Attachment D Bid Schedule.pdf

PDF 70 KB Posted

Attached to
Replace Roofs on Campus Federal contract opportunity
Solicitation number
36C26223B0007
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document is an attachment to a solicitation providing details on roof replacement work at multiple buildings on the campus of the VA New Mexico Healthcare System in Albuquerque. The main bid item involves replacing roofs on seven buildings over 685 calendar days. There are four deductive bid alternates that would remove specific buildings from the scope of work and reduce the contract duration. Alternate 1 would delete work on Building 8 and reduce duration to 615 days. Alternate 2 would further delete work on Building 45 and reduce duration to 445 days. Alternate 3 would further delete work on Building 39 and reduce duration to 365 days. Alternate 4 would further delete work on Building 1 and reduce duration to 263 days. Award will be made to the lowest bidder based on available funding and considering the bid amounts for the main item and deductive alternates sequentially. The work must be performed by a verified Service-Disabled Veteran-Owned Small Business.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D BID SCHEDULE

VA36C26223B0007

REPLACE ROOFS ON CAMPUS

PROJECT NO. 501-19-100

A. MAIN BID ITEM – This project will be awarded to replace Seven (7) building roofs, including demolition and removal of existing site elements, at the Raymond G. Murphy VA

Medical Center, Albuquerque, New Mexico, Project No. 501-19-100.

1. Contractor shall completely prepare sites for building operations, including demolition and removal of existing structures, and perform work as required by drawings and specifications. Contractor shall furnish all labor, material, equipment, and supervision required to perform the work described in drawings and specifications. Contractor shall perform all work in strict accordance with applicable VA construction standards and procedures to replace 7 Building Roof Systems. At Roofs for repair and complete tear down that include Buildings 1, 8, 11, 14, 39, 46 and 45, as depicted in the drawings and specifications provided in Section C of this solicitation.

Construction Duration: Six Hundred & Eighty-five (685) calendar days

Main Bid Item: $__________________________________________

B. DEDUCTIVE BID ALTERNATE No.1

1. All work as indicated in the Main Bid Item except, delete all work associated with

BUILDING 8. Work includes general construction, alterations, Re-roofing necessary removal of existing structures and construction and certain other items. Scope as listed in narrative in General Requirements Specification Section 00-01-10 in coordination with drawings and specifications.

Construction Duration: Six Hundred Fifteen (615) calendar days.

Deductive Bid Alternate No.1: $_________________________________

C. DEDUCTIVE BID ALTERNATE No.2

1. All work as indicated in Deductive Bid Alternate No. 1 except, delete all work associated with BUILDING 45. Work includes general construction, alterations, Re-roofing necessary removal of existing structures and construction and certain other items.

Scope as listed in narrative in General Requirements Specification Section 00-01-10 in coordination with drawings and specifications.

Construction Duration: Four Hundred Forty-five (445) calendar days.

Deductive Bid Alternate No. 2: $_____________________________________

ATTACHMENT D BID SCHEDULE

VA36C26223B0007

D. DEDUCTIVE BID ALTERNATE No. 3

1. All work as indicated in Deductive Bid Alternate No. 2 except, delete all work associated with BUILDING 39. Work includes general construction, alterations, Re-roofing necessary removal of existing structures and construction and certain other items.

Scope as listed in narrative in General Requirements Specification Section 00-01-10 in coordination with drawings and specifications.

Construction Duration: Three Hundred Sixty-five (365) calendar days.

Deductive Bid Alternate No. 3: $______________________________________

E. DEDUCTIVE BID ALTERNATE No. 4

1. All work as indicated in Deductive Bid Alternate No. 3 except, delete all work associated with BUILDING 1. Work includes general construction, alterations, Re-roofing necessary removal of existing structures and construction and certain other items.

Scope as listed in narrative in General Requirements Specification Section 00-01-10 in coordination with drawings and specifications.

Construction Duration: Two Hundred Sixty-three (263) calendar days.

Deductive Bid Alternate No. 4: $_______________________________________

It is intended that award will be made on the Main Bid Item. However, in the event all offers received on the main bid exceed the funds available, a single award will be made after considering the offers made on the alternate bid items. Bidder shall quote a price on each bid item listed to be considered responsive. The solicitation will be awarded to the lowest bid in sequence of listed deductive alternates from Deductive Alternate No. 1 through Deductive Alternate No. 4, based on available funding.