE ANY WATER QUALITY READINGS WITH

INFECTION CONTROL STAFF IF REQUESTED UPON COMPLETION OF

FLUSHING AFFECTED SYSTEMS.

SINGLE FIXTURE OUTAGES (1 FIXTURE - APPLY TO MAJORITY OF CASES)

COORDINATE ACCESS TO INDIVIDUAL ROOMS AND/OR FIXTURES WITH

DEPARTMENT MANAGERS AND VA COTR FOR THIS PROJECT.

IF STOP VALVES ON WALL SUFFUCUENTLY HOLD WATER, THEN NO

NEED TO PROVIDE ANY OUTAGE SIGNAGE OR COORDINATION SINCE

PLUMBER WILL BE ACTIVELY WORKING ON FIXTURE OUT OF SERVICE.

UPON COMPLETION OF MIXING VALVE ASSEMBLY INSTALLATION,

PLUMBER SHALL TEST OUTPUT OF VALVE AND ASJUST AS REQUIRED.

RECORD ALL TESTING RESULTS WITHIN AN OVERALL PROJECT LOG FILE

TO TURN OVER TO OWNER ON PROJECT COMPLETION.

FLUSH ALL 3/8" TUBING INSTALLED FOR MINIMUM OF 5 MINUTES, IF

FIXTURE HAS ANY AERATORS OR STRAINERS, CLEAN THOSE OUT AT

END OF FLUSHING SEQUENCE.

CLEAN SPACE TO ORIGINAL CONDITION ON COMPLETION.

CONTRACTOR OUTAGE RESPONSIBILITIES: INCLUDING, BUT NOT

LIMITED TO, THE FOLLOWING;

PROVIDE ADEQUATE NOTIFICATION AND SCHEDULING OF ALL

OUTAGES. REFER TO OUTAGE SIZE NOTES FOR ADVANCE

NOTIFICATION TIME REQUIRED FOR EACH TYPE OF OUTAGE.

PROVIDE A DETAILED TIME TABLE OF ENTIRE OUTAGE DURATION.

INCLUDE WHERE EACH PLUMBING CREW WILL BE LOCATED DURING

EACH HOUR OF OUTAGE.

PROVIDE A SAFETY PLAN FOR VA REVIEW WITH EMERGENCY

CONTINGENCY PLANNING FOR SCENARIOS THAT MAY OCCUR.

PROVIDE INFECTION CONTROL PLANNING PER INFECTION CONTROL

RISK ASSESSMENT (ICRA) REQUIREMENTS FOR EACH SPECIFIC AREA.

SETTING UP PRE-OUTAGE MEETINGS (WHEN REQUESTED) TO REVIEW

SCOPE OF OUTAGE WITH VA REPRESENTATIVES AND AFFECTED STAFF.

CONTRACTOR SHALL RECORD MEETING MINUTES AND DISTRIBUTE

ACCORDINGLY.

CONTRACTOR MAY BE REQUESTED TO PRODUCE COLOR DRAWINGS

TO REPRESENT AREAS AFFECTED BY EACH OUTAGE THAT VA MAY

UTILIZE FOR DISTRIBUTION TO DEPARTMENTS DURING COORDINATION

AND NOTIFICATION PHASE.

VA FACILITIES REPRESENTATIVE OUTAGE RESPONSIBILITIES:

INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING;

NOTIFICATION OF ALL AFFECTED DEPARTMENTS OF STAFF AND

PLANNING FOR TEMPORARY WATER FOR PATIENT CARE OR

EQUIPMENT.

GENERATING INFECTION CONTROL RISK ASSESSMENT (ICRA) FORMS

FOR EACH SPECIFIC AREA AFFECTED WITHIN OUTAGE. SUBMIT TO

CONTRACTOR IN TIMELY FASHION TO PROVIDE THE OPPORTUNITY TO

REACT TO ANY SPECIAL REQUIREMENTS OR CONSIDERATIONS.

ASSISTING CONTRACTOR IN LOCATING ISOLATION VALVES, AND

SYSTEM DRAINS, REQUIRED FOR ISOLATION OF PIPING TO BE MODIFIED

DURING OUTAGE.

HAVING AT LEAST ONE(1) FACILITY REPRESENTATIVE ON SITE TO

ASSIST CONTRACTOR WITH LOCATING VALVES AND/OR

TROUBLESHOOTING ISSUES THAT MAY ARISE DURING OUTAGE.

SMALL OUTAGES VA / CONTRACTORMAJOR OUTAGES LARGE OUTAGES

A.

B.

C.

D.

E.

F.

A.

B.

C.

D.

E.

F.

G.

H.

I.

A.

B.

C.

D.

E.

F.

A.

B.

C.

D.

A.

B.

C.

D.

E.

F.

G.

H.

FOR ALL AREAS THAT THE INFECTION CONTROL REPRESENTATIVE

DEEMS AS HIGH RISK WITHIN THE CORRESPONDING INFECTION

CONTROL RISK ASSESSMENT (ICRA) THE FOLLOWING MINIMUM

REQUIREMENTS SHALL BE MAINTAINED WHILE PERFORMING WORK:

PROVIDE AIRLOCK VESTIBULE INTO CONSTRUCTION AREA. SECOND

DOOR MAY BE THE EXISTING ACCESS INTO SPACE WITH AIRLOCK

VESTIBULE CONSTRUCTED OF A POLY BARRIER WITH ZIPPER ENTRY.

PROVIDE SIGNAGE ON DOOR TO RESTRICT ACCESS TO ONLY THOSE

INVOLVED WITH CONSTRUCTION ACTIVITIES OR INSPECTIONS.

POSITION PORTABLE HEPA FILTERS BOTH INSIDE CONSTRUCTION AREA,

AND JUST OUTSIDE OF AIRLOCK VESTIBULE ENTRY POINT.

PROVIDE VISIBLE ROOM PRESSURE INDICATOR AT CONSTRUCTION

ENTRY POINT. CONTRACTOR WILL BE RESPONSIBLE TO KEEP A FULL

RECORD OF DAILY PRESSURIZATION LEVELS AND CONFIRM AREA IS

ALWAYS ABOVE -0.01" WC NEGATIVE PRESSURIZATION AT ALL TIMES.

REMOVE ANY SENSITIVE EQUIPMENT FROM WITHIN CONSTRUCTION

BOUNDARIES. IF EQUIPMENT CANNOT BE TEMPORARILY RELOCATED,

THEN CONTRACTOR SHALL TIGHTLY SEAL EACH PIECE TO GUARANTEE

PROTECTION AGAINST DUST GENERATED IN SPACE.

COORDINATE ACCESS TO/FROM CONSTRUCTION SITE WITH

DEPARTMENT MANAGER AND PERFORM ANY TRANSPORT OF

DEMOLISHED MATERIALS DURING PREMIUM HOURS IF NECESSARY.

CONFIRM ACCEPTABLE LIMITS OF NOISE WITH DEPARTMENT MANAGER

AND ANY APPLICABLE TIME SCHEDULES WHERE NO NOISE, OR LIMITED

WORK, COULD BE ENFORCED.

CLEAN SPACE AFTER EACH WORK SHIFT. UPON COMPLETION OF WORK

ALL TEMPORARY BARRIERS AND AIRLOCKS SHALL BE COMPLETELY

REMOVED AND CLEANED TO ORIGINAL CONDITION. COORDINATE

TERMINAL CLEANING WITH VA REPRESENTATIVES PRIOR TO TURNING

BACK OVER TO HOSPITAL USE.

FOR ALL AREAS THAT THE INFECTION CONTROL REPRESENTATIVE

DEEMS AS MODERATE RISK WITHIN THE CORRESPONDING INFECTION

CONTROL RISK ASSESSMENT (ICRA) THE FOLLOWING MINIMUM

REQUIREMENTS SHALL BE MAINTAINED WHILE PERFORMING WORK:

CLOSE DOOR TO SPACE AND SEAL PERIMETER WITH TAPE, TEMPORARY

GASKETING, OR POLY SHEETING AS REQUIRED TO HOLD A TIGHT SEAL.

IF THE PLUMBING FIXTURE(S) BEING MODIFIED IS IN AN OPEN AREA

WHERE STAFF OR PATIENTS ARE LOCATED THEN CONTRACTOR WILL

PROVIDE A POLY BARRIER AROUND ENTIRE WORK ZONE WITH HEPA

FILTERS ON BOTH INSIDE, AND OUTSIDE, OF ENCLOSURE.

PROVIDE SIGNAGE ON DOOR TO RESTRICT ACCESS TO ONLY THOSE

INVOLVED WITH CONSTRUCTION ACTIVITIES OR INSPECTIONS.

UTILIZE A MOBILE HEPA FILTER(S) TO BE WITHIN 15' OF ANY AREA

WHERE WALL ANCHORS ARE BEING DRILLED, OR OTHER DUST

FORMING ACTIVITIES WILL OCCUR, TO MANAGE DUST AND

CONSTRUCTION DEBRIS WITHIN SPACE.

COVER ALL SENSITIVE EQUIPMENT WITHIN ROOM WITH POLY SHEETING

TO PROTECT FOR DUST AND DEBRIS. OR ALTERNATELY A TEMPORARY

POLY BARRIER, WITH ENTRY ZIPPER, CAN BE INSTALLED DIRECTLY

AROUND THE AREA(S) REQUIRING MODIFICATION.

UPON COMPLETION OF WORK REMOVE ALL POLY BARRIERS, COVERS,

TAPE OR GASKETING, AND MATERIALS USED DURING CONSTRUCTION.

CLEAN SPACE TO ORIGINAL CONDITION PRIOR TO TURNING OVER TO VA

STAFF FOR USE AND/OR FINAL TERMINAL CLEANING.

FOR ALL AREAS THAT THE INFECTION CONTROL REPRESENTATIVE

DEEMS AS LOW RISK WITHIN THE CORRESPONDING INFECTION

CONTROL RISK ASSESSMENT (ICRA) THE FOLLOWING MINIMUM

REQUIREMENTS SHALL BE MAINTAINED WHILE PERFORMING WORK:

KEEP DOOR CLOSED TO ROOM OR SPACE WHENEVER WORK IS BEING

PERFORMED. NO TAPE OR SEALING OF DOOR PERIMETER WILL BE

REQUIRED.

PROVIDE SIGNAGE ON DOOR TO RESTRICT ACCESS TO ONLY THOSE

INVOLVED WITH CONSTRICTION ACTIVITIES OR INSPECTIONS.

UTILIZE A MOBILE HEPA FILTER TO BE WITHIN 15' OF ANY AREA WHERE

WALL ANCHORS ARE BEING DRILLED, OR OTHER DUST FORMING

ACTIVITIES WILL OCCUR, TO MANAGE DUST AND CONSTRUCTION

DEBRIS WITHIN SPACE.

FULLY CLEAN AREA UPON COMPLETION OF WORK.

ICRA - LOW RISKICRA - HIGH RISK ICRA - MODERATE

A.

B.

C.

D.

E.

F.

A.

B.

C.

D.

ULTIMATELY THE FINAL DETERMIONATION OF ALL RISK WILL BE

DECIDED BY THE INFECTION CONTROL REPRESENTATIVE FOR VA,

AND/OR THE COTR FOR THIUS PROJECT. BIDS SHALL FOLLOW

DIRECTION GIVEN BELOW THROUGHOUT THESE DRAWINGS.

REFER TO 'KEY NOTES - ICRA RATINGS OF SPACES' FOUND IN LOWER

LEFT HAND CORNER OF DRAWING 1356-PP003 WHICH WILL DEFINE

EACH SPECIFIC FIXTURE MODIFICATION KEY NOTE WITH ONE OF THE

THREE RISK LEVELS DEFINED WITHIN THIS DRAWING PACKAGE.

CONSTRUCTION PROCEDURES TO BE FOLLOWED FOR ALL THREE RISK

LEVELS ARE DEFINED ON THIS DRAWING 1356-PP002.

IN ADDITION AN 'INFECTION CONTROL RISK ASSESSMENT' (ICRA) FORM

HAS BEEN PROVIDED FOR CONTRACOR REFERENCE ON DRAWING 1356-

GC001. IT WILL BE THE CONTRACTOR'S RESPONSIBLITY TO FILL OUT

THESE FORMS PRIOR TO WORK IN ANY AREA TO CONFIRM RISK

ASSESSMENT ASSIGNED WITHIN THESE DOCUMENTS IS APPROPRIATE.

FLOOR PLANS LAYOUTS OF BASEMENT THROUGH FOURTH LEVEL HAVE

BEEN PROVIDED ON DRAWING 1356-GC100, 1356-GC110, 1356-GC120,

1356-GC130, AND 1356-GC140 TO SHOW WHERE EACH DEPARTMENT IN

THIS MEDICAL FACILITY ARE LOCATED, ALONG WITH APPROXIMATE

BOUNDARIES OF THOSE FUNCTIONS. CONTRACOTR MAY USE THESE

DRAWINGS FOR REFERENCE WHILE PLANNING FOR SCHEDULED

ACCESS TO AREAS AND/OR ROOMS WITHIN THOSE DEPERATRMENT TO

COMPLETE SCOPE OF WORK INDICATED ON DRAWINGS.

CONTRACTOR SHALL ALSO USE THESE REFERENCES WILL SHEDULING

RISER OUTAGES THAT OCCUR DURING THE PHASED REPLACEMENT OF

8" DOMESTIC WATER PIPING LOOP AND ASSOCIATED TAKE-OFF PIPIJNG

TO MAJOR PLUMBING RISERS. REFER TO NOTES ON THOSE PHASED

DRAWINGS ABOUT PROVISIONS FOR TEMPORARY SINKS AND/OR

CONNECTIONS TO DEPARTMENTS TO ALLOW FOR CONTINUATION OF

WATER SERVICE TO CRITICAL AREAS DURING THOSE WEEKEND

PLUMBING RISER OUTAGES.

RISK IDENTIFICATION

A.

B.

C.

D.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

C R e v it P ro je c ts

\V A

B u ild in g

P h a s e

M e c h a n ic a l ja s o n g o tt w a lt

.r v t

/3 /2

:2

:0

A M

MECHANICAL GENERAL NOTES PREVENT LEGIONELLA,

PHASE III

MINNEAPOLIS

618-14-118

11/30/2022 JG/KP CH/DL618-14-118

1356-PP002

41360DATE REG. NO.

I HEREBY CERTIFY THAT THIS PLAN,

SPECIFICATION OR REPORT WAS PREPARED BY ME

OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MINNESOTA.

JASON GOTTWALT, P.E.

61 CLOSE MAIN LOOP VALVES, ON INBOARD SIDE OF RISER TAKE-OFF, AS

REQUIRED TO MINIMIZE WATER OUTAGE IN SYSTEM DURING

INSTALLATION OF HOT/RECIRC LOOP SPLITTING VALVES, AND

CORRESPONDING MID SECTION DRAINS.

IF INBOARD VALVES NOTED IN KEY NOTE #61 DO NOT SUFFICIENTLY

HOLD, THAN CONTRACTOR TO WORK CLOSELY WITH VA

REPRESENTATIVE TO CLOSE OUTBOARD SIDE VALVES AND

COORDINATE APPROPRIATE SCHEDULE FOR OUTAGE TO RISER #1,

LAUNDRY, WAREHOUSE, AND OTHER IMPACTED BASEMENT AREAS.

ALL WORK TO BE PERFORMED DURING OVERTIME OR WEEKEND

HOURS TO LIMIT IMPACT ON FACILITY. REFER TO NOTES ON THESE

DRAWING ASSOCIATED TO 'MAJOR OUTAGES' FOR PLANNING

PURPOSES.

IF INBOARD VALVES NOTED IN KEY NOTE #61 DO NOT SUFFICIENTLY

HOLD, THAN CONTRACTOR TO WORK CLOSELY WITH VA

REPRESENTATIVE TO CLOSE OUTBOARD SIDE VALVES AND

COORDINATE APPROPRIATE SCHEDULE FOR OUTAGE TO PORTION OF

BASEMENT LEVEL AND ENTIRE RISER #4 AND RISER #7. ALL WORK TO

BE PERFORMED DURING OVERTIME OR WEEKEND HOURS TO LIMIT

IMPACT ON FACILITY. REFER TO NOTES ON THESE DRAWING

ASSOCIATED TO 'MAJOR OUTAGES' FOR PLANNING PURPOSES. REFER

TO TWO ALTERNATE METHODS OF VALVE REPLACEMENT IN KEY NOTES

BELOW WHICH MAY BE DETERMINED BY AMOUNT OF ACTUAL LEAKAGE

WITNESSED.

PRIOR TO DEMOLITION OF EXISTING VALVES, INSTALL 2" DRAIN INTO

COLD WATER MAIN, 1-1/4" DRAIN IN HOT WATER, AND 3/4" DRAIN IN

RECIRC PIPING BETWEEN RISER ISOLATION VALVES AND VERIFY AN

ACCEPTABLE LEAKAGE WITHIN ISOLATED SECTION OF PIPING LOOP

MAIN BETWEEN EXISTING GATE VALVES. REVIEW LEAKAGE RATE WITH

ENGINEER OF RECORD AND VA PLUMBING SHOP FOR FINAL APPROVAL

OF ACCEPTABLE RISK PRIOR TO VALVE REPLACEMENT INDICATED.

THE INDICATED 8" COLD WATER ISOLATION GATE VALVE TO BE

LABELED AS LOOP SPLIT DEVICE. HOWEVER, THE CONTRACTOR SHALL

LEAVE THIS VALVE OPEN IN A LOOP ARRANGEMENT FOR COLD WATER

SYSTEM (NOT CLOSING IT OFF LIKE HOT/RECIRC LOOP SPLIT).

INSTALL, OR REPLACE, 4" HOT WATER ISOLATION VALVE WITH A TRIPLE

OFFSET HIGH PERFORMANCE BUTTERFLY VALVE. UTILIZE ONE OF THE

TWO METHODS DESCRIBED BELOW.

INSTALL, OR REPLACE, 2-1/2" CIRCULATING WATER ISOLATION VALVE

USING A FULL PORT BALL VALVE.

PROVIDE FULL SIZED 2-1/2" CROSSOVER CIRCULATION PIPE AT END OF

SPLIT LOOP THAT WAS CREATED WITH NEW VALVES. INSTALL A 2"

CIRCUIT SETTER VALVE WITH ISOLATION ON EITHER SIDE FOR SERVICE

AND CHECK VALVE TO PREVENT BACKFLOW CONDITION, REFER TO

DRAWING DETAILS. COORDINATE FINAL BALANCE WITH ENGINEER OF

RECORD, ASSUME THAT BALANCE WILL REQUIRE ADJUSTMENT UP TO

FOUR(4) TIMES DURING PROCESS OF PROJECT PHASING.

WORK SCOPE ABOVE WILL DRAMATICALLY IMPACT EXISTING BALANCE

OF RECIRCULATION SYSTEM THROUGHOUT BUILDING 70. PROJECT

BIDS SHALL INCLUDE A BALANCING CONTRACTOR TO PERFORM THE

FULL SYSTEM REBALANCING (MULTIPLE TIMES) FOR THE HOT WATER

CIRCULATION SYSTEM DURING THESE KEY MILESTONE EVENTS

DESCRIBED BELOW.

• INITIAL BALANCE DATA: PRIOR TO STARTING ANY SYSTEM

MODIFICATION BALANCING CONTRACTOR SHALL OBTAIN OVERALL

FLOW READINGS, PUMP INLET/OUT PRESSURE DIFFERENTIAL

(BOTH LOCATIONS), AND INITIAL TROUBLESHOOTING OF EXISTING

TEMPERATURE SENSORS READING COLD (LESS THAN 124

DEGREES). SUBMIT INITIAL REPORT TO ENGINEER-OF-RECORD.

• NOTE THAT ACTUAL CLOSURE OF VALVES INSTALLED ABOVE TO

SPLIT HOT/RECIRC LOOPS WILL NOT OCCUR UNTIL AFTER FINAL

PHASE 8 OF COLD WATER LOOP REPLACEMENT IS COMPLETE.

HOWEVER, AFTER EACH PHASE INVOLVING RISER PIPING

REPLACEMENT THE BALANCING OF RECIRC SYSTEMS SHALL BE

RECHECKED AND CONFIRMED BY USING TEMPERATURE SENSORS

FOR EACH CIRCUIT SETTER. INTENT WOULD BE FOR PLUMBING

CONTRACTOR TO HAVE ALL CIRCUIT SETTER REPLACEMENT FOR

THAT RISER (BBI 3001) REPLACED PRIOR, OR DURING, THE PHASE

OUTAGE THAT DISCONNECTS AND RECONNECTS THAT PIPING AS

SHOWN IN THE PHASING DRAWINGS FOR COLD LOOP

REPLACEMENT.

1. PHASES 1 THROUGH 8 EACH REQUIRING BALANCING/REPORTS.

2. CHECKING OF ADJACENT RISERS TO VERIFY NO NEGATIVE

IMPACT TO THEIR PREVIOUS RECIRC BALANCE.

• AFTER ALL EIGHT(8) PHASES OF COLD WATER LOOP, AND RISER,

REPLACEMENTS ARE COMPLETED, THEN CONTRACTOR SHALL

PHYSICALLY CLOSE VALVES INSTALLED ABOVE TO SPLIT LOOPS

INTO NORTH/SOUTH HALVES OF BUILDING 70. BALANCING

CONTRACTOR SHALL THEN PERFORM A COMPREHENSIVE FINAL

BALANCE OF ENTIRE BUILDING AND SUBMIT RECIRCULATION FLOW

VALUES FOR ALL CIRCUIT SETTERS.

21 VERIFY NETWORK ADDRESS OF ALL PREVIOUSLY INSTALLED

TEMPERATURE SENSORS THROUGHOUT BUILDING. TESTING METHOD

SHALL SEND TEST SIGNAL AT EACH SENSOR WIRE AND VERIFY IT IS

APPROPRIATELY AND ACCURATELY LABELED AND LOCATED ON

BUILDING AUTOMATION COMPUTER. CONTROLS CONTRACTOR TO

KEEP AN ACCURATE LOG OF ALL SENSORS AND GUARANTEE ALL

ADDRESSES ARE CORRECT EVEN IF MISTAKES ARE FOUND AFTER

STANDARD 1-YEAR CONTRACTOR WARRANTY CYCLE. REFER TO TABLE

ON DRAWING 1356-PP501 FOR COMPLETE LIST OF EXISTING

TEMPERATURE SENSORS.

IN ADDITION TO ABOVE, CONTROLS CONTRACTOR SHALL ALSO

PROVIDE TREND LOGGING OF ALL SENSORS THROUGHOUT PROJECT

TO RECORD DEVIATIONS AND IMPACT OF PROJECT MODIFICATIONS.

RECORDS SHALL BE KEPT AND PROVIDED TO ENGINEER OR VA

REPRESENTATIVE UPON REQUEST. INCLUDE COMPACT DISC WITH

DIGITAL FILES OF ALL TREND LOGS RECORDED DURING

CONSTRUCTION TO TURN IN WITH PROJECT CLOSE-OUT DOCUMENTS.

THIS PORTION OF WORK ASSOCIATED WITH TREND LOGGING SHALL BE

PERFORMED UNDER BASE BID CONTRACT.

BBI 4001 (BASE BID)

GENERAL DESCRIPTION: SPLIT BASEMENT LEVEL HOT AND

RECIRCULATION DOMESTIC WATER LOOPS INTO TWO HALVES TO

ELIMINATE POTENTIAL FOR STAGNANT SECTIONS OF PIPING WITH

LIMITED FLOW DUE TO EQUALIZED PRESSURE IN LOOP.

UNDER BASE BID, PERFORM THE FOLLOWING;

BBI 2001

REFER TO DRAWINGS 1356-PP101.0 THROUGH 1356-PP108.6 (22

DRAWING IN TOTAL) FOR COMPLETION OF PHASED REPLACEMENT OF

GALVANIZED PIPING AND SYSTEM COMPONENTS / EQUIPMENT.

BBI 6001 (BASE BID)

GENERAL DESCRIPTION: VERIFY NETWORK ADDRESSES OF ALL

PREVIOUSLY INSTALLED TEMPERATURE SENSORS.

UNDER ACCEPTANCE OF THIS ALTERNATE, PERFORM THE FOLLOWING;

31 REPLACE EXISTING 1/2" BALANCING VALVE WITH NEW CIRCUIT SETTER,

CHECK VALVE, AND BALL VALVES ON EITHER END TO ISOLATE ENTIRE

ASSEMBLY FOR SERVICE, REFER TO DETAILS WITHIN THIS DRAWING

PACKAGE. CONTRACTOR WILL NEED TO TEMPORARILY ISOLATE

CIRCULATING WATER TO LARGE AREA OF BUILDING (if possible) OR

COORDINATE OUTAGE. IF OUTAGE IS REQUIRED THEN REFER TO

NOTES AND GUIDELINES IDENTIFIED WITHIN THIS DRAWING PACKAGE

FOR COORDINATION WITH VA REPRESENTATIVE. REINSULATE AND

REPLACE ALL DAMAGED OR MISSING INSULATION AFTER COMPLETION

OF WORK. TAG CIRCUIT SETTER ASSEMBLY WITH NUMBER

DESIGNATED BY VA FACILITIES BY PROVIDING LAMINATE SIGNAGE PER

SPECIFICATION REQUIREMENTS. BALANCE EACH ASSEMBLY TO

APPROXIMATELY 1 GPM UNLESS SPECIFICALLY NOTED OTHERWISE.

RELOCATE EXISTING DDC TEMPERATURE SENSOR IF REQUIRED.

SAME AS KEY NOTE #31 EXCEPT FOR A 3/4" SIZE ASSEMBLY. REFER TO

DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.

SAME AS KEY NOTE #31 EXCEPT FOR A 1" SIZE ASSEMBLY. REFER TO

DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.

SAME AS KEY NOTE #31 EXCEPT FOR A 1-1/4" SIZE ASSEMBLY. REFER

TO DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.

SAME AS KEY NOTE #31 EXCEPT FOR A 1-1/2" SIZE ASSEMBLY. REFER

TO DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.

SAME AS KEY NOTE #31 EXCEPT FOR A 2" SIZE ASSEMBLY. REFER TO

DRAWINGS, OR SCHEDULE, FOR BALANCING FLOW RATE.

BBI 3001 (BASE BID)

GENERAL DESCRIPTION: REPLACEMENT OF ALL EXISTING CIRCUIT

SETTER BALANCING VALVES WITH NEW ASSEMBLIES INCLUDING

CHECK VALVE AND ISOLATION VALVES FOR SERVICING.

UNDER BASE BID, PERFORM THE FOLLOWING;

41 THIS KEY NOTE IS FOR CONTRACTOR REFERENCE ONLY. VALVES ARE

HIGHLIGHTED FOR REFERENCE ONLY IN PLANNING OUTAGES TO

AREAS OF EACH FLOOR IF REQUIRED FOR PLUMBING MODIFICATIONS

INDICATED WITHIN THESE DRAWINGS. CONTRACTOR WILL BE

RESPONSIBLE TO VERIFY CONDITIONS OF EXISTING VALVES AND

PROVIDE VA FACILITIES PROPER NOTIFICATION OF OUTAGE PER

REQUIREMENTS ON DRAWING 1356-PP002.

ANY DISCREPANCIES OF VALVE SIZES, OR LOCATIONS, INDICATED

SHALL BE IDENTIFIED ON FINAL AS-BUILT DRAWING DOCUMENTATION

UTILIZED FOR UPDATING OF VA REFERENCE MATERIALS AND INCLUDE

WITHIN CLOSE OUT DOCUMENTS.

EXISTING VALVES

GENERAL DESCRIPTION: EXISTING TAKE-OFF VALVES AT EACH FLOOR

ARE PLANNED FOR REPLACEMENT UNDER A SEPARATE CONTRACT

THAT MAY, OR MAY NOT, BE COMPLETED IN TIME FOR THIS PROJECT.

EXISTING VALVES MAY LEAK AND COULD REQUIRE SOME

INTERMEDIATE MEASURES TO ISOLATE OR DRAIN DURING SYSTEM

MODIFICATIONS IDENTIFIED WITHIN THIS DRAWING PACKAGE.

IF CONTRACTOR FINDS TAKE-OFF VALVES THAT DO NOT ADEQUATELY

HOLD THEN VA FACILITIES WILL EITHER REPLACE OR REPAIR THOSE

VALVES. OTHERWISE ADDITIONAL COMPENSATION REQUESTS MAY BE

REVIEWED FOR CONTRACTOR PROPOSED ALTERNATIVES BASED ON

EACH ENCOUNTERED SCENARIO. (THIS NOTE DOES NOT APPLY TO

LARGE EXISTING BASE OF RISER VALVES THAT MAY HAVE LEAKAGE.

SEE NOTES FROM 'VALVE UPGRADES' PORTION OF THIS DRAWING FOR

SUGGESTED METHODS OF DEALING WITH THAT SITUATION WHILE

REPLACING PIPING MAINS, AND RISER VALVES, ON LOWER LEVEL.)

1D

BBI 1001-1011 (BASE BID)

GENERAL DESCRIPTION: INSTALLATION OF MIXING VALVES, OR

FIXTURES WITH BUILT-IN SCALD PROTECTION, AT EVERY PLUMBING

FIXTURE WITHIN BUILDING 70. NOTE THAT THIS ALTERNATE WILL BE

BROKEN DOWN INTO PRICING 'PER RISER'. CONTRACTOR TO SUBMIT

SEPARATED LINE ITEM COSTS FOR FIXTURES ASSOCIATED WITH EACH

NEW RECIRCULATION ZONE AND BROKEN APART AS FOLLOWS;

BBI 1001 - RISER 'M' AND ASSOCIATED BASEMENT AREAS

BBI 1002 - RISER #2 AND ASSOCIATED BASEMENT AREAS

BBI 1003 - RISER #3 AND ASSOCIATED BASEMENT AREAS

BBI 1004 - RISER 'A' AND ASSOCIATED BASEMENT AREAS

BBI 1005 - RISER #7 AND ASSOCIATED BASEMENT AREAS

BBI 1006 - RISER #4 AND ASSOCIATED BASEMENT AREAS

BBI 1007 - RISER 'E' AND ASSOCIATED BASEMENT AREAS

BBI 1008 - RISER #6 AND ASSOCIATED BASEMENT AREAS

BBI 1009 - RISER 'J' AND ASSOCIATED BASEMENT AREAS

BBI 1010 - RISER 'K' AND ASSOCIATED BASEMENT AREAS

BBI 1011 - RISER 'G' AND ASSOCIATED BASEMENT AREAS

SITUATION #1: COUNTER MOUNTED LAVATORY IN THE FOLLOWING

ROOM TYPE

PUBLIC TOILET ROOM

REPLACE LAVATORY FIXTURE WITH SINGLE HANDLE FAUCET (WITH

INTEGRATED THERMOSTATIC MIXING VALVE RATED FOR 180 DEG. F

WATER TEMPERATURE, ASSE 1070 COMPLIANT): UTILIZE ONE OF THE

FOLLOWING NEW FIXTURES (OR APPROVED EQUIVALENT);

SINGLE HOLE = CHICAGO 410-T41E2805ABCP, 0.5 GPM

4" C-C = CHICAGO 420-T41E2805ABCP, 0.5 GPM

8" C-C = USE SINGLE HOLE FIXTURE WITH CHROME PLUG COVERS

ALSO PROVIDE FINAL CONNECTIONS TO EACH REPLACED FAUCET

WITH 3/8" CHROME PLATED BRASS TUBING WITH TRAP WRAP

INSTALLED OVER ALL EXPOSED PIPING. COORDINATE ACCESS WITH VA

REPRESENTATIVE TO EACH PUBLIC RESTROOM AS REQUIRED.

SITUATION #2: WALL HUNG LAVATORY IN THE FOLLOWING ROOM

TYPE

PUBLIC TOILET ROOM

SAME AS ABOVE (SITUATION #1) EXCEPT PROVIDE PVC SHROUD UNDER

EACH EXISTING WALL HUNG LAV TO CONCEAL TRAP/PIPING, TRUBRO

LAVATORY SHIELD OR EQUAL. VERIFY EACH WALL HUNG LAV MODEL

PRIOR TO ORDERING SHROUD AND TRIM UNDERSIDE AS REQUIRED TO

A MAXIMUM ALLOWABLE 1/8" GAP TO BE CAULKED UPON COMPLETION.

SECURE SHROUD TO WALL WITH VELCRO STRIPS.

SITUATION #3: COUNTER MOUNTED LAVATORY / SINK IN THE

FOLLOWING ROOM TYPES

PATIENT TOILET ROOM

STAFF ROOM

TREATMENT ROOM

KITCHEN

WORK ROOM

PROCESS ROOM

CORRIDOR

PRIVATE ROOM

EXISTING FIXTURE TO REMAIN. PROVIDE EACH LAV / SINK WITH AN

UNDER COUNTER MOUNTED MIXING VALVE (ASSE 1070 COMPLIANT),

WATTS SERIES LFUSG-B OR SIMILAR. MIXING VALVE SHALL BE

CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE AND

INSTALLED WITHIN A SERVICEABLE LOCATION. PERFORM ALL

CONNECTIONS UNDER SINK TO / FROM MIXING VALVE AND FIXTURE

WITH 3/8" CHROME PLATED BRASS TUBING.

SITUATION #4: WALL HUNG LAVATORY / SINK - FAUCET WITH HANDLE(S)

IN THE FOLLOWING ROOM TYPES

PATIENT TOILET ROOM

STAFF ROOM

TREATMENT ROOM

KITCHEN

WORK ROOM

CORRIDOR

HOUSEKEEPING (Reference only - no alterations required)

PRIVATE ROOM

SAME AS ABOVE (SITUATION #3) EXCEPT PROVIDE PVC SHROUD UNDER

EACH EXISTING WALL HUNG LAV / SINK TO CONCEAL NEW MIXING

VALVE, TRUBRO LAVATORY SHIELD OR EQUAL. VERIFY EACH WALL

HUNG LAV / SINK MODEL PRIOR TO ORDERING SHROUD AND TRIM

UNDERSIDE AS REQUIRED TO A MAXIMUM ALLOWABLE 1/8" GAP TO BE

CAULKED. SECURE SHROUD TO WALL WITH VELCRO STRIPS.

SITUATION #5: WALL HUNG LAVATORY / SINK,

FLOOR MOUNT OR WALL MOUNT SINK -

FAUCET WITH FOOT PEDALS OR KNEE CONTROL IN THE FOLLOWING

ROOM TYPES

STAFF ROOM

TREATMENT ROOM

KITCHEN

WORK ROOM

PROCESS ROOM

CORRIDOR

HOUSEKEEPING (Reference only - no alterations required)

PRIVATE ROOM

EXISTING FIXTURE TO REMAIN. PROVIDE UNDER LAV / SINK MOUNTED

MIXING VALVE (ASSE 1070 COMPLIANT), WATTS SERIES LFUSG-B OR

SIMILAR. MIXING VALVE SHALL BE CAPABLE OF HANDLING 180 DEG. F

WATER TEMPERATURE. UTILIZE EXISTING HOT & COLD WATER STOP

VALVES ON WALL TO REDUCE OR ELIMINATE ANY OUTAGE

REQUIREMENTS. OTHERWISE COORDINATE MINOR SERVICE OUTAGE

WITH AFFECTED AREAS AS REQUIRED DURING INSTALLATION.

SITUATION #6: SHOWER / BATHTUB IN THE FOLLOWING ROOM TYPES

PATIENT TOILET ROOM (Reference only - no alterations required)

STAFF ROOM (Reference only - no alterations required in this phase)

VERIFY AND RECORD MODEL NUMBER OF SHOWER VALVE ASSEMBLY

AND SUBMIT TO ENGINEER TO VERIFY EXISTING SHOWER / TUB VALVE

HAS BUILT-IN SCALD PROTECTION IN COMPLIANCE WITH ASSE 1016.

IF EXISTING MIXING VALVE IS DETERMINED NON-COMPLIANT THAN

CONTRACTOR SHALL PROVIDE MIXING VALVE TO PROTECT INCOMING

HOT WATER TO EXISTING SHOWER. MIXING VALVE SHALL BE ASSE

1070 COMPLIANT AND INSTALLED WITHIN WALL CAVITY TO BE

ACCESSIBLE VIA REMOVABLE ACCESS PANEL OR STEEL RECESSED

BOX TO CONTAIN MIXING VALVE, WATTS SERIES LFUSG-B OR SIMILAR.

BASE BID SHALL INCLUDE THIRTY-SIX(36) MIXING VALVE INSTALLATIONS

AS DESCRIBED ABOVE.

1A

2D

4D

2A

ROOM TYPE:

1. PUBLIC TOILET ROOM

2. PATIENT TOILET ROOM

3. STAFF ROOM (TOILET, LOCKERS, BREAK, OFFICE, CONFERENCE, ETC.)

4. TREATMENT ROOM (EXAM, PROCEDURE, SURGERY, IMAGING, PREP/RECOVERY, ETC.)

5. KITCHEN (DINING)

6. WORK ROOM (MEDS, SOILED UTILITY, NOURISH / NUTRITION, NURSE STATION, CLEAN, ETC.)

7. PROCESS ROOM (LAB, STERILIZER, WATER TREATMENT, ETC.)

8. CORRIDOR

9. HOUSEKEEPING

0. PRIVATE ROOM (PATIENT BED, VISITOR BED, ON CALL, ETC.)

FIXTURE DESCRIPTION:

A. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE FAUCET

B. WALL HUNG LAV / SINK: DECK MOUNT SPOUT, 2 FOOT PEDALS

C. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT 2 HANDLE EYEWASH FAUCET D. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT 2 HANDLE FAUCET E. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT SPOUT, 2 FOOT PEDALS F. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): DECK MOUNT EYEWASH SPOUT, 2 FOOT PEDALS G. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 2 HANDLE FAUCET H. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT SPOUT, 2 FOOT PEDALS I. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 2 HANDLE EYEWASH FAUCET J. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 1 HOLE LAB FAUCET ASSEMBLY

W/2 HANDLES

K. CEILING MOUNT EMERGENCY SHOWER

L. FLOOR MOUNT EMERGENCY COMBINATION SHOWER & EYEWASH

M. WALL MOUNT EMERGENCY EYEWASH

N. DECK MOUNT EMERGENCY EYEWASH

O. SHOWER ENCLOSURE: WALL MOUNT SHOWER FAUCET

P. BATHTUB: WALL MOUNT TUB / SHOWER FAUCET

Q. CABINET ASSEMBLY WITH BUILT-IN SINK & FAUCET

R. FLOOR MOUNT OR WALL MOUNT SINK: WALL MOUNT 2 HANDLE FAUCET

S. WALL MOUNT 2 COMPARTMENT SS SCRUB SINK ASSEMBLY

T. HOPPER (FLUSHING RIM SINK)

U. FLOOR MOUNT 2 COMPARTMENT SS SINK: (2) WALL MOUNT 2 HANDLE FAUCET

V. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT SINGLE HANDLE FAUCET

W. WALL HUNG LAV / SINK: DECK MOUNT EYEWASH SPOUT, 2 FOOT PEDALS

X. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT SINGLE HANDLE FAUCET Y. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT 2 HANDLE FAUCET Z. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT EYEWASH SPOUT, 2 FOOT PEDALS

AA. WALL HUNG LAV / SINK: WALL MOUNT SPOUT, 2 FOOT PEDALS

BB. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE EYEWASH FAUCET

CC. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE FAUCET, 2 FOOT PEDALS

DD. WALL HUNG LAV / SINK: DECK MOUNT SPOUT, KNEE CONTROL

EE. WALL MOUNT 1 COMPARTMENT SS SCRUB SINK ASSEMBLY

FF. FLOOR MOUNT EMERGENCY EYEWASH

GG. DROP IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT 2 HANDLE EYEWASH FAUCET

HH. SHOWER ENCLOSURE: WALL MOUNT SECURITY SHOWER ASSEMBLY

II. WALL MOUNT SS SECURITY LAV ASSEMBLY

JJ. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (SHROUD BELOW): DECK MOUNT SPOUT, 2 FOOT PEDALS KK. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): WALL MOUNT 2 HANDLE FAUCET LL. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): WALL MOUNT 1 HANDLE FAUCET

MM. FLOOR MOUNT OR WALL MOUNT SINK: WALL MOUNT SPOUT, KNEE CONTROL

NN. FLOOR MOUNT OR WALL MOUNT SINK: DECK MOUNT SINGLE HANDLE CONTROL, HOSE & SPRAY ASSEMBLY OO. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (OPEN BELOW): WALL MOUNT 2 HANDLE FAUCET

PP. FLOOR MOUNT OR WALL MOUNT SINK: WALL MOUNT 2 HANDLE FAUCET & PRE-RINSE SPRAY

QQ. WALL MOUNT HOSE STATION WITH MIXING VALVE

RR. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT SINGLE HANDLE EYEWASH

FAUCET

SS. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 1 HOLE PRE-RINSE SPRAY

FAUCET W/2 HANDLES

TT. WALL HUNG LAV / SINK: DECK MOUNT 2 HANDLE EYEWASH FAUCET, 2 FOOT PEDALS

UU. DROP-IN, UNDERMOUNT OR INTEGRAL LAV / SINK (CABINET BELOW): DECK MOUNT 2 HANDLE FAUCET, 2 FOOT

PEDALS

VV. FLOOR MOUNT SS SECURITY LAV ASSEMBLY

MIXED TEMP PLUMBING FIXTURE KEY NOTES:

ROOM TYPE, FIXTURE DESCRIPTION,

RISER NUMBER

ROOM TYPE

(NUMBERS 0-9) FIXTURE DESCRIPTION

(LETTERS A-VV)

BBI RISER NUMBER

(NUMBERS 1001-1012)0A -1

1Y

3D 3G 3J 3X 3Y

4G 4H 4J

6D 6E 6G 6J 6V

7D

8D 8E 8G

0D 0G

3A

3B

4A

6A

8A

9B

2O 2P

3O

4B

6B

8B

BBI 1001 - 1012 (cont.)

SITUATION #8: INDEPENDENT EMERGENCY FIXTURES IN THE

FOLLOWING ROOM TYPES

STAFF ROOM

TREATMENT ROOM

KITCHEN

WORK ROOM

PROCESS ROOM

CORRIDOR

EXISTING FIXTURE AND ASSOCIATED MIXING VALVE TO REMAIN.

SITUATION #9: FLOOR MOUNTED, COUNTER MOUNTED OR WALL HUNG

LAVATORY / SINK - WALL MOUNTED FAUCET IN THE FOLLOWING ROOM

TYPES

TREATMENT ROOM

KITCHEN

WORK ROOM

PROCESS ROOM

CORRIDOR

HOUSEKEEPING (Reference only - no alterations required)

PRIVATE ROOM

EXISTING FIXTURE TO REMAIN. PROVIDE MIXING VALVE (ASSE 1070

COMPLIANT) WITHIN WALL CAVITY TO BE ACCESSIBLE VIA REMOVABLE

PANEL, WATTS SERIES LFUSG-B OR SIMILAR. MIXING VALVE SHALL BE

CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE. EXISTING

HOT AND COLD WATER STOP VALVES ON WALL MAY REMAIN AND BE

UTILIZED TO REDUCE OR ELIMINATE OUTAGE REQUIREMENTS.

SITUATION #10: SECURITY SHOWER IN THE FOLLOWING ROOM TYPES

PATIENT TOILET ROOM

STAFF ROOM

EXISTING SHOWER VALVE TO REMAIN. PROVIDE MIXING VALVE (ASSE

1070 COMPLIANT) WITHIN WALL CAVITY TO BE ACCESSIBLE VIA

REMOVABLE ACCESS PANEL OR STEEL RECESSED BOX, WATTS SERIES

LFUSG-B OR EQUIVALENT. MIXING VALVE SHALL BE CAPABLE OF

HANDLING 180 DEG. F WATER TEMPERATURE. ACCESS PANEL OR

STEEL RECESSED BOX SHALL BE SECURITY TYPE (ANTI-LIGATURE WITH

SECURITY SCREWS).

SITUATION #11: WALL HUNG SS SECURITY LAV ASSEMBLY IN THE

FOLLOWING ROOM TYPES

PATIENT TOILET ROOM

EXISTING FIXTURE TO REMAIN. PROVIDE MIXING VALVE (ASSE 1070

COMPLIANT) WITHIN WALL CAVITY TO BE ACCESSIBLE VIA REMOVABLE

PANEL, WATTS SERIES LFUSG-B OR EQUIVALENT. MIXING VALVE SHALL

BE CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE. ACCESS

PANEL SHALL BE SECURITY TYPE (ANTI-LIGATURE WITH SECURITY

SCREWS).

SITUATION #12: HOSE & SPRAY ASSEMBLIES, FAUCETS WITH PRE-RINSE

SPRAY, HOSE STATIONS IN THE FOLLOWING ROOM TYPES

KITCHEN

PROCESS ROOM

EXISTING HIGH TEMPERATURE FIXTURE TO REMAIN.

SITUATION #13: FLOOR MOUNT SS SECURITY LAV ASSEMBLY IN THE

FOLLOWING ROOM TYPES

PATIENT TOILET ROOM

EXISTING FIXTURE TO REMAIN. PROVIDE MIXING VALVE (ASSE 1070

COMPLIANT), WATTS SERIES LFUSG-B OR SIMILAR, INSTALLED WITHIN

SECURE COMPARTMENT BELOW LAV. MIXING VALVE SHALL BE

CAPABLE OF HANDLING 180 DEG. F WATER TEMPERATURE. EXISTING

HOT AND COLD WATER STOP VALVES MAY REMAIN (IF LOCATED WITHIN

SECURE COMPARTMENT) TO AVOID WATER OUTAGE. OTHERWISE

COORDINATE MINOR SERVICE OUTAGE WITH AFFECTED AREAS AS

REQUIRED DURING INSTALLATION.

4R

6Q 6R 6T 6AA

7R 7U

9R

0R

ICRA RATING OF SPACES

IN GENERAL, THE FOLLOWING FIXTURE TAGS SHALL HAVE THE

ASSOCIATED INFECTION CONTROL RISK ASSESSMENT (ICRA) RATING

APPLIED TO THOSE AREAS. CONFIRM EACH AREA WITH INFECTION

CONTROL REPRESENTATIVE AND REFER TO NOTES ON DRAWING 70-

PP002 FOR MINIMUM REQUIREMENTS TO BE MAINTAINED IN EACH WORK

ZONE. COORDINATE SCHEDULING/ACCESS OF EACH SPACE WITH

DEPARTMENT REPRESENTATIVE A MINIMUM OF 2-WEEKS IN ADVANCE

(EACH DEPARTMENT MAY REQUEST ADDITIONAL TIME IF NEEDED,

DEPENDING ON TYPE OF PATIENT CARE WITHIN THAT AREA).

1. PUBLIC TOILET ROOM:

• MODERATE RISK

2. PATIENT TOILET ROOM:

• MODERATE TO HIGH RISK (confirm with ICRA)

3. STAFF ROOM (TOILET, LOCKERS, BREAK, OFFICE, CONFERENCE, ETC.)

• LOW RISK

4. TREATMENT ROOM (EXAM, PROCEDURE, SURGERY, IMAGING,

PREP/RECOVERY, ETC.)

• MODERATE TO HIGH RISK (confirm with ICRA)

5. KITCHEN

• HIGH RISK

6. WORK ROOM (MEDS, SOILED UTILITY, NOURISH / NUTRITION, NURSE

STATION, CLEAN, ETC.)

• MODERATE RISK

7. PROCESS ROOM (LAB, STERILIZER, WATER TREATMENT, ETC.)

• HIGH RISK

8. CORRIDOR

• CONFIRM WITH ICRA BASED ON ADJACENT AREAS

9. HOUSEKEEPING

• LOW RISK

0. PRIVATE ROOM (PATIENT BED, VISITOR BED, ON CALL, ETC.)

• MODERATE TO HIGH RISK (confirm with ICRA)

1D1A 1Y

2A

4C

3D 3G 3J 3M 3O

4D 4E 4F

6C 6D 6E 6F 6G

7B 7D

8B 8D 8E

0A 0B

2D 2G

3A 3B

4A 4B

6A 6B

8A

0D 0G

2O 2P

3P

4G 4H 4I 4J 4M

6H 6I 6J

7G

8J

7H

4N 4R

6K

7I 7J

8K 8N

2Y

6L 6N 6Q 6R

7L 7M

9A

0R

4M 4N

6FF

7L 7M

8K 8N

2G

4S

4V

4AA

4CC

4FF

6H

7Q

9A

4E 4Y

4EE

4JJ

3P

3V

3M

2HH

3HH

2II

2HH 2II

3V 3X 3Y 3HH

4S 4V 4W 4Y

LIST BELOW OF VALVE SIZES AND QUANTITIES ON EACH LEVEL IS FOR

REFERENCE ONLY. CROSS CHECK WITH PLANS AND SITE CONDITIONS.

M-RISER (located near gridline EE-29)

• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor (east): 4” CW, 2” HW, & ¾” RECIRC valves

• Second Floor (south): 3” CW, 2.5” HW, & 1¼” RECIRC valves

• Third Floor: 4” CW, 2” HW, & 1” RECIRC valves

• Fourth Floor (north): 2.5” CW, 1.5” HW, & ¾” RECIRC valves

• Fourth Floor (south): 2” CW, 2” HW, & ¾” RECIRC valves SHAFT #2 RISER (located near gridline W-25)

• First Floor: 3” CW, 2.” HW, & ¾” RECIRC valves

• Second Floor: 3” CW, 2.5” HW, & 1” RECIRC valves

• Third Floor: 3” CW, 2.5” HW, & 3/4” RECIRC valves

• Fourth Floor (north): 1.5” CW, 1” HW, & ½” RECIRC valves

• Fourth Floor (south): 1.5” CW, ¾” HW, & ½” RECIRC valves SHAFT #3 RISER (located near gridline U-23)

• First Floor: 2.5” CW, 1.5” HW, & ¾” RECIRC valves

• Second Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Third Floor: 2” CW, 1.5” HW, & ½” RECIRC valves

• Fourth Floor: 2” CW, ¾” HW, & ¾” RECIRC valves A-RISER (located near gridline L-29)

• First Floor: 3” CW, 2” HW, & 1” RECIRC valves

• Second Floor (west): 3” CW, 2” HW, & 1” RECIRC valves

• Second Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves

• Third Floor (west): 3” CW, 2” HW, & ¾” RECIRC valves

• Third Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves

• Fourth Floor (west): 1” CW, ½” HW, & ½” RECIRC valves

• Fourth Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves SHAFT #7 RISER (located near gridline Z-20)

• First Floor: 3” CW, 2” HW, & 3/4” RECIRC valves

• Second Floor: 3” CW, 2” HW, & 3/4” RECIRC valves

• Third Floor: 3” CW, 2” HW, & 3/4” RECIRC valves

• Fourth Floor: 3” CW, 2” HW, & 3/4” RECIRC valves SHAFT #4 RISER (located near gridline M-20)

• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Third Floor: 3” CW, 1.5” HW, & ¾” RECIRC valves

• Fourth Floor: 3” CW, 2” HW, & ¾” RECIRC valves E-RISER (located near gridline B-21)

• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor: 2.5” CW, 2” HW, & 1.5” RECIRC valves

• Third Floor: 4” CW, 2” HW, & ¾” RECIRC valves

• Fourth Floor: 3” CW, 2.5” HW, & ¾” RECIRC valves SHAFT #6 RISER (located near gridline U-13)

• First Floor: 1.5” CW, 1.25” HW, & ¾” RECIRC valves

• Second Floor: 4” CW, 2” HW, & 1” RECIRC valves

• Third Floor: 3” CW, 2.5” HW, & ¾” RECIRC valves

• Fourth Floor: 2.5” CW, 1” HW, & ½” RECIRC valves J-RISER (located near gridline EE-10)

• First Floor(east): 2.5” CW, 2” HW, & ¾” RECIRC valves

• First Floor(north): 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor (north): 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves

• Third Floor (north): 2” CW, 2” HW, & ¾” RECIRC valves

• Third Floor (south): 2.5” CW, 2” HW, & ¾” RECIRC valves

• Fourth Floor (north): 2” CW, 2” HW, & ¾” RECIRC valves

• Fourth Floor (south): 3” CW, 2” HW, & ¾” RECIRC valves K-RISER (located near gridline W-8)

• First Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Third Floor: 3” CW, 2” HW, & ¾” RECIRC valves

• Fourth Floor: 3” CW, 2.5” HW, & ¾” RECIRC valves G-RISER (located near gridline H-9)

• First Floor(west): 3” CW, 2” HW, & ¾” RECIRC valves

• First Floor(north): 3” CW, 2” HW, & 1.5” RECIRC valves

• Second Floor (west): 3” CW, 2” HW, & ¾” RECIRC valves

• Second Floor (north): 2” CW, 1.5” HW, &…