Attachment_D_-_County-Furnished_Equipment,_Accessories,_and_Services.docx

DOCX document 34 KB Posted

Attached to
SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Project
Solicitation number
41015
Issued by
Sacramento County, San Francisco City, California

About this file

This is an Attachment D document outlining county-furnished equipment and services for the SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation project, a Sacramento County Department of Airports project under CUPCCAA Informal Bid Contract No. 41015 dated September 2026. The County will furnish two pieces of equipment: two Compact crawler boom lifts (JLG X500AJ model) and one Electric slab scissor lift (Genie GS-4655 model). County-furnished services include base equipment rental, delivery and unloading at County-designated points, pickup, supplier and breakdown-service coordination, and standard accessories and operating documents supplied with the units. The Contractor is responsible for providing qualified operators and support personnel, rigging, power/charging/fuel, load-distribution materials, floor and finish protection, security, and all other items required for safe operation. The County will coordinate delivery, use, and return dates before mobilization, and the Contractor must participate in equipment turnover and report any discrepancies.

The document establishes evaluated-use limitations specific to Supporting Document SD-01, which excludes JLG outrigger and Genie loading in designated Areas A or B, lift loading in Areas D or E and on existing Concourse floors, terrazzo protection, and expansion-joint-cover capacity. Any alternate equipment or deviation from cited requirements requires prior written County authorization and Engineer acceptance when applicable. The mezzanine on Sheet A-133 is not expressly evaluated, and unevaluated use requires written County authorization and required Engineer acceptance. The Contractor must submit access, loading, protection, and staging information in the submittals required by Attachment B and review all Supporting Documents cited for applicable equipment specifications, operating data, equipment-loading requirements, access information, and structural limitations.

View the file

Other files

File Type Posted
SMF_Pedestrian_Walkway_Hub_-_Flight_Paths_Public_Art_Installation_Project.pdf PDF
Non_AIP_Contracts_(all_other_transactions)_2026.docx DOCX document
Solicitations_Construction_FAA_Language_2026.docx DOCX document
Attachment_A_-_Minimum_Contractor_Qualifications.docx DOCX document
Final_Special_Provisions_SMF_Pedestrian_Walkway_Hub_-_Flight_Paths_Public_Art_Installation_Project_092326bns.docx DOCX document
SD-13_–_SMF_Pedestrian_Walkway_Hub_–_Asbestos_Assessment_–_June_26,_2026.pdf PDF
SD-12-_SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Public_Artwork_Deferred_Submittal_-_Approved.pdf PDF
SD-11-SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Permit_CCBP2024-00027-DEF02.pdf PDF
SD-10-SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Scope_Interface_Markup_Drawing.pdf PDF
SD-09-_SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_JLG_X500AJ_Specifications.pdf PDF
SD-08-SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Genie_GS-4655_Specifications.pdf PDF
SD-07-SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Curtain_Wall_Attachment_Details.pdf PDF
SD-06-_SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Structural_Calculations_-_Approved.pdf PDF
SD-05-SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Bird_Mounting_Locations.pdf PDF
SD-04_-_SMF_Pedestrian_Walkway_-_Finish_Floor_Plans_-_Areas_A,_B_and_C_-_Sheets_A-121,_A-122,_A-123_and_A-133.pdf PDF
SD-03_-_SMF_Pedestrian_Walkway_-_Overall_Floor_Plan_-_Sheet_A-110.pdf PDF
SD-02_-_SMF_Pedestrian_Walkway_-_Reference_Plan_-_Sheet_A-010.pdf PDF
SD-01-SMF_Pedestrian_Walkway_Hub_Flight_Paths_-_Equipment_Loading_Memo.pdf PDF
Attachment_E_-_Sleeve-Joint_Reference_Photographs.docx DOCX document
Attachment_C_-_Bid_Item_Schedule.docx DOCX document
Attachment_B_-_Required_Submittal_Register.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Attachment D

Sacramento County Department of Airports SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Project

ATTACHMENT D

COUNTY-FURNISHED EQUIPMENT, ACCESSORIES, AND SERVICES

CUPCCAA Informal Bid | Contract No. 41015 | September 2026 The Sacramento County Department of Airports will furnish the equipment identified in this Attachment for the Flight Paths public art installation. The County-furnished equipment, accessories, and services are limited to those expressly identified below.

REQUIRED REVIEW OF SUPPORTING DOCUMENTS: The Contractor shall review and comply with each Supporting Document cited for the applicable equipment. Manufacturer specifications, operating data, equipment-loading requirements, access information, and structural limitations are not repeated in this Attachment. The cited Supporting Documents and the other Contract Documents govern those requirements.

Item
County-Furnished Equipment
Quantity
Applicable Supporting Documents
County-Furnished Accessories and Services
1
Equipment: Compact crawler boom lift

Manufacturer/Model: JLG X500AJ

2
Specifications/operating data: See Supporting Document SD-09.

Loading requirements/limitations: See Supporting Document SD-01.

Access/plan information: See Supporting Documents SD-02, SD-03, and SD-04.

County-furnished: Base equipment rental; delivery and unloading at the County-designated point; pickup; supplier and breakdown-service coordination; and standard accessories and operating documents supplied with the unit.

2
Equipment: Electric slab scissor lift

Manufacturer/Model: Genie GS-4655

1
Specifications/operating data: See Supporting Document SD-08.

Loading requirements/limitations: See Supporting Document SD-01.

Access/plan information: See Supporting Documents SD-02, SD-03, and SD-04.

County-furnished: Base equipment rental; delivery and unloading at the County-designated point; pickup; supplier and breakdown-service coordination; and standard accessories and operating documents supplied with the unit.

Contractor-furnished items and responsibilities: Unless expressly stated otherwise, the Contractor shall provide qualified operators and support personnel; rigging; power, charging, or fuel; load-distribution materials; floor and finish protection; security and care; and all other items required for safe operation and the Contractor's means and methods. Required access, loading, protection, and staging information shall be included in the submittals required by Attachment B.

Delivery, turnover, and changes: The County will identify the delivery/staging point and coordinate delivery, use, and return dates before mobilization. The Contractor shall participate in equipment turnover and promptly report any difference in the furnished unit or condition. Alternate equipment or a deviation from a cited requirement requires prior written County authorization and Engineer acceptance when applicable.

Evaluated-use limitations: SD-01 covers only the stated areas and configurations. It excludes JLG outrigger and Genie loading in Areas A or B; lift loading in Areas D or E and on existing Concourse floors; terrazzo protection; and expansion-joint-cover capacity. The Sheet A-133 mezzanine is not expressly evaluated. Unevaluated use requires written County authorization and required Engineer acceptance.

Contract No. 41015
CUPCCAA Informal Bid
Page 1 of 1