REVISED SHEETS_BLDGS 1_14_39_45_46.pdf
PDF 8 MB Posted
- Attached to
- Replace Roofs on Campus Federal contract opportunity
- Solicitation number
- 36C26223B0007
About this file
This solicitation is for roof replacement services at multiple buildings on the VA New Mexico Healthcare System campus in Albuquerque, New Mexico. Work includes general construction, roofing, alterations, mechanical, electrical and demolition services. The requirement is set aside exclusively for SDVOSB contractors listed in the SBA VetCert database. The NAICS code is 236220 with a size standard of $45M. The contract value is estimated between $5-10M. The point of contact is Steven Covell at the VA Network Contracting Office 22 in Long Beach, California.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses RFIs 43_ 54 VA Reroofs 501_19_100.docx | DOCX document | |
| 36C26223B0007 0003.pdf | ||
| 36C26223B0007 0002.pdf | ||
| RFIs 1_ 42 VA Reroofs 501_149_100 _ Addendum 01.pdf | ||
| REVISED SHEETS_BLDG_1_BLDG_45_BLDG_46.pdf | ||
| Pages 31_60 from 00 _ ABQ PV Drawing.pdf | ||
| Pages 1_30 from 00 _ ABQ PV Drawing.pdf | ||
| Pages 61_95 from 00 _ ABQ PV Drawing.pdf | ||
| VA Roofing 501-19-100_General Spec Manual_FINAL-UPDATD.pdf | ||
| Amendment 0001 36C26223B0007.pdf | ||
| Attachment A Specifications.pdf | ||
| Attachment E ACM Testing Report.pdf | ||
| Solicitation 36C26223B0007.pdf | ||
| Attachment B Drawings.pdf | ||
| Attachment C Wage Determination.pdf | ||
| Attachment D Bid Schedule.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
M
G
H
H
F
K
L
J
S
I
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RDRD
RD
RD
E
E
E
C1
E
E
RD
E
Core #1
Core #4
Core #5
F
T
F
T
F
T
F
T F
T
F
T
F
T
F
T
F
T F
T
F
T
F
T
1/4"/FT
1/8"/FT
RD RD
F
T
F
T
RD
F
T
RD
12 12
23 23
23 23
8 8
8 9 10 11 12 13 14
15 17 191816
A
C
D
F
G
H
E
B
M A
T C
H L
I N
E
W
E S
T M
A T
C H
L I N
E
W
E S
T
M A
T C
H L
I N
E
E
A S
T M
A T
C H
L I N
E
E
A S
T
1C
1B
BRIDGE & DOOR 10
OVERHD
@ H LEVEL
@ J LEVEL
26.0'
52.0'
39.0'
39.0'
61.0'
69.17'
52.0'
36.0'
26.0'
13.0'
34.0'
26.0'
39.0'
39.0'
26.0'
Core #12
Spike #15
Core #6
Core #8
Core #9
Core #7
6 9 1A
6 9
60.0'
1C
1A
1D
SYMBOLS LEGEND
RD ROOF DRAIN
THRU WALL SCUPPER
V PLUMBING VENT PENETRATION
CURB MOUNTED EXAUST VENT
ARCHITECTURAL VENTS
DUCTWORK PENETRATION
E ELECTRICAL CONDUIT PENETRATION
ORD OVERFLOW ROOF DRAIN
OPEN CANALE
ACCESS LADDER
ACCESS ROOF HATCH
CURB MOUNTED MECHANICAL UNIT
CURB MOUNTED SKYLIGHT
E ELECTRICAL CONDUIT
G GAS PIPE
SURFACE MOUNTED DUCTWORK
CHAIN-LINK ENCLOSED WALKWAY
MINI-SPLIT COMPESSOR
CRICKET
DOOR TAG NUMBER, REFER TO EXISTING DOOR SHEET
A203 & DOOR SCHEDULE SHEET A601
Project Number
Building Number
Drawing Number
Project Title
Location
Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A102
BUILDING #1 - ROOF PLAN
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
VHG Architects 2428 Baylor Drive SE Albuquerque, NM 87106 505.247.9955 Van Gilbert
ROOF CONSULTANT:
Armstrong Group Inc.
PO Box 92977 Albuquerque, NM 87199 505.235.7596 David Armstrong
REPLACE ROOFS ON CAMPUS
New Mexico VA Campus
501-19-100
Building #1 Project Director
DRA ML/AMBRevisions: Date:
1/8" = 1'-0"
BUILDING #1 - ROOF PLAN - EAST
F3
GENERAL SHEET NOTES
1. THE CONTRACTOR SHALL NOT REMOVE ANY EXISTING ROOFING SYSTEM,
DAMAGED DECKING, OR INSTALL NEW ROOFING SYSTEM WHEN WEATHER
CONDITIONS THREATEN THE INTEGRITY OF THE BUILDING CONTENTS OR
OCCUPANTS. THE CONTRACTOR SHALL COMPLETE EACH DAY'S ROOFING
CYCLE AND PROVIDE A WELDED OR FOAMED TEMPORARY SEAL AT
JUNCTION OF NEW ROOF AND EXISTING ROOF. THE CONTRACTOR SHALL
MAINTAIN A WATERPROOF COMPLETED AREA WITH EACH ROOFING CYCLE.
NO TOLERANCES WILL BE GIVEN.
2. ALL LOCATIONS OF ITEMS SHOWN ON ROOF PLANS ARE APPROXIMATE.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
3. PERFORM ALL DISCONNECTS, EXTENSIONS AND RECONNECTIONS AS
REQUIRED TO ACCOMMODATE NEW ROOF HEIGHTS, FOR ITEMS BEING RAISED
AND REMOUNTED FOR RE-ROOFING WORK. AND MUST BE PART OF
CONTRACTORS SUBMITTED WORK SCHEDULE AND MUST BE SCHEDULED
PRIOR TO ANY DISCONNECT OR RECONNECT. RETURN ALL ITEMS TO
OPERATIONAL CONDITION PRIOR TO END OF DAY'S WORK. NOTIFY THE
ARCHITECT OF ANY DEFECTIVE ITEMS DISCOVERED DURING WORK.
4. PIPES 1-1/2" AND SMALLER SHALL BE SUPPORTED AT 8'-0" O.C. MAXIMUM
AND PIPES 2" AND LARGER SHALL BE SUPPORTED AT 10'-0" O.C. MAXIMUM.
5. THIS IS A POPULATED BUILDING SPECIAL CONSIDERATION, SCHEDULING,
NOISE LEVELS AND STAGING WILL BE REQUIRED DURING ROOFING.
6. THE CONTRACTORS SHALL HAVE THE OPPORTUNITY TO ACQUAINT
THEMSELVES WITH ALL EXISTING CONDITIONS AT THE PREBID AND BY
APPOINTMENT IF SECONDARY INSPECTION IS NEEDED. NO ALLOWANCES
SHALL BE MADE FOR CONDITIONS THAT ARE CLEARLY VISIBLE OR
DETECTABLE WITH SOME RESEARCH EFFORT.
7. THE LOADING AREA AVAILABLE AT GROUND LEVEL IS A FIRE, EMERGENCY
AND SECURITY ACCESS AREA, A STRICT SCHEDULE FOR STAGING OF
DELIVERIES AND CRANING OF MATERIAL MUST BE SUBMITTED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE. CONTRACTOR IS
RESPONSIBLE FOR COORDINATING ALL NECESSARY PERMITS. ALL MATERIALS
WILL HAVE TO BE STORED ON THE ROOF AREAS AND IN STAGING AREA, AS
WELL AS SANITARY FACILITIES.
8. NO EMPLOYEES WILL BE ALLOWED IN THE BUILDING. ESCORTED SECURITY
WILL NEED TO BE SCHEDULED FOR THE FOLLOWING: ACCESS TO THE ROOF
AND ACCESS TO AREAS WITHIN THE BUILDING NECESSARY TO COMPLETE THE
SCOPE OF WORK.
9. BEFORE ANY UTILITY CUT OFFS OR DEMOLITION IS TO OCCUR, A SCHEDULE
MUST BE SUBMITTED TO THE ARCHITECT AND APPROVED BY VA
REPRESENTATIVE. REFER TO SECTION 01 00 00 FOR ADVANCE NOTICE
REQUIREMENTS. WORK SCHEDULES WILL BE REQUIRED TO BE SUBMITTED TO
THE OWNER REPRESENTATIVE TWICE WEEKLY, ANTICIPATING THE NEXT
WEEK'S WORK.
10.THE CONTRACTOR SHALL PROVIDE LICENSED PLUMBING, MECHANICAL AND
ELECTRICAL CONTRACTORS TO REMOVE AND REINSTALL ALL EXISTING
EQUIPMENT ON THE ROOF. ALL EQUIPMENT SHALL BE FULLY OPERATIONAL
WHEN REINSTALLED. CONTRACTOR'S WORK SHALL MEET CURRENT
APPLICABLE BUILDING CODES AND OSHA SAFETY REQUIREMENTS.
11.THE ROOFING CONTRACTOR SHALL PROVIDE FASTENERS AS REQUIRED
FOR CORROSIVE AGENTS ADDED TO TREATED WOOD NAILERS (IF
PRESERVED WOODS ARE USED) AND AS RECOMMENDED BY THE ROOFING
MANUFACTURER AND AS REQUIRED FOR THE WARRANTY.
12. ALL ROOFING SHALL BE ATTACHED TO THE BUILDING IN ACCORDANCE WITH
FM 1-75 WIND UPLIFT FASTENING PATTERN AND ASCE 7 REQUIREMENTS.
13.THE DETAILS SHOWN IN DRAWINGS AND PLANS ARE FOR INTENT. THE MOST
STRINGENT REQUIREMENTS BETWEEN CONSTRUCTION DOCUMENTS,
MANUFACTURERS' DETAILS, SMACNA REQUIREMENTS AND NRCA
RECOMMENDATIONS WILL BE REQUIRED.
14. ALL AREAS TO RECEIVE NEW ROOFING MEMBRANE SHALL BE
INCORPORATED INTO ROOFING WARRANTY, INCLUDING NEW WALL AND
PARAPET MEMBRANE WORK. WARRANTY SHALL INCLUDE ALL
PENETRATIONS, FLASHING AND TERMINATIONS. CONTRACTOR SHALL
PROVIDE AND INSTALL ALL FLASHINGS, TRIM, SEALANTS, NAILERS,
MATERIALS, ETC. REQUIRED TO PROVIDE A COMPLETE WATERPROOF AND
NO DOLLAR LIMIT WARRANTED SYSTEM.
15.CONTRACTOR TO FIELD VERIFY ALL CONDITIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
16.THE ROOFING SYSTEM SHALL BE INSTALLED PER PLANS, DETAILS,
SPECIFICATIONS & MANUFACTURER'S REQUIREMENTS, AND PROVIDE A 30
YEAR NO DOLLAR LIMIT WARRANTY AS OUTLINED IN THE SPECIFICATIONS.
17.PREDRILL ALL METAL FLASHING/ COUNTER FLASHING MATERIAL PRIOR TO
INSTALLING FASTENERS.
18.THESE DRAWINGS INDICATE, IN GENERAL, ITEMS OF MATERIAL AND
EQUIPMENT WHICH MUST BE REMOVED, REUSED, REFINISHED OR
MODIFIED. NO ATTEMPT HAS BEEN MADE TO INDICATE EACH AND EVERY
PORTION OF DEMOLITION AND REMODELING WORK. THE INTENT OF THE
DRAWINGS IS TO PROVIDE A GUIDELINE TO THE CONTRACTOR(S) TO BETTER
ENABLE HIM TO ANTICIPATE THE ENTIRE SCOPE OF WORK. THE
CONTRACTOR(S) ARE ADVISED TO VISIT THE JOB SITE TO GET FAMILIAR
WITH THE WORK : SCOPE, EXTENT AND ROOF AREAS, PRIOR TO BIDDING.
SEE GENERAL NOTE 6 IN REGARD TO SCHEDULING SITE VISITS.
19. ALL WALLS OVER 32" WILL REQUIRE INTERIM TERM BAR. FASTEN 12" O.C..
20.CONTRACTOR SHALL INCLUDE ALL MECHANICAL AND ELECTRICAL COSTS
NECESSARY FOR DISCONNECTING OF EXISTING ROOFTOP EQUIPMENT AND
ITS RE-INSTALLATION . CONDUCT NECESSARY TESTS TO VERIFY THAT UNITS
ARE FUNCTIONAL. THIS INCLUDES RAISING OF CURBS TO MEET 12" ABOVE
FINISHED ROOF. ALL CURBS GREATER THAN 24" WILL REQUIRE A CRICKET.
21.ON EXISTING ROOFING SYSTEMS AND WALLS THAT ARE NOT PART OF THIS
ROOFING PROJECT, ANY DAMAGE OCCURRING DURING THE RENOVATION
WORK SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER. NOTIFY OWNER/
ARCHITECT IN WRITING PRIOR TO STARTING WORK IF ANY DAMAGES ARE
PRESENT. DAMAGES NOT REPORTED WILL BE CONSIDERED NEW AND
CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS. REPAIRS MUST NOT VOID
ANY EXISTING WARRANTIES.
22.ALL SECURITY, SATELLITE, WEATHER STATIONS, PHONE AND BUILDING
DECORATIONS WILL BE HANDLED BY OWNER. COORDINATE WITH OWNER
ON DISCONNECT AND RECONNECT.
23.ALL TOOLS AND WORK RELATED EQUIPMENT MUST BE WITHIN WORKERS'
POSSESSION AND CONTROL AT ALL TIMES.
24.CONTRACTOR SHALL PROVIDE AN INVENTORY OF ALL NON WORKING AND
ABANDONED MECHANICAL EQUIPMENT, SUPPLY LINES, DAMAGED
CEILING TILES, SIDEWALKS AND OTHER BLDG COMPONENTS THAT COULD
BE AFFECTED BY ROOFING PROCESS. ALL ABANDONED ITEMS SHALL BE
REMOVED.
25.COORDINATE ALL MECHANICAL UNIT SHUTOFFS WITH THE PROJECT
MANAGER/COR. NO COORDINATION IS TO TAKE PLACE WITH THE USER GROUP.
26.THE DESIGNER AND CONSULTANT IS NOT RESPONSIBLE FOR THE ACT AND
OMISSION OF ANY CONTRACTOR, SUBCONTRACTOR, MATERIAL SUPPLIER,
INCLUDING BUT NOT LIMITED TO THE FOLLOWING: SAFETY PRECAUTIONS /
PROGRAMS AND THEIR ENFORCEMENT, OR FOR THE CONSTRUCTION MEANS
AND METHODS, TECHNIQUES, SEQUENCING AND PROCEDURES EMPLOYED BY
THE CONTRACTORS AND THE INCLUSION OF THE REQUIREMENTS OF THE
MANUFACTURE FROM THEIR PUBLISHED DOCUMENTS, PROCEDURES, AND
THEIR STAFF ISSUED VERBAL AND WRITTEN INSTRUCTIONS AND REMEDIES.
27.ALL EQUIPMENT THAT CONTAINS FLAMMABLE FLUIDS MUST EITHER BE
REMOVED ON A DAILY BASIS OR THE EQUIPMENT TANK MUST BE DRAINED AT
END OF EACH DAY. ANY FLAMMABLE FLUID IN CONTAINERS MUST BE
REMOVED FROM THE ROOF ON A DAILY BASIS.
28.ROOF MUST BE WATERTIGHT AT ALL TIMES. CONTRACTOR MUST SUBMIT A
NIGHT SEAL PLAN.
29.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS.
30.WELD ALL INDUCTION PLATES DAILY, WELD SEAMS DAILY AND PROBE SEAMS
DAILY.
1. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2"
HIGH DENSITY COVERBOARD WITH BONDING ADHESIVE. 1/2" HD
COVERBOARD TO BE FOAM ADHERED WITH MANUFACTURER APPROVED
AND UPLIFT TESTED FOAM ADHESIVE TO NEW MIN. 2 LAYERS
POLYISOCYANURATE INSULATION EQUALING R-20. INSULATION IS TO BE
FOAM ADHERED TO NEW PEEL AND STICK MEMBRANE THAT HAS BEEN
APPLIED TO THE EXISTING CONCRETE DECK. SEE E1/A0101.
1A. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2" HD
COVERBOARD WITH BONDING ADHESIVE. 1/2" HD COVERBOARD TO BE
FOAM ADHERED WITH MANUFACTURER APPROVED AND UPLIFT TESTED
FOAM ADHESIVE TO NEW MIN. 2 LAYERS POLYISOCYANURATE INSULATION
EQUALING R-20. FIRST LAYER OF INSULATION IS TO MECHANICALLY
FASTENED TO EXISTING METAL DECK. ALL REMAINING LAYERS TO BE
FOAM ADHERED. SEE D1/A101.
1B. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2" HD
COVERBOARD WITH BONDING ADHESIVE. 1/2" HD COVERBOARD TO BE
MECHANICALLY FASTENED TO NEW 3/4" EXTERIOR GRADE CDX PLYWOOD
THAT HAS BEEN MECHANICALLY FASTENED THRU THE NEW INSULATION
TO THE EXISTING PURLINS. NEW MIN. 2 LAYERS POLYISOCYANURATE
INSULATION EQUALING R-20 IS TO BE FOAM ADHERED TO THE EXISTING
TECTUM DECKING. SEE F1/A101.
1C. BASE BID TO INCLUDE 1000SF OF METAL B DECK REPLACEMENT. PROVIDE
UNIT PRICE PER SF FOR DECK REPLACEMENT AS WELL.
1D. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2" HD
COVERBOARD WITH BONDING ADHESIVE. 1/2" HD COVERBOARD TO BE
FOAM ADHERED WITH MANUFACTURER APPROVED AND UPLIFT TESTED
FOAM ADHESIVE TO NEW MIN. 2 LAYERS POLYISOCYANURATE INSULATION
EQUALING R-20. FIRST LAYER OF INSULATION IS TO BE MECHANICALLY
FASTENED THRU NEW LAYER OF ½” FIRE TREATED PLYWOOD THAT HAS
BEEN MECHANICALLY FASTENED TO THE EXISTING WOOD DECK. ALL
REMAINING INSULATION LAYERS ARE TO BE FOAM ADHERED.
2. ALL NEW IDENTIFIED CRICKETS IN AREAS INDICATED ON DRAWINGS MUST
PROVIDE POSITIVE SLOPE AND DRAINAGE, WATER TESTED TO INSURE
POSITIVE DRAINAGE. CRICKETS NEED TO BE MINIMUM
1/4
" GREATER THEN
THE SLOPE OF THE ROOF AND BUILT WITH 3 TO 1 RATIO TO CREATE
POSITIVE SLOPE. CRICKETS ARE SHOWN FOR INTENT AND ARE NOT TO
SCALE. CONTRACTOR IS RESPONSIBLE FOR POSITIVE DRAINAGE.
3. VENT PIPE / ELECTRICAL / GAS PIPE PENETRATIONS THROUGH ROOF TO
BE LEFT IN PLACE. INSTALL NEW MEMBRANE ROOF FLASHING AS
REQUIRED TO TERMINATE NEW ROOFING. SEE DETAILS B1, B3, B5/A501.
4. EXISTING HVAC MECHANICAL EQUIPMENT TO REMAIN. INSTALL NEW KNEE
CURBS TO REPLACE ANY WOOD SUPPORTS. SEE DETAIL D6/A501.
INSTALL NEW FLASHING AT EXISTING PENETRATION CURB ENCLOSURE.
SEE DETAIL B6/A501.
5. INSTALL ROOF DRAINS PER DETAIL F1/A501. ALL DRAINS MUST BE
REPLACED WITH NEW DRAINS. THE DRAINS CAN BE NEW DRAIN INSERTS
WITH METAL COATED FLANGES THAT IS ACCEPTABLE AND WARRANTED
IN THE ROOFING SYSTEM. CLEAN OUT ALL ROOF DRAINS.
6. ALL SURFACE RUN GAS LINES AND ELECTRICAL CONDUITS TO HAVE NEW
SUPPORTS PER DETAIL D7/A501.
7. INSTALL NEW FLASHING AT NON -EGRESS DOOR THRESHOLD, SEE DETAIL
F8/A501.
8. INSTALL NEW MEMBRANE COATED OVERFLOW CANALE AT EXISTING
SCUPPER/CANALE LOCATIONS. SEE DETAIL F3/A501. PATCH & SEAL
STUCCO ON OUTSIDE. COLOR COAT TO MATCH.
9. EXISTING LIGHTNING PROTECTION SYSTEM TO BE REMOVED AND
RECYCLED AND/OR DISPOSED PROPERLY. CONTRACTOR SHALL
RECYCLE LIGHTNING PROTECTION METALS AND REVERT THE DOLLAR
AMOUNT BACK TO CONTRACT FOR CHANGE ORDERS. REFER TO
LIGHTNING PROTECTION SHEETS LP-101, LP-102 & LP-106 FOR
INSTALLATION OF NEW LIGHTNING PROTECTION SYSTEM. CONTRACTOR
TO PROVIDE PROPER SECUREMENT, SEE DETAIL D5/A501.
10. REMOVE EXISTING STEEL RAMP, COORDINATE REPLACEMENT OR
RE-INSTALLATION AT THESE LOCATIONS WITH NEW ROOF LEVEL. INSTALL
NEW DOOR THRESHOLD FLASHING PER DETAIL F8/A501.
11. PROVIDE NEW METAL EDGE DETAIL AT ROOF AREA C1,
SEE DETAIL. F6, F7/A501.
12. EXISTING VENT BOXES TO BE WRAPPED COMPLETELY IN ROOF
MEMBRANE, INSTALL METAL EDGE PER DETAIL F6, F7/A501.
13. RAISE EXISTING DOOR THRESHOLD AT EGRESS DOOR AND INSTALL NEW
FLASHING PER DETAIL D8/A501. MODIFY EXISTING DOOR AND FRAME TO
FIT NEW OPENING OR REPLACE. COLOR TO MATCH EXISTING.
14. REMOVE EXISTING COUNTERFLASHING AND INSTALL NEW TWO PIECE
COUNTERFLASHING ABOVE OLD REMOVED COUNTERFLASHING.
SEE DETAIL D1/A501.
15. INSTALL NEW DIVIDER WALL, SEE DETAIL D3/A501.
16. REMOVE EXISTING CAPPED DUCT DOWN TO DECK. INFILL AND REROOF.
17. REMOVE EXISTING WOOD DOOR & TRANSOM AND REPLACE WITH NEW
CUSTOM WOOD DOOR W/ INSULATED GLAZING TO MATCH EXISTING.
COLOR TO MATCH.
18. EXISTING CHAINLINK EGRESS ENCLOSURE TO REMAIN. PROVIDE NEW
FLASHING BOOT AT SUPPORTS PER DETAILB1, B3/A501. INSTALL NEW
WALKPADS FULL LENGTH AND WIDTH OF ENCLOSURE WALKWAY AREA.
19. RAISE EXISTING DOOR THRESHOLD AT NON-EGRESS DOOR AND INSTALL
NEW FLASHING PER DETAIL F8/A501. MODIFY EXISTING DOOR AND FRAME
TO FIT NEW OPENING, UNLESS NOTED TO REPLACE.
20. WRAP MEMBRANE OVER RAISED CURB AT WALKWAY AREA.
21. ELEVATED CONCRETE WALKWAY TO REMAIN.
22. INSTALL TAPERED INSULATION BEHIND BAFFLE TO ALLOW FOR POSITIVE
DRAINAGE.
23. INSTALL NEW MEMBRANE COATED OVERFLOW CANALE, SEE DETAIL
F3/A501. PATCH & SEAL STUCCO ON OUTSIDE. COLOR COAT TO MATCH.
24. EXISTING ROOF LADDER TO BE DISCONNECTED AND RE-INSTALLED AS REQUIRED
TO INSTALL NEW ROOF SYSTEM. VERIFY LADDER IS PROPERLY SECURED TO
WALL. IF NOT, PROVIDE PROPER SECUREMENT. PROVIDE AND INSTALL TWO
ROWS OF WALKPADS AT EACH LADDER LANDING.
25. REMOVE ALL CAULKING BY GRINDING OR OTHER METHODS SO NOT TO
DAMAGE STUCCO WALL. REMOVE ANY LOOSE STUCCO MATERIAL AND
PREP AS REQUIRED BY MANUFACTURER TO INSTALL NEW ELASTOMERIC
COATING TO PARAPET EDGE. SEE DETAIL F1/A502.
26. INSTALL NEW DOOR AND HM FRAME. SEE DOOR SCHEDULE SHEET A601
FOR ADDITIONAL INFORMATION.
27. WALKPAD, AS SPECIFIED, TO BE INSTALLED: DOUBLE ROW OF WALKPAD
AT ACCESS POINT AND THREE WORKING SIDES OF ROOFTOP EQUIPMENT.
PROVIDE SINGLE ROW WALKPAD FROM ALL ACCESS POINTS TO
EQUIPMENT. PROVIDE TWO ROWS OF WALKPADS AT ALL ROOF HATCH
AND ACCESS LADDER LANDINGS. LAYOUT SHOWN ON PLANS IS FOR
INTENT. FINAL LAYOUT MAY VARY BASED ON ACTUAL FIELD CONDITIONS.
SHEET KEYNOTES
REFERENCE KEY PLAN
PLAN
NORTH
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
TRUE
NORTH
GENERAL NOTES
1. DENOTES DOOR NUMBER TAG. REFER TO SHEETS A203 & A601 FOR
ADDITIONAL DOOR INFORMATION.
Issue Date October 5, 2022
FINAL CONSTRUCTION
BID DOCUMENTS
July 12, 2023 Amendment 00032
SYMBOLS LEGEND
RD ROOF DRAIN
THRU WALL SCUPPER
V PLUMBING VENT PENETRATION
CURB MOUNTED EXAUST VENT
ARCHITECTURAL VENTS, SEE PHOTO ________
DUCTWORK PENETRATION
E ELECTRICAL CONDUIT PENETRATION - PITCH PAN
ORD OVERFLOW ROOF DRAIN
OPEN CANALE
ACCESS LADDER
ACCESS ROOF HATCH
CURB MOUNTED MECHANICAL UNIT
CURB MOUNTED SKYLIGHT
E ELECTRICAL CONDUIT
G GAS PIPE
SURFACE MOUNTED DUCTWORK
CHAIN-LINK ENCLOSED WALKWAY
MINI-SPLIT COMPESSOR
SURFACE MOUNTED SOLAR CONTROL PANEL
CONCRETE PAVER WALKWAY
CURB MOUNTED AIR INTAKE / EXHAUST
HAZARDOUS AIR EXAUST UNITS
Core #1
Core #2
Core #3
1A
S L O
P E
S L O
P E
7 7
SLOPE
SLOPE
S L O
P E
A
A
B
C
5 6432
B
C
D
10.0'10.0'
12.76'
10 10
80 MIL THERMOPLASTIC MEMBRANE
MIN. 2 LAYERS R-30 RIGID INSULATION
EXISTING WOOD DECK
1/2" HD COVERBOARD
1/2" EXTERIOR GRADE
FIRE-TREATED PLYWOOD
Project Number
Building Number
Drawing Number
Project Title
Location
Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A101
BUILDING #14 - ROOF PLAN
F i t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
VHG Architects 2428 Baylor Drive SE Albuquerque, NM 87106 505.247.9955 Susan Lloyd
ROOF CONSULTANT:
Armstrong Group Inc.
PO Box 92977 Albuquerque, NM 87199 505.235.7596 David Armstrong
REPLACE ROOFS ON CAMPUS
New Mexico VA Campus
501-19-100
Building #14 Project Director
DRA ML/AMBRevisions: Date:
1/4" = 1'-0"
BUILDING #14 - ROOF PLAN
F3
GENERAL SHEET NOTES
1. THE CONTRACTOR SHALL NOT REMOVE ANY EXISTING ROOFING SYSTEM,
DAMAGED DECKING, OR INSTALL NEW ROOFING SYSTEM WHEN WEATHER
CONDITIONS THREATEN THE INTEGRITY OF THE BUILDING CONTENTS OR
OCCUPANTS. THE CONTRACTOR SHALL COMPLETE EACH DAY'S ROOFING
CYCLE AND PROVIDE A WELDED OR FOAMED TEMPORARY SEAL AT
JUNCTION OF NEW ROOF AND EXISTING ROOF. THE CONTRACTOR SHALL
MAINTAIN A WATERPROOF COMPLETED AREA WITH EACH ROOFING CYCLE.
NO TOLERANCES WILL BE GIVEN.
2. ALL LOCATIONS OF ITEMS SHOWN ON ROOF PLANS ARE APPROXIMATE.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
3. PERFORM ALL DISCONNECTS, EXTENSIONS AND RECONNECTIONS AS
REQUIRED TO ACCOMMODATE NEW ROOF HEIGHTS, FOR ITEMS BEING
RAISED AND REMOUNTED FOR RE-ROOFING WORK. AND MUST BE PART OF
CONTRACTORS SUBMITTED WORK SCHEDULE AND MUST BE SCHEDULED
PRIOR TO ANY DISCONNECT OR RECONNECT. RETURN ALL ITEMS TO
OPERATIONAL CONDITION PRIOR TO END OF DAY'S WORK. NOTIFY THE
ARCHITECT OF ANY DEFECTIVE ITEMS DISCOVERED DURING WORK.
4. PIPES 1-1/2" AND SMALLER SHALL BE SUPPORTED AT 8'-0" O.C. MAXIMUM
AND PIPES 2" AND LARGER SHALL BE SUPPORTED AT 10'-0" O.C. MAXIMUM.
5. THIS IS A POPULATED BUILDING SPECIAL CONSIDERATION, SCHEDULING,
NOISE LEVELS AND STAGING WILL BE REQUIRED DURING ROOFING.
6. THE CONTRACTORS SHALL HAVE THE OPPORTUNITY TO ACQUAINT
THEMSELVES WITH ALL EXISTING CONDITIONS AT THE PREBID AND BY
APPOINTMENT IF SECONDARY INSPECTION IS NEEDED. NO ALLOWANCES
SHALL BE MADE FOR CONDITIONS THAT ARE CLEARLY VISIBLE OR
DETECTABLE WITH SOME RESEARCH EFFORT.
7. THE LOADING AREA AVAILABLE AT GROUND LEVEL IS A FIRE, EMERGENCY
AND SECURITY ACCESS AREA, A STRICT SCHEDULE FOR STAGING OF
DELIVERIES AND CRANING OF MATERIAL MUST BE SUBMITTED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE. CONTRACTOR SHALL
COORDINATE ALL NECESSARY PERMITS. ALL MATERIALS WILL HAVE TO BE
STORED ON THE ROOF AREAS AND IN STAGING AREA, AS WELL AS
SANITARY FACILITIES.
8. NO EMPLOYEES WILL BE ALLOWED IN THE BUILDING. ESCORTED
SECURITY WILL NEED TO BE SCHEDULED FOR THE FOLLOWING: ACCESS TO
THE ROOF AND ACCESS TO AREAS WITHIN THE BUILDING NECESSARY TO
COMPLETE THE SCOPE OF WORK.
9. BEFORE ANY UTILITY CUT OFFS OR DEMOLITION IS TO OCCUR, A
SCHEDULE MUST BE SUBMITTED TO THE ARCHITECT. REFER TO SECTION 01
00 00 FOR ADVANCE NOTICE REQUIREMENTS. WORK SCHEDULES WILL
BE REQUIRED TO BE SUBMITTED TO THE OWNER REPRESENTATIVE TWICE
WEEKLY, ANTICIPATING THE NEXT WEEK'S WORK.
10. THE CONTRACTOR SHALL PROVIDE LICENSED PLUMBING, MECHANICAL
AND ELECTRICAL CONTRACTORS TO REMOVE AND REINSTALL ALL EXISTING
EQUIPMENT ON THE ROOF. ALL EQUIPMENT SHALL BE FULLY
OPERATIONAL WHEN REINSTALLED. CONTRACTOR'S WORK SHALL MEET
CURRENT APPLICABLE BUILDING CODES.
11. THE ROOFING CONTRACTOR SHALL PROVIDE FASTENERS AS REQUIRED
FOR CORROSIVE AGENTS ADDED TO TREATED WOOD NAILERS (IF
PRESERVED WOODS ARE USED) AND AS RECOMMENDED BY THE ROOFING
MANUFACTURER AND AS REQUIRED FOR THE WARRANTY.
12. ALL ROOFING SHALL BE ATTACHED TO THE BUILDING IN ACCORDANCE
WITH FM 1-75 WIND UPLIFT FASTENING PATTERN AND ASCE 7
REQUIREMENTS.
13. THE DETAILS SHOWN IN DRAWINGS AND PLANS ARE FOR INTENT. THE
MOST STRINGENT REQUIREMENTS BETWEEN CONSTRUCTION DOCUMENTS,
MANUFACTURERS' DETAILS, SMACNA REQUIREMENTS AND NRCA
RECOMMENDATIONS WILL BE REQUIRED.
14. ALL AREAS TO RECEIVE NEW ROOFING MEMBRANE SHALL BE
INCORPORATED INTO ROOFING WARRANTY, INCLUDING NEW WALL AND
PARAPET MEMBRANE WORK. WARRANTY SHALL INCLUDE ALL
PENETRATIONS, FLASHING AND TERMINATIONS. CONTRACTOR SHALL
PROVIDE AND INSTALL ALL FLASHINGS, TRIM, SEALANTS, NAILERS,
MATERIALS, ETC. REQUIRED TO PROVIDE A COMPLETE WATERPROOF AND
NO DOLLAR LIMIT WARRANTED SYSTEM.
15. CONTRACTOR TO FIELD VERIFY ALL CONDITIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
16. THE ROOFING SYSTEM SHALL BE INSTALLED PER PLANS, DETAILS,
SPECIFICATIONS & MANUFACTURER'S REQUIREMENTS, AND PROVIDE A 30
YEAR NO DOLLAR LIMIT WARRANTY AS OUTLINED IN THE SPECIFICATIONS.
17. PREDRILL ALL METAL FLASHING/ COUNTER FLASHING MATERIAL PRIOR
TO INSTALLING FASTENERS.
18. THESE DRAWINGS INDICATE, IN GENERAL, ITEMS OF MATERIAL AND
EQUIPMENT WHICH MUST BE REMOVED, REUSED, REFINISHED OR
MODIFIED. NO ATTEMPT HAS BEEN MADE TO INDICATE EACH AND EVERY
PORTION OF DEMOLITION AND REMODELING WORK. THE INTENT OF THE
DRAWINGS IS TO PROVIDE A GUIDELINE TO THE CONTRACTOR(S) TO
BETTER ENABLE HIM TO ANTICIPATE THE ENTIRE SCOPE OF WORK. THE
CONTRACTOR(S) ARE ADVISED TO VISIT THE JOB SITE TO GET FAMILIAR
WITH THE WORK : SCOPE, EXTENT AND ROOF AREAS, PRIOR TO BIDDING.
SEE GENERAL NOTE 6 IN REGARD TO SCHEDULING SITE VISITS.
19. ALL WALLS OVER 32" WILL REQUIRE INTERIM TERM BAR. FASTEN 12" O.C..
20. CONTRACTOR SHALL INCLUDE ALL MECHANICAL AND ELECTRICAL
COSTS NECESSARY FOR DISCONNECTING OF EXISTING ROOFTOP
EQUIPMENT AND ITS RE-INSTALLATION . CONDUCT NECESSARY TESTS TO
VERIFY THAT UNITS ARE FUNCTIONAL. THIS INCLUDES RAISING OF CURBS
TO MEET 12" ABOVE FINISHED ROOF. ALL CURBS GREATER THAN 24" WILL
REQUIRE A CRICKET.
21. ON EXISTING ROOFING SYSTEMS AND WALLS THAT ARE NOT PART OF
THIS ROOFING PROJECT, ANY DAMAGE OCCURRING DURING THE
RENOVATION WORK SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER.
NOTIFY OWNER/ ARCHITECT IN WRITING PRIOR TO STARTING WORK IF ANY
DAMAGES ARE PRESENT. DAMAGES NOT REPORTED WILL BE CONSIDERED
NEW AND CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS. REPAIRS
MUST NOT VOID ANY EXISTING WARRANTIES.
22. ALL SECURITY, SATELLITE, WEATHER STATIONS, PHONE AND BUILDING
DECORATIONS WILL BE HANDLED BY OWNER. COORDINATE WITH OWNER
ON DISCONNECT AND RECONNECT.
23. ALL TOOLS AND WORK RELATED EQUIPMENT MUST BE WITHIN WORKERS'
POSSESSION AND CONTROL AT ALL TIMES.
24. CONTRACTOR SHALL PROVIDE AN INVENTORY OF ALL NON WORKING AND
ABANDONED MECHANICAL EQUIPMENT, SUPPLY LINES, DAMAGED
CEILING TILES, SIDEWALKS AND OTHER BLDG COMPONENTS THAT COULD
BE AFFECTED BY ROOFING PROCESS. ALL ABANDONED ITEMS SHALL BE
REMOVED.
25. COORDINATE ALL MECHANICAL UNIT SHUTOFFS WITH THE PROJECT
MANAGER. NO COORDINATION IS TO TAKE PLACE WITH THE USER GROUP.
26. THE DESIGNER AND CONSULTANT IS NOT RESPONSIBLE FOR THE ACT
AND OMISSION OF ANY CONTRACTOR, SUBCONTRACTOR, MATERIAL
SUPPLIER, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: SAFETY
PRECAUTIONS / PROGRAMS AND THEIR ENFORCEMENT, OR FOR THE
CONSTRUCTION MEANS AND METHODS, TECHNIQUES, SEQUENCING AND
PROCEDURES EMPLOYED BY THE CONTRACTORS AND THE INCLUSION OF
THE REQUIREMENTS OF THE MANUFACTURE FROM THEIR PUBLISHED
DOCUMENTS, PROCEDURES, AND THEIR STAFF ISSUED VERBAL AND
WRITTEN INSTRUCTIONS AND REMEDIES.
27. ALL EQUIPMENT THAT CONTAINS FLAMMABLE FLUIDS MUST EITHER BE
REMOVED ON A DAILY BASIS OR THE EQUIPMENT TANK MUST BE DRAINED
AT END OF EACH DAY. ANY FLAMMABLE FLUID IN CONTAINERS MUST BE
REMOVED FROM THE ROOF ON A DAILY BASIS.
28. ROOF MUST BE WATERTIGHT AT ALL TIMES. CONTRACTOR MUST
SUBMIT A NIGHT SEAL PLAN.
SHEET KEYNOTES
1. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2"
HIGH DENSITY COVERBOARD WITH BONDING ADHESIVE. 1/2" HD
COVERBOARD TO BE FOAM ADHERED WITH MANUFACTURER APPROVED
AND UPLIFT TESTED FOAM ADHESIVE TO NEW TO NEW 1/8"/FT TAPERED
POLYISOCYANURATE INSULATION WITH A 1 1/2" START MINIMUM WITH AN
AVERAGE R-30. FIRST LAYER OF INSULATION IS TO BE MECHANICALLY
FASTENED THRU NEW LAYER OF 1/2" FIRE TREATED PLYWOOD THAT HAS
BEEN MECHANICALLY FASTENED TO THE EXISTING WOOD DECK, ALL
REMAINING INSULATION LAYERS ARE TO BE FOAM ADHERED. DO NOT
PENETRATE EXPOSED CEILINGS BELOW. SEE DETAIL B4/A101.
1A. NEW ROOF ASSEMBLY AT ROOF AREA C: FULLY ADHERE 80 MIL TPO
MEMBRANE TO 1/2" HIGH DENSITY COVERBOARD WITH BONDING
ADHESIVE. 1/2" HD COVERBOARD TO BE MECHANICALLY FASTENED THRU
NEW LAYER OF 1/2" FIRE TREATED PLYWOOD TO THE EXISTING WOOD
DECK. DO NOT PENETRATE EXPOSED CEILINGS BELOW.
2. ALL NEW IDENTIFIED CRICKETS IN AREAS INDICATED ON DRAWINGS MUST
PROVIDE POSITIVE SLOPE AND DRAINAGE, WATER TESTED TO INSURE
POSITIVE DRAINAGE. CRICKETS NEED TO BE MINIMUM
1/4
" GREATER THEN
THE SLOPE OF THE ROOF WITH 3 TO 1 RATIO TO CREATE POSITIVE SLOPE.
CRICKETS ARE SHOWN FOR INTENT AND ARE NOT TO SCALE.
CONTRACTOR IS RESPONSIBLE FOR POSITIVE DRAINAGE.
3. VENT PIPE / ELECTRICAL / GAS PIPE PENETRATIONS THROUGH ROOF TO
REMAIN. INSTALL NEW MEMBRANE ROOF FLASHING AS REQUIRED TO
TERMINATE NEW ROOFING SEE DETAILS B1, B3, B5/A501.
4. EXISTING HVAC MECHANICAL EQUIPMENT TO BE REMOVED. INFILL ANY
ASSOCIATED DECK PENETRATIONS WITH 1/2" EXTERIOR GRADE PLYWOOD
OVERLAPPING OPENING BY 2" AND MECHANICALLY FASTENED TO WOOD
DECK.
5. WRAP MEMBRANE UP PARAPET WALLS AND TERMINATE PER DETAIL
D1/A501.
6. INSTALL NEW CANALES TO MATCH EXISTING, PROVIDE COATED METAL
LINERS. WELD MEMBRANE TO LINER. SEE DETAIL F1/A501. PATCH AND
SEAL STUCCO ON OUTSIDE AND COLOR COAT TO MATCH.
7. EXISTING LIGHTNING PROTECTION SYSTEM TO BE REMOVED AND
RECYCLED AND/OR DISPOSED PROPERLY. CONTRACTOR SHALL RECYCLE
LIGHTNING PROTECTION METALS AND REVERT THE DOLLAR AMOUNT
BACK TO CONTRACT FOR CHANGE ORDERS. REFER TO LIGHTNING
PROTECTION SHEETS LP-103 & LP-106 FOR INSTALLATION OF NEW
LIGHTNING PROTECTION SYSTEM. CONTRACTOR TO PROVIDE PROPER
SECUREMENT, SEE DETAIL F9/A501.
8. INSTALL NEW HIGH WALL FLASHING. SEE DETAIL F5/A501.
9. INSTALL EXISTING BUILDING WALL LIGHT IN NEW LOCATION.
10. INFILL ABANDONED DUCT PENETRATIONS WITH 1/2" EXTERIOR GRADE
PLYWOOD, OVERLAPPING OPENING BY 2" AND MECHANICALLY FASTENED
T WOOD DECK.
11. INSTALL NEW FLASHING AT NEW GOOSENECK DUCT PENETRATION. SEE
DETAIL D3/A501.
12. COORDINATE RE-INSTALLATION OF INTERNET ANTENNA WITH OWNER.
13. INSTALL NEW DOWNSPOUT AT EXISTING SCUPPER. ROUTE DOWNSPOUT
TO AVOID EXISTING ACCESS DOOR LOCATED DIRECTLY BENEATH THE
SCUPPER.
14. WALKPAD, AS SPECIFIED, TO BE INSTALLED: DOUBLE ROW OF WALKPAD
AT ACCESS POINT AND THREE WORKING SIDES OF ROOFTOP EQUIPMENT.
PROVIDE SINGLE ROW WALKPAD FROM ALL ACCESS POINTS TO
EQUIPMENT. PROVIDE TWO ROWS OF WALKPADS AT ALL ROOF HATCH
AND ACCESS LADDER LANDINGS. LAYOUT SHOWN ON PLANS IS FOR
INTENT. FINAL LAYOUT MAY VARY BASED ON
ACTUAL FIELD CONDITIONS.
1,692 SF. (SPRAY FOAM OVER BUR) - ROOF A
238 SF. FRONT PORCH (SPRAY FOAM) - ROOF C
240 SF. REAR PORCH -SPRAY FOAM - ROOF B
GENERAL SHEET NOTES, CONT'D.
29. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS.
30. WELD ALL INDUCTION PLATES DAILY, WELD SEAMS DAILY AND PROBE
SEAMS DAILY.
REFERENCE KEY PLAN
2,170 SF
N.T.S.
N.T.S.
BLDG. #14 - ROOF ASSEMBLY
B4
N.T.S.
N.T.S.
ROOF A - CORE PHOTO
F1
CORE #1 - ROOF AREA A:
· 4" SPRAY FOAM
· METAL SHEET
· 1" BUR
· 1" FIBERBOARD
· T&G WOOD DECKING
· CORE THICKNESS: APPROX. 6"
N.T.S.
N.T.S.
ROOF B - CORE PHOTO
E1
N.T.S.
N.T.S.
ROOF C - CORE PHOTO
D1
CORE #3 - ROOF AREA C:
· 1 1/2" SPRAYFOAM
· 2 HYPOLON MEMBRANES
· 3" ISO
· BUR
· WOOD DECK
· CORE THICKNESS: APPROX. 6"
CORE #2 - ROOF AREA B:
· 1 1/2" SPRAY FOAM W/ GRAVEL
· HYPOLON MEMBRANE
· 3 1/2" ISO
· BUR
· 8 PLY BUR
· T&G WOOD DECK
· CORE THICKNESS: APPROX. 7
Issue Date October 5, 2022
FINAL CONSTRUCTION
BID DOCUMENTS
July 12, 2023
THRU WALL SCUPPER
V PLUMBING VENT PENETRATION
CURB MOUNTED EXAUST VENT
ARCHITECTURAL VENTS, SEE PHOTO ________
DUCTWORK PENETRATION
E ELECTRICAL CONDUIT PENETRATION - PITCH PAN
ORD OVERFLOW ROOF DRAIN
OPEN CANALE
ACCESS LADDER
ACCESS ROOF HATCH
CURB MOUNTED MECHANICAL UNIT
CURB MOUNTED SKYLIGHT
E ELECTRICAL CONDUIT
G GAS PIPE
SURFACE MOUNTED DUCTWORK
CHAIN-LINK ENCLOSED WALKWAY
MINI-SPLIT COMPESSOR
SURFACE MOUNTED SOLAR CONTROL PANEL
CONCRETE PAVER WALKWAY
CURB MOUNTED AIR INTAKE / EXHAUST
580 SF
RD
RD
RD
RD
E
E
E
E
E
E
E
E
E
E
E
RD
RD
F t
F t
F t
F t
F t
F t
Core #6
Core #1
Core #2
Core #3
Core #4
Core #5
A
B
C
F t F t
F t
F t
1/4"/Ft
1A
6 3
8 8
7 9
7 9 14
1 2
B
A
C
D
E
21.24'
14.2'
10.4'
80 MIL THERMOPLASTIC MEMBRANE
MIN. 2 LAYERS R-25 RIGID INSULATION
EXISTING LIGHTWEIGHT
CONCRETE OVER METAL
DECK
" HD COVERBOARD
80 MIL THERMOPLASTIC MEMBRANE
EXISTING WOOD DECK
1/2" HD COVERBOARD
1/2" EXTERIOR GRADE
FIRE TREATED PLYWOOD
Project Number
Building Number
Drawing Number
Project Title
Location
Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A101
BUILDING #39 - ROOF PLAN
F i t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
VHG Architects 2428 Baylor Drive SE Albuquerque, NM 87106 505.247.9955 Susan Lloyd
ROOF CONSULTANT:
Armstrong Group Inc.
PO Box 92977 Albuquerque, NM 87199 505.235.7596 David Armstrong
REPLACE ROOFS ON CAMPUS
New Mexico VA Campus
501-19-100
Building #39 Project Director
DRA ML/AMBRevisions: Date:
1/8" = 1'-0"
BUILDING #39 - ROOF PLAN
F2
GENERAL SHEET NOTES
1. THE CONTRACTOR SHALL NOT REMOVE ANY EXISTING ROOFING SYSTEM,
DAMAGED DECKING, OR INSTALL NEW ROOFING SYSTEM WHEN WEATHER
CONDITIONS THREATEN THE INTEGRITY OF THE BUILDING CONTENTS OR
OCCUPANTS. THE CONTRACTOR SHALL COMPLETE EACH DAY'S ROOFING
CYCLE AND PROVIDE A WELDED OR FOAMED TEMPORARY SEAL AT
JUNCTION OF NEW ROOF AND EXISTING ROOF. THE CONTRACTOR SHALL
MAINTAIN A WATERPROOF COMPLETED AREA WITH EACH ROOFING CYCLE.
NO TOLERANCES WILL BE GIVEN.
2. ALL LOCATIONS OF ITEMS SHOWN ON ROOF PLANS ARE APPROXIMATE.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
3. PERFORM ALL DISCONNECTS, EXTENSIONS AND RECONNECTIONS AS
REQUIRED TO ACCOMMODATE NEW ROOF HEIGHTS, FOR ITEMS BEING
RAISED AND REMOUNTED FOR RE-ROOFING WORK. AND MUST BE PART OF
CONTRACTORS SUBMITTED WORK SCHEDULE AND MUST BE SCHEDULED
PRIOR TO ANY DISCONNECT OR RECONNECT. RETURN ALL ITEMS TO
OPERATIONAL CONDITION PRIOR TO END OF DAY'S WORK. NOTIFY THE
ARCHITECT OF ANY DEFECTIVE ITEMS DISCOVERED DURING WORK.
4. PIPES 1-1/2" AND SMALLER SHALL BE SUPPORTED AT 8'-0" O.C. MAXIMUM
AND PIPES 2" AND LARGER SHALL BE SUPPORTED AT 10'-0" O.C. MAXIMUM.
5. THIS IS A POPULATED BUILDING SPECIAL CONSIDERATION, SCHEDULING,
NOISE LEVELS AND STAGING WILL BE REQUIRED DURING ROOFING.
6. THE CONTRACTORS SHALL HAVE THE OPPORTUNITY TO ACQUAINT
THEMSELVES WITH ALL EXISTING CONDITIONS AT THE PREBID AND BY
APPOINTMENT IF SECONDARY INSPECTION IS NEEDED. NO ALLOWANCES
SHALL BE MADE FOR CONDITIONS THAT ARE CLEARLY VISIBLE OR
DETECTABLE WITH SOME RESEARCH EFFORT.
7. THE LOADING AREA AVAILABLE AT GROUND LEVEL IS A FIRE, EMERGENCY
AND SECURITY ACCESS AREA, A STRICT SCHEDULE FOR STAGING OF
DELIVERIES AND CRANING OF MATERIAL MUST BE SUBMITTED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE. CONTRACTOR SHALL
COORDINATE ALL NECESSARY PERMITS. ALL MATERIALS WILL HAVE TO BE
STORED ON THE ROOF AREAS AND IN STAGING AREA, AS WELL AS
SANITARY FACILITIES.
8. NO EMPLOYEES WILL BE ALLOWED IN THE BUILDING. ESCORTED
SECURITY WILL NEED TO BE SCHEDULED FOR THE FOLLOWING: ACCESS TO
THE ROOF AND ACCESS TO AREAS WITHIN THE BUILDING NECESSARY TO
COMPLETE THE SCOPE OF WORK.
9. BEFORE ANY UTILITY CUT OFFS OR DEMOLITION IS TO OCCUR, A
SCHEDULE MUST BE SUBMITTED TO THE ARCHITECT. REFER TO SECTION 01
00 00 FOR ADVANCE NOTICE REQUIREMENTS. WORK SCHEDULES WILL BE
REQUIRED TO BE SUBMITTED TO THE OWNER REPRESENTATIVE TWICE
WEEKLY, ANTICIPATING THE NEXT WEEK'S WORK.
10. THE CONTRACTOR SHALL PROVIDE LICENSED PLUMBING, MECHANICAL
AND ELECTRICAL CONTRACTORS TO REMOVE AND REINSTALL ALL EXISTING
EQUIPMENT ON THE ROOF. ALL EQUIPMENT SHALL BE FULLY OPERATIONAL
WHEN REINSTALLED. CONTRACTOR'S WORK SHALL MEET CURRENT
APPLICABLE BUILDING CODES.
11. THE ROOFING CONTRACTOR SHALL PROVIDE FASTENERS AS REQUIRED
FOR CORROSIVE AGENTS ADDED TO TREATED WOOD NAILERS (IF
PRESERVED WOODS ARE USED) AND AS RECOMMENDED BY THE ROOFING
MANUFACTURER AND AS REQUIRED FOR THE WARRANTY.
12. ALL ROOFING SHALL BE ATTACHED TO THE BUILDING IN ACCORDANCE
WITH FM 1-75 WIND UPLIFT FASTENING PATTERN AND ASCE 7
REQUIREMENTS.
13. THE DETAILS SHOWN IN DRAWINGS AND PLANS ARE FOR INTENT. THE
MOST STRINGENT REQUIREMENTS BETWEEN CONSTRUCTION DOCUMENTS,
MANUFACTURERS' DETAILS, SMACNA REQUIREMENTS AND NRCA
RECOMMENDATIONS WILL BE REQUIRED.
14. ALL AREAS TO RECEIVE NEW ROOFING MEMBRANE SHALL BE
INCORPORATED INTO ROOFING WARRANTY, INCLUDING NEW WALL AND
PARAPET MEMBRANE WORK. WARRANTY SHALL INCLUDE ALL
PENETRATIONS, FLASHING AND TERMINATIONS. CONTRACTOR SHALL
PROVIDE AND INSTALL ALL FLASHINGS, TRIM, SEALANTS, NAILERS,
MATERIALS, ETC. REQUIRED TO PROVIDE A COMPLETE WATERPROOF AND
NO DOLLAR LIMIT WARRANTED SYSTEM.
15. CONTRACTOR TO FIELD VERIFY ALL CONDITIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
16. THE ROOFING SYSTEM SHALL BE INSTALLED PER PLANS, DETAILS,
SPECIFICATIONS & MANUFACTURER'S REQUIREMENTS, AND PROVIDE A 30
YEAR NO DOLLAR LIMIT WARRANTY AS OUTLINED IN THE SPECIFICATIONS.
17. PREDRILL ALL METAL FLASHING/ COUNTER FLASHING MATERIAL PRIOR
TO INSTALLING FASTENERS.
18. THESE DRAWINGS INDICATE, IN GENERAL, ITEMS OF MATERIAL AND
EQUIPMENT WHICH MUST BE REMOVED, REUSED, REFINISHED OR
MODIFIED. NO ATTEMPT HAS BEEN MADE TO INDICATE EACH AND EVERY
PORTION OF DEMOLITION AND REMODELING WORK. THE INTENT OF THE
DRAWINGS IS TO PROVIDE A GUIDELINE TO THE CONTRACTOR(S) TO
BETTER ENABLE HIM TO ANTICIPATE THE ENTIRE SCOPE OF WORK. THE
CONTRACTOR(S) ARE ADVISED TO VISIT THE JOB SITE TO GET FAMILIAR
WITH THE WORK : SCOPE, EXTENT AND ROOF AREAS, PRIOR TO BIDDING.
SEE GENERAL NOTE 6 IN REGARD TO SCHEDULING SITE VISITS.
19. ALL WALLS OVER 32" WILL REQUIRE INTERIM TERM BAR. FASTEN 12" O.C..
20. CONTRACTOR SHALL INCLUDE ALL MECHANICAL AND ELECTRICAL
COSTS NECESSARY FOR DISCONNECTING OF EXISTING ROOFTOP
EQUIPMENT AND ITS RE-INSTALLATION . CONDUCT NECESSARY TESTS TO
VERIFY THAT UNITS ARE FUNCTIONAL. THIS INCLUDES RAISING OF CURBS
TO MEET 12" ABOVE FINISHED ROOF. ALL CURBS GREATER THAN 24" WILL
REQUIRE A CRICKET.
21. ON EXISTING ROOFING SYSTEMS AND WALLS THAT ARE NOT PART OF
THIS ROOFING PROJECT, ANY DAMAGE OCCURRING DURING THE
RENOVATION WORK SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER.
NOTIFY OWNER/ ARCHITECT IN WRITING PRIOR TO STARTING WORK IF ANY
DAMAGES ARE PRESENT. DAMAGES NOT REPORTED WILL BE CONSIDERED
NEW AND CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS. REPAIRS
MUST NOT VOID ANY EXISTING WARRANTIES.
22. ALL SECURITY, SATELLITE, WEATHER STATIONS, PHONE AND BUILDING
DECORATIONS WILL BE HANDLED BY OWNER. COORDINATE WITH OWNER
ON DISCONNECT AND RECONNECT.
23. ALL TOOLS AND WORK RELATED EQUIPMENT MUST BE WITHIN WORKERS'
POSSESSION AND CONTROL AT ALL TIMES.
24. CONTRACTOR SHALL PROVIDE AN INVENTORY OF ALL NON WORKING AND
ABANDONED MECHANICAL EQUIPMENT, SUPPLY LINES, DAMAGED
CEILING TILES, SIDEWALKS AND OTHER BLDG COMPONENTS THAT COULD
BE AFFECTED BY ROOFING PROCESS. ALL ABANDONED ITEMS SHALL BE
REMOVED.
25. COORDINATE ALL MECHANICAL UNIT SHUTOFFS WITH THE PROJECT
MANAGER. NO COORDINATION IS TO TAKE PLACE WITH THE USER GROUP.
26. THE DESIGNER AND CONSULTANT IS NOT RESPONSIBLE FOR THE ACT
AND OMISSION OF ANY CONTRACTOR, SUBCONTRACTOR, MATERIAL
SUPPLIER, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: SAFETY
PRECAUTIONS / PROGRAMS AND THEIR ENFORCEMENT, OR FOR THE
CONSTRUCTION MEANS AND METHODS, TECHNIQUES, SEQUENCING AND
PROCEDURES EMPLOYED BY THE CONTRACTORS AND THE INCLUSION OF
THE REQUIREMENTS OF THE MANUFACTURE FROM THEIR PUBLISHED
DOCUMENTS, PROCEDURES, AND THEIR STAFF ISSUED VERBAL AND
WRITTEN INSTRUCTIONS AND REMEDIES.
27. ALL EQUIPMENT THAT CONTAINS FLAMMABLE FLUIDS MUST EITHER BE
REMOVED ON A DAILY BASIS OR THE EQUIPMENT TANK MUST BE DRAINED
AT END OF EACH DAY. ANY FLAMMABLE FLUID IN CONTAINERS MUST BE
REMOVED FROM THE ROOF ON A DAILY BASIS.
28. ROOF MUST BE WATERTIGHT AT ALL TIMES. CONTRACTOR MUST
SUBMIT A NIGHT SEAL PLAN.
SHEET KEYNOTES
1. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2"
HIGH DENSITY COVERBOARD WITH BONDING ADHESIVE. 1/2" HD
COVERBOARD TO BE FOAM ADHERED WITH MANUFACTURER APPROVED
AND UPLIFT TESTED FOAM ADHESIVE TO NEW MIN. 2 LAYERS
POLYISOCYANURATE INSULATION EQUALING R-30. FIRST LAYER OF
INSULATION IS TO BE MECHANICALLY FASTENED TO THE EXISTING
LIGHTWEIGHT CONCRETE OVER METAL DECK, ALL REMAINING INSULATION
LAYERS ARE TO BE FOAM ADHERED. SEE DETAIL C6/A101.
BASE BID TO INCLUDE 1200SF OF LIGHTWEIGHT CONCRETE DECK
REPLACEMENT. PROVIDE UNIT PRICE PER SF FOR DECK REPLACEMENT AS
WELL.
1A. FOR ROOF AREA 'C': FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2" HIGH
DENSITY COVERBOARD WITH BONDING ADHESIVE. 1/2" HD COVERBOARD
TO BE MECHANICALLY FASTENED THRU NEW LAYER OF 1/2" FIRE TREATED
PLYWOOD TO THE EXISTING WOOD DECK. DO NOT PENETRATE EXPOSED
CEILINGS BELOW. SEE DETAIL B6/A101.
BASE BID TO INCLUDE 1000SF OF 3/4" PLYWOOD DECK REPLACEMENT.
PROVIDE UNIT PRICE PER SF FOR DECK REPLACEMENT AS WELL.
2. ALL NEW IDENTIFIED CRICKETS IN AREAS INDICATED ON DRAWINGS MUST
PROVIDE POSITIVE SLOPE AND DRAINAGE, WATER TESTED TO INSURE
POSITIVE DRAINAGE. CRICKETS NEED TO BE MINIMUM
1/4
" GREATER THEN
THE SLOPE OF THE ROOF WITH 3 TO 1 RATIO TO CREATE POSITIVE SLOPE.
CRICKETS ARE SHOWN FOR INTENT AND ARE NOT TO SCALE.
CONTRACTOR IS RESPONSIBLE FOR POSITIVE DRAINAGE.
3. VENT PIPE / ELECTRICAL / GAS PIPE PENETRATIONS THROUGH ROOF TO
BE LEFT IN PLACE. INSTALL NEW MEMBRANE ROOF FLASHING AS
REQUIRED TO TERMINATE NEW ROOFING. SEE DETAILS B1, B3, B5/A501.
4. EXISTING HVAC MECHANICAL EQUIPMENT TO BE REMOVED, RAISED AND
REINSTALLED AS REQUIRED FOR NEW ROOFING INSTALLATION. INSTALL
NEW KNEE CURBS TO REPLACE ANY WOOD SUPPORTS. SEE DETAIL
F7/A501. INSTALL NEW FLASHING AT EXISTING PENETRATION ENCLOSURE.
5. PRIMARY ROOF DRAINS: CLEAN,TEST FOR POSITIVE DRAINAGE AND
REINSTALL DRAIN STRAINER. IF STRAINER IS PLASTIC, REPLACE WITH
CAST IRON. SEE DETAILS F1/A501. VERIFY PROPER DRAINAGE AND SOLID
CONNECTION OF DRAIN BOWL AND PIPE. INSTALL NEW MANUFACTURER
APPROVED COMPATIBLE SYSTEM.
6. ALL SURFACE RUN GAS LINES AND ELECTRICAL CONDUITS TO HAVE NEW
SUPPORTS PER DETAIL D8/A501.
7. PROVIDE NEW FAUX COPING WITH NEW NAILER PER DETAIL D1, D3/A501.
8. PROVIDE NEW COATED METAL CANALE LINERS, WELD MEMBRANE TO
LINER. PROVIDE SHOP DRAWINGS OF EACH TYPE OF SCUPPER. SEE
DETAIL F3/A501. PATCH & SEAL STUCCO ON OUTSIDE. COLOR COAT TO
MATCH.
9. EXISTING LIGHTNING PROTECTION SYSTEM TO BE REMOVED AND
RECYCLED AND/OR DISPOSED PROPERLY. CONTRACTOR SHALL RECYCLE
LIGHTNING PROTECTION METALS AND REVERT THE DOLLAR AMOUNT
BACK TO CONTRACT FOR CHANGE ORDERS. REFER TO LIGHTNING
PROTECTION SHEETS LP-102 & LP-106 FOR INSTALLATION OF NEW
LIGHTNING PROTECTION SYSTEM. CONTRACTOR TO PROVIDE PROPER
SECUREMENT, SEE DETAIL D7/A501.
10. INSTALL NEW ROOF HATCH AND RAISE CURB AS REQUIRED PER DETAIL
F8/A501. REROUTE EXISTING WIRING OUTSIDE OF HATCH.
11. COORDINATE NEW MECHANICAL BASED ON NEW MECHANICAL
PROJECTS.
12. INSTALL NEW COUNTERFLASHING ON HIGH WALL CONDITIONS.
SEE DETAILS F5/A501.
13. INSTALL NEW ROOF CURB DETAIL, SEE DETAIL B7, B8/A501.
14. INSTALL 3/4" FIRE TREATED PLYWOOD ON THE INTERIOR OF THE PARAPET
WALL AND NEW FIRE TREATED NAILERS AT THE TOP OF ALL PARAPET
WALLS, SEE DETAIL D1. D3/A501.
15. INSTALL NEW ACCESS LADDER AT NEW ROOF HATCH.
16. INSTALL NEW ROOF TO WALL EXPANSION JOINT. SEE DETAIL D9/A-501.
RAISE AND RE-INSTALL EXISTING CONDUIT AS REQUIRED TO
ACCOMMODATE NEW ROOFING AND EXPANSION JOINT INSTALLATION.
17. WALKPAD, AS SPECIFIED, TO BE INSTALLED: DOUBLE ROW OF WALKPAD
AT ACCESS POINT AND THREE WORKING SIDES OF ROOFTOP EQUIPMENT.
PROVIDE SINGLE ROW WALKPAD FROM ALL ACCESS POINTS TO
EQUIPMENT. PROVIDE TWO ROWS OF WALKPADS AT ALL ROOF HATCH
AND ACCESS LADDER LANDINGS. LAYOUT SHOWN ON PLANS IS FOR
INTENT. FINAL LAYOUT MAY VARY BASED ON
ACTUAL FIELD CONDITIONS.
9,631 SF
GENERAL SHEET NOTES, CONT'D.
29. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS.
30. WELD ALL INDUCTION PLATES DAILY, WELD SEAMS DAILY AND PROBE
SEAMS DAILY.
REFERENCE KEY PLAN
N.T.S.
N.T.S.
BLDG. #39 - ROOF ASSEMBLY
C6
N.T.S.
BLDG. #39 - ROOF ASSEMBLY ROOF C
B6
Issue Date October 5, 2022
FINAL CONSTRUCTION
BID DOCUMENTS
July 12, 2023 Amendment 00032
959 SF
B
A
A
C
C
C
D
F
E
G
E
E
E
RD
ORD
E
E
RD
ORD
E
E
E
E
E
E
RD
RD
RD
RD
HI
F
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
RD
E
E
E
E
DIVIDER WALL
DIVIDER WALL
DIVIDER WALL
RD
RD
RD
RD
RD
RD
RD
RD
RD
5RD
RD
RD
RD
1A
S L
O P
E
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE SLOPE
SLOPE
SLOPE
S L O
P E
S L O
P E
S L
O P
E
S L
O P
E
SLOPE
SLOPE
SLOPE
S L O
P E
S L
O P
E
S L
O P
E
EJ
S L
O P
E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
SLOPE
SLOPE
S L
O P
E
SLOPE
108108
XX
7 7
1 2
A
3 4 5 6 7 8 9 10 11 12
B
C
D
E
F
G
H
I
J
15.72'
15.72'
15.72'
15.72'
15.72'
15.72'
15.72'
15.72'
15.72'
19.76'
12.0'
1B
1B
1B
1B
1B
1B
1B
1B
1B
1B
1B
1B
1B
1B
1C
1B
SYMBOLS LEGEND
RD ROOF DRAIN
THRU WALL SCUPPER
V PLUMBING VENT PENETRATION
CURB MOUNTED EXAUST VENT
ARCHITECTURAL VENTS, SEE PHOTO ________
DUCTWORK PENETRATION
E ELECTRICAL CONDUIT PENETRATION - PITCH PAN
ORD OVERFLOW ROOF DRAIN
OPEN CANALE
ACCESS LADDER
ACCESS ROOF HATCH
CURB MOUNTED MECHANICAL UNIT
CURB MOUNTED SKYLIGHT
E ELECTRICAL CONDUIT
G GAS PIPE
SURFACE MOUNTED DUCTWORK
CHAIN-LINK ENCLOSED WALKWAY
MINI-SPLIT COMPESSOR
SURFACE MOUNTED SOLAR CONTROL PANEL
CONCRETE PAVER WALKWAY
CURB MOUNTED AIR INTAKE / EXHAUST
80 MIL THERMOPLASTIC MEMBRANE
1/4"/FT TAPERED INSULATION, WITH A
MINIMUM 1 1/2" START, AVERAGE R-30
EXISTING METAL DECK
1/2" HD COVERBOARD
80 MIL THERMOPLASTIC MEMBRANE
1/4"/FT TAPERED INSULATION, WITH A
MINIMUM 1 1/2" START, AVERAGE R-30
EXISTING METAL DECK
1/2" HD COVERBOARD
1/2" HD COVERBOARD
PEEL & STICK VAPOR BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A101
BUILDING #45 - ROOF PLAN
F i t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
VHG Architects 2428 Baylor Drive SE Albuquerque, NM 87106 505.247.9955 Susan Lloyd
ROOF CONSULTANT:
Armstrong Group Inc.
PO Box 92977 Albuquerque, NM 87199 505.235.7596 David Armstrong
REPLACE ROOFS ON CAMPUS
New Mexico VA Campus
501-19-100
Building #45 Project Director
DRA ML/AMBRevisions: Date:
1/16" = 1'-0"
BUILDING #45 - ROOF PLAN
F2
GENERAL SHEET NOTES
1. THE CONTRACTOR SHALL NOT REMOVE ANY EXISTING ROOFING SYSTEM,
DAMAGED DECKING, OR INSTALL NEW ROOFING SYSTEM WHEN WEATHER
CONDITIONS THREATEN THE INTEGRITY OF THE BUILDING CONTENTS OR
OCCUPANTS. THE CONTRACTOR SHALL COMPLETE EACH DAY'S ROOFING
CYCLE AND PROVIDE A WELDED OR FOAMED TEMPORARY SEAL AT
JUNCTION OF NEW ROOF AND EXISTING ROOF. THE CONTRACTOR SHALL
MAINTAIN A WATERPROOF COMPLETED AREA WITH EACH ROOFING CYCLE.
NO TOLERANCES WILL BE GIVEN.
2. ALL LOCATIONS OF ITEMS SHOWN ON ROOF PLANS ARE APPROXIMATE.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
3. PERFORM ALL DISCONNECTS, EXTENSIONS AND RECONNECTIONS AS
REQUIRED TO ACCOMMODATE NEW ROOF HEIGHTS, FOR ITEMS BEING
RAISED AND REMOUNTED FOR RE-ROOFING WORK. AND MUST BE PART OF
CONTRACTORS SUBMITTED WORK SCHEDULE AND MUST BE SCHEDULED
PRIOR TO ANY DISCONNECT OR RECONNECT. RETURN ALL ITEMS TO
OPERATIONAL CONDITION PRIOR TO END OF DAY'S WORK. NOTIFY THE
ARCHITECT OF ANY DEFECTIVE ITEMS DISCOVERED DURING WORK.
4. PIPES 1-1/2" AND SMALLER SHALL BE SUPPORTED AT 8'-0" O.C. MAXIMUM
AND PIPES 2" AND LARGER SHALL BE SUPPORTED AT 10'-0" O.C. MAXIMUM.
5. THIS IS A POPULATED BUILDING SPECIAL CONSIDERATION, SCHEDULING,
NOISE LEVELS AND STAGING WILL BE REQUIRED DURING ROOFING.
6. THE CONTRACTORS SHALL HAVE THE OPPORTUNITY TO ACQUAINT
THEMSELVES WITH ALL EXISTING CONDITIONS AT THE PREBID AND BY
APPOINTMENT IF SECONDARY INSPECTION IS NEEDED. NO ALLOWANCES
SHALL BE MADE FOR CONDITIONS THAT ARE CLEARLY VISIBLE OR
DETECTABLE WITH SOME RESEARCH EFFORT.
7. THE LOADING AREA AVAILABLE AT GROUND LEVEL IS A FIRE, EMERGENCY
AND SECURITY ACCESS AREA, A STRICT SCHEDULE FOR STAGING OF
DELIVERIES AND CRANING OF MATERIAL MUST BE SUBMITTED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE. CONTRACTOR SHALL
COORDINATE ALL NECESSARY PERMITS. ALL MATERIALS WILL HAVE TO BE
STORED ON THE ROOF AREAS AND IN STAGING AREA, AS WELL AS
SANITARY FACILITIES.
8. NO EMPLOYEES WILL BE ALLOWED IN THE BUILDING. ESCORTED
SECURITY WILL NEED TO BE SCHEDULED FOR THE FOLLOWING: ACCESS TO
THE ROOF AND ACCESS TO AREAS WITHIN THE BUILDING NECESSARY TO
COMPLETE THE SCOPE OF WORK.
9. BEFORE ANY UTILITY CUT OFFS OR DEMOLITION IS TO OCCUR, A
SCHEDULE MUST BE SUBMITTED TO THE ARCHITECT. REFER TO SECTION 01
00 00 FOR ADVANCE NOTICE REQUIREMENTS. WORK SCHEDULES WILL BE
REQUIRED TO BE SUBMITTED TO THE OWNER REPRESENTATIVE TWICE
WEEKLY, ANTICIPATING THE NEXT WEEK'S WORK.
10. THE CONTRACTOR SHALL PROVIDE LICENSED PLUMBING, MECHANICAL
AND ELECTRICAL CONTRACTORS TO REMOVE AND REINSTALL ALL EXISTING
EQUIPMENT ON THE ROOF. ALL EQUIPMENT SHALL BE FULLY OPERATIONAL
WHEN REINSTALLED. CONTRACTOR'S WORK SHALL MEET CURRENT
APPLICABLE BUILDING CODES.
11. THE ROOFING CONTRACTOR SHALL PROVIDE FASTENERS AS REQUIRED
FOR CORROSIVE AGENTS ADDED TO TREATED WOOD NAILERS (IF
PRESERVED WOODS ARE USED) AND AS RECOMMENDED BY THE ROOFING
MANUFACTURER AND AS REQUIRED FOR THE WARRANTY.
12. ALL ROOFING SHALL BE ATTACHED TO THE BUILDING IN ACCORDANCE
WITH FM 1-75 WIND UPLIFT FASTENING PATTERN AND ASCE 7
REQUIREMENTS.
13. THE DETAILS SHOWN IN DRAWINGS AND PLANS ARE FOR INTENT. THE
MOST STRINGENT REQUIREMENTS BETWEEN CONSTRUCTION DOCUMENTS,
MANUFACTURERS' DETAILS, SMACNA REQUIREMENTS AND NRCA
RECOMMENDATIONS WILL BE REQUIRED.
14. ALL AREAS TO RECEIVE NEW ROOFING MEMBRANE SHALL BE
INCORPORATED INTO ROOFING WARRANTY, INCLUDING NEW WALL AND
PARAPET MEMBRANE WORK. WARRANTY SHALL INCLUDE ALL
PENETRATIONS, FLASHING AND TERMINATIONS. CONTRACTOR SHALL
PROVIDE AND INSTALL ALL FLASHINGS, TRIM, SEALANTS, NAILERS,
MATERIALS, ETC. REQUIRED TO PROVIDE A COMPLETE WATERPROOF AND
NO DOLLAR LIMIT WARRANTED SYSTEM.
15. CONTRACTOR TO FIELD VERIFY ALL CONDITIONS PRIOR TO BID. NO
ALLOWANCES WILL BE MADE FOR ADDITIONAL AMOUNTS OF ROOFING
MATERIAL, FLASHING, LABOR, ETC. NOT VERIFIED AND NOTIFIED BY THE
CONTRACTOR TO THE OWNER REPRESENTATIVE PRIOR TO BID.
16. THE ROOFING SYSTEM SHALL BE INSTALLED PER PLANS, DETAILS,
SPECIFICATIONS & MANUFACTURER'S REQUIREMENTS, AND PROVIDE A 30
YEAR NO DOLLAR LIMIT WARRANTY AS OUTLINED IN THE SPECIFICATIONS.
17. PREDRILL ALL METAL FLASHING/ COUNTER FLASHING MATERIAL PRIOR
TO INSTALLING FASTENERS.
18. THESE DRAWINGS INDICATE, IN GENERAL, ITEMS OF MATERIAL AND
EQUIPMENT WHICH MUST BE REMOVED, REUSED, REFINISHED OR
MODIFIED. NO ATTEMPT HAS BEEN MADE TO INDICATE EACH AND EVERY
PORTION OF DEMOLITION AND REMODELING WORK. THE INTENT OF THE
DRAWINGS IS TO PROVIDE A GUIDELINE TO THE CONTRACTOR(S) TO
BETTER ENABLE HIM TO ANTICIPATE THE ENTIRE SCOPE OF WORK. THE
CONTRACTOR(S) ARE ADVISED TO VISIT THE JOB SITE TO GET FAMILIAR
WITH THE WORK : SCOPE, EXTENT AND ROOF AREAS, PRIOR TO BIDDING.
SEE GENERAL NOTE 6 IN REGARD TO SCHEDULING SITE VISITS.
19. ALL WALLS OVER 32" WILL REQUIRE INTERIM TERM BAR. FASTEN 12" O.C..
20. CONTRACTOR SHALL INCLUDE ALL MECHANICAL AND ELECTRICAL
COSTS NECESSARY FOR DISCONNECTING OF EXISTING ROOFTOP
EQUIPMENT AND ITS RE-INSTALLATION . CONDUCT NECESSARY TESTS TO
VERIFY THAT UNITS ARE FUNCTIONAL. THIS INCLUDES RAISING OF CURBS
TO MEET 12" ABOVE FINISHED ROOF. ALL CURBS GREATER THAN 24" WILL
REQUIRE A CRICKET.
21. ON EXISTING ROOFING SYSTEMS AND WALLS THAT ARE NOT PART OF
THIS ROOFING PROJECT, ANY DAMAGE OCCURRING DURING THE
RENOVATION WORK SHALL BE REPAIRED AT NO EXPENSE TO THE OWNER.
NOTIFY OWNER/ ARCHITECT IN WRITING PRIOR TO STARTING WORK IF ANY
DAMAGES ARE PRESENT. DAMAGES NOT REPORTED WILL BE CONSIDERED
NEW AND CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS. REPAIRS
MUST NOT VOID ANY EXISTING WARRANTIES.
22. ALL SECURITY, SATELLITE, WEATHER STATIONS, PHONE AND BUILDING
DECORATIONS WILL BE HANDLED BY OWNER. COORDINATE WITH OWNER
ON DISCONNECT AND RECONNECT.
23. ALL TOOLS AND WORK RELATED EQUIPMENT MUST BE WITHIN WORKERS'
POSSESSION AND CONTROL AT ALL TIMES.
24. CONTRACTOR SHALL PROVIDE AN INVENTORY OF ALL NON WORKING AND
ABANDONED MECHANICAL EQUIPMENT, SUPPLY LINES, DAMAGED
CEILING TILES, SIDEWALKS AND OTHER BLDG COMPONENTS THAT COULD
BE AFFECTED BY ROOFING PROCESS. ALL ABANDONED ITEMS SHALL BE
REMOVED.
25. COORDINATE ALL MECHANICAL UNIT SHUTOFFS WITH THE PROJECT
MANAGER. NO COORDINATION IS TO TAKE PLACE WITH THE USER GROUP.
26. THE DESIGNER AND CONSULTANT IS NOT RESPONSIBLE FOR THE ACT
AND OMISSION OF ANY CONTRACTOR, SUBCONTRACTOR, MATERIAL
SUPPLIER, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: SAFETY
PRECAUTIONS / PROGRAMS AND THEIR ENFORCEMENT, OR FOR THE
CONSTRUCTION MEANS AND METHODS, TECHNIQUES, SEQUENCING AND
PROCEDURES EMPLOYED BY THE CONTRACTORS AND THE INCLUSION OF
THE REQUIREMENTS OF THE MANUFACTURE FROM THEIR PUBLISHED
DOCUMENTS, PROCEDURES, AND THEIR STAFF ISSUED VERBAL AND
WRITTEN INSTRUCTIONS AND REMEDIES.
27. ALL EQUIPMENT THAT CONTAINS FLAMMABLE FLUIDS MUST EITHER BE
REMOVED ON A DAILY BASIS OR THE EQUIPMENT TANK MUST BE DRAINED
AT END OF EACH DAY. ANY FLAMMABLE FLUID IN CONTAINERS MUST BE
REMOVED FROM THE ROOF ON A DAILY BASIS.
28. ROOF MUST BE WATERTIGHT AT ALL TIMES. CONTRACTOR MUST
SUBMIT A NIGHT SEAL PLAN.
SHEET KEYNOTES
OUTLINE OF SOLAR PANELS
SEE DEMO KEYNOTE A
OUTLINE OF SOLAR PANELS
OUTLINE OF SOLAR PANELS
OUTLINE OF SOLAR PANELS
Core #8
F t
F t
Core #7
F t
1/4"/Ft.
Core #1
Core #2
Core #3
Core #4
Core #5
Core #6
1. NEW ROOF ASSEMBLY: FULLY ADHERE 80 MIL TPO MEMBRANE TO 1/2"
HIGH DENSITY COVERBOARD WITH BONDING ADHESIVE. 1/2" HD
COVERBOARD TO BE FOAM ADHERED WITH MANUFACTURER APPROVED
AND UPLIFT TESTED FOAM ADHESIVE TO NEW 1/4"/FT TAPERED
POLYISOCYANURATE INSULATION WITH A 1 1/2" START MINIMUM WITH AN
AVERAGE R-30. FIRST LAYER OF INSULATION IS TO BE MECHANICALLY
FASTENED TO THE EXISTING METAL DECK, ALL REMAINING INSULATION
LAYERS ARE TO BE FOAM ADHERED. SEE DETAIL E1/A101.
1A. NEW ROOF ASSEMBLY - ROOF AREA B: FULLY ADHERE TPO MEMBRANE TO
1/2" HIGH DENSITY COVERBOARD WITH BONDING ADHESIVE. 1/2" HD
COVERBOARD TO BE FOAM ADHERED WITH MANUFACTURER APPROVED
AND UPLIFT TESTED FOAM ADHESIVE TO NEW 1/4"/FT TAPERED
POLYISOCYANURATE INSULATION WITH A 1 1/2" START MINIMUM WITH AN
AVERAGE R-30. ALL LAYERS OF INSULATION TO BE FOAM ADHERED TO
NEW PEEL & STICK VAPOR BARRIER THAT HAS BEEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .