Pages 61_95 from 00 _ ABQ PV Drawing.pdf
PDF 13 MB Posted
- Attached to
- Replace Roofs on Campus Federal contract opportunity
- Solicitation number
- 36C26223B0007
About this file
This document outlines a federal solicitation for roof replacement services at the VA New Mexico Healthcare System campus in Albuquerque, New Mexico. The solicitation seeks to "Replace Roofs on Campus" and will procure all necessary supervision, labor, materials, equipment, and transportation to accomplish the work. The scope includes general construction, roofing replacement, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. All work must be performed according to the solicitation terms and conditions, specifications, drawings, and applicable local and VA building codes. This procurement is set aside as a 100% SDVOSB requirement and contractors must be verified in the VetCert database. The NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $45 million. The estimated value of this construction project is between $5 million and $10 million. Interested parties should contact the contracting specialist, Steven J. Covell, at the email provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses RFIs 43_ 54 VA Reroofs 501_19_100.docx | DOCX document | |
| 36C26223B0007 0003.pdf | ||
| REVISED SHEETS_BLDGS 1_14_39_45_46.pdf | ||
| Pages 31_60 from 00 _ ABQ PV Drawing.pdf | ||
| Pages 1_30 from 00 _ ABQ PV Drawing.pdf | ||
| 36C26223B0007 0002.pdf | ||
| RFIs 1_ 42 VA Reroofs 501_149_100 _ Addendum 01.pdf | ||
| REVISED SHEETS_BLDG_1_BLDG_45_BLDG_46.pdf | ||
| VA Roofing 501-19-100_General Spec Manual_FINAL-UPDATD.pdf | ||
| Amendment 0001 36C26223B0007.pdf | ||
| Attachment A Specifications.pdf | ||
| Attachment E ACM Testing Report.pdf | ||
| Solicitation 36C26223B0007.pdf | ||
| Attachment B Drawings.pdf | ||
| Attachment C Wage Determination.pdf | ||
| Attachment D Bid Schedule.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSS 6"x4"x`1|8`" WELDED
BOTTOM CHORD
HSS 14"x6"x`3|16̀" WELDED
COLUMN ASSEMBLY
HSS 14"x6"x`3|16̀" WELDED
COLUMN ASSEMBLY
2" SQ 11GA
TRUSS STRUT
(2) `3|8`" x 1" LONG HEX HEAD
CAP SCREW, w/ AVK KNURLED
THREADED INSERT (TYP. FOR ALL
PURLIN CONNECTIONS)
15 x 7" x `3|8`"
POST TOP PLATE
HSS 6"x4"x`1|8`" WELDED
TOP CHORD
FORMED APEX GUSSET
`1|4`" THK
FORMED 10GA
PURLIN CLIP
FORMED 10GA
PURLIN CLIP
(8) `3|4`" X 6" GRADE 5 BOLTS PER EA.
TOP CHORD
CONNECTION
`1|4`" THK. FORMED BOTTOM
CHORD CLIP - EACH SIDE
(4) `3|4`" X 6" GRADE 5 BOLTS PER EA.
BOTTOM
CHORD CONNECTION
2" SQ 11GA
TRUSS STRUT
FORMED APEX GUSSET
`1|4`" THK
SOLAR RACKING ALUMINUM
RAIL SYSTEM
(8) `3|4`" X 6" GRADE 5 BOLTS PER EA.
TOP CHORD
CONNECTION
HSS 6"x4"x`1|8`" WELDED
TOP CHORD
`3|8`" x 1" LONG HEX HEAD
CAP SCREW, w/ AVK KNURLED
THREADED INSERT (TYP. FOR ALL
L-FOOT CONNECTIONS)
HSS 6"x4"x`1|8`" WELDED
BOTTOM CHORD
(4) `3|4`" X 6" GRADE 5 BOLTS PER EA.
BOTTOM
CHORD CONNECTION
HSS 14"x6"x`3|16̀" WELDED
COLUMN ASSEMBLY
`1|4`" THK. FORMED BOTTOM
CHORD CLIP
`1|4`" THK. FORMED BOTTOM
CHORD CLIP
VA REVIEW COMMENTS1 03/29/11
PNM REVIEW COMMENTS2 10/30/11
FINAL AS-BUILTS3 02/29/12
VA REVIEW COMMENTS1 03/29/11
PNM REVIEW COMMENTS2 10/30/11
FINAL AS-BUILTS3 02/29/12
HSS 6"x4"x`1|8`" WELDED
BOTTOM CHORD
HSS 14"x6"x`5|16̀" WELDED
COLUMN ASSEMBLY
HSS 14"x6"x`5|16̀" WELDED
COLUMN ASSEMBLY
2" SQ 11GA
TRUSS STRUT
(2) `3|8`" x 1" LONG HEX HEAD
CAP SCREW, w/ AVK KNURLED
THREADED INSERT (TYP. FOR ALL
PURLIN CONNECTIONS)
15 x 7" x `3|8`"
POST TOP PLATE
HSS 6"x4"x`3|16̀" WELDED
TOP CHORD
FORMED APEX GUSSET
`1|4`" THK
FORMED 10GA
PURLIN CLIP
(2) `3|8`" x 1" LONG HEX HEAD
CAP SCREW, `w|̀ AVK KNURLED
THREADED INSERT (TYP. FOR ALL
PURLIN CONNECTIONS)
FORMED 10GA
PURLIN CLIP
(8) `3|4`" X 6" GRADE 5 BOLTS PER EA.
TOP CHORD
CONNECTION
`1|4`" THK. FORMED BOTTOM
CHORD CLIP
(4) `3|4`" X 6" GRADE 5 BOLTS PER EA.
BOTTOM
CHORD CONNECTION
2" SQ 11GA
TRUSS STRUT
FORMED APEX GUSSET
`1|4`" THK
SOLAR RACKING ALUMINUM
RAIL SYSTEM
(8) `3|4`" X 6" GRADE 5 BOLTS PER EA.
TOP CHORD
CONNECTION
HSS 6"x4"x`3|16̀" WELDED
TOP CHORD
HSS 6"x4" WELDED
TOP CHORD
6"x4" TUBE PURLIN
(REF SHT 1.0)
10GA FORMED PURLIN
BRACKET
`3|8`" x 1" LONG HEX HEAD
CAP SCREW, w/ AVK KNURLED
THREADED INSERT (TYP. FOR ALL
L-FOOT CONNECTIONS)
HSS 6"x4"x`1|8`" WELDED
BOTTOM CHORD
HSS 14"x6"x`1|4`" WELDED
COLUMN ASSEMBLY
`1|4`" THK. FORMED BOTTOM
CHORD CLIP - EACH SIDE
(4) `3|4`" X 6" GRADE 5
BOLTS PER EA. BOTTOM
CHORD CONNECTION
VA REVIEW COMMENTS1 03/29/11
PNM REVIEW COMMENTS2 10/30/11
FINAL AS-BUILTS3 02/29/12
VA REVIEW COMMENTS1 03/29/11
PNM REVIEW COMMENTS2 10/30/11
FINAL AS-BUILTS3 02/29/12
File details come from the government source that posted it. Updated .